Document xjq845xbMMDwxvqNLwq9gGpbQ
PLAINTIFF'S EXHIBIT
UC-4023
ASBESTOS TESTING INC.
5205 NOYES AVE. CHARLESTON, WV 25304 (304) 925-5795
November 18, 1986
Erik A. Osby Industrial Hygiene Dept. Union Carbide Corporation P.0. Box 2831 Charleston, WV 25330
The following bulk insulation analysis pertain to samples received on 11/14/86. All bulk insulation analyses are performed in accordance with EPA recommendations concerning analysis of bulk insulation using Polarized Light Microscopy.
ANALYSIS RESULTS
Sample #1 Roofing material-Bldg. 190
70%-Asbestos (Chrysotile) 30^-Epoxy Resin
Sample #2 Ceiling material, womens' bathroom-Bldg. 190
N.D.-Asbestos* 5%-Cellulose
95%-Gunnite Clay
Sample #3
Material deposited on compressor-Bldg. 190 11/13/86
N.D.-Asbestos* 5%-Mineral Wool 5%-Synthetics Fibers
35%-Dirt 55%-Paint
Sample #4
Ten inch pipe insulation (mid-section)Bldg. 308
15%-Asbestos (Chrysotile) 85%-Clay
Sample #5
Verticle steamline insulation from hallway in mid-section of Bldg. 308
35%-Asbestos (Chrysotile) 65%-Clay
Respectfully submitted,
*N.D. denotes none detected.
John S. Ferrell Industrial Hygienist
L UCC 020814
4l
ATI
ASBESTOS TESTING INC.
5205 NOYES AVE. CHARLESTON, WV 25304 * {304} 925-6795 October 23, 1986
Erik A, Osby Industrial Hygiene Dept. Union Carbide Corporation
P.0. Box 2831 Charleston, WV 25330
The following bulk insulation analysis results pertain to samples received on 10/21/86. All bulk insulation analysis is performed in accordance with EPA recommendations concerning analysis of bulk insulation using Polarized Light Microscopy.
ANALYSIS RESULTS
Sample #1
N.D.-Asbestos 1%-Mineral Wool 5%-Cellulose
94%-Clay
Sample #2
N.D.-Asbestos 1%-Mineral Wool
99%-Foam Glass
Sample #3
5%-Asbestos (Chrysotile) 10%-Cellulose 85%-Foam Glass
Sample #4
85%-Asbestos ( 5%-Amosite) (80%-Chrysotile)
15%-Clay
Sample #5
40%-Asbestos (10%-Amosite) (30-Chrysotile)
60%-Clay
Sample #6
15%-Asbestos (Amosite) 85%-Clay
Respectfully
submitted /
'criL. ^
l U.
^John S. Ferrell
Industrial Hygienist
UCC 020815
Union Carbide Agricultural Products Company. Inc.
Institute Plant
JO****,
INDUSTRIAL HYGIENE SAMPLING RE ^GTL^CjSjg^
Hr. F. Boggs COPIES TO: TO:
Mr. D. A. Duga^'
Building 303
Hr. C. E. Miller
institute Plant
Mr. D. D. Miller
Mr. M. E- Tapp________
Mr. L. W. Youngblood
Purpose:
________ ________
Quarterly
X
Semiannually
Regulatory Agency Inspection
________ ________
Annually Other (See Comments)
Sample Date(s): August 1, A and 5. 19B6
Sample Location: LandfillDepartment No.:
308
Process/Activity: Waste Disposal______ _
Contaminant: Asbestos___________________________ _
Exposure Limit:
OSHA 0.2 ibers/cc
(TWAq);r_^TOA12^
ACGIH 0.2 fibers/cc
(TWA );~(TWA O
UCC
-(TWA ) ;r(TWA12)
)
1/
Sample Type:
AIHA ________-(TWA0);3(TWA
1
X Personal
X Area
)
a
_______
Source
XZ
Surface Wipe
______ Other (See comments)
Analytical Method: Per 29 CFR 1910.1001, Appex. A
Results: _____ See Comments
X See Attached Table
COMMENTS: Four lob positions at the Goff Mountain Landfill were monitored for exposure to airborne asbestos fibers on the above dates. Area concentrations of airborne asbestos were measured too. The monitoring encompassed typical asbestos waste disposal, which consisted of using a front end loader and a bulldozer to blend the material with dirt and pack it down. The front end loader and bulldozer each were equipped with enclosed.cabs and air conditioning units that provided filtered, cooled air to the cabs. In addition, the equipment operators wore half-mask dual-cartridge dust respirators while in the cabs,_______ ____________________ ___________
UCC 0208)6
2
The monitorinq also covered operation of the drum crus
and typical
area cleanup bv the laborer. Cleanup consisted of sweeping the paved area
around the landfill office and removing debris from the perimeter of the
landfill.
Due to the hot and dry weather, "worst case" conditions existed durinq the survey reqardinq the potential for qeneration of airborne- asbestos fiber concentrations. The monitorinq and analytical procedures we r~ performed in accordance with 29 CFR 1910.1001, including Appendix A.
The personal monitoring results for the laborer ar 1 environmental
specialist iob positions were all below the PEL as well as the action level
(ie, one-half the PEL) for asbestos. The front end loadt i and bulldozer
operators' exposures also were below the PEL thouqh they di i reach the 0.1
fiber/cc action level. The area monitorinq results showed the >. concentrations
of airborne asbestos fibers qreater than the PEL were Q' derated in the
immediate vicinity of the bulldozer and front end loader vhl' they were being
used to blend and fill asbestos waste material. However, the extremely low concentration measured directly downwind of the disposal m ea at the drum
crushinq facility showed that the airborne asbestos fibers rapidly settled
and/or dissipated within the confines of the landfill.
Based on the above results the following actions are required:
A copy of these monitorinq results must be posted i~ 'lately in the
workplace (ie, the landfill office) where they will be accessible to all affected employees (including contract employees) for review. The
affected employees should be made aware that the :
ts have been
posted. (Note: this was done prior to issuance of fi ' report).
UC'C 020817
Because airborne asbestos fiber concentrations measured at the disposal area during blending and filling exceeded the PEL, the "face" of the landfill must be established as a regulated area as soon as possible but no later than November 17, 1986. This requires:
1. Posting of warning signs in conformance with the requirements of
29 CFR 1910.1001 (J)(l)(i) and (ii) to identify the regulated
a rea-
________________
'
2. Prohibition of eating, drinking, smoking, application of cosmetics and tobacco and gum chewing in the regulated area.
3. Use of half-mask air-purifying respirators equipped with high efficiency filters (or better*) by anyone entering the regulated area, regardless of duration.
*Note: Powered air purifying respirators must be provided to
employees If they choose to use that type of respirator. In \
addition, employees using negative pressure respirators must be fit tested before enterinq the asbestos regulated area and they
must be fit tested every six months thereafter. Selection, use
and care of respirators must be in accordance with the requirements of 29 CFR 1910 .1001
(G).
Traininq must be provided to the front end loader and bulldozer
operators no later than October 20, 1986 and at least annually thereafter since these two iob positions were exposed to airborne
UCC 020818
4
concentrations of asbestos fibers at the action level. Training must cover the topics shown in 29 CFR 1910.1001 (J)(5).
Medical surveillance must be provided or made available to the Front end loader and bulldozer operators no later than November 17, 1986 and at least annually thereafter since these two job positions were exposed to airborne concentrations of asbestos fibers at the action level. Medical surveillance must be performed in accordance with 29 CFR 1910.10Q1(L)
RECOMMENDATIONS: In order to complete Implementation of the above required activities, the following recommendations are made:
i; Per the advice of Employee Relations Department and Medical Department supervision, Environmental Protection Department supervision should
. Immediately pursue the establishment of a contract between Union Carbide and Henson Brothers, Inc, in order to provide asbestos training, medical surveillance, respirator fit testing (if necessary) and respirator training to the bulldozer and front end loader operators on a fee-for-servlce basis. When the contract is established, Industrial Hygiene personnel will be available to provide the regulred training and fit testing, upon request.
2. Environmental Protection Department supervision should take appropriate steps as soon as possible to insure that a sufficient guantlty of suitable respirators are on hand for the heavy equipment operators and the Institute Plant truck drivers who must enter the requlated arca. In additlon, a routine prograni (1C one does not ______
UCC 020819
5
/ already exist) should be established with Safety Supply for the
cleaning, disinfecting. Inspection and repair of the respirators.
_/ \ _
--,
_____
___
____
3. Maintenance Area VI supervision should contact this office as soon as possible to coordinate the respirator fit testing and training that is required for Institute Plant truck drivers to enter the landfill regulated area. (Mote: Already underway at this time.)
/
4. Environmental Protection Department supervision should contact this office Cor assistance in establishing the regulated area at the landfill. (Note: Aiready underway at this time.)
Report Date; October 17, 1986
Signed:
Room: 172 Phone
NOTE:
ALL PERSONAL SAMPLE RESULTS MUST BE DISCUSSED WITH THE PARTICIPATING EMPLOYEE
6105
UCC 020820
Union Carbide Agricultural Products Company, inc.
Institute Plant
INDUSTRIAL HYGIENE SAMPLING RESULTS
WORKPLACE LOCATION:
Landfill
NAME(s) OF SAMPLER(s): E.A. Osby & J.L. Miller
CONTAMINANT:
Asbestos
OSHA PEL: TWAp0.2 Fibers/cc.TWAi ? -
AIHA WEEL: TWAg--,TWAI2 -
REPORT DATE: October 17, 1986
ACGIH TLV: TWApO.2 Fibers/cc,TWAi?
UCC GUIDELINE:
TWAg' - ,TWAl?
Sample Number
Sample Date
W-4700-AA7915 W-4700-AA7923
8-1-86
CO
1
J
CO
W-4701-AA7925 V-4701-AA7932
8-4-86 8-4-86
W-4702-AA7935
8-5-86
V-4700-AA7916 W-4700-AA7924
8-1-86 8-1-86
W-4701-AA7926 W-4701-AA7933
8-4-86 8-4-86
W-4702-AA7936 W-4702-AA7940
8-5-86 8-5-86
Sample Description
Sample Time (min.)
Sample Results (fibers/cc)*
Front End Loader Operator
L. E. Pauley L. E. Pauley
265 125
** AA
L. E. Pauley L. E. Pauley
170 0.11 225 0.099
0.10
L. E. Pauley Bulldozer Operator C. E. Wheeler c. E. Wheeler
C- E. Wheeler c. E. Wheeler
c. E , Wheeler c. E. Wheeler
375
265 120
170 225
180 195
0.068
0.051 0.17 0.09
0.097 0.10 0.099
0.087 0.12 0.10
UCC 020821
Sample Number
Sample Date
W-4700-AA7917
8-1-86
W-4701-AA7927
8-4-86
W-4702-AA7938
8-5-86
V-4701-AA7928 W-4701-AA7934
8-4-86 8-4-86
V-4702-AA7937
8-5-86
W-4700-AA791B
8-1-86
W-4700-M7922
8-1-B6
W-4701-AA7929
8-4-86
W-4700-AA7919 VI-4702-AA7931
8-1-86 8-5-86
2- -
Sample Description
Sample Time (min.)
Sample Results (fibers/cc)*
Senior Enviromentai Specialist
J. R. Fizer
375
J. R. Fizer J. P. Monroe
395 205
Teaque Laborer
R. L. Barker R. L. Barker
303 90
A. E. Barker
370
Back end of front end loader while asbestos was being worked into landfill
35
Back end of front end loader while asbestos was being worked into landfill
10
Back end of front end loader while asbestos was being worked into landfill
15
Drum crusher area
304
On side of bulldozer while asbestos was being worked into landfill
15
0.01 0.018 0.028
0.021 0.016 0.020 0.029
0.39
1.2
**
0.0047 0.98
Personal sample results are reported as time-weighted averages. Sample could not be analyzed for asbestos fibers due to excessive
dus t accumu1a tion.
UCC 020822
A
ATI
ASBESTOS TESTING INC
5205 NOYES AVE. CHARLESTON, WV 25304 (304) 925-5795 October 5 , 1986
Ed McComas Industrial Hygiene Dept. Union Carbide corporation P.O. Box 2331 Charleston, WV 25330
The following analysis result pertains to a sample received 10/2/36. All bulk insulation analysis is performed in accordance with EPA recommendations concerning the analysis of bulk insulation
using polarized light microscopy.
ANALYSIS RESULT
Samule #1
Building 236, Locker Room steamline
15-^-Asbestos (103-Amosite) ( 5%-Chrysotile)
35^-Clay
Respectfully submitted,
John S. Ferrell Industrial Hygienist
UCC 020823
ASBESTOS TESTING INC.
5205 NOYES AVE. * CHARLESTON, WV 25304 (304)925-6795
August 3, 1^36
Erik A. Osby Industrial Hygiene Dent. Union Carbide Cornertat ion ?.0. 3-x 2331 Charies ton . WV 25 333
The following bulk insulation analysis results oertain tc samples received on 3/1'36 and 8/7/36. All bulk insulation analysis is ner formed in accordance with SPA recommendations concerning analysis of bulk insulation using solarized 11?nt micresc cny .
ANALYSIS RESULTS
UCC 020824
ASBESTOS TESTING INC.
5207 NOYES AVE. CHARLESTON, WV 25304 (304)925-6795
July 11. 1^86
Erik Osby Union Carbide Corn.-Institute Industrial Hygiene Dent.
?.C. Box 2331 Char] estor,, WV 25330
The following analysis cf bulk insulation pertain to samol.es received on 6/1C/86. All bulk insulation analysis is performed in accordance with E?A recommendations concerning analysis of
bulk insulation using solarized lig.ot microseooy.
-.LYSIS RESULTS
Q ~^^1 rI Mcnyl Phene 1-Header passing .fi re a c t or
g,, 1 'ne-nr'und ie';,'i.
J Ll p;j r* ' ^
22H-asbestos (2)8--Ames ite ) (22^-Chrysotile)
: ~j2,'o-f --ury i a^ y.
lOL-hsbestos 1C, i-Clay
;2-a : I -Y :-r, neat exchanger
C-H-Asbes tes 2Cm-Mineral Wool 7 5,8-Clay
5H-\ernicuiite
UCC 020825
ASBESTOS TESTING INC.
5207 NOYES AVE. CHARLESTON, WV 25304 (304)'r?25-67g5 V-
June 6, 1986
Erik A. Os by Industrial Hygiene Dept. Union Carbide Cornoration P.G. Box 2331
;n, W.V. 2533C
to t1' % 'O
The foilowing analyses results pertain to samples received 6//36. All bul'.c insulation analysis Is performed in accordance vr'th EA recommendations concerning analysis of bulk insulation using oolarized light microscopy.
ANALYSIS RESULT!
Sample y~l
Building 303. Basement Ceiling Tile
0#-Asbestos
90#-Mineral Wool 5#-Ceilulose 5#-Glue
mole #2
Building 303Southeastern Pioe Insulation
25#-Asbestcs (20#-Araosite) ( 5#-Cnryscfcile )
75#-Magnesite
Respectfully submitted.
Industrial Hygienist
UCC 020826
A
ATI
ASBESTOS TESTING INC.
5207 NOYES AVE. CHARLESTON, WV 253Q4 \&4) ^S-A795
June 5, 19-0
&^
<* %
jinx a. oscv Industrial Hygiene Dent. Unin Carbine C~rocrat: cn
?.0. Box 2q31 Charleston, *.V. 25330
The fellow5nr analysis result pertain tc samples received 6 '3/%. All bulk~*insulation analysis is performed in accordance wJtn E?A recommendations concerning analysis of bulk insulation us'ng oolarj zed light microscopy.
ANALYSIS RESULTS
Sample ~1
Phosgene Control Room Insulation-Steamline
lpiS-Asbes t os (15^ Amosite)
3p%-Clay
Respectfully submitted, 'L-j x/
ohn S. Eerrell Industrial Hyc.ienist
UCC 020827
ASBESTOS TESTING INC.
5207 NOYES AVE. CHARIESTON, WV 25304 (304) 925-6795
Erik A. Osby In.iustrial Hygiene Deofc.
Union Carbide~Corporation
?.0. Box ?S31 Charleston. W.V. 25330
Mr. Osby.
The bulk insulation sample results pertain to samples received on 4/17/36. All bulk insulation analysis is oerformed in accordance with EPA recommendations concerning analysis of bulk insulation using solarised light microscopy.
ANALYSIS RESULTS
Samole #1
Mechanica Room, first flcor-31ig. 304
20%-Asbestcs
( 5^-Amosite) (Ip^-Chrysotile) 15^-Mineral Wool 65^-C lay
Sample #2
Wall Panel, second floor-31dg. 304
20^-Asbestos (2C$-Chrysotle)
55^-Cellulose 20$-Clay
5$-Glue
Sample #3
Furnace Insulation, second flcor-Sldg. 30^
25$-Asbestos
( 5$-A.mos ite) (20$-Chrysotile) 6 0$-Mineral Wool 15^-Clay
Sample #4
Pipe Insulation, second floor-Bldg. 30^
20^-Asbestos
(15$-Amosite) ( 5>-Ghrysotile) 30$-Clay
UCC 020828
Samnle #5
Ceiling; Ti le . third floor; 31dg. 304
r
Samnle $6
Ceiling Panel, third floor. Bldg. 304
Qf/o--Asbestos 95`^-Ce 1 lulose
5;^?-Glue
0$ -A s ce s t os 95'^-Mineral Wool
o-fl-Z i-^y
*
Respectfully submitted,
- ^ ` -
, \'fJL-'c-C^-
John S. Ferre 11 Industrial Hygienist
t i
\
UCC 020829
ASBESTOS TESTING INC.
5207 NOYES AVE. CHARIESTON, WV 25304 (204)925-6795
hvril 16 , 1986
Guy L. Arbaugh Union Carbide Corn.- Institute 3uilbins: -f2 Room 172
?.C. Box ??31 Charleston, T.v.V. 26062
Plant
Mr. Arbauoh,
T'ne following bulk asbestos analysis results pertain to samnles received on 4 /15/B6. Please note that all analysis of bulk asbestos samnles are analyzed oer E?A orocedural recommendations concerning bulk asbestos analysis using polarized li~ht microscooy. Thank you for your consideration.
ANALYSIS RESULTS
Samole #1
Taken by C. Burr!ss
Cfy-Asbestos 55v-Pa int 95:o -Magnesite
Samole #2
Taken by C. Miller
O^-Asbes tcs 1%-Mineral V.'ccl 9d/o-Calc Ite
Respectfully submitted,
,/ //'
John S. Ferre 11
UCC 020830
Union Carbide Agricultural Products Company, Inc.
Institute Plant
INDUSTRIAL HYGIENE SAMPLING RESULTS
TO: Mr. P. J. Morris. COPIES TO:
Building 23
__________________
Mr. M. Adkins, Jr.
Mr. c. R. Thomas
Institute Plant___________________
Mr. L. W. Youngblood
Purpose:
________ ________
Quarterly ________ Semiannually ________
Regulatory Agency Inspection
x
Annually Other (See Comments)
Sample Date(s): December 19, 1985
Sample Location: MIC-II Unit - Malnt. Comp. 7 Department No.: 327
Process/Activity: Pipe Insulation removal_______________________________________________
Contaminant: Asbestos____________________________ _
Exposure Limit: OSHA 2 flbers/cc____________ ACGIH _________ _
ucc
Sample Type:
x Personal
x Area
______ Source
Surface Wipe
______ Other (see comments)
Analytical Method:
NIOSH 7400
Results: _______ See comments
x See Attached Table
COMMENTS: A Maintenance Complex 7 Insulator/palnter was monitored for
exposure to airborne asbestos fibers on the above date. Area concentrations
of airborne asbestos fibers were measured too. Monitoring was performed while
Insulation was being stripped from pipes that were lying on a plastic sheet
inside the dike wall that surrounds the old phthallc anhydride tanks at the
MIC-II Unit. It was not necessary to wet the insulation as it was being
removed because it had become water logged and, at the time of removal, was
frozen due to the cold weather. Nevertheless, respirators and protective
clothing were worn by the three men performing the work.
_since the airborne fiber concentration was unknown at the time of
sampling, two sets of samples (having different sample times? were taken to
insure that at least one of the sets would produce valid results. All
monitoring results were below the lower calibration limit for the analytical
UCC 020831
Union Carbide Agricultural Products Company, Inc.
Institute Plant
INDUSTRIAL HYGIENE SAMPLING RESULTS- CONTINUED
method, which is well below the OSHA permissible exposure limit. Area concentrations and personal exposures to airborne asbestos fibers were
maintained at sate levels during this lob.
____________ _____________________________
RECOMMENDATIONS: None
__________ _____________ ______________________ --
Report Date:
January 14, 1986_______ __
Bldg. 2
Room: 172 Phone
6105
NOTE:
ALL PERSONAL SAMPLE RESULTS MUST BE DISCUSSED WITH THE PARTICIPATING EMPLOYEE
1335k
UCC 020832
Union Carbide Agricultural Products Company, Inc.
institute Plant
INDUSTRIAL HYGIENE SAMPLING RESULTS
WORKPLACE LOCATION: HIC-II Unit, Maint. Comp. 7 SAMPLER'S MAMS: B. A. Osby
CONTAMINANT: Asbestos_____________________
REPORT DATS: January 14, 1986
Sample Number
Sample Date
V-4409-1 V-4409-4
12-19-85 12-19-85
W-4409-2 V-4409-S
V-4409-3 W-4409-6
12-19-85 12-19-85
12-19-85 12-19-85
Sample Description
Sample Time (min.)
Sample Results fibers/cc)
INSULATOR/PAINTER D. C- Chambers D. C. Chambers
60 < 0.10
18 < 0.32 TWA=< 0.02
East side of insulation removal site - 3 feet from activity.
60 16
< 0.10 < 0.36
Northwest side of insulation removal site - 5 feet from activity.
60 15
< 0.10 < 0.38
1335k
UCC 020833
ENVIRONMENTAL HEALTH LABORATORY
1021 Georgia Ave. / Macon. Georgia 31201 (800) 841-8919 / In GA (912) 745-4702
LABORATORIES IN MACON. QA AND HARTFORD. CT
EH1
------------
LABORATORY ANALYSIS REPORT
%
o
vV %
%
To. Account: Location:
E. A. Osby
Union Carbide Agricultural Products Co., Inc.
P. 0. Box 2831 Charleston, WV 25301
Report No.: Purchase Order No.:
Date Received: Date Reported:
86A0007 Revised N/A
01-03-86
01-14-86
Analysis: Fiber Count Analytical Method : NI0SH 7400; Phase Contrast Microscopy;
Walton-Beckett Reticle; 450 x magnification
Sample No. (AA)
Air Volume (Liters)
Fibers, longer than 5 microns, per cc of air.
W-4409-1 120 <0.095
W-4409-2 120 <0.095
W-4409-3 120 <0.095
W-4409-4
36 <0.32
W-4409-5
32 <0.36
W-4409-6
29.8
<0.38
cc= Cubic Centimeter.
A blank filter was not provided. We recommend that a blank be submitted with each set of samples so that the sampling media can be checked for possible interferences or background contamination.
Chemist = Less ttian
Jeanne A. Gibbs UCC 020834
-Datei