QUEBEC ASBESTOS KIITDS iSSCCIATIOH R5FCP.T 0? TWEIiTT-SECOia) KEETnS - "SCTSTICAL AID KSSjAESHCaMTITSS
^ Thetford Mines, Que.
January 16th., 1962
PRESENTi '
Messrs.: G.P. Jenkins, Chairsan O.7. Brink
/ /
R.A. Bxaaley-Hoare H.A. Saith.
;
. E. Dodda-tiebron v/V.P. Archer
j
7.C. Lindsay
P..J. Harrill
J.J. Sztuke
7.P. Hodgson
D.O. Poirier
H.C. Jfcaro-
I
G.V. Riley
J.P. Wiser
J.K. Quigley
_
. L.Q. Mcetpetit, Secretaiy
J.J. Pard
Asbestos Carp. Ltd., non n a
Bell Asbestos Hines Ltd.,
B
9
Jchna-Hflcrilla Co. Lt;.
9 9 B B9
Carey Canadian Hines Ltd.,
9 9 99
Plinthcte Hines ltd.,
BB
Jcbasan*s Cospsry Ltd.,
b
b.
.
Lake Asbestos of Quabee ktd., Rational Aabeatos Kinas Ltd., Sicolet Asbestos Hines Ltd., QAMA Sherbrooke Laboratory
C.C. .
C.R. Butcheroft Jkk, Heausler
- S, Collier H.K. Voodrooffe . P.E. PeUetiar V.E.Soatar
Asbestos textile Institute Asbestos Ceasat Producer* Asa Coordisator for QmfATI,iCPA Dept, of Hines & Tech. Surveys
Quebec Departoaot of Kinas Quebec Asbestos Mining Asa'n
1.2.3.-
4.5.6.7.8.9.10.11.-
Minutes of 21st Meeting - Koveaber 14th, 1961
Bausr^cHett
Water Drainage Bate Testa
a) Treeness Test
b) Sheet Mould Test
Grit end Spicule Content
Magnetic Rating
Oil Absorption
Dyckerbof*
Central Agency far Supply of Testing Sqaipnect
Report on ATI Meeting
Hew Business
Date of Kext Meeting
-K
J
a--
L3 '
v
i+ (. iJ M
1 v
*1.- "fco minutes of the tuanty-firot meeting were approvod. Tho titlo of Mr. J. J, Pare, Director of the QAMA Sherbrooke Laboratory, 1-ad beau incorrectly stated.
2.- The work of the fiauer-McHett Sub-0oaciittee is continuing, on the reproducibility
of results with modified mid-feather, vith tests bair performed at the Bell Asbestos
'lisas Laboratory. Chairman 0.Hrink is to neat representatives froa Sauer Pros. Co.
to discuss iao*rovamenta in the screen gaskets oul sclreen cluMping.
.
3.- a) The Tentative Kethod for Freeness Test of Asbestos Fibres was presented in
the ASTH foroat and accepted by coabers.
.
b) The Tentative Method for Vater Drainage Bate covers the water drainage rate from Asbestos fibres by means of a conoercially available apparatus, the Sheet Mould. Presented in the ASK4 format, the Teat Method was accepted by Berbers. .
44* On the Grit and Spicule Content, the Sub-Ccecities is continuing its work to check accuracy of equipment. Chalman R. Dodda^lebros asked the opinion czf members as to the liaitations of grades to be tested. Indications are that grades 7D and longer mMqm'M be tested by the Orndy Content Method; recommendations will be cede
for the next seeting.
5.* The SubsCosmittee on Magnetic Rating is Awaiting for results oa specimens
being tested by A.T.X., following their approved procedure.
.
6.- Dr. R.J. Merrill reported that the Sub-Cooaittee on Oil Absorption will sou
start research for a test procedure. Discussion followed oa exactly what to areasure:
viscosity cr rate of ihminj^n. A progress report will be presented for the next
meeting.
.
7.- Work ie continuing on the calibration cf the Dyckerhoff Antooatie Air Peraeability Tester. The Sub-Cocattoe will accumulate data oa the effects of loading the cell in one operation instead of four, as now specified in the Test Procedure.
8. * Messrs. ?.P, Hodgson and H.C. Fbazo will consider the possibilities of estab-
HeMrg a central agency for. the supply of testing equipment.
'.
9. - At a recent A.T.I. meeting, information was requested on the surface area of' asbestos fibre before aoy packaging compression, compared to re-conditioned fibre following packaging.-' Investigations will be carried out by Mr. G.F. Brink, in cooperation with Messrs. .C. Pfcaro and 7.C. Lindsay.
10.- A) Mr. M.C.vJfcaro was nominated ehairnan of a new Sub-Committee on the Meas
urement of Asbeatoe Fibre Weight per Cubic Poet.
B) The ATI is continuing work as Frictional Properties of Asbestos; a shear*
ing force test will be devised at JK Research, lbs ATI is also giving various
consideration to the spxdsgback characteristic of asbestos fibre.
C) The Manual of Testing Procedures has now been edited and is ready for
printing. Copiea of the Manual will be distributed during the next month..
D) Mr, J.J. Para, director of the QAK4 Sherbrooke Laboratory, will attend
the meetings of the Technical Sub-Committees whenever possible.
.
E) An open discussion was led by Messrs. F.P. Hodgson and J.I. Fare, oa the
particular tests to be'perforood by the Sherbrooke laboratory on asbestos fibre
samples to be submitted by each producer.
.
H#. The date of the next meeting was tentatively set for March 20th, 1962, at 10 A.M., at the office of Asbestos Corporation Limited in Tbetford Minas, Qus.