Document xjq845xbMMDwxvqNLwq9gGpbQ

PLAINTIFF'S EXHIBIT UC-4023 ASBESTOS TESTING INC. 5205 NOYES AVE. CHARLESTON, WV 25304 (304) 925-5795 November 18, 1986 Erik A. Osby Industrial Hygiene Dept. Union Carbide Corporation P.0. Box 2831 Charleston, WV 25330 The following bulk insulation analysis pertain to samples received on 11/14/86. All bulk insulation analyses are performed in accordance with EPA recommendations concerning analysis of bulk insulation using Polarized Light Microscopy. ANALYSIS RESULTS Sample #1 Roofing material-Bldg. 190 70%-Asbestos (Chrysotile) 30^-Epoxy Resin Sample #2 Ceiling material, womens' bathroom-Bldg. 190 N.D.-Asbestos* 5%-Cellulose 95%-Gunnite Clay Sample #3 Material deposited on compressor-Bldg. 190 11/13/86 N.D.-Asbestos* 5%-Mineral Wool 5%-Synthetics Fibers 35%-Dirt 55%-Paint Sample #4 Ten inch pipe insulation (mid-section)Bldg. 308 15%-Asbestos (Chrysotile) 85%-Clay Sample #5 Verticle steamline insulation from hallway in mid-section of Bldg. 308 35%-Asbestos (Chrysotile) 65%-Clay Respectfully submitted, *N.D. denotes none detected. John S. Ferrell Industrial Hygienist L UCC 020814 4l ATI ASBESTOS TESTING INC. 5205 NOYES AVE. CHARLESTON, WV 25304 * {304} 925-6795 October 23, 1986 Erik A, Osby Industrial Hygiene Dept. Union Carbide Corporation P.0. Box 2831 Charleston, WV 25330 The following bulk insulation analysis results pertain to samples received on 10/21/86. All bulk insulation analysis is performed in accordance with EPA recommendations concerning analysis of bulk insulation using Polarized Light Microscopy. ANALYSIS RESULTS Sample #1 N.D.-Asbestos 1%-Mineral Wool 5%-Cellulose 94%-Clay Sample #2 N.D.-Asbestos 1%-Mineral Wool 99%-Foam Glass Sample #3 5%-Asbestos (Chrysotile) 10%-Cellulose 85%-Foam Glass Sample #4 85%-Asbestos ( 5%-Amosite) (80%-Chrysotile) 15%-Clay Sample #5 40%-Asbestos (10%-Amosite) (30-Chrysotile) 60%-Clay Sample #6 15%-Asbestos (Amosite) 85%-Clay Respectfully submitted / 'criL. ^ l U. ^John S. Ferrell Industrial Hygienist UCC 020815 Union Carbide Agricultural Products Company. Inc. Institute Plant JO****, INDUSTRIAL HYGIENE SAMPLING RE ^GTL^CjSjg^ Hr. F. Boggs COPIES TO: TO: Mr. D. A. Duga^' Building 303 Hr. C. E. Miller institute Plant Mr. D. D. Miller Mr. M. E- Tapp________ Mr. L. W. Youngblood Purpose: ________ ________ Quarterly X Semiannually Regulatory Agency Inspection ________ ________ Annually Other (See Comments) Sample Date(s): August 1, A and 5. 19B6 Sample Location: LandfillDepartment No.: 308 Process/Activity: Waste Disposal______ _ Contaminant: Asbestos___________________________ _ Exposure Limit: OSHA 0.2 ibers/cc (TWAq);r_^TOA12^ ACGIH 0.2 fibers/cc (TWA );~(TWA O UCC -(TWA ) ;r(TWA12) ) 1/ Sample Type: AIHA ________-(TWA0);3(TWA 1 X Personal X Area ) a _______ Source XZ Surface Wipe ______ Other (See comments) Analytical Method: Per 29 CFR 1910.1001, Appex. A Results: _____ See Comments X See Attached Table COMMENTS: Four lob positions at the Goff Mountain Landfill were monitored for exposure to airborne asbestos fibers on the above dates. Area concentrations of airborne asbestos were measured too. The monitoring encompassed typical asbestos waste disposal, which consisted of using a front end loader and a bulldozer to blend the material with dirt and pack it down. The front end loader and bulldozer each were equipped with enclosed.cabs and air conditioning units that provided filtered, cooled air to the cabs. In addition, the equipment operators wore half-mask dual-cartridge dust respirators while in the cabs,_______ ____________________ ___________ UCC 0208)6 2 The monitorinq also covered operation of the drum crus and typical area cleanup bv the laborer. Cleanup consisted of sweeping the paved area around the landfill office and removing debris from the perimeter of the landfill. Due to the hot and dry weather, "worst case" conditions existed durinq the survey reqardinq the potential for qeneration of airborne- asbestos fiber concentrations. The monitorinq and analytical procedures we r~ performed in accordance with 29 CFR 1910.1001, including Appendix A. The personal monitoring results for the laborer ar 1 environmental specialist iob positions were all below the PEL as well as the action level (ie, one-half the PEL) for asbestos. The front end loadt i and bulldozer operators' exposures also were below the PEL thouqh they di i reach the 0.1 fiber/cc action level. The area monitorinq results showed the >. concentrations of airborne asbestos fibers qreater than the PEL were Q' derated in the immediate vicinity of the bulldozer and front end loader vhl' they were being used to blend and fill asbestos waste material. However, the extremely low concentration measured directly downwind of the disposal m ea at the drum crushinq facility showed that the airborne asbestos fibers rapidly settled and/or dissipated within the confines of the landfill. Based on the above results the following actions are required: A copy of these monitorinq results must be posted i~ 'lately in the workplace (ie, the landfill office) where they will be accessible to all affected employees (including contract employees) for review. The affected employees should be made aware that the : ts have been posted. (Note: this was done prior to issuance of fi ' report). UC'C 020817 Because airborne asbestos fiber concentrations measured at the disposal area during blending and filling exceeded the PEL, the "face" of the landfill must be established as a regulated area as soon as possible but no later than November 17, 1986. This requires: 1. Posting of warning signs in conformance with the requirements of 29 CFR 1910.1001 (J)(l)(i) and (ii) to identify the regulated a rea- ________________ ' 2. Prohibition of eating, drinking, smoking, application of cosmetics and tobacco and gum chewing in the regulated area. 3. Use of half-mask air-purifying respirators equipped with high efficiency filters (or better*) by anyone entering the regulated area, regardless of duration. *Note: Powered air purifying respirators must be provided to employees If they choose to use that type of respirator. In \ addition, employees using negative pressure respirators must be fit tested before enterinq the asbestos regulated area and they must be fit tested every six months thereafter. Selection, use and care of respirators must be in accordance with the requirements of 29 CFR 1910 .1001 (G). Traininq must be provided to the front end loader and bulldozer operators no later than October 20, 1986 and at least annually thereafter since these two iob positions were exposed to airborne UCC 020818 4 concentrations of asbestos fibers at the action level. Training must cover the topics shown in 29 CFR 1910.1001 (J)(5). Medical surveillance must be provided or made available to the Front end loader and bulldozer operators no later than November 17, 1986 and at least annually thereafter since these two job positions were exposed to airborne concentrations of asbestos fibers at the action level. Medical surveillance must be performed in accordance with 29 CFR 1910.10Q1(L) RECOMMENDATIONS: In order to complete Implementation of the above required activities, the following recommendations are made: i; Per the advice of Employee Relations Department and Medical Department supervision, Environmental Protection Department supervision should . Immediately pursue the establishment of a contract between Union Carbide and Henson Brothers, Inc, in order to provide asbestos training, medical surveillance, respirator fit testing (if necessary) and respirator training to the bulldozer and front end loader operators on a fee-for-servlce basis. When the contract is established, Industrial Hygiene personnel will be available to provide the regulred training and fit testing, upon request. 2. Environmental Protection Department supervision should take appropriate steps as soon as possible to insure that a sufficient guantlty of suitable respirators are on hand for the heavy equipment operators and the Institute Plant truck drivers who must enter the requlated arca. In additlon, a routine prograni (1C one does not ______ UCC 020819 5 / already exist) should be established with Safety Supply for the cleaning, disinfecting. Inspection and repair of the respirators. _/ \ _ --, _____ ___ ____ 3. Maintenance Area VI supervision should contact this office as soon as possible to coordinate the respirator fit testing and training that is required for Institute Plant truck drivers to enter the landfill regulated area. (Mote: Already underway at this time.) / 4. Environmental Protection Department supervision should contact this office Cor assistance in establishing the regulated area at the landfill. (Note: Aiready underway at this time.) Report Date; October 17, 1986 Signed: Room: 172 Phone NOTE: ALL PERSONAL SAMPLE RESULTS MUST BE DISCUSSED WITH THE PARTICIPATING EMPLOYEE 6105 UCC 020820 Union Carbide Agricultural Products Company, inc. Institute Plant INDUSTRIAL HYGIENE SAMPLING RESULTS WORKPLACE LOCATION: Landfill NAME(s) OF SAMPLER(s): E.A. Osby & J.L. Miller CONTAMINANT: Asbestos OSHA PEL: TWAp0.2 Fibers/cc.TWAi ? - AIHA WEEL: TWAg--,TWAI2 - REPORT DATE: October 17, 1986 ACGIH TLV: TWApO.2 Fibers/cc,TWAi? UCC GUIDELINE: TWAg' - ,TWAl? Sample Number Sample Date W-4700-AA7915 W-4700-AA7923 8-1-86 CO 1 J CO W-4701-AA7925 V-4701-AA7932 8-4-86 8-4-86 W-4702-AA7935 8-5-86 V-4700-AA7916 W-4700-AA7924 8-1-86 8-1-86 W-4701-AA7926 W-4701-AA7933 8-4-86 8-4-86 W-4702-AA7936 W-4702-AA7940 8-5-86 8-5-86 Sample Description Sample Time (min.) Sample Results (fibers/cc)* Front End Loader Operator L. E. Pauley L. E. Pauley 265 125 ** AA L. E. Pauley L. E. Pauley 170 0.11 225 0.099 0.10 L. E. Pauley Bulldozer Operator C. E. Wheeler c. E. Wheeler C- E. Wheeler c. E. Wheeler c. E , Wheeler c. E. Wheeler 375 265 120 170 225 180 195 0.068 0.051 0.17 0.09 0.097 0.10 0.099 0.087 0.12 0.10 UCC 020821 Sample Number Sample Date W-4700-AA7917 8-1-86 W-4701-AA7927 8-4-86 W-4702-AA7938 8-5-86 V-4701-AA7928 W-4701-AA7934 8-4-86 8-4-86 V-4702-AA7937 8-5-86 W-4700-AA791B 8-1-86 W-4700-M7922 8-1-B6 W-4701-AA7929 8-4-86 W-4700-AA7919 VI-4702-AA7931 8-1-86 8-5-86 2- - Sample Description Sample Time (min.) Sample Results (fibers/cc)* Senior Enviromentai Specialist J. R. Fizer 375 J. R. Fizer J. P. Monroe 395 205 Teaque Laborer R. L. Barker R. L. Barker 303 90 A. E. Barker 370 Back end of front end loader while asbestos was being worked into landfill 35 Back end of front end loader while asbestos was being worked into landfill 10 Back end of front end loader while asbestos was being worked into landfill 15 Drum crusher area 304 On side of bulldozer while asbestos was being worked into landfill 15 0.01 0.018 0.028 0.021 0.016 0.020 0.029 0.39 1.2 ** 0.0047 0.98 Personal sample results are reported as time-weighted averages. Sample could not be analyzed for asbestos fibers due to excessive dus t accumu1a tion. UCC 020822 A ATI ASBESTOS TESTING INC 5205 NOYES AVE. CHARLESTON, WV 25304 (304) 925-5795 October 5 , 1986 Ed McComas Industrial Hygiene Dept. Union Carbide corporation P.O. Box 2331 Charleston, WV 25330 The following analysis result pertains to a sample received 10/2/36. All bulk insulation analysis is performed in accordance with EPA recommendations concerning the analysis of bulk insulation using polarized light microscopy. ANALYSIS RESULT Samule #1 Building 236, Locker Room steamline 15-^-Asbestos (103-Amosite) ( 5%-Chrysotile) 35^-Clay Respectfully submitted, John S. Ferrell Industrial Hygienist UCC 020823 ASBESTOS TESTING INC. 5205 NOYES AVE. * CHARLESTON, WV 25304 (304)925-6795 August 3, 1^36 Erik A. Osby Industrial Hygiene Dent. Union Carbide Cornertat ion ?.0. 3-x 2331 Charies ton . WV 25 333 The following bulk insulation analysis results oertain tc samples received on 3/1'36 and 8/7/36. All bulk insulation analysis is ner formed in accordance with SPA recommendations concerning analysis of bulk insulation using solarized 11?nt micresc cny . ANALYSIS RESULTS UCC 020824 ASBESTOS TESTING INC. 5207 NOYES AVE. CHARLESTON, WV 25304 (304)925-6795 July 11. 1^86 Erik Osby Union Carbide Corn.-Institute Industrial Hygiene Dent. ?.C. Box 2331 Char] estor,, WV 25330 The following analysis cf bulk insulation pertain to samol.es received on 6/1C/86. All bulk insulation analysis is performed in accordance with E?A recommendations concerning analysis of bulk insulation using solarized lig.ot microseooy. -.LYSIS RESULTS Q ~^^1 rI Mcnyl Phene 1-Header passing .fi re a c t or g,, 1 'ne-nr'und ie';,'i. J Ll p;j r* ' ^ 22H-asbestos (2)8--Ames ite ) (22^-Chrysotile) : ~j2,'o-f --ury i a^ y. lOL-hsbestos 1C, i-Clay ;2-a : I -Y :-r, neat exchanger C-H-Asbes tes 2Cm-Mineral Wool 7 5,8-Clay 5H-\ernicuiite UCC 020825 ASBESTOS TESTING INC. 5207 NOYES AVE. CHARLESTON, WV 25304 (304)'r?25-67g5 V- June 6, 1986 Erik A. Os by Industrial Hygiene Dept. Union Carbide Cornoration P.G. Box 2331 ;n, W.V. 2533C to t1' % 'O The foilowing analyses results pertain to samples received 6//36. All bul'.c insulation analysis Is performed in accordance vr'th EA recommendations concerning analysis of bulk insulation using oolarized light microscopy. ANALYSIS RESULT! Sample y~l Building 303. Basement Ceiling Tile 0#-Asbestos 90#-Mineral Wool 5#-Ceilulose 5#-Glue mole #2 Building 303Southeastern Pioe Insulation 25#-Asbestcs (20#-Araosite) ( 5#-Cnryscfcile ) 75#-Magnesite Respectfully submitted. Industrial Hygienist UCC 020826 A ATI ASBESTOS TESTING INC. 5207 NOYES AVE. CHARLESTON, WV 253Q4 \&4) ^S-A795 June 5, 19-0 &^ <* % jinx a. oscv Industrial Hygiene Dent. Unin Carbine C~rocrat: cn ?.0. Box 2q31 Charleston, *.V. 25330 The fellow5nr analysis result pertain tc samples received 6 '3/%. All bulk~*insulation analysis is performed in accordance wJtn E?A recommendations concerning analysis of bulk insulation us'ng oolarj zed light microscopy. ANALYSIS RESULTS Sample ~1 Phosgene Control Room Insulation-Steamline lpiS-Asbes t os (15^ Amosite) 3p%-Clay Respectfully submitted, 'L-j x/ ohn S. Eerrell Industrial Hyc.ienist UCC 020827 ASBESTOS TESTING INC. 5207 NOYES AVE. CHARIESTON, WV 25304 (304) 925-6795 Erik A. Osby In.iustrial Hygiene Deofc. Union Carbide~Corporation ?.0. Box ?S31 Charleston. W.V. 25330 Mr. Osby. The bulk insulation sample results pertain to samples received on 4/17/36. All bulk insulation analysis is oerformed in accordance with EPA recommendations concerning analysis of bulk insulation using solarised light microscopy. ANALYSIS RESULTS Samole #1 Mechanica Room, first flcor-31ig. 304 20%-Asbestcs ( 5^-Amosite) (Ip^-Chrysotile) 15^-Mineral Wool 65^-C lay Sample #2 Wall Panel, second floor-31dg. 304 20^-Asbestos (2C$-Chrysotle) 55^-Cellulose 20$-Clay 5$-Glue Sample #3 Furnace Insulation, second flcor-Sldg. 30^ 25$-Asbestos ( 5$-A.mos ite) (20$-Chrysotile) 6 0$-Mineral Wool 15^-Clay Sample #4 Pipe Insulation, second floor-Bldg. 30^ 20^-Asbestos (15$-Amosite) ( 5>-Ghrysotile) 30$-Clay UCC 020828 Samnle #5 Ceiling; Ti le . third floor; 31dg. 304 r Samnle $6 Ceiling Panel, third floor. Bldg. 304 Qf/o--Asbestos 95`^-Ce 1 lulose 5;^?-Glue 0$ -A s ce s t os 95'^-Mineral Wool o-fl-Z i-^y * Respectfully submitted, - ^ ` - , \'fJL-'c-C^- John S. Ferre 11 Industrial Hygienist t i \ UCC 020829 ASBESTOS TESTING INC. 5207 NOYES AVE. CHARIESTON, WV 25304 (204)925-6795 hvril 16 , 1986 Guy L. Arbaugh Union Carbide Corn.- Institute 3uilbins: -f2 Room 172 ?.C. Box ??31 Charleston, T.v.V. 26062 Plant Mr. Arbauoh, T'ne following bulk asbestos analysis results pertain to samnles received on 4 /15/B6. Please note that all analysis of bulk asbestos samnles are analyzed oer E?A orocedural recommendations concerning bulk asbestos analysis using polarized li~ht microscooy. Thank you for your consideration. ANALYSIS RESULTS Samole #1 Taken by C. Burr!ss Cfy-Asbestos 55v-Pa int 95:o -Magnesite Samole #2 Taken by C. Miller O^-Asbes tcs 1%-Mineral V.'ccl 9d/o-Calc Ite Respectfully submitted, ,/ //' John S. Ferre 11 UCC 020830 Union Carbide Agricultural Products Company, Inc. Institute Plant INDUSTRIAL HYGIENE SAMPLING RESULTS TO: Mr. P. J. Morris. COPIES TO: Building 23 __________________ Mr. M. Adkins, Jr. Mr. c. R. Thomas Institute Plant___________________ Mr. L. W. Youngblood Purpose: ________ ________ Quarterly ________ Semiannually ________ Regulatory Agency Inspection x Annually Other (See Comments) Sample Date(s): December 19, 1985 Sample Location: MIC-II Unit - Malnt. Comp. 7 Department No.: 327 Process/Activity: Pipe Insulation removal_______________________________________________ Contaminant: Asbestos____________________________ _ Exposure Limit: OSHA 2 flbers/cc____________ ACGIH _________ _ ucc Sample Type: x Personal x Area ______ Source Surface Wipe ______ Other (see comments) Analytical Method: NIOSH 7400 Results: _______ See comments x See Attached Table COMMENTS: A Maintenance Complex 7 Insulator/palnter was monitored for exposure to airborne asbestos fibers on the above date. Area concentrations of airborne asbestos fibers were measured too. Monitoring was performed while Insulation was being stripped from pipes that were lying on a plastic sheet inside the dike wall that surrounds the old phthallc anhydride tanks at the MIC-II Unit. It was not necessary to wet the insulation as it was being removed because it had become water logged and, at the time of removal, was frozen due to the cold weather. Nevertheless, respirators and protective clothing were worn by the three men performing the work. _since the airborne fiber concentration was unknown at the time of sampling, two sets of samples (having different sample times? were taken to insure that at least one of the sets would produce valid results. All monitoring results were below the lower calibration limit for the analytical UCC 020831 Union Carbide Agricultural Products Company, Inc. Institute Plant INDUSTRIAL HYGIENE SAMPLING RESULTS- CONTINUED method, which is well below the OSHA permissible exposure limit. Area concentrations and personal exposures to airborne asbestos fibers were maintained at sate levels during this lob. ____________ _____________________________ RECOMMENDATIONS: None __________ _____________ ______________________ -- Report Date: January 14, 1986_______ __ Bldg. 2 Room: 172 Phone 6105 NOTE: ALL PERSONAL SAMPLE RESULTS MUST BE DISCUSSED WITH THE PARTICIPATING EMPLOYEE 1335k UCC 020832 Union Carbide Agricultural Products Company, Inc. institute Plant INDUSTRIAL HYGIENE SAMPLING RESULTS WORKPLACE LOCATION: HIC-II Unit, Maint. Comp. 7 SAMPLER'S MAMS: B. A. Osby CONTAMINANT: Asbestos_____________________ REPORT DATS: January 14, 1986 Sample Number Sample Date V-4409-1 V-4409-4 12-19-85 12-19-85 W-4409-2 V-4409-S V-4409-3 W-4409-6 12-19-85 12-19-85 12-19-85 12-19-85 Sample Description Sample Time (min.) Sample Results fibers/cc) INSULATOR/PAINTER D. C- Chambers D. C. Chambers 60 < 0.10 18 < 0.32 TWA=< 0.02 East side of insulation removal site - 3 feet from activity. 60 16 < 0.10 < 0.36 Northwest side of insulation removal site - 5 feet from activity. 60 15 < 0.10 < 0.38 1335k UCC 020833 ENVIRONMENTAL HEALTH LABORATORY 1021 Georgia Ave. / Macon. Georgia 31201 (800) 841-8919 / In GA (912) 745-4702 LABORATORIES IN MACON. QA AND HARTFORD. CT EH1 ------------ LABORATORY ANALYSIS REPORT % o vV % % To. Account: Location: E. A. Osby Union Carbide Agricultural Products Co., Inc. P. 0. Box 2831 Charleston, WV 25301 Report No.: Purchase Order No.: Date Received: Date Reported: 86A0007 Revised N/A 01-03-86 01-14-86 Analysis: Fiber Count Analytical Method : NI0SH 7400; Phase Contrast Microscopy; Walton-Beckett Reticle; 450 x magnification Sample No. (AA) Air Volume (Liters) Fibers, longer than 5 microns, per cc of air. W-4409-1 120 <0.095 W-4409-2 120 <0.095 W-4409-3 120 <0.095 W-4409-4 36 <0.32 W-4409-5 32 <0.36 W-4409-6 29.8 <0.38 cc= Cubic Centimeter. A blank filter was not provided. We recommend that a blank be submitted with each set of samples so that the sampling media can be checked for possible interferences or background contamination. Chemist = Less ttian Jeanne A. Gibbs UCC 020834 -Datei