RE: OSHA ASBESTOS STANDARD - PILOT CERAMIC HEADER PROGRAM
Ref: Letter R. P. Carter to Industrial Hygienists, 7/22/75 captioned "OSHA Asbestos Standard - Regulation 1910.1001 (Formerly 1910.93a)
The purpose of this memorandum is to restate the policy of the Ingot Division regarding the use of asbestos-containing materials in our Ingot Plants, and to update the status of the ceramic header program. Mr. R. P. Carter's referenced letter, which you should have already received from other sources, asked that each location review their use of asbestos bearing materials. Our position is that acceptable non asbestos substitutes are currently available to the plants for all but a few ingot plant applications of Marinite, and these are:
1. FDC headers and back-up rings 2. HDC headers and back-up boards 3. HDC mold basin liners
The following programs are going on with respect to replacement of Marinite in these remaining applications:
FDC and HDC Headers
The R-680 cast-to-size ceramic header program is proceeding per my letter of June 10, 1975. Attachment I to this letter provides additional details on the status of this program, along with- some instructions for the participating plants. Another possible future substitute for Marinite in these appli cations is calcium aluminate board which is still in the devel opment stage at Johns-Manville.
FDC Back-Up Rings
Some plants have had success with vacuum formed ceramic rings available commercially (Lafayette and Vernon, I believe). Calcium aluminate board is also a future possibility pending successful development by Johns-Manville.
HDC Back-Up Boards
Calcium aluminate board is the only current candidate for the
ARD 007183
Memorandum October 23, 1975 Page 2
large back-up boards, although vacuum formed ceramics would have application in the small HDC units (6X6 and rounds).
HDC Basin Lining
The most promising material at present is LDS Moldable. An experimental HDC basin at ATC is still looking good and a plant trial will be forthcoming. Substitute board materials have not shown sufficient strength to withstand bolt-up pres sures in the unsupported areas.
It is essential that each plant keep up-to-date with these developments through contacts with Dr. R. G. LaBar's group at ATC. In addition, each plant must have programs going to eliminate the use of asbestos materials in those areas where satisfactory substitutes are already available. Subsequent to Mr. R. P. Carter's referenced letter, OSHA has proposed an asbestos fiber standard much tighter than anticipated. The Industrial Hygiene people will eventually be in touch with the plants; but, if this proposed'standard were to be adopted at some future date, it would nearly preclude even having asbestos materials in the plant.
J. A. DUNBAR
JAD:skm
SAME LETTER TO:
J. N. Rumble - Badin R. C. Ashurst - Cressona H. McLaughlin, III - Davenport W. K. Dalton - Lafayette J. H. Mudge - Massena T. J. Randall - Rockdale R. E. Aungst, Jr. - Tennessee D. W. Freeman - Tennessee H. F. Godges - Vancouver W. C. Harvey - Vernon C. F. Nowak - Warrick G. L. Paolino - Wenatchee
Information Copies:
R. G. LaBar - Alcoa Technical Center D. L. Schaffer - Pittsburgh
A. J. Sartschev/R. E. Albrecht - Wm. Penn Hotel
T. B. Bonney/R. P. Carter - Pittsburgh
V. w. Rieke - Pittsburgh
M. J. Caprio - Pittsburgh
ARD 007184
ATTACHMENT I
PILOT CERAMIC HEADER PROGRAM
In review, the pilot program at ATC has three major objectives: 1. To gain production experience using ceramic headers in a
variety of sizes and configurations at various plants prior to commitment to wholesale changeover. 2. To gain experience in the manufacture of R680 parts regarding practices, equipment and cost in order to make the proper decision in setting up permanent supplies i.e. outside manufacture, single facility, multiple facities, etc. 3. To provide total supply of Vancouver's header needs in order to prevent imminent expenditure of capital funds to collect Marinite dust.
The attached letter by Mr. R. E. Albrecht covers the status of the program with respect to current headers available for produc tion or in production, headers for which design has been completed, and a schedule for completion of design for the balance of the headers covered in the pilot program. In order to cover header production, each plant should enter a blanket order with ATC Ceramic Section for each size involved with an item to cover the cost of ceramic mold tooling. Schedules and releases against these orders would then be established by monthly contact between the plant and ATC. Also attached is a letter by Dr. R. G. LaBar which lists the estimated mold and production costs. ^Header production is already proceeding on several items so purchase orders should be entered as soon as possible. Further questions should be referred to Dr. R. G. LaBar or G. D. Schnittgrund at ATC or myself.
J. A. DUNBAR Attachments
ARD 007185
/M/e, J>
'DUAtB'rffc Z4>H,8.
FROM
R. E. ALBRECHT
'
MECHANICAL ENGINEERING DIVISION PITTSBURGH OFFICE - 3 WPH
TO "`MR. A. i. SARTSCHEV
MECHANICAL ENGINEERING DIVISIOI
PITTSBURGH OFFICE - 3 WPH
October 14, 1975
RE: CERAMIC HEADER PROGRAM PROGRESS
The following is a summary of the ceramic header program progress to date and projected completion dates.
(1) Header mold sizes completed at ATC (For 45 clamping)
9" Dia. FDC
15" DU. FDC 16-3/4" Dia. FDC 22" Dia. FDC
6" Dia. HDC
7" Dia. HDC
Vancouver Massena Vernon Lafayette Badin, Wenatchee Badin, Wenatchee
(2) Header designs completed and forwarded to plants for approval.
8" Dia. FDC 8" Dia. FDC
9" Dia. FDC 11" Dia. FDC 11" Dia. FDC 12" Dia. FDC 16" Dia. FDC 16" Dia. FDC
Massena Vernon Lafayette Lafayette Vancouver Badin Badin Cressona
.
(3) Header designs to be completed and forwarded to plants for approval by 31 October.
6-1/8", 7", 8" & 10" Dia. FDC
18" Dia. FDC
6" x 6" HDC
30# Bariok I HDC
Vancouver Lafayette Vancouver Wenatchee
(4) Massena has redesigned their 18-5/8" Dia. FDC Mold package. The redesign includes 45 clamping for ceramic headers. Drawings are completed and will be submitted for review.
ARD 007186
tMMI (NV !*>
Mr. A. J. Sartschev October 14, 1975 She^t lie'. 2
(3) Dr. LaBar has ordered a larger capacity mixer anJ de-airing pomp and submitted an R/A for a larger firing furnace. Dr. LaBar estimates delivery and installation of the furnace in February 1976. After the furnace is installed ATC will be ready to start manufacturing fuii comple ments of the above size headers. Until February 1976 ATC will have only limited manufacturing capacity.
R. E. ALBRECHT
CC: J. Z. Nelson - Pittsburgh - 3 WPH R. G. LaBar - Alcoa Technical Center
ARD 007187
R. G. LABAR CERAMIC SECTION ALCOA TECHNICAL CENTER - B
>
\ \*
10 \ MR. J. A*. DUNBAR PITTSBURGH OFFICE
October 6, 1975
RE: CERAMIC HEADER PILOT PROJECT
The attached is an estimate of costs per piece for selected headers and impellers. While we believe these -to be fairly accurate, I envision reductions for high volume items such as the Vancouver 9 in., Wenatchee Barlok and 6-in. and 7-in. HDC for Badin and Wenatchee with multiple tooling. The tooling labor costs available to date have been somewhat eratic, ranging from $333 for the Badin 12-in. diameter FDC to $1099 for the Massena 15-in. diameter FDC. However, the charge for Vancouver's two 9-in. diameter FDC and Massena's 8-in. diameter FDC made at the same, time was $1143 which is an average of $381 per mold. So, adding on for materials, a realistic tooling charge for a medium-size FDC header may be in the range of $500-$600 using the ATC machine shop at $21.50 per hour. Again, this may be high. It is possible that machining time would decrease if one machinist were always to do the work and did several at one time.
Shop orders are being set up and an internal accounting system for our own records is being established. Your help in obtaining purchase orders to cover mold tooling and header manufacture will be appreciated. I would suggest that each plant specify on their requisition that $600 be allowed for each mold tooling (probably need six for Vancouver 9 in., four for Vancouver 11 in., six for Vancouver 6x6 HDC, two each for 6 in. and 7 in. HDC, 30# Barlok), and the estimated monthly requirements in addition to the initial startup. That way, each plant could notify us on a monthly basis if a release of the monthly requirement is needed or not. Adjust ments will be made .to reflect the actual costs.
In case you do not know, a much larger mixer and vacuum deairing pump have" been ordered so the only other major item that remains to be acquired is a larger furnace.
R. G. LABAR
RGL/rms
Attachment
cc: Library, ATC-C A. J. Sartschev, Pittsburgh D. L. Schaffer/M. L. Redhair, M. J. Caprio, Pittsburgh F. M. Townsend, Pittsburgh
Pgh.
A! -CDA
E. W. Miguelucci, ATC-D G. MacZura, East St. Louis G. K. Turnbull/R. E. Spear, ATCL. K. Hudson, ATC-C
ARD 007188
' " f (' fv I )
COST ESTIMATES PRECISION CAST R-680
Item 15-in. Diameter FDC _ ,, .
REDACTED
12-in. Diameter FDC
;
9-in. Diameter FDC
22-in. Diameter FDC
20-in. Diameter AxialFlow Impeller
R-622 Disperser
___________ $15 14 14 20 66 22
. Cost/Piece
ARD 007189