Document xjqXDkX3ODmx5J0ZQEX782jOb
INTER-OFFICE MEMO TENNECO CHEMICALS, INC
A
At Piscataway
From W,C. Champion
At Burlington
subject
QUALITY control monthly report January, 1974
Date January 29, .1974
Copy to
w.A. Britton
H.B, Carr P. Gawason H.R. Horton F.W, Kanzler R. A. Lojewski W, Miringoff J.W. Poarch P. R. Scarito A, C. Siegel
j/.T. Sweeney
File
I. RESIN PLANTS
Materials
Methocel
a. The last four shipments received at Burlington had low (out of specification) viscosities. They were accepted for use because of immediate plant needs.
b. Ferromagnetic contamination counts continue to be high. Round-robin testing (Dow, Burlington, Flemington) will begin in February.
2.
a. Due to short supply of Atlantic gelatin, Hormel gelatin has been used for most of the month. Particle size has shown broader distribution and more fines.
b. Two samples of mixed "A" and "B" types were received from Atlantic, representing a range of products which can be more easily supplied than the current separate products. Performance of these products is being investigated in the Flemington Pilot Plant.
Antistats
Evaluation of Monamine ADS-100 (Mona Industries) as an alter nate to Ninol 1281 is continuing. Results to date show equiv alent antistatic properties, but heat stability testing is not yet completed.
COLORITE 012540
Page 2
4. Lucidol 223M (2-EHP)
One recent-lot of this raw material showed active oxygen assays - below the specification minimum of 40%. A Corrective Action
Request was submitted to Purchasing. Lucidol (G. Kuzma) indi cated that their Technical Services Group is investigating.
4
5. Raw Material Survey
Handling and storage requirements for raw materials used in Burlington resin production were reviewed. Recommendations for required procedures to permit storage of a six-month supply were made.
B. In-Process Testing
1. Oxygen Analysis
*
As a result of a continuing Quality Control program. Teledyne Trace Oxygen Analyzers have been ordered for the monomer re covery compressors in the Burlington Homopolymer, Copolymer and Plastisol Plants. Until these units are installed (ex pected delivery mid-March), we will continue to monitor each compressor for oxygen.
2. Large Particle Batch (Flemington)
!
A large particle batch of 22S/16R was examined in an effort to determine the cause. The particles were found to be tight agglomerates rather than BB's, and no evidence of mischarge was observed. Production has adjusted water/monomer ratio to avoid further occurrences.
C. Finished Product Testing
1. Reduced Acetate Charge
%
Bound acetate testing is being performed on selected samples of each copolymer lot produced in support of an LOP intended to lead to reduced acetate charges in all copolymers. Prelim inary results indicate that the bound acetate concentration has been reduced to mid-specification for higher acetate re sins (T/315, T/314) and to low-end specification for the lower acetate resins (T/389, T/390) after a 1% (based on total mon omer) reduction in acetate charge. A further reduction in charged acetate will be explored.
2. Pantasote 315 Type
One bulk car of Pantasote copolymer was analyzed prior to ship
COLORITE 012541
ment to Rosin Plant customers. This resin was found to be lower in bulk density and finer in particle size compared with Tenneco 315.
Process Engineering Support 1. Flemington Conversion
Samples of copolymer centrifuge effluent and recovered VAcM storage sump water were treated with lime and caustic to determine required levels for neutralization under simulated effluent conditions. Results were transmitted to Process Engineering.
2. Defbamer Evaluation
Of six candidates evaluated, one defoamer from Nopco and one from Hercules were found to be acceptable foam break and retarding capabilities, compared with TBP. Further tests will be performed with latex samples tq check filterability and heat stability of the resin after defoamer treatment.
3. Plastisol Filter Cloth
The monofilament cloth being evaluated in "A" Plant (NY76W42) was found unacceptable for filtering of sodium lauryl sulfatebased latices because of high effluent solids (12%). An alternate type (NY76K22), which showed acceptable effluent solids, will be evaluated in the plant.
General 1. Raw Sewage Analysis
Samples of raw sewage were examined in an effort to explain high COD levels. The suspected cause is copolymer fines from recent production using Hormel gelatin.
2. Resin for Resale a. Three Sea-Land containers of CIRES 25100 (T/225 type) were similar to previous shipments. b. Thirty Sea-Land containers of Kema-Nord PE-712 (T/1760) were similar to previous shipments.
3. Specifications
Revised specifications for all homopolymer, copolymer and plas-
COLORITE 012542
Page 4
tisol raw materials were issued during the report period.
II. COMPOUND PLANT
A. Raw Materials
1. Nuoplaz plasticizers 6055 (125.7M lbs), 6903 (237.4M lbs) and
6054 (84.9M lbs) were successfully used in place of DOP in
various formulations,
i
2. Purchased resins from Pantasote (225 type), Firestone (225 type), Conoco (225 type) and Goodrich (250-12S type) were used in compound with no significant problems,
3. All standard formulations now using T/250-12, with the ex ception of Western Electric compounds and T/2022, will be switched to using T/225 as they occur in the schedule.
B. Fords Plant Support
Effective February 1, all lots of Supercryl produced in Fords will be tested at the Compound Plant for processing efficiency and op tical properties. Product specifications will be established once sufficient data is available.
WCC/jst