The following are points of Aroclor vapor losses within Dept. 246.
Source
.1 Drowning Jet stack
Estimated Loss 0.l#/day
2. Fume removal stack
Unknown
3- Vacuum Jets (6) 4. Thermlnol furnace
Unknown Unknown
5. Storage tanks (9) 6. Tank car loading (2)
0.5#/day 0.25#/day
7. Trailer loading (l) 8. Finished product tanks (4)
0.25#/day <0.l#/day
9- Blend tanks (2) 10. Surge tanks (2)
c0.l#/day < 0.l#/day
11. #6, #7, #8 chlorlnator sampling points
Unknown
12. Mix tanks (3)
0.25#/day
13- Intermediate storage tank
0.1#/day