Enerplus - Various Well Sites Partial Compliance Evaluation (PCE) On-Site Clean Air Act (CAA) Inspections Inspection Date(s): November 5-8, 2023 Inspection Report Date: January 11, 2024 EPA Representatives: Katelyn Bergl, US EPA Region 8, Clean Air Act Inspector Youn Joo Kim, US EPA Region 8, Clean Air Act Inspector Tribal Representatives: Dwight Bruce, Jr, MHA Energy Talon Two Crow, MHA Energy Company Representatives: None Inspection Report Prepared By: Katelyn Bergl, US EPA Region 8, Clean Air Act Inspector Youn Joo Kim, US EPA Region 8, Clean Air Act Inspector Inspection Report Reviewed By: Scott Patefield, Manager, Enforcement and Compliance Assurance Division, Air and Toxics Enforcement Branch Applicable Rules: 40 C.F.R Part 49, Subpart K: Federal Implementation Plan for Oil and Natural Gas Well Production Facilities; Fort Berthold Indian Reservation (Mandan, Hidatsa and Arikara Nation), North Dakota (Fort Berthold FIP) 40 C.F.R Part 60, Subpart OOOOa: Standards of Performance for Crude Oil and Natural Gas Facilities for which Construction, Modification or Reconstruction Commenced After September 18, 2015 (NSPS OOOOa) Compliance Assistance None Enforcement History Enerplus Resources (USA) Corporation (Enerplus) is subject to the terms of two active Consent Agreement Final Orders (CAFO): Docket No. CAA-08-2020-0008 and Docket No. CAA-08-2019- 00012. Docket No. CAA-08-2020-0008 was entered on August 13, 2020, and has not been terminated. Docket No. CAA-08-2019-00012 was entered on September 4, 2019, with Bruin E&P Partners, LLC. On June 2, 2021, Enerplus submitted notice that it purchased the entity Bruin E&P Partners, LLC. Enerplus became subject to the terms of the 2019 CAFO thereafter. Additionally, Enerplus was previously subject to the conditions of a 2011 CAFO, CAA-08-2011-0021, which was terminated July 13, 2021. Areas of Concern 1. The EPA detected hydrocarbon emissions from the storage tanks at the following well pads: x Henry Bad Gun West x Wetterhorn x Bross x Turtles/Butterflies 2. The EPA detected hydrocarbon emissions from an unlit flare at the following well pads: x Stewart x Igneous x Windom 3. The EPA detected unburned hydrocarbon (UBHC) emissions from operating utility flares at the following well pads: x Clouds West x Leviathan x Longs x Lizards 4. The EPA detected visible emissions from a flare at the following well pads: x Henry Bad Gun West x Metals North x Cats x Oklahoma x Music East x Duck/Hans x Bross x Elements East See Table 1 below for more details regarding inspected locations and Tables 2 & 3 for inspection observation details for all pads. A log of images and videos captured during the inspections is provided in Appendix A. Page 2 of 14 General Inspection Information Unannounced well pad inspections were conducted jointly by U.S. EPA and Fort Berthold Indian Reservation (FBIR) Tribal inspectors on November 5-8, 2023, at multiple Enerplus facilities located on the FBIR. The EPA evaluated each Enerplus well site listed in Table 1 using audio, visual, and olfactory (AVO) inspection methods including the use of an optical gas imaging (OGI) camera and EPA Reference Method 22. At each well pad, inspectors scanned the crude and/or water storage tanks, closed vent system and flares onsite for any detectable emissions. Specifically, inspectors scanned storage tank covers and closed vent systems for hydrocarbon emissions to determine compliance with the Clean Air Act, including the Fort Berthold FIP and NSPS OOOOa. Each well pad inspection followed the approach below: 1. Record the entry sign of the well pad when available. Survey the entire well pad with OGI camera. 2. Record the number and type of site process equipment such as well heads, tanks, and emission control devices. 3. Record AVO indications of emissions from the storage tanks, closed vent system to the control devices and control devices. 4. Using the OGI camera, survey each process in infrared modes (auto, manual, and/or highsensitivity modes). Record any uncontrolled emissions with the OGI camera and describe the frequency and magnitude of emissions in the field notebook. 5. Observe control devices (enclosed combustor or utility flare) for visible emissions. If there is visible emissions present, conduct Method 22 and record the observations. 6. Using two OGI cameras, confirm any observations of uncontrolled emissions with another inspector. 7. If there are operators present onsite, share any Areas of Concern. Table 1 lists general inspection and well pad details for each inspected well pad. The well pad information located in Table 1 is from the North Dakota Industrial Commission (NDIC) well index located online at https://www.dmr.nd.gov/oilgas/. Table 1: Inspection and Well Pad Details of Facilities Inspected November 5-8, 2023 Date 11/5/2023 11/5/2023 11/5/2023 11/5/2023 11/5/2023 11/5/2023 11/5/2023 11/7/2023 Arrival Time 14:36 15:07 15:13 15:24 15:41 16:40 17:07 8:09 Departure Time 14:52 15:12 15:22 15:35 15:47 16:45 17:12 8:19 Pad Name Missouri Maroon Stewart Vermejo Bierstadt Snakes East Marsupials East Metals East Well Name(s) Fort Berthold 152-94-14D-1116H FB 152-93-7D-6-1H FBIR 152-93-18B-19-2H FB 152-93-7C-6-9H FB 152-94-13A-24-3H Redbelly 152-94-18A-19H TF Fool Bear 23-34H, Flyer 15294-23DH TF Nickle, Cobalt, Steel, Zinc, Platinum, Lead, Titanium Latitude 47.97845 47.99121 47.99090 47.99315 47.99136 47.991 47.96374 47.55935 Longitude -102.668215 -102.62847 -102.63569 -102.63613 -102.64351 -102.752 -102.66928 -102.52870 Page 3 of 14 11/7/2023 8:25 11/7/2023 8:47 11/7/2023 9:19 11/7/2023 11/7/2023 11/7/2023 11/7/2023 11/7/2023 9:31 9:43 9:55 10:02 10:19 11/7/2023 10:33 11/7/2023 10:44 11/7/2023 11:01 11/7/2023 11:27 11/7/2023 11:37 11/7/2023 11/7/2023 11/7/2023 11/7/2023 11/7/2023 11/7/2023 11/7/2023 11/7/2023 11:43 11:54 12:57 13:06 13:29 13:49 14:00 14:18 8:42 9:04 9:29 9:40 9:50 10:00 10:17 10:31 10:43 10:55 11:10 11:36 11:40 11:52 12:05 13:05 13:11 13:34 13:59 14:14 14:25 11/7/2023 14:35 11/7/2023 14:51 11/7/2023 14:58 11/7/2023 15:15 11/7/2023 15:26 11/8/2023 7:53 11/8/2023 8:01 11/8/2023 8:18 11/8/2023 8:40 11/8/2023 9:07 11/8/2023 9:20 11/8/2023 9:23 11/8/2023 9:32 14:49 14:58 15:05 15:25 15:45 8:00 8:05 8:22 8:50 9:16 9:22 9:28 9:47 Igneous Henry Bad Gun West Metals North Voigt/Zane Cats Ethan Hall Oklahoma Windom Lincoln Pyramid Sneffels J.M. Hall Music West Music East Duck/Hans Trees East Trees West Peppers Mountains Wetterhorn Clouds West Bross Sunshine San Luis Belford Yale Castle James Bugs Character Leviathan Anderson Huron Longs Scoria 147-93-09C-04-22 Henry Bad Gun 8D-5-1-H Zirconium Voigt 32-34H, Zane 32-24H Persian Anna G baker 6B-30-2H TF FB 148-94-36D-25-2H Fort Berthold 148-94-36C-254H FB 148-94-36C-25-3H Fort Berthold 147-94-2A-111H Fort Berthold 147-94-2B-113H JM Hall 1-19H Harmony 148-93-18C-07-2H TF Music 148-93-18D-07-4H TF Hans 20-21-H Pine 148-94-12D-01-3H Oak 148-94-12C-01-1H Santaka 148-94-11C-2H-TF Denali 148-95-12D-01H-TF FB 148-95-13A-24-3H Nimbus 149-94-33D-28H, Cirrus, Alto, Haze, Vapor, Cumulus, Stratus, Fog, Lenticular Fort Berthold 148-95-23C-144H Fort Berthold 148-95-23D-141H Fort Berthold 148-95-24C-131H FB Belford 148-95-22D-1510B Fort Berthold 148-95-27B-345H FB 150-94-3B-10-1H FB James 150-94-3B-10-13B Beetle 150-94-11C-12H Honor 150-94-06B-18HTF FB Leviathan 151-94-27A-3412T FB 151-94-26B-35-10H Fort Berthold 151-94-26B-351H FB 151-94-26A-35-4H Page 4 of 14 47.55746 47.55951 47.58974 47.58881 47.58631 47.58762 47.58746 47.58953 47.58777 47.58779 47.58892 47.63120 47.63230 47.63311 47.63100 47.64668 47.64698 47.64684 47.64684 47.64583 47.67479 47.61666 47.61877 47.62056 47.61591 47.61707 47.84630 47.84634 47.82322 47.84682 47.87516 47.87574 47.87595 47.87461 -102.54422 -102.55104 -102.56325 -102.55765 -102.57241 -102.58219 -102.58875 -102.60079 -102.60634 -102.61498 -102.62442 -102.58470 -102.58015 -102.57422 -102.56093 -102.59507 -102.60175 -102.61398 -102.71906 -102.72252 -102.71067 -102.75056 -102.74125 -102.73338 -102.76393 -102.77077 -102.70188 -102.69932 -102.68323 -102.76135 -102.68926 -102.68378 -102.68011 -102.66880 11/8/2023 9:53 11/8/2023 11/8/2023 11/8/2023 10:38 10:49 11:51 11/8/2023 12:22 10:10 10:45 10:55 12:11 12:29 Elements East Breakfast Lizards Turtles/ Butterflies Turtle East Fire, Water, Furlong Waffle, Ham, Sausage, Bacon Komodo 151-94-17A-20H-TF Snapper 152-94-33C-28H Leather back 152-94-33C-28H 47.89023 47.90847 47.90776 47.93611 47.93559 -102.71258 -102.72645 -102.73560 -102.73224 -102.716192 Observations and Regulatory Applicability Fort Berthold FIP and NSPS OOOOa regulations which are potentially relevant to the Areas of Concern observed during inspections are summarized in this section. Tables 2 and 3 at the end of this report summarize inspection observations and findings. Table 2 summarizes storage tank observations. Table 3 includes details of control devices and related observations. See Appendix A for a log of images and videos taken during the inspections. Fort Berthold FIP Applicability Based on drilling information reported to the NDIC well index by Enerplus, the facilities listed in Table 1 were completed after the August 12, 2007, applicability date (per 40 C.F.R. 49.4161) and are producing from the Bakken Pool (per 40 C.F.R 49.4163(a)(1)) and are thus subject to the Fort Berthold FIP. Closed Vent System Equipment Requirements [ 49.4165(b)] Per 49.4165(b)(1), "Each closed-vent system must route all produced natural gas and natural gas emissions from production and storage operations to the natural gas sales pipeline or the control devices...". The EPA, using an OGI camera, detected natural gas emissions from production and storage tanks at four out of forty-seven well pads evaluated. See Area of Concern #1 above. Utility Flare Requirements [ 49.4165(c)] Per 49.4165(c)(6)(vi), "The owner or operators must ensure that each enclosed combustor and utility flare is maintained in a leak-free condition." The EPA, using an OGI camera, detected emissions from an unlit flare at three out of forty-seven wells pads evaluated. See Area of Concern #2 above. Per 49.4165(c)(1), "For each enclosed combustor or utility flare, the owner or operator must follow the manufacturer's written operating instructions, procedures and maintenance schedule to ensure good air pollution control practices for minimizing emissions." The EPA noted UBHC emissions indicating poor air pollution control practices from lit flares at four out of forty-seven well pads evaluated. See Area of Concern #3 above. Per 49.4165(c)(6)(vii), "The owner or operator must ensure that each enclosed combustor and utility flare is operated with no visible smoke emissions." Per 49.4166(g)(3) and EPA Reference Method 22, the EPA noted black smoke emissions at eight out of forty-seven well pads evaluated. See Area of Concern #4 above. NSPS OOOOa Applicability Based on Enerplus' NSPS OOOOa annual reporting, the EPA believes that storage vessels and associated emissions control equipment at 31 of the 47 oil and natural gas production facilities identified in Table 1 are potentially subject to requirements for storage vessel affected facilities in NSPS OOOOa: x Anderson Page 5 of 14 x Belford x Bierstadt x Breakfast x Bross x Bugs x Cats x Clouds West x Duck/Hans x Elements East x Ethan Hall x Igneous x James x Leviathan x Lincoln x Lizards x Longs x Marsupials East x Metals East x Metals North x Missouri x Oklahoma x Peppers x Pyramid x Snakes East x Sneffels x Stewart x Turtles East x Vermejo x Wetterhorn x Windom Closed Vent System Equipment Requirements [ 60.5411a(c)] Per 60.5411a(c)(1), owners and operators must "Design the closed vent system to route all gases, vapors, and fumes emitted from the material in the storage vessel to a control device that meets the requirements specified in 60.5412(c) and (d), or to a process." The EPA, using an OGI camera, observed emissions from the closed vent systems at the Wetterhorn and Bross pads. See Area of Concern #1 above. Control Device Requirements [ 60.5412a(d) and 60.5413a(e)] Per 60.5412a(d)(1)(ii), owners and operators must, for each combustion control device, "install and operate a continuous burning pilot flame." The EPA observed unlit pilot flames at the Stewart, Igneous, and Windom pads. See Area of Concern #2 above. Per 60.5413(a)(e)(8), owners and operators must, "Operate each control device following the manufacturer's written operating instructions, procedures and maintenance schedules to ensure good air pollution control practices for minimizing emissions." The EPA noted UBHC emissions indicating poor Page 6 of 14 air pollution control practices from lit flares at the Clouds West, Leviathan, Longs, and Lizards pads. See Area of Concern #3 above. Per 60.5412a(d)(1)(iii), owners and operators must, "Operate the combustion control device with no visible emissions, except for periods not to exceed a total of 1 minute during any 15-minute period." The EPA observed black smoke continuously for more than five minutes (per Method 22) at the Metals North, Cats, Oklahoma, Duck/Hans, Bross, and Elements East pads. See Area of Concern #4 above. Page 7 of 14 Table 2: Inspection Details: Storage Tank Observations Well Pad Name Missouri Pad Maroon Pad Stewart Pad Number of Storage Tanks 16 5 15 AVO (Audio, visual, olfactory) Observations None None None Emissions Description None None None Vermejo Pad Bierstadt Pad Snakes East Pad Marsupials East Pad Metals East Pad Igneous Pad Henry Bad Gun West Pad Metals North Pad Voigt/Zane Pad Cats Pad Ethan Hall Pad Oklahoma Pad Windom Pad Lincoln Pad Pyramid Pad Sneffels Pad JM Hall Pad Music West Pad Music East Pad Duck/Hans Pad Trees East Pad Trees West Pad Peppers Pad Mountains Pad 12 10 Not recorded 4 None Odor detected None None 10 None 12 None 12 Odor detected 8 None 10 Odor detected next to tanks 10 None 16 None 18 None 16 None 10 None 22 None 12 None 6 None 8 None 8 None 9 None 8 None 8 None 6 None 5 None None None None None None None Intermittent emissions from produced water tank None None None None None None None None None None None None None None None None None Page 8 of 14 Media File Name None DC_3342 DC_3345, IR_3348 IR_3351 IR_3354 None None None None MOV_3390 None None None None None None None None None None None None None None None None None Notes Confirmed tank levels with OGI Confirmed tank levels with OGI Confirmed tank levels with OGI Wetterhorn Pad 14 Clouds West Pad 11 Bross Pad 12 Sunshine Pad 12 San Luis Pad 14 Belford Pad 14 Yale Pad 12 Castle Pad 10 James Pad 12 Bugs Pad 6 Character Pad 22 Leviathan Pad 11 Anderson Pad 12 Huron Pad 14 Longs Pad 10 Elements East Pad 8 Breakfast Pad 6 Lizards Pad 4 Turtles/ Butterflies 30 Pad Turtles East 7 Odor detected None Odor detected None None Odor detected None None None None None None None None None None None None None None Continuous large plume of emissions venting from thief hatch. None Continuous large plume of emissions venting from top of tank, possibly tank 1465. None None None None None None None None None None None None None None None Continuous venting emissions from piping on top of the tank 998654. Inspectors observed a medium sized continuous plume. Due to wind, video may minimize extent of the leak. Another continuous emission point was observed by inspectors from a thief hatch near the middle of the tank battery. Enerplus employee Donald fixed the thief hatch leak while inspectors were on-site. Inspectors confirmed the thief hatch was no longer leaking. None MOV_3393, MOV_3394 None MOV_3397, MOV_3398 None None None None None None None None None None None None None None None MOV_3429. MOV_3430 None An Enerplus employee was notified of Bross Pad tank emissions at an adjacent pad and said that the tanks recently underwent maintenance due to issues maintaining proper tank levels. Spoke to operator while onsite. Page 9 of 14 Table 3: Inspection Details: Control Devices and AVO/OGI Observations Well Pad Name Number of Control Device(s) Control Device (CD) Type Visible Pilot Flame (Y/N) Active Flaring (Y/N) Method 22 Observations Missouri 2 Pad Maroon 1 Pad Stewart 1 Pad High Yes, No, Pressure No No (HP_ Tri- tip, Air assist Low Yes No Pressure (LP)-HP LP-HP No No None None None Vermejo 1 Pad Bierstadt 1 Pad Snakes 2 East Pad LP-HP No No HP No No HP, Yes, Yes, HP Tri-tip Yes Yes None None None Marsupials 2 East Pad Metals East 2 Pad Igneous 2 Pad High Yes, Yes, Capacity Yes Yes (HC) 2- prong, HP HP 3-prong, Yes, Yes, LP 2-prong Yes Yes LP, Yes, Yes, HP 3-prong No No None None None Emission Description None None Continuous emissions from unlit flare, detected odor None None Active flaring (observed high volumes from both flares ~4ft of flame) Unburnt hydrocarbon trails were observed from both flares None Possible continuous plume detected by OGI from a potentially unlit flare (HP-3 prong) Media File Name None None MOV_3347 MOV_3350, MOV_3351 None None MOV_3359 MOV_3389 Slope to K/O Drum Downward Downward Downward Downward Upward Downward Downward Downward Downward Notes The facility was under "Frac Protect". The facility was under "Frac Protect". The facility was under "Frac Protect". The site was inaccessible, so inspection of flares was conducted outside of the fence line. Page 10 of 14 Henry Bad 1 Gun West Pad Metals 2 North Pad Voigt/Zane 1 Pad Cats Pad 2 Ethan Hall 3 Pad Oklahoma 1 Pad Windom 2 Pad Lincoln 1 Pad Pyramid 3 Pad HP Yes Yes Yes HP 2-prong, Yes, Yes, LP 2-prong Yes Yes HP-LP Yes Yes HP 2-prong, No, No, LP Yes Yes HP 2-prong, Yes, Yes, LP 2-prong, Yes, Yes, LP 2-prong Yes Yes HP-LP Yes Yes Yes None Yes None Yes Air Assist, Yes, No, HP-HC Yes No None HC-LP Yes Yes Air Assist, Yes, Yes, HP, Yes, No, HP-LP Yes Yes None None Continuous visible emissions for >5 minute per Method 22. Continuous visible emission from LP flare for >5 minute per Method 22. None Continuous visible emissions from LP flare for >5 minute per Method 22. None None None None None None Downward Downward Downward Downward Downward Continuous visible emissions from HPLP flare for >5 minute per Method 22. Observed emissions from unlit Air Assist flare (it was unlit at the time of the arrival), the OGI video shows when the pilot is lit. Trailing unburned hydrocarbon was observed after the flare lit. None None MOV_3391, MOV_3392 None Downward Downward Downward Flare operating temperature was observed to be 441 F. None None Downward Page 11 of 14 Sneffels 2 Pad JM Hall 1 Pad Music 1 West Pad Music East 1 Pad Duck/Hans 2 Pad Trees East 1 Pad Trees West 1 Pad Peppers 2 Pad Mountains 2 Pad Wetterhorn 1 Pad Clouds 2 West Pad Bross Pad 1 HC, Yes, No, Air Assist Yes No HC Yes Yes LP Yes Yes HC Yes Yes HP 2-prong, Yes, Yes, LP Yes Yes LP Yes Yes LP Yes Yes HP 3-prong, Yes, No, LP 2-prong Yes Yes HP-LP, Yes, Yes, HP 2-prong Yes No HP-LP Yes No HP 3-prong, Yes, No, LP 2-prong Yes Yes HP-LP Yes Yes None None None Yes Yes None None None None None None Yes None None None None None Downward Downward Downward Continuous visible emissions from HC flare for >5 minute per Method 22. Continuous visible emissions from LP flare for >5 minute per Method 22. None None None DSCN0090. Upward JPG Nikon image of pipe slope to flare. Hissing sound audible from flare. Downward Hissing sound audible from flare. Operating temperatures were 1300, 1500, and 1600 degrees Fahrenheit as observed on the flare control panels. Downward Downward None Downward None UBHC Trail from LP Flare Continuous visible emissions from HPLP flare for >5 minute per Method 22. MOV_3396 Downward Odor detected Flare was also "burping". The burning was not continuous and would decrease almost to a level of not flaring at all, and then the flame size would suddenly and dramatically increase. Page 12 of 14 Sunshine 1 Pad San Luis 1 Pad Belford 2 Pad Yale Pad 1 Castle Pad 1 James Pad 2 Bugs Pad 2 Character 1 Pad Leviathan 3 Pad Anderson 2 Pad Huron Pad 1 Longs Pad 2 HP-LP HC-LP Yes Yes Yes Yes HP 3-prong, Yes, Yes, Air Assist No No HC-LP Yes No HC Yes No HP 2-prong, Yes, No, Air Assist Yes Yes HP 3-prong, Yes, Yes, LP 2-prong Yes Yes HC Yes Yes Air Assist, Yes, No, HC, Yes, No, HP 4-prong Yes No HP, Yes, Yes, Air Assist Yes No HP-LP No No Air Assist, Yes, No, HP 3-prong Yes No None None None None Downward None None Downward None None None None None None Downward Downward Downward None None None None Downward Downward None None None None Pilot is lit but not combusting. Puffs of unburned hydrocarbon was observed via OGI from HP 4-prong flare. The operating temperature was 1300F. None MOV_3406, DC_3405, DC_3407, DC_3408 Downward Downward None UBHC emissions from air assist flare. Pilot was lit but no flame was visible, there was no heat signature, and the gas was not being combusted. There was no green light indicating proper operations. Alarm Page 13 of 14 MOV_3413 Downward Downward Inspectors shared the OGI findings with Enerplus employees on-site and Enerplus employees began troubleshooting at that time. Elements 2 East Pad Breakfast 3 Pad Lizards 2 Pad HP 2-prong, Yes, Yes, Yes LP 2-prong Yes Yes HP 2-prong, Yes, No, HP 4-prong, Yes, No, Air Assist Yes No LP, Yes, No, HP 2-prong Yes No None None Turtles/ 2 Butterflies Pad Turtles 3 East Pad HC-LP, HC-LP Yes, Yes, Yes Yes LP 4-prong, Yes, Yes, HP 3-prong, Yes, No, HP 3-prong Yes Yes None None lights were red. The pilot temperature was 850F. Continuous smoking from a large flame (2~3 ft) for >5 minute per Method 22. None None None Downward Downward Continuous venting from HP flare tip. Pilot is lit but no flame is visible, no heat trail is visible on OGI camera. Small and continuous plume. None MOV_3420 Downward Downward None Downward LP flare had a large flame (5-6 ft), loud roaring operation. HP not flaring and/or was minimally flaring. Page 14 of 14 APPENDIX A: Photograph and Video Log File Name DC_3340.JPG DC_3342.JPG DC_3343.JPG DC_3344.JPG DC_3345.JPG IR_3346.JPG MOV_3347.MP4 IR_3348.JPG DC_3349.JPG MOV_3350.MP4 MOV_3351.MP4 DC_3353.JPG IR_3354.JPG DSCN0031.JPG DSCN0032.JPG MOV_3359.MP4 DSCN0073.JPG DSCN0074.JPG MOV_3389.MP4 DSCN0075.JPG MOV_3390.MP4 DSCN0076.JPG DSCN0077.JPG DSCN0078.JPG DSCN0079.JPG DSCN0080.JPG DSCN0081.JPG MOV_3391.MP4 MOV_3392.MP4 Description Entry Sign photo Entry Sign photo Tank Battery ID photo Entry Sign photo Tank Battery ID photo Still OGI image of continuous emissions from unlit flare OGI video of continuous emissions from unlit flare Confirmation of liquid levels in storage tanks Entry Sign photo OGI video of flare operations and tank levels. OGI video of flare operations. Entry Sign photo Still OGI image confirming liquid levels in storage tanks "Site Release In Effect" notice sign at site entry Entry Sign photo UBHC trail from flares Entry Sign photo Entry Sign photo OGI video of possible continuous emissions from potentially unlit flare. Entry Sign photo Intermittent emissions from produced water tank Entry Sign photo Entry Sign photo Entry Sign photo Entry Sign photo Entry Sign photo Entry Sign photo OGI video of the pilot and flare lighting. When inspectors arrived onsite, the flare was unlit and venting emissions. Just before MOV_3391 was captured, the flare appears to have relit. After MOV_3391 was recorded, the flare was actively flaring but a trail of UBHC was observed from the OGI camera. MOV_3392 captures the trailing UBHC from the flare. Page 1 of 3 Well Pad Missouri Pad Maroon Pad Maroon Pad Stewart Pad Stewart Pad Stewart Pad Stewart Pad Stewart Pad Vermejo Pad Vermejo Pad Vermejo Pad Bierstadt Pad Bierstadt Pad Marsupial East Pad Marsupial East Pad Marsupial East Pad Metals East Pad Igneous Pad Igneous Pad Henry Bad Gun West Pad Henry Bad Gun West Pad Metals North Pad Voigt/Zane Pad Cats Pad Ethan Hall Pad Oklahoma Pad Windom Pad Windom Pad Windom Pad DSCN0082.JPG DSCN0083.JPG DSCN0084.JPG DSCN0085.JPG DSCN0086.JPG DSCN0087.JPG DSCN0088.JPG DSCN0089.JPG DSCN0090.JPG DSCN0091.JPG DSCN0092.JPG DSCN0093.JPG DSCN0094.JPG DSCN0095.JPG DSCN0096.JPG MOV_3393.MP4 MOV_3394.MP4 DSCN0097.JPG MOV_3396.MP4 DSCN0098.JPG MOV_3397.MP4 MOV_3398.MP4 DSCN0099.JPG DSCN0100.JPG DSCN0101.JPG DSCN0102.JPG DSCN0103.JPG DC_3401.JPG DC_3402.JPG DC_3403.JPG DC_3404.JPG DC_3405.JPG MOV_3406.MP4 DC_3407.JPG Entry Sign photo Entry Sign photo Tank Battery ID photo Tank Battery ID photo Entry Sign photo Entry Sign photo Entry Sign photo Entry Sign photo Slope of piping to flare Entry Sign photo Entry Sign photo Entry Sign photo Entry Sign photo Entry Sign photo Entry Sign photo Continuous large plume of emissions venting from a thief hatch on the top of the tank. Continuous large plume of emissions venting from a thief hatch on the top of the tank. Alternate view to MOV_3393. Entry Sign photo UBHC Trail from LP Flare Entry Sign photo Continuous large plume of emissions venting from top of tank, possibly tank 1465. Continuous large plume of emissions venting from top of tank, possibly tank 1465. Entry Sign photo Entry Sign photo Entry Sign photo Entry Sign photo Entry Sign photo Entry Sign photo Entry Sign photo Entry Sign photo Entry Sign photo Flares OGI video of flares. Pilot is lit on the HP 4-prong flare, but gas is not being combusted and puffs of UBHC were recorded. Flare control panel, displaying operating temperature. Page 2 of 3 Lincoln Pad Pyramid Pad Pyramid Pad Pyramid Pad Sneffels Pad J.M. Hall Pad Music West Pad Music East Pad Music East Pad Duck/Hans Pad Trees East Pad Trees West Pad Peppers Pad Mountains Pad Wetterhorn Pad Wetterhorn Pad Wetterhorn Pad Clouds West Clouds West Bross Pad Bross Pad Bross Pad Sunshine Pad San Luis Pad Belford Pad Yale Pad Castle Pad Castle Pad James Pad Bugs Pad Character Pad Leviathan Pad Leviathan Pad Leviathan Pad DC_3408.JPG DC_3409.JPG DC_3410.JPG DC_3411.JPG DC_3412.JPG MOV_3413.MP4 DC_3414.JPG DC_3417.JPG DC_3419.JPG MOV_3420.MP4 DC_3425.JPG MOV_3429.MP4 MOV_3430.MP4 DC_3431.JPG Flare control panel, displaying the Steffes control panel label. Entry Sign photo Entry Sign photo Entry Sign photo Entry Sign photo Unburned hydrocarbon emissions from air assist flare. Pilot was lit but no flame was visible, there was no heat signature, and the gas was not being combusted. Entry Sign photo Entry Sign photo Entry Sign photo Continuous venting from HP flare tip. Pilot is lit but no flame is visible, no heat trail is visible on OGI camera. Small and continuous plume. Entry Sign photo Continuous venting emissions from piping on top of the tank 998654. Inspectors observed a medium sized continuous plume. Due to wind, video may minimize extent of the leak. Continuous venting emissions from a thief hatch on the top of the tank. This leak was fixed while on-site by an Enerplus operator. Inspectors confirmed the thief hatch was no longer leaking. Entry Sign photo Leviathan Pad Leviathan Pad Anderson Pad Huron Pad Longs Pad Longs Pad Elements East Pad Breakfast Pad Lizards Pad Lizards Pad Turtles/Butterflies Pad Turtles/Butterflies Pad Turtles/Butterflies Pad Turtle East Pad Page 3 of 3