FILE NAME: Powhatan (PHN) DATE: 1965 DOC#: PHN019 DOCUMENT DESCRIPTION: Govt Inspection Reports
DIVISION 0? OCCUPATIONAL HEALTH INVESTIGATION R SERVICE
Dato 1 i.ov 1965
fient Powhatan Mining Co*
P.H. Engineer
dre3S
6721 Windsor Mill Ed. Baitimore
B.3.S.
lan Visits
Code"No. M 10
T75T
03
Employees p 2 T 12
PURPOSE
REASON
PERSON TO RECEIVE REPORT
1
______ Survey
2 _____ Reinspection
1 _____ Self Initiated 2 O.D. Report
Mr Fred A. Mott
3 .__ Investigation 4 - Study
Complaint - Request 3 _____Management
PERSONS. INTERVIEWED
5 * Follow-Up
4 ___ Labor.
Same'
..
6 _Consultation
5 Neighbors
7
______ Special Act6ivities ______ Health OffMirceSari Smith
Supt.
8 _____Project Activities 7
______ Other
RECO&SNDATIQNS REGARDING ENVIRON!ENTAL PRQBLE-S
New Problems . '* . None
Reauested Improvement * *
\ Code Persons
Sanitation Asbestos
Not Completed 0 Field Studies
..
Poq^isei+.od Tnrnmwnsnt
T MB installed, showers in process Barger to wear respirator. Withdraw as
adequate ventilation present.
*cp>
- 0
i 1
*\'
.. -Onda__ P^T-5nrq
10 1
.
*
Remarks
Code ' Persons "
Samples submitted for analysis
Memo x
Plant Record
Lotto r/Rapert
No. 0
'
\ V
-`r. * ^-r -V
&ext V isit /,7
Reviewed 7____ . ^
JrldM-
?owhataa Mining Company
Follow-up
A new Kelso dust collector and separator system has been installed to collect dust at top and bottom ox primary crusher and at elevator boot fro/n primary crusher. There was no dust at all at any of the above three places. Very little noise here*
There are nov; two baggers and both have exhaust lines in back of the bagger funnel. Ro. 1 bagger at which screened asbestos is bagged had air velocities at top of bag of lpO to 200* per minute. At a home made wooden open faced hood affair^ over the weigh scales, air velocities are 100 to 125*. This hood just installed this year ;)<> to catch any dust that might be raised if asbes tos is removed or added.to the bag. It takes eight minutes to fill a 100 lb. bag at the bagger.
A similar -exhaust line at bagger and hood .over scales has been installed at' No. 2 bagger .which bags unscreened asbestos. Not ,in operation this AM.
Acid washing of the asbestos is still dene outside then the wet asbe3t.os is carried into a small building for water washing and pressing under a hand press to eliminate the water and is then steam dried. This purified asbestos is then screened and packed by a man wearing a Dustfoe respirator. While the atmosphere seemed clear, judging by the dust on the floor, some of the fine asbestos escapes the exhaust hood; Air velocities at the hood.were 100 to 125* per minute. There is also a 6" flex hose which can be placed any place in the room and is used to clean up the fine asbestos.
Sanitation
A toilet and U and WB have been installed in the small building. A concrete block-addition with roof and-windows has been completed and work is progress-* ing toward installation of two showers. lockers are to be installed.
Medical
'
.
Mr. Smith said that x-rays are done every six months by both the mobile unit arid county health.
Mr. Mett and Smith both accompanied me on the tour. Mr. Kett says he is think ing 'of moving to North Carolina where the mineral comes from.
Recommendations
None - no correspondence