Document xj12YdZJKJOjqX6GZ27r5ek20
Author: MICHAEL R FORESMAN at MONCG16
Date:
5/15/96 9:37 AM
Priority: Normal
TO: MICHAEL A PIERLE at MONESHOl
Subject: Anniston
---------------------------------------------------------------------------- Message Contents
Mike:
Detailed below is a summary of the Anniston LRP and the proposed reserve increases. A detailed summary sheet is being faxed over as I didn't have time to get it into a computer data base. Litigation costs are not included in my estimate.
($k)
1996 1997 1998 1999 2000 2001 Total
Remediation Projects RCRA Projects
6575 5360 2940 280 200 90 15465 740 1325 1400 2450 2620 690 9135
Total
24600
Anniston Reserve Bal. 3/31/96 Est. expenditures 3/31-12/31/96 Est. reserve bal. 12/31/96
5931 5430 501
Reserve Supplement 4th.Qtr.96/lst.Qtr.97 Reserve Supplement 4th.Qtr.98/lst.Qtr.99
10,500 6,500
/D inoltASi&ht iv/f' Oyof~\,olr
^6
DSW 122832 STLCOPCB4032797
05/15/96 WED 08:46 FAX 314 694 6262
\.
MONSANTO-ESH
ANNISTON REMEDIATION ft RCRA
PROJECT ADMINISTRATION PROPERTY PURCHASE ENGINEERING
SL 2 is 7.0 4-t.o 3So
5
3 15 Boo So
A- Vm. IS (a 5 iqo I3oo So Zoo
i \s 25o So
.
447
.
2- 3
4- TVTAU
l 5 15 VP <o
Z-S o 2?o o
75o
So So So too
4 CoO 1 oo I5e>
44 3-0
O loo
o 0 O So
oi T#rA_ O 2LIS o 21 So So 75o
ENG. DESIGN (GOLDER) 4 o So loo loo 23 o 1 OO |o o |or \DO 4oo 3o< loo loo
o II40
BETHEL CHURCH WEST END LANDFILL SOUTH LANDFILL EAST SIDE DRAINAGE EAST SIDE REMEDY NORTH SIDE DRAINAGE
S
So
s 2.0 0 4-5 3oo Zo o mo o
7>*> l O l\o ISO So So Too 1 ooo 1 ftoo ns
Zo 3o So o
O
O 4<>o o
o
S' i Zo Soo l5oo
oD
ao
o 5o
O Soo |o o
25 2S5o
175 SoiJ l Oo
o Boo
\ 5oo \ OOO
O lo \o o lo
o
2o
lo lo o \o
O BSO
o 2l 5 lo 3530 \o 2.o\5 o l ooo 1 o W60
PLANT STORM SEWER SUB TOTAL RCRA
\oo d IS-LP iZoS \SSS
2.0 0 3 OO \ oo 1845 sns lc4-
\ oo \\2-o
oO 1435 12GS
to o 2 z to 1 o 53<>o 244 25 o Zoo 40
51o ISU5
GW MONITORING SYSTEM &5 zs \5~ ISO 34 o So
25 2-5 2 S 125 \ DO (oo loo loo 415
RFI ON-SITE RFI OFF-SITE CORRECTIVE ACTION SUB TOTAL
<c5
2.S
loo 25 o 3So Zoo 25-0 \So So (o5 3oo O o o 13
So 2So 2So 55 IdoO 3So o O 1*40
ZSe> 4-oo T4o 2-5 o
325
4-2$
32-5
2*>o" 25o Too SooO
1325 l4-t> 24s o
t<X> 4133'
TOTAL PROJECT
1885 133o \8t>S 22*15 'ISIS l24o
1445 23C.O 15=\o Ue5 434o Zl3o %Qlo G,4o 7.4400
-
STLCOPCB4032798
@002