Document xj12YdZJKJOjqX6GZ27r5ek20

Author: MICHAEL R FORESMAN at MONCG16 Date: 5/15/96 9:37 AM Priority: Normal TO: MICHAEL A PIERLE at MONESHOl Subject: Anniston ---------------------------------------------------------------------------- Message Contents Mike: Detailed below is a summary of the Anniston LRP and the proposed reserve increases. A detailed summary sheet is being faxed over as I didn't have time to get it into a computer data base. Litigation costs are not included in my estimate. ($k) 1996 1997 1998 1999 2000 2001 Total Remediation Projects RCRA Projects 6575 5360 2940 280 200 90 15465 740 1325 1400 2450 2620 690 9135 Total 24600 Anniston Reserve Bal. 3/31/96 Est. expenditures 3/31-12/31/96 Est. reserve bal. 12/31/96 5931 5430 501 Reserve Supplement 4th.Qtr.96/lst.Qtr.97 Reserve Supplement 4th.Qtr.98/lst.Qtr.99 10,500 6,500 /D inoltASi&ht iv/f' Oyof~\,olr ^6 DSW 122832 STLCOPCB4032797 05/15/96 WED 08:46 FAX 314 694 6262 \. MONSANTO-ESH ANNISTON REMEDIATION ft RCRA PROJECT ADMINISTRATION PROPERTY PURCHASE ENGINEERING SL 2 is 7.0 4-t.o 3So 5 3 15 Boo So A- Vm. IS (a 5 iqo I3oo So Zoo i \s 25o So . 447 . 2- 3 4- TVTAU l 5 15 VP <o Z-S o 2?o o 75o So So So too 4 CoO 1 oo I5e> 44 3-0 O loo o 0 O So oi T#rA_ O 2LIS o 21 So So 75o ENG. DESIGN (GOLDER) 4 o So loo loo 23 o 1 OO |o o |or \DO 4oo 3o< loo loo o II40 BETHEL CHURCH WEST END LANDFILL SOUTH LANDFILL EAST SIDE DRAINAGE EAST SIDE REMEDY NORTH SIDE DRAINAGE S So s 2.0 0 4-5 3oo Zo o mo o 7>*> l O l\o ISO So So Too 1 ooo 1 ftoo ns Zo 3o So o O O 4<>o o o S' i Zo Soo l5oo oD ao o 5o O Soo |o o 25 2S5o 175 SoiJ l Oo o Boo \ 5oo \ OOO O lo \o o lo o 2o lo lo o \o O BSO o 2l 5 lo 3530 \o 2.o\5 o l ooo 1 o W60 PLANT STORM SEWER SUB TOTAL RCRA \oo d IS-LP iZoS \SSS 2.0 0 3 OO \ oo 1845 sns lc4- \ oo \\2-o oO 1435 12GS to o 2 z to 1 o 53<>o 244 25 o Zoo 40 51o ISU5 GW MONITORING SYSTEM &5 zs \5~ ISO 34 o So 25 2-5 2 S 125 \ DO (oo loo loo 415 RFI ON-SITE RFI OFF-SITE CORRECTIVE ACTION SUB TOTAL <c5 2.S loo 25 o 3So Zoo 25-0 \So So (o5 3oo O o o 13 So 2So 2So 55 IdoO 3So o O 1*40 ZSe> 4-oo T4o 2-5 o 325 4-2$ 32-5 2*>o" 25o Too SooO 1325 l4-t> 24s o t<X> 4133' TOTAL PROJECT 1885 133o \8t>S 22*15 'ISIS l24o 1445 23C.O 15=\o Ue5 434o Zl3o %Qlo G,4o 7.4400 - STLCOPCB4032798 @002