SAFETY - A. H. Sather
Occupational Injuries
1980 November Year-to-Date
1979 Year-to-Date
Injuries Treated
First Aid Medical Cases Restricted Workday Cases Restricted Workdays
Lost Time
5 46 0 14 02 0 23 00
38 9 2
29 1
Injuries by Department
Vinyl Operations Compound Operations Maintenance Laboratory Receiving .& Warehouse Office
1 13 2 20 1 24 14 00 01
15 4
24
2 0 3
Injuries by Type
Cuts and Abrasions Eye Injuries Burns Bruises Strains and Sprains Other
3 32 04 18 2 13 04 04
14 6
12
11 8 2
As of November 30, 1980, the plant operated 511 days or 660,622 manhours without a disabling injury.
Safety Meetings
A.H. Sather conducted the November Safety Meetings. The topics covered 1980 year-to-date safety performance, job planning for safety, incident control, attitude effects, and an open discussion of problem areas experienced by plant personnel. Employees were encouraged to suggest possible solutions to the problems they brought up. Management personnel present at the meetings included Department Heads, the Plant Superintendent or Manager, and second level Supervisors.
New Employee Orientation
Seven (7) new casual employees were given new employee safety orientation. Also, Steve Saborsky - Compound Business Area Manager was given an extensive orientation into chemical exposure controls and employee attitude concerns.
-1-
DTH 000021432
SAFETY - (continued)
OSHA Compliance
A significant amount of activity occurred in this area during the reporting period. The activities are listed below:
A. A memo summarizing additional areas of lead related work was circulated for comment. This memo summarized the bases for future work including improved work practice controls, respirator requirements, engineering controls, labeling and others.
B. Respirator training for all personnel who may have need to wear respirators was conducted. Makeup sessions were scheduled for the first week in December to train the remaining personnel.
C. Routine VCM and Lead Dosimetry. The results of which are shown below.
VCM
A total of 77 samples were analyzed four (4) of which indicated overexposure. The results are shown below and overexposures explained.
Range (ppm)
Number
Percent
0.0 - 0.5 0.5 - 1.0 1.0 - 5.0 5.0+
70 90.91 3 3.90 1 1.29 3 3.90
77 100.00
Four overexposures occurred during the reporting period. One of them occurred to an old module operator who did not identify a source and was not wearing a respirator. Another occurred to a'dryer operator who was performing fire watch work in the new module. While performing a check for leaks, be crossed a VCM gas concentration escaping from the sewer during blowdown tank pumpout - he was not wearing a respirator. Another occurred to a new module operator who
was performing a VCM filter change and was wearing a respirator. The remain ing overexposure occured to a mechanic who spent his monitoring period working on jobs in the vinyl unit. No source was isolated and he was not wearing a respirator.
Lead
A total of thirteen (13) samples were analyzed, two (2) of which indicated overexposure. The results and overexposure explanations are shown below:
-2DTH 000021433
SAFETY - (continued)
OSHA Compliance (continued)
Lead
Range
Number
Percent
Less than PEL Greater than PEL
11 2 13
84.6 15.4 100.0
The two (2) overexposures occurred to Line III compounders while performing normal work including housekeeping. Both men were wearing respirators.
-3-
DTH 000021434
VINYL - P. E. Markey
Production
Month
Y.T.D.
1. Total Production, MM Lbs. 2. Production Rate, M Lbs./C.D. 3. Charges, Reactor Batches/C.D. 4. Total Charges 5. Reactor Stream Factor
6. Drying Rates, Average Lbs./C.D. 7. Dryer Stream Factor, % 8. Accounting Days
28.0 933
22.4 672
92.6 6019
92.3 30
245.0 731
17.5 5848
75.3
5779 75.3
335
Vinyl Department production for November was 103% of budget at 28.0 MM pounds.
Reactor and dryer stream factors were 92.6% and 92.3% respectively. The major items affecting stream factor and production were:
1. A condenser cleaning on 743 reactor during which time advantage was taken by utilizing excess dryer capacity to upgrade material via de bagging and deboxing operations. This resulted in a penalty of 0.8% for the reactors and 1.1% for the dryers.
2. A number of routine smaller stream factor penalties comprised the balance.
Resin Quality Summary
Resin Type
Prime Pounds
"BC" Grade
"H" Grade
% of Total Production
5305 5385 5425 5465 Sifter Overflow
1,434,215 22,180,161
3,206,360 581,722
-
_ 1,500 374,449 (140,302)
--
--
- 374,680
5.1 80.0 11.5
2.1
1.3
TOTAL
27,402,458 374,449 235,878
100.0
Quality performance for November was 97.8% customer grade with 1.3% "BC" grade and 0.9% "H" grade.
Cost
The variable cost variance was $646.7 M favorable with $572.2 M due to price and $74.5 M due to efficiency. The major price variance was $574.5 M for VCM. Favor able efficiency variances were: $28.2 M for VCM, $37.8 for processing additives, and $10.6 M due to a different product mix. Variances due to off-grade were minimal.
The monomer raw material requirement for November was 1.01456 lbs. VCM/lb. resin versus the 1.0196 standard. (Y.T.D. is 1.01818.)
-3-
DTH 000021435
VINYL - (continued) General 1. Resin packaging for November totaled 5,796,699 pounds. Resin debagging
and deboxing totaled 140,302 pounds upgrading "H" grade resin to customer grade. 2. A large chem wash spill occurred in the old reactor module as a result of a chem wash valve failing to close on D-600 reactor during polymerization. When chem washing operations were begun on D-400 reactor, the resulting pressurization of D-400 and the chem wash retain header blew chem wash out of the tank. No one was injured as a result of the incident.
-4-
DTH 000021436
COMPOUND - J. R. McCrimon
Compound Production
Month
#' s/Day
Y.T.D.
Line I, M Pounds Line V, M Pounds
Line III, M Pounds Total, M Pounds Accounting Days
710 49 12,303
662 33 1,630
2,277
99 28,910
3,649 126 42,843
30 335
Line I operated 14.6 days during November at an average rate of 49 M pounds per day. Major items affecting production efficiency were: product changes (32.6 hours). No. 1 blender gearbox repairs (19.9 hours), dicers (8.3 hours), skip hoist (6.5 hours), and quality control 8.7 hours).
Line V operated 20.3 days during November at an average rate of 33 M pounds per day. Major items affecting production efficiency were: product changes (35.0 hours), cleaning equipment due to quality control (20.1 hours), Werner-Pfleiderer (18.4 hours), Orbitran (14.8 hours), plasticizer weighing (14.1 hours), putting up raw materials (12.9 hours), and maintenance on vibrators (5.5 hours).
Line III operated 23 days during November at an average rate of 99 pounds per day. Line III production was affected by: product changes(47.1 hours), mill temperature control system (13.3 hours), FCM seal changes (10.6 hours), and steam leak repairs (10.5 hours). Line III was also down 135.5 hours for repairs to "B." blender gear box. Line I and V operated during the Line III outage.
Quality performance for flexible compounds was 3.9% off-grade of which 55.9% was due to mill scrap. "BC" production was 4.0%.
The raw material requirements for flexible compounds was 1.04086 pounds of raw material per pound of compound versus a 1.01301 standard. (Y.T.D. is 1.01700.)
The variable cost variance for compound was ($25.8 M) with $42.1 M due to price and ($67.9 M) due to efficiency. The variance due to product mix was $10.3 M. The only major efficiency variance was ($32.0 M) for vinyzene SB-1 which is a result of an incorrect inventory in October and the use of vinyzene BP-5 (an equivalent, obsolete raw material). The IPA budget is based on SB-1; however, BP-5 is not pound per pound equivalent to SB-1. There were no major price variances for the month.
Dry Blend
Month
#'s/Day
Y.T.D.
Production, M Pounds Accounting Days
2,881 30
175 22,418 335
-5-
DTH 000021437
COMPOUND - (continued)
Dry Blend - (continued)
Dry Blend operated 16.5 days (based on 24 hour day) during November at an average rate of 175 M pounds per day. Production included 80172B, 80273G, 80274, 80174, and 90171. Dry Blend production was hindered by: product changes (11 changes, 10.1 hours), quality control (12.6 hours), putting up raw materials (7.1 hours), out of resin (5.3 hours), boxing limited (6.8 hours).
Quality performance for the month was 99.3% customer grade.
The raw material requirement for dry blend was 1.00056 pounds of raw material per pound of dry blend versus a standard of 1.00321. (Y.T.D. is 1.00421.)
The variable cost variance for dry blend was $49.0 M with ($0.6 M) due to price and $49.6 M due to efficiency. The variance due to product mix was $57.3 M. There were no major price or efficiency variances for the month.
Plasticizer
Month
#'s/Day
Y.T.D.
Production, M Pounds Accounting Days
922 64 30
9,074 335
Plasticizer operated 16 days during November at an average rate of 64 M pounds per day. Production included: D0P, 610P and DIDP.
VRP production totaled 107 M pounds (10.4%). Production was limited by: steam curtailment due to boiler revisions, safety disc changes (4) and Schenk filter maintenance.
The raw material requirement for plasticizer was 1.12481 pounds of raw materials per pound of plasticizer versus a 1.08233 standard. (Y.T.D. is 1.11123.)
The variable cost for plasticizer was ($52.3 M) with ($41.5 M) due to price and ($10.9 M) due to efficiency. Major price variances were: ($10.4 M) for Alfol 610, and ($18.0 M) for 2-ethylhexanol. There were no major efficiency variances.
The variance due to product mix was ($1.5 M).
General
Total customer grade compound inventory decreased from 6.0 to 4.8 MM pounds during November.
-6-
DTH 000021438
MECHANICAL - S. J. Vincent
Vinyl
There was one large reactor seal failure and one reactor condenser cleaned this month. The condenser cleaned was on the 743 reactor and the seal failure was on 741 reactor. Problems with the seal oil system was the cause of this seal failure. There were no reactor gearbox failures in this period.
In the vinyl old module, four seal failures and two overhauls occurred to pumps and comperssors. The seals replaced were on the "A" vacuum pump, the west VCM charge pump, the south sphere pump and the recovered VCM charge pump. The "B" recovery compressor and the reactor rinse pump were overhauled. There were no repairs in the vinyl new module.
Valves repaired or replaced in this period were the charge water valve on 743 reactor, D-600 dump valve, 742 main dump valve, D-500 dump valve and a new check valve was installed in the east charge water pump in the new module. Three loading hoses were replaced and the north Corken compressor was replaced with the spare compressor.
General repairs and projects completed in the vinyl production area involved the quench section of the incinerator inspection and the cleaning of the spray heads. A work platform was installed at the new module charge water filter. Both seal oil system pumps were replaced in the new module. Two safety lifting cages were fabricated and installed in the recovery area of both modules. Third pens were installed on three new module recorders; one remains to be done. The level and pressure transmitters were calibrated for the old module middle re ceiver. Several flowmeters were cleaned and repaired.
Repairs to vinyl drying equipment included the #2 Bird replacement and the spare bowl being overhauled. P.M. inspections were completed on the #2, #5 and #7 dryer trains, along with, minor repairs. Control panel wiring revisions were completed to dryer control sections.
Compound - Dry Blend - Plasticizer - and Silo Storage
Repairs to the compounding equipment involved a Line III shutdown to make re pairs to the "B" blender gearbox. With the unit down, the blender and mill vent hoods were cleaned and new sample ports were installed on the plasticizer charge lines. Also completed was repacking both blenders and repairing process leaks. The seals were changed three times on the FCM in this period.
Repairs to the Line I compounding equipment were to overhaul the #3 dicer and to build up a spare blender gearbox. The compound product star valve was overhauled, the compounding boxing hopper transfer line was revised and a manway installed for cleaning the hopper. Lockouts were also installed on the Line I breaker panel.
-7-
DTH 000021439
MECHANICAL - (continued)
Compound - Dry Blend - Plasticizer - and Silo Storage (continued) Major repairs in the dry blend unit were to overhaul "C" blender gearbox, re anchor the "B" and "D" gearboxes and repair chain guards. Some repairs were completed to the Orbitran controller and spares were checked. The only major repair in the plasticizer unit was to replace the phthalic anhydride charge pump seal. Utilities and Service There were some repairs to equipment in the pi ant air system in this period. The valves were repaired in #2 air compressor and the motor was rebuilt. The aftercoolers were repaired on the #5 and #7 compressor and the west heater replaced in the #3 air dryer. The new Joy air compressor motor was drawing high amps, so some tuning on the compressor controls was necessary to alleviate this problem. The propane vaporizers were test fired four times in this period with no problems. The #1 boiler was down to install the economizer and to wash tubes. Planner The Planner estimated 95 work orders and ordered material for 28 work order projects. There were 17 new invoice registers issued and 12 closed. There were 16 statements processed for payment. The Planner updated the Line III shutdown plan and worked with the Utility Supervisor to update the Utility Run Sheets.
-8-
DTH 000021440
MECHANICAL ENGINEERING - J. A. Dixon
AFE's Submitted, Approved, and Closed
The following AFE's were submitted and approved during November:
AFE No.
Title
Authorized
9750 9760 9770 9020
Rotary Dryer Insulation (Energy) Emergency AMS Kill System Reactor Pressure Relief Modifications Repairs to Line I Compounder
$ 22,000 335,000 560,000 38,000
Completion reports were issued for the following AFE during November:
AFE No.
Title
Authorized
9258
Dryer Operation Improvements
$315,000
There were no AFE's closed to field charges during November.
Design
Design work is in progress on the following projects:
- Fixed Point Monitor Data Computer & Warning Lights - Compressor & Vacuum Pump Seal Flush Revisions - Breathing Air Modifications - Spill Prevention Plasticizer Unloading Area - Crammer Feeder Access Platform - Sweco Installation - No. 4, 5 & 6 - Kemp Air Dryer Modifications - Fire Protection Improvements - Phase II - Multi grade Resin Production Facilities - Spare Inert Incinerator - Batch Water Stripping
AFE Activity
1. AFE 9519 - Critical Spare Equipment - J. P. Windham
Performance tests of the Colt-on transfer unit have been successful under some conditions and inconsistent under some conditions. Minor modifications and additional tests are scheduled for December.
-9-
DTH 000021441
MECHANICAL ENGINEERING - (continued)
AFE Activity (continued)
2. AFE 9689 - Diking of Sphere & Curbing of Drum Storage Areas - J. L. White
All exterior and interior walls are complete. Approximately 80% of the backfilling and grade work is complete.
3. AFE 9709 - Facilities for Multigrade Resin Production - S. Krause
Overall project design is 90% complete. Bids have been requested for piping, structural steel, and equipment setting. Foundation work is in progress.
4. AFE 9729 - Fire Protection Improvements - Phase II - M. Ingle
The design of this project is approximately 99% complete. Part Ipiping installation is nearly complete. Bids have been requested for part II piping, structural steel and equipment setting.
5. AFE 9739 - Methocel Charge Revisions - J. L. White
Construction is in progress and is scheduled to be operational in December.
6. AFE 9530 - Spare Incinerator - D. Haub
Piping isometrics are 75% complete. The concrete bid package is to be issued in December. Instrumentation drafting is in progress.
7. AFE 9580 - Boiler Economizers - J. L. White
All three economizers have been installed and are operational. Painting and insulation remain to be completed.
8. AFE 9590 - Critical Spare Equipment - J. P. McKee
Quotes have been requested from qualified vendors for construction of the spare reactor condenser.
9. AFE 9610 - API Clean Water Bypass - M. S. Richards
Sewer construction is in progress and the skimmer equipment has been set in place. Completion is scheduled for December.
-10-
DTH 000021442
MECHANICAL ENGINEERING - (continued)
AFE Activity (continued)
10. AFE 9630 - Water Stripping - M. Ingle
Overall project design is 85% complete. The construction of the founda tion and sewer is in progress.
11. AFE 9660 - Hot Water Charge Tank Replacement - J. P. McKee
Concrete work is complete. The piping and electrical contracts were let and work is in progress. This project is scheduled to be operational in December.
12. AFE 9680 - Fixed Point Monitor Data Computer & Warning Lights - R. B. Harned
Overall project design is 55% complete. A draft of the purchase contract has been submitted to the vendor. Projected delivery is sometime in February, 1981. Debugging of software in Ponca City will require approximately one month. Modifications of the Gas Chromatograph are being handled by MED/ISD.
13. AFE 9690 - Breathing Air Modifications - J. L. White Quotes have been requested for the air receiver and long lead items.
14. AFE 9720 - Reactor Agitator Replacement - M. S. Richards
The agitators have been placed on order. MED has been requested to study the feasibility of removing one of the eight reactor supports for more accessible placement of the agitators.
15. AFE 8395 - Interplace Communications - Phase II - R. B. Harned
The installation contract has been let and construction is scheduled to start in December. Equipment delivery is scheduled in January.
Construction - G. A. Morgan
Nine contracts were let during November. They were for:
1. Piping, Structural and Equipment Setting for Hot Water Charge Tank Replace ment.
2. Electrical Installation for Hot Water Charge Tank Replacement.
3. Piping, Structural and Instrumentation for Methocel Charge Improvements.
4. Installation of Phase II Interplant Communications.
-11-
f*TH 000021443
MECHANICAL ENGINEERING - (continued)
Construction - (continued) 5. Insulation of New Air Dryer. 6. Installation of Spill Containment Trench. 7. Insulation of Vinyl Rotary Dryers. 8. Extension of Main Plant Breakroom. 9. Phase III of Concrete Work and Underground Facilities for Plant Expansion. Twenty-seven (27) register tickets were issued during November.
-12-
DTH 000021444
1) Thru October, 1980 Actual Accounting 2) Thru November, 1980
ABnnnm-N Airriinuir.vnoNS km'okt
Aurii. Capital NO, MscRirnoN'
9237 Heated Plasticizer Addition System
D:\TF.
/Mini.
AITROVK!) Ai l-: AMT.
10/11/77 37,000
CD FINAL
i:xri:\H!:n comm mm Torn, i:st.
to inn.
PUL__ COST COMP.
UNPr.u tovuo \UTH. AMT.
1ST. LST. COMP. Cl.OS. inn: ill'll
Rl MARKS
13,135 15,494
37,000
0 12/80 3/81 Design in progress.
9143 Plasticizer Chemical Exposure Abatement
8/21/7S 152,000
143,863 145,203 145,203
6,797
9/80 12/80 Closed to field charges.
9519 9559
Critical Spare Equipment Color Weigh Room Modifications
2/6/79 4/19/79
175,000 25,000
107,874 18,552
161,480 19,443
163,000 25,000
12,000 0
12/80 3/81 Revisions in progress. 1/81 4/81 Revisions in progress.
9589 9609
Instrument Air Dryer Reactor Inert Vent System
5/30/79 6/28/78
110,000 90,000
90,134 13,483
95,229 17,895
110,000 90,000
0 12/80 3/81 Revisions in progress. 0 3/81 6/81 Project on hold.
9629 Air Compressor
7/9/79 340,000
263,856 276,730 340,000
0 3/81 6/81 Revisions in progress.
9639 Revisions to Emission Recovery System
7/12/79 100,000
62,991 73,359 100,000
0 12/80 3/81 Revisions in progress.
9649 Double Block Valves for VCM Charge 7/18/79 182,000
144,765 169,793 182,000
0 12/80 3/81 Project operational.
9669 New Air Header
8/15/79 25,000
17,423 18,566
25,000
0 12/80 3/81 Revisions in progress.
9689 Diking of Sphere & Curbing of Drum Storage Areas
9/15/79 170,U00
112,427 129,782 170,000
0 3/81 6/81 Construction in progress.
9699 Plant Dryer Debottlenecking
9709 Facilities for Multiple Grade Resin Production
9719 Aberdeen PVC Resin Expansion
9729 Fire Protection Improvements Phase II
9739 Methocel Charge Revision
9759 9510
Aberdeen PVC Resin Expansion
Miscellaneous Projects Under 110,000
9530 Spare Incinerator
9550 P.A. Handling Improvement
9560 Safety Equipment
9/15/79 9/20/79
80,000 870,000
6,775 43,740
24,615 337,145
80,000 870,000
9/10/79 10/1/79
850,000 490,000
11,421 23,062
824,900 172,846
850,000 490,000
10/3/79 66,000
12/10/79 11 ,150,0G0 1/3/80 150,000
8,814 35,369
66,000
1,582,079 5,430,600 11 ,150,000 102,514 126,359 150,000
1/23/80 3/3/80 3/12/80
650,000 63,000 25,000
2,659 25,352
1,854
221,552 33,914 7,843
650,000 63,000 25,000
0 3/81 6/81 Construction in progress. 0 3/81 6/81 Construction in progress.
0 8/81 4/81 Reactor vendor on strike. 0 6/81 9/81 Construction in progress.
0 2/81 5/81 Construction in progress. 0 9/81 12/81 Foundation work in progress. 0 12/80 3/81 Fifty-one projects approved.
0 6/81 9/81 Engineering in progress CEO. 0 2/81 5/81 Unloading line complete. 0 3/81 6/81 Smoke detection portion
complete.
9570 Replace T-100 P.A. Tank
3/27/80 119,000
9530 Boiler Economizers
3/26/80 140,000
9590 Critifcal Spare Equipment
3/26/80 59,000
9600 Calcium Stearate Addition System
4/2/80
84,000
9610 API Clean Water Bypass
4/15/80 23,000
9630 Water Stripping
4/30/80 810,000
9650 Miscellaneous Projects Under $10,000
5/3G/80 150,000
9660 Hot Water Charge Tank Replacement
6/4/30 160,000
9670 Laboratory Equipment
7/9/80
32,000
9680 Fixed Point Monitor Data Computer and Warning Lights
9/4/80 113,000
9690 Breathing Air Modifications
9/9/30
21,000
9700 Compound Fines & Streamers Removal 10/1/80 95,000
9710 Fire Protection - Phase III
10/14/30 385,000
9720 Reactor Agitator Replacement
10/14/30 420,000
9730 Compound Line III Debottlenecking 10/16/80 1 ,350,000
9740 Modifications to Make Profile Ory blend
10/27/80 200,000
57,877 62,311
44 0
4,665 15,671 68,216
62,366 119,000
138,767 140,000
11,486
59,000
420 84,000
16,682
23,000
220,244 810,000
127,838 150,000
1,606 1,063
0
115,364 30,533 9,683
160,000 32,000
113,000
0 0 21,000 0 0 95,000 0 0 335,000 0 190,890 420,000 0 0 1 ,350,000
0 o' 200,000
0 12/80 3/81 Project on hold. 0 12/80 3/81 Project operational. 0 12/80 3/81 Condenser quotes requested. 0 5/81 8/81 Engineering scheduled. 0 12/80 3/81 Sewer construction in progress 0 4/81 7/81 Sewer construction in progress 0 12/80 3/81 Forty-one projects approved.
0 2/81 5/81 Construction in progress. 0 12/80 3/81 Analyzer purchased. 0 9/81 12/81 Engineering in progress.
0 3/81 6/81 Engineering in progress. 0 10/81 1/82 Engineering scheduled. 0 10/81 1/82 Engineering sched.lcd CED. 0 10/81 1/82 Agitators on order. 0 10/81 1/82 Engineering scheduled. 0 10/31 1/82 Eng i neor i ng sc hod., 1 ed.
9750 Rotary Dryer Insulation (Energy)
11/10/80 22,000
0 27,391
27,391
( 5,301) 2/81 3/HI Contract let.
-13-
DTH 000021445
Ainu. Capital
NO.
description
ARHUDi-nN authorizations report
1DATE
Airni.
iapproved AM: amt.
U)
expended
to date
C)
committed
to n,\ it:
FINAL
TOTAL EST. COST COMP.
UNDER (OVER)
AUIH, AMT.
EST. 1ST.
COMP. CI.OS. DATE DATE
1REMARKS
9760 Emergency AMS Kill System
11/15/80 335,000
0 0 335,000
0 8/81 11/81 Engineering Scheduled.
9770 Reactor Pressure Relief Modifications 11/25/30 560,000
0 0 560,000
0 12/81 3/32 Engineering in progress.
8395 Interplant Communications - Phase II 1/22/S0 55,000
0 20,183
55,000
0 6/81 9/81 Construction in progress
Expense
9010 Centrifuge Rotor Repair
9/19/80 20,000
0 0 20,000
0 2/81 5/81 Repairs in progress.
9020 Repairs to Line I Compounder
11/24/80 38,000
0 0 38,000
0 11/81 2/82 Parts to be ordered.
-14-
DTH 000021446
PERSONNEL - J. L. Carter
EMPLOYMENT Charles A. Clark, Senior Drafter
TO/FROM LEAVE OF ABSENCE None.
TRANSFER/PROMPTION Darnell Perry, Compound Utility, transferred to Vinyl Utility.
RETIREMENT None.
TERMINATION Clarence Johnson, Compound Utility
OTHER During November there were 13 casual labor employee on payroll. Total hours worked were 2150.50.
-15-
DTH 000021447
CONOCO CHEMICALS Aberdeen, Mississippi
November 1980
MONTHLY PERSONNEL REPORT
Salaried Employees
79*
Minority Employees #
Hourly Employees Total Employees Employees (Hourly)
New Employees Terminations
155 234*
0 1
Salaried
Hourly
Total
Hourly Min. Hired % Min. Hired
Hourly Min. Term. % Min. Term.
0 Q 1 100%
6
58 64
DEPARTMENTS Warehouse Gen. Plant Maintenance Laboratory Compound Vinvl
PAR # EMPLOYEES MIN. EHP. . % MIN.
99
2 22%
10 11
4 36%
46 46
7 15%
22 20
3 15%
37 33
26 79%
32 32
13 40%
NEW HIRES YTD
00 0 !4: 00 00 00 00
TERM. YTD TURNOVER YTD
Q0
0
0
0 2 0 16.6%
0 0 __J2
D___
0 0 ___ Q _ _Q___
1 4** 3%
Q*
0 1 ___0_____ 31--
Plasticizer
5
4
3 75% 0 0 0 0 0 0
Number of Applicants:
Month
4
Year to Date
212
APPLICANT BREAKDOWN:
# Minority
0
% Minority
0
# Female
2
% Female
50%
*Includes three (3) temporary employees.
**Includes one (1) retirement and is not counted in turnover rates.
Hires (Hourly) :
Month
Q
Year to Date
4
Terminations (Hourly) :
Month
1_______ Year to Date
7**
Overall Turnover
.6%
Projected Annual Turnover 4.5%
-16-
000021448
dth
CfDT>
O
o
o
-s
-c*
Q7T --I (DCL 3
"5
03>
o o
CO --* --
3 cr
z 00
o CO
-5
4*CO 4* CO o o5-S
-L i-
OVERTIME AND ABSENTEEISM
DTH 000021449
PROCESS ENGINEERING - R. A. Frohreich
A. Expansion Project
The concrete package for the Fluid Bed Dryer Area was awarded during November. Field work is continuing in the V-ll and CRD reactor areas, slurry blend tank areasand silo area. A trip was made to Bird Machine Company to discuss operation of the centrifuges. Major pieces of the dryer package were received. Assistance was given to Litwin personnel who were in the plant for field work.
B. Resin Reclaim
A revised process design incorporating comments from CED and PED was issued. An AFE request was submitted in November.
C. Reactor Area Drum Storage
The process design to provide a curbed drum storage for each reactor area was issued.
D. Fuel Storage Tank Curbing
The design to curb the plant's fuel storage tanks was issued.
E. Line III Mill Temperature Control
A process design to install a new mill heating system is underway.
F. Emergency AMS Kill System
The AFE request for this project was submitted and approved.
G. Reactor Emergency Cooling System
The AFE request for the project was approved in November.
H. Reactor Agitator Replacement
The Class "A" design to replace the D-300 and D-400 reactors' agitators is being prepared.
I. Heat Recovery System
The AFE request for recovering heat from the V-ll centrate water and the batch water strippers (Part I) was submitted. The conomics were calculated for recovering heat from the V-10 centrate water (Part II).
-18-
DTH 000021450
PROCESS ENGINEERING - (continued)
J. Process Water Filter Replacement
Economics for replacing the process water filters with a different type filter to reduce filter replacement costs were calculated. Process Engineering is working with the Mechanical Group to reduce the capital costs of the project by installing vertical filters rather than horizontal ones.
K. VCM Tank Farm Revisions
The revised Class "A" design to add liquid detectors, a VCM knockout pot, and make other revisions to the VCM unloading area was issued.
L. Hot Water Charge Pump Problem
A report was issued on the hot water charge pump problem. The main problem appears to be improper suction piping.
M. High Level Alarms for Recovered VCM Receivers
The Class "A" design for this project has been completed.
N. Improved Rupture Disc Holders
The Class "A" design for this project is being prepared.
O. Cooling Tower Blowdown Bypass
The Class "A" design for this project is being prepared. This project will collect blowdown from all plant cooling towers (including the compound cooling tower) and send the water directly to No. 6 pond.
P. Sifter Overflow Reclaim
The Class "A" design for this project is being prepared.
Q. Normal Kill Addition System
The Class "A" design for this project is being prepared.
R. Dry Blend Production
Process Engineering is assisting Operations in increasing dry blend production rates. Observations to date indicate that problems with the weigh-up and transfer systems have been a significant cause of lower rates.
-19-
DTH 000021451
PROCESS ENGINEERING - (continued)
S. Rag Layer Reduction
Process Engineering is examining the possibility of eliminating carbon black from plasticizer production to reduce the rag layer and reduce disposal costs of the filter cake material.
T. Schenk Filter Start-Up
Process Engineering assisted Operations in starting up the Schenk filter and retraining the operators.
U. Irritant Reduction
The AFE request to reduce irritant by installation of submerged aerators in No. 4 pond and making modifications in the plasticizer waste water treatment system was submitted.
V. Line V Color Test Run
Process Engineering assisted operations in the test run to reduce color problems on Line V. Favorable results were obtained by adding filler later in the Wei ex cycle.
W. Reactor Slurry Residual VCM Testing
A slurry sampler has been fabricated and tested to sample slurry during reactor steam stripping. The slurry will be sampled and analyzed for residual VCM when the reactor is cooled to 180 F during the cooldown period of the steam stripping cycle.
-20-
DTH 000021452
ENVIRONMENTAL - V. E. Messick
Particulates
Two dryers were sampled for particulates in November and were within allowable 1imits.
Water
All effluent permaters were within NPDES limitations in November.
A sample for pesticides and PCB's which is required for the NPDES renewal permit was collected and sent for analysis. The permit application will be submitted upon receipt of the analysis.
Process Engineering assisted the waste water trailer in obtaining T-460 material for shock testing. The tests with the waste water trailer are nearing completion. The trailer is scheduled to leave the week of December 15.
VCM
The comprehensive survey of all VCM piping and equipment is nearing completion. Points with high VCM concentration have been reported to operations via the plant's Leak Detection and Elimination Plan for corrective action.
Hazardous Waste Management
The RCRA permit application for treatment, storage, and disposal of hazardous wastes was submitted. A report on the plant's compliance with RCRA was issued.
Other
Preparations are being made for the incompany environmental audit to be conducted in December.
Another vendor has been located to purchase the waste oil. The oil will be sold in December.
-21-
DTH 000021453
Flow GPM
Jan. - Ave. Max.
810 941
Feb. - Ave. Max.
645 802
Mar. - Ave. Max.
595 743
Apr. - Ave. 628 Max. 877
May - Ave.' 304 Max. 480
June - Ave. 670 Max. 804
July - Ave. 696 Max. 813
Aug. - Ave. 698 Max. 753
Sept. - Ave. 679 Max. 767
Oct. - Ave. 956 Max. 1066
Nov. - Ave. 1032 Max. 1076
Dec. - Ave. Max.
TABLE I
-WATER COMPLIANCE WITH
NPDES PERMIT PARAMETERS
BOD PPM LB./DY.
COD PPM LB./DY.
Sus. Solids PPM LB./DY.
43 131
436 1342
86 851 216 2214
11 103 13 143
6 42 8 56
29 220 36 314
21 147 30 232
15 116 24 171
66 502 95 828
54 378 67 519
10 79 13 125
11 74 14 94
12 86 13 129
16 69 32 184
6 49 11 84
53 197 74 426
40 316 51 367
10 40 14 81
12 98 15 145
14 112 19 145
7 56 9 70
5 42 7 64
9 110 17 217
16 196 33 390
39 322 78 597
32 270 42 380
22 168 27 248
27 316 45 576
28 347 45 531
11 88 14 no
15 126 24 187
7 44 14 89
7 78 11 119
11 131 23 272
Diss. O2
6.8-8.5 6.7-7.9 6.6-8.3
6.4-8.3
6.7-7.3 6.7-7.3 6.6-7.3 6.5-6.9 6.2-6.7 6.1-7.3 7.2-7.5
NPDES - Ave. Max.
32 387 43 520
1390 - 1940
_ 605 - 909
>6.0
ph 7.7-8.0 7.1-7.8 7.1-7.8
7.5-8.4 7.2-7.9 7.5-7.9 7.3-8.0 7.6-7.9 6.5-7.9 7.6-8.0 7.4-7.8
6.0-8.5
-22-
DTH 000021454
ENERGY CONSERVATION - V. L. Thornhill
I. Plant Operations
Total energy consumption for November was 113.4 MMM BTUs. The energy consumption per pound of product increased from 3066 BTU/lb. to 3193 BTU/lb.
II. Plant Energy Conservation Program
Steam Leaks
Nine (9) steam leaks were repaired in November.
Boiler Economizers
Installation of the third and final economizer was completed. Initial results indicate a total average heat recovery of 1.3 MM BTU per hour from the three units.
Energy Reporting
The third quarter energy performance report was issued in November. The plant showed an unadjusted energy savings of 23.6% compared to the 1972 base year.
-23-
DTH 000021455
ITEM
Production, MM Lbs.
Resin Dry Blend Compound Plasticizer
TOTAL
Natural Gas
Consumption, MSCF Conversion, BTU/SCF Energy Consumption, MMM BTU
Electricity
Consumption, MM KWH Conversion, BTU/KWH Energy Consumption, MMM BTU
Propane
Consumption, M Gal, Conversion, BTU/Gal. Energy Consumption, MMM BTU
Total
Energy Consumption, MMM BTU Energy Consumption , BTU/Lb.
Boiler Operating Data
No. 1 No. 2 No. 3
ENERGY CONSERVATION DATA 1979
NOVEMBER
1980
NOVEMBER
26.7 4.9 2.7 1 .1
35.5
28.0 2.9 3.6
1.0
35.5
55314 1020
56.420
59512
1020
60.702
4.9824 10000 49.824
5.2063
10000
52.065
3.5 92000
0.322
6.475 92000
0.596
106.566 3010
113.363 3193
Avg. Stack Temp.
1979
1980
395 285 417 290 421 269
Avg. % Excess Air
1979
1980
30 33 28 38 52 32
-24-
DTH 000021456
LABORATORY - R. D. Jackson
CUSTOMER COMPLAINTS Customer
Product
Complaint
Report By
Kaiser Aluminum
34641 Blk.
Undispersed Material
RDJ
WAIVERS RECEIVED
Date Identification
11/5 11/7 11/14 11/17
11/21 11/24 11/25 11/26 11/26
CPU CONX 45309 T-2220 CPU PLCX 43229 PLCX 43872 CPU PLCX 42672 PLCX 43220
Product
VRP 5385-3 5385-3 80273G 5385-3 5385-3 80172B 5385-3 5385-3
Customer
Heritage Charlotte Pipe Certain-Teed Air Products Carl on Charlotte Pipe Columbia Plastics Charlotte Pipe Can--Tex
Reason
Waived Jl___
Color
CJM
Particle Size ELK
Particle Size RDJ
Eq. Torque
JRW
Particle Size ELK
Particle Size ELK
Long Stability JRW
Particle Size ' CJM
Particle Size CJM
PRODUCT DEVELOPMENT & SERVICE
Sample Shipments
Ship Date
Product
11/5
5385-1 5425 5465
Amount (Lbs.)
5 5 5
Customer General Tire & Rubber Co.
Requested _i1
PCM
11/7
17461 Blk
50 Gama International
MFM
11/7
5385-1
50 Hal stab Company
MR
11/11
5385-1 5425
50 Uni royal Chemical 50
JLI
11/12
5385-3
5
Eslon Thermoplastics, Inc.
PCM
11/12
5305
50 Gossen Inc.
MR
11/17
NPD-1 Resin 10 Carlon
CJM
11/17
5385-1
2 P.C.I. Industries
PCM
11/17
5305
100 Conoco Inc.
TAT
11/17
5425
50
Fritz Air Freight (Export)
JPM
-25-
DTH 000021457
LABORATORY - (continued)
PRODUCT DEVELOPMENT & SERVICE (continued)
Amount
Ship Date
Product
(Lbs.)
11/17
38963 Wat. Cl. 200
38551 Nat.
200
Customer Grayline., Inc.
Requested By
MM
11/17
5305 5385-1
50 Crown Wire 50
NTH
11/17
38611 Nat.
50
Trio Products
JTW
11/18
5385-3
50 General Binding Corp.
MFM
11/18
5385-1
5X5 Crane Plastics
JTW
11/19
18031 Cl. Bl. 14331 Cl. Bl. 15041 Cl. Bl. 16851 Cl. Bl.
50 50 50 50
PMS
MED
COMPOUND DEVELOPMENT AND SERVICE
Special Compound Testing
Complete Western Electric specification tests were run on one lot of 34861 Gray 546 and on two lots of W.E. 536-C1 Gray 546. A limited number of tests were run on two more samples of 34861 Gray 546 and on one sample of 36861 Natural.
Oven aging tests were run on two shipments of 35851 Natural compound to PhelpsDodge.
New Compounds
Quality control specifications and standards were prepared for a new compound (35341) which was received under the experimental designation ADK 4184-99A.
Color Matching
A color match was prepared for 38551 Brown 5. The Quality Control Laboratory was supplied with the formula and a color standard.
Melt Flow Tests Melt flow tests were run on production samples of 18031 Cl. B1. 50 for Tenex.
-26-
DTH 000021458
LABORATORY - (continued)
QUALITY CONTROL TESTING
Resin
Regular Samples = 344 Bag Samples = 141 Other In-Process Samples = 3,666 Bulk Shipments = 201 (Railcars = 82; Trucks = 119)
Dry Blend (Rigid)
Blenders Produced = 309 Blenders Tested = 298 Blenders Adjusted = 8.4% Other In-Process Samples = 425 Bulk Shipments = 40 (Railcars = 4; Trucks = 36)
Compound (Flexible)
Blenders Produced = 462 Blenders Adjusted =4.5% Line V Production = 371 Skids; 32 Boxes Other In-Process Samples = 619 Bulk Shipments = 21 (Railcars = 4; Trucks = 17)
Resin Heat Stability
Thirty-seven (37) lots of resin were tested for oven heat stability.
5385 5425
5305 5465
16 lots 12 lots
6 lots 3 lots
All the samples were within specifications for heat stability.
RVCM of Shipments
A total of 124 shipment samples were tested for residual VCM in November. None of the samples exceeded 10 ppm. A summary of this data is below.
Product
5305 5385 5425 5465 Dry Blend
Number of Samples Avg. RVCM, ppm
48 48 16
4
1.3 1.2 0.1 0.1
8 0.4
-27-
DTH 000021459
LABORATORY - (continued)
QUALITY CONTROL TESTING (continued)
Inherent Viscosity
A total of 599 samples were analyzed in November. All railcar shipments and 5305 truck shipments were tested for inherent viscosity.
Raw Material Testing
Seventy-two (72) lots of plant raw materials were tested and approved for use. Several lots of SP-33 clay were rejected for giving low values for volume re sistivity. Apparently, Freeport Kaolin is encountering problems with starting up new calciners. Shipments of Hydrol 710 (hydrated alumina) continue to be spotty in dispersibility. Samples of Alcoa paper grade and Alu Chem AC-714 hydrated alumina were tested and found to disperse well; however, comments from Western Electric personnel indicate that they will not be approved in their compounds.
MISCELLANEOUS PROJECTS
Resin Volume Resistivity
Samples of 5425 and 5465 resin tested for volume resistivity gave values equivalent to the control resin.
Residual VCM in Slurry
A total of 667 slurry samples were tested for RVCM. The overall average was 163 ppm. There were no cases of the daily average exceeded 400 ppm.
RVCM of Blowdown Tanks
A total of 150 samples of blowdown tank water were tested for RVCM. The overall average was 1.7 ppm.
RVCM of 5305 Regular Samples
A total of 31 samples of 5305 taken from the regular Q.C. sample were tested for RVCM. The monthly average was 3.0 ppm.
Personnel Dosimetry
There were 146 analysis of VCM dosimeters reported to the Safety Department in November.
-28-
DTH 000021460
LABORATORY - (continued)
MISCELLANEOUS PROJECTS (continued)
L & N Particle Size Tester
A precision study was done on the L & N Microtrac Particle Size Tester in November. The short term precision was good at + 1% relative (for average particle size value) but the long term test results were unsatisfactory. In the long term (2 week) test samples run by 12 Q.C. Technicians showed relative variation to + 20%. A check by one operator using best known technique shows the long term reproducibility to be +3.5% relative. The factory representative reported that their long term study showed 3% relative error. Retraining and retesting of technicians precision is the next step toward optimum utilization of the L & N Microtrac.
-29-
DTH 000021461
TRANSPORTATION ---J. E. Stark
Shipment by Product - M/lbs.
November
Year-to-Date
Resin Plasticizer
Dry Blend Compound
Total
21420 80
2751 4705
. 28956
184884 809
24874 42363
252930
Number of Shipment by Mode R/C
O.T Bulk
O.T Van
Resin - Bulk
: Package
Export
Platicizer
Dry Blend - Bulk
- Package
- Export
Compound - Bulk
- Package
Export
Other
Antifreeze
A1umina
75 51
,,
.
3
2
11 14 '
87
Back Hauls for November__ _ i
67
Number of Shipment by Month--Year-to--Date
4 73
.3
11
19 7
..
11731
January February March April May June July August
SeDtember October
November
*.
R/C
104
111
130 69 42
55
57 79
102
128 87
Bulk
53 83 95 43 41 36 41 51 53 76 67
Van
72
66
64
84
75 136
52 65 62 107 117
C.O.T.
4
4
1
C.O.T. 0 0 1 0 0 0 0 0 0 1
4
C.C. TOFC
39
1. 2
2
2
'13
- '
,
59 0 2
C.C TOFC
42 21 4 37 0
50 30 70 20 12 0 72 43 0 59 0
CPU TOTAL
16 179 13 18
75
22
30 37
14 11
27
22 58
7
84 418 34
CPU TOTAL
36 273 35 320 48 375
29 230
30 191 74 308
64 222
89 296 53 279
116 471
84 418
-30- .
DTH 000021462
TRANSPORTATION - (continued)
Material Handling Report
M/Lbs.
T/L
Packaged Resin from Production Packaged Compound, Dry Blend from Prod. Transferred from Main to Prairie Transferred from Prairie to Prairie Reverse Transfer Resin to Plant Reverse Transfer Compound to Plant Shipment from Warehouses Special Packaging Transferred from Prairie to Main
TOTAL
5670 3483 4090
0 162
0 6764 3767 1417 25353
140 86 101
0 4 0 167 93
35 262
Off-Grade in Storage
Material
Sifter Overflow Resin "BC" Resin "H" Mills Scraps Compound "B" Compound "H" Dry Blend "O.G."
TOTAL
D. F. Operation
M/Lbs.
1073 2286
703 52
1077 137 271
5599
T/L
27 56 17
1 27
3 7 138
This month's inventory showed a gain of 2.3 MM lbs. of finished product. Export orders for the month were higher due to a 1000 MT order for Hooker. There were several compound and dry blend orders for export also.
-31-
DTH 000021463
LOCATION MAIN-East
TOTAL M SQ. FT.
48
Prairie 12-1 12-2
12-3
12 22
21
12-4 12-5
22 21
12-6
...
21
12-7 12-8 12-9 12-12
21 21 . 21 21
ABERDEEN WAREHOUSE
CONTENTS Compounds Dry Blend Export Resin Conoco Resin HDPE Dry Blend Res i n Export Resin Conoco Export Resin .
. 3-5 3
1-0 6
- -3 .2
4 -3
.4 3-4
Conoco Resin Resin O.G. Mill Scraps Cmpd 0. G. Dry Blend 0. G. Sifter Overflow Resin 0. G. Compound Resin Raw Material Resin 0. G. Conoco Resin
Conoco Resin Conoco Resin
4.4
1 1-4 _ -1 -
.8 9 1 2-8 2 3-4 .4-5 3.6
ESTIMATED MM POUNDS ON FLOOR OPEN TOTAL
.5-4 . -5
4-6 10.0 1-0 1.5
* 4.3
3.5
* 3-8 * 4.4
3.5 3.5
* 3.3
2.5
3.1 3.4 * 4.5
* 3.6
.4 3.5 1 3.5
3.5
3.5 3 3.5
Total
230
Sub-Total (Plug-Aisles)
Total Conoco -32-
42.0 3.9
36 3
9 6 45 9
DTH 000021464
ABERDEEN FIRST-AID CASES 12 MONTHS MOVING AVERAGE 50 45 40 35 30 25 20
15
10 5
0
DTH 000021465
ABERDEEN OSHA RECORDABLE INJURIES 12 MONTH MOVING AVERAGE
20
15
10
5
0 DTH 000021466
MONTHLY HOURLY TURNOVER
DTH 000021467
ENERGY USAGE
B TU /LB .
DTH 000021468
Monthly
12 Month Moving Average
ABERDEEN PLANT PRODUCTION 1980
MM POUNDS CUMULATIVE
35 30 25
20
15
6
5 4 3
2 1
6
5 4 3 2
1,
2
i:
0
----------- actual ----------- CUMULATIVE
DTH 000021469
ABERDEEN PLANT EFFICIENCY 1980
POUNDS OF RAW MATERIAL/POUND OF PRODUCT
DTH 000021470
ABERDEEN PLANT INVENTORIES
DTH 000021471
OFF GRADE
ABERDEEN PLANT QUALITY PERFORMANCE 1980
STANDARD 0.41
STANDARD 1.02 '
STANDARD 1.35
DTH 000021472