The 18 Bauer Hill was couured and installed upon your recommendation You propaned
i, *,
that dust should be dry milled if possible
That is the way the mill was installed
"
It was tried last work and found that the voids in plate filled and the flow of chod
from weigh hopper stopped We can have food lines altered and run dust and water
objective is to redaco Our ultimate through it still holding at .008 getting
now
oe
coe
, anbeaton by a portion of glass fiber introduction Why should all of your sriginal
planning be changed ?However if you have valid reasons based on findings later ?
than April 1961 when this prog vanrseat m up will be glad to divoaundeisf
necessary have the plant make the necessary piping ohanges