Document xLm9ygq7xM906kOb8J5Xao0b
SAFETY & HOUSEKEEPING PLANT INSPECTION
1981
(
PLAINTIFF'S EXHIBIT
MONSANTO CHEMICAL INTERMEDIATES COMPANY
TEXAS CITY
sc ,7sa?
STG 1083988
COMPANY CONFIDENTIAL
LAM025942
TO: THE 1981 PLANT INSPECTION COMMITTEE
Welcome to the Texas City plant. We look forward to sharing with you our experiences, philosophies, and approach to safety. These inspec tions provide us an opportunity to obtain an unbiased assessment of our effectiveness in managing safety.
Our emphasis in Texas City is not on statistics, but on incidents. We have continued to focus on ALL incidents to try to determine root cause and take corrective action. We strongly be1'eve that if we are respon sive in taking corrective action to prevent recurrence of these, the statistics will take care of themselves. We also encourage safety sug gestions through our unit and craft safety suggestion log books. We are committed to responding to and providing feedback on each of these. We are finding that more and more of these suggestions are being taken care of at the unit level as they should be.
You will hear more about our safety programs during our presentations; however, there are a few points I would like to make. Based on a detailed analysis of our safety organization, training, and emphasis, we feel that the key elements are in place. Our current thrust is on emphasizing basic safety principles and attitudes with the objective of improving the quality and followup on safety programs plantwide. We are concerned by an increase in both the number and seriousness of our incidents in 1981 and are trying to find the right combination that will turn this around.
As a special emphasis of this inspection, we would very much appreciate it if, during your tour of our facilities, you talk to as many of our wage and first-line supervision as possible. This is "where it all happens" and we would like your help in assessing how this group perceives our safety procedures, programs and, most importantly, our commitment. Also, please test the level of knowledge and understanding of our safety related procedures. During the feedback session, we encourage you to be candid with us and "tell it like it is" in this as well as all other areas.
We hope your visit with us will be helpful, informative, and enjoyable. We are proud of our people and our facilities and look forward to intro ducing them to you.
Sincerely,
G. L. Tromblee Plant Manager
SC 17688
STG 1083989
LAM025943
1981 INSPECTION TEAM
NEEDHAM COPPEDGE, Chairman Plant Manager Columbia, Tennessee Plant
). R. "JIM" LOVE
Project Engineering Superintendent J. F. Queeny Plant, St. Louis
Q
MICHAEL E. WHELAN
Plantwide E & I Supervisor W. G. Krummrich Plant, St. Louis
JOHN R. ZELLE
Manufacturing Supervisor W. G. Krummrich Plant, St. Louis
SC 17689
ST6 1083990
LAM025944
PLANT MANAGER'S SAFETY BOARD
W.G.Juhl PT Director
G.T. Ryan supt. Mfg.
G. A. Danner Supt. Plant Serv.
S. G. Pappas Energy Coordinator
J. G. Trafton Supt. Mfg.
B. C. Lancaster CED Site Supt.
D. W. Metten Supt. Acctg.
G.W.Daues Supt. Mfg.
O. E. Kaldenberg Supt. Personnel
C. F. Navarrete Supt. Mfg.
G. E. Small Mgr. Proc. Engr. CED
C. M. McCullough Plant Engineer
SC 17690
LAM025945
1083991
SAFETY & HOUSEKEEPING ACTION COMMITTEE (SHAC)
K. E. Bretz Mfg: Supv.
). L. Carothers Engr. Spec.
J. A. Glass Supt., LP&S
j.). McClellan Chairman Mfg. Supt.
J. M. Gatewood Maint. Supt.
K. D. Oden Group Supv.
SC 17691
John Stone Safety Engr.--CED
STG 1083992
LAM025946
SAFETY ADVISORY ACTION COMMITTEE (SAC)
G.W?Daues Chairman Supt. Mfg.
D. E. Kaldenberg Supt. Personnel
C. F. Navarrete Supt. Mfg.
S. G. Pappas Energy Coordinator
SC 17692
ST6 1083995
LAM025947
PROCESS TECHNOLOGY SAFETY COMMITTEE
P. D. Johnson
Linda Lewis
David Truitt Chairman
Wen-Chin Liao
R. L. Long
W. H. Temple
SC 17693
STG 108399%
LAM025948
HOURLY SAFETY COMMITTEE
W. E. Bean Chairman ]uly-Dec.
Insulator
). M. Burkhalter Pipefitter
Jessie Butler Chairman Jan.-May
Prod. Foreman
L. E. Derrick III Pumper-Gauger
E. L. Doty Operator
Austin Gates Chairman May & June
Laborer
Vivian Hargrove Operator
C.O. Jackson Operator
J. H. Martin Operator
A. E. Mofley Operator
Ruby Mosley Janitor
C. R. Richardson Operator
M. A. Riddle Safety Engineer
SC 17694
R. L. Sartain Boilermaker
STG 1083995
U/VI025949
OFFICE SAFETY COMMITTEE
Vtr~-
Dorothy Bibby PT-AN
Ernestine Chuoke ESTERS-MICC
Marilyn Decker PT-MEOH/HOAC
Quirino Escamilla PT-STYRENE
R.T. Hammann Safety
Fay Hogg Material Handling
Sue Lessa Chairman July-Dee
Maintenance
L. K. Salles MISD
P. H.Siems Maintenance
A. R. Sorensen PT-AN
Loretta Thomas Engineering
T. W. Triplett Accounting
Peggy Wansbrough Chairman Jan-July
Prod. Control
Betty White ESTERS-MICC
J.E. Williamson Plant Security
Kathryn Woodard Stores
SC 17695
*Te l083"6 LAM025950
ACCOUNTING SAFETY COMMITTEE
H. C. Hughes Chairman
SC 17696
ST6 1083997
LAM025951
sc 17697 ST6 1083998
UM025952
i Monsanto
l Texas City I I A SAFER PLACE TO I WORK BECAUSE OF ME I l l l l
j i
LAM025953
GENERAL INFORMATION
PLANT LOCATION
The plant is located at the southeast corner of Texas City. Total plant area is 358 acres of which 243 are in use for manufacturing. This total acreage includes 80 acres northeast of Texas City in the Amburn Tract, 18 acres south of the plant at Swan Lake, and 18 acres of peripheral property adjacent to the plant. The Amburn Tract property is the site of our fire training area and a lagoon used to decant river mud from the plant water treating clarifier. The Swan Lake property is used for nonhazardous waste disposal.
ORGANIZATION
Manufacturing Operations at Texas City are administered by the Chemical Intermediates Company, which operates seven manufacturing units plus site utilities and environmental control operations. The Industrial Chemicals Company is guest operator of six manufacturing units.
Other Manufacturing functions at Texas City include MISO, Accounting, Personnel, Plant Engineering and Plant Services. The Personnel depart ment includes a medical dispensary and industrial hygiene laboratory. Plant Engineering includes instrument, electrical, and mechanical mainte nance and project construction groups with a large central shop facility, as well as plant security and off-shift supervisory personnel. Plant Services includes purchasing, stores, production planning and scheduling, and material handling functions, an engineering design group for plant projects, and a materials/mechanical technology group responsible for fabrication and rotating equipment specification as well as inspection of existing equipment. The plant also operates a Control Laboratory for process and product analyses.
Process Technology at Texas City includes a major laboratory and engineer ing center which supports product line oprations and capital projects and provides process and analytical technology development as well as business planning guidance. Styrene and acetic acid licensing are also administered through the Process Technology department.
Corporate Engineering at Texas City Includes a process engineering group which supports Chemical Intermediates capital project development and a construction group which executes CED projects at the plant.
Other staff functions at Texas City include Marketing and Patent offices.
SC 17699
STG 1084000
LAM025954
EMPLOYMENT
The plant employs 1697 people in the following classifications:
Wage Salaried:
Manufacturing, Exempt Non-exempt
Process Technology, Exempt Non-exempt
Corporate Engineering, Exempt Non-exempt
Marketing/Patent, Exempt Non-exempt
Total
969
372 136
126 61
21 2
5 5
1697
Plant operating and craft wage personnel are represented by the Texas City, Texas, Metal Trades Council, an association of thirteen craft and operating unions. Cafeteria workers are representef by Local 347, International Union of Operating Engineers, AFL-CIO. Security guards are represented by the Associated Guards of the United States.
MAJOR PRODUCTS
The major finished products of the plant are as follows:
CHEMICAL INTERMEDIATES COMPANY
Styrene Monomer used for plastics, synthetic rubber, and surface coating materials.
High Density Pol ethylene used in the plastics industry as film, wire coating and molding material. This unit is expected to operate until 1983 under contract to Cities Service.
Methanol used in the production of anti-freeze, formalde hyde and acetic acid.
Acetic Acid used in making cellulose acetate and vinyl acetate monomer, and for fiber and agricultural production.
Acetone Cyanohydrin used for manufacturing polymethyl methacrylate plastic.
Acrylonitrile used for fibers, nylon and structural plastics.
SC 17700
STG 1084001
LAM025955
INDUSTRIAL CHEMICALS COMPANY
Synthetic Lactic Acid used in the food industry as a preservative.
Phthalic Anhydride used in plasticizers, polyesters, alkyd resins, dyes and pharmaceuticals.
Phthalate Esters used in food-grade plastics, floor tile, film, fabrics, and adhesives.
Oxo-Alcohol used in manufacture of phthalate esters.
Tertiary Butyl amine (TBA) used as intermediate for the rubber and tire industry.
TEXAS CITY PLANT HISTORY
1941 ... Thirty-acre tract purchased under auspices of Defense Plant Corporation.
1942 ... Construction started on Styrene monomer unit and supporting Ethylene units.
1946 ... Plant purchased by Monsanto from United States Government.
1947 ... Ship explosions in harbor completely destroyed plant; recon struction of Styrene and Ethylene units started immediately.
1951 ... Construction begun on Acrylonitrile, Hydrogen Cyanide, and Vinyl Chloride monomer units plus supporting Oxygen and Acetylene units.
1952 ... Started up Oxygen, Acetylene, Hydrogen Cyanide, Acrylonitrile and Vinyl Chloride monomer units.
1954 ... Construction begun on Methanol and low density Polyethylene units plus high-purity Ethylene units.
1955 ... Started up TBA unit.
1956 ... Construction begun on new Ethylene units.
1957 ... Started up new Ethylene unit.
1959 ... Tract of 68 acres adjacent to plant acquired and filled by dredging for future plant expansion.
1962 ... Construction begun on high density Polyethylene unit.
1963 ... Started up Lactic Acid unit.
SC 17701
ST6 1084002
LAM025956
1969 ... 22 acres adjacent to south side of plant acquired for new
deep-water docking facility and product storage area. Construction started on new Methanol and Acetic Acid units. Construction begun on Phthalic Anhydride and Esters units. 1970 ... Started up new Methanol, Acetic Acid, and Esters units. Acetylene, Acrylonitrile, Vinyl Acetate and old Methanol units shut down and dismantled. Construction begun on Oxo-alcohol and new Styrene units.
1971 ... Started up EVCL unit. Started up Phthalic Anhydride and Oxo-alcohol units.
1972 ... Part of low density Polyethylene shut down. Started up new Styrene unit. Started up new primary waste water treatment.
1973 ... Signed contract for secondary waste water treatment at Gulf Coast Waste Disposal Authority (GCWDA) regional treatment facility.
1974 ... Started up new Ethylbenzene unit. Construction begun on new Acrylonitrile unit. EVCL unit shut down.
1975 ... Construction started on Acetone Cyanohydrin unit. Low density Polyethylene unit shut down and dismantling started. Started up GCWDA secondary treatment facility.
1976 ... Acetone Cyanohydrin started up. Low density Polyethylene dismantling complete.
1977 ... Started up new Acrylonitrile unit. Hydrogen Cyanide unit shut down.
1978 ... Chrome-Zinc removal project completed. Storm water diversion project completed.
SC 17702
STG 108*003
LAM025957
1979 ... Major energy conservation project completed. Boiler fuel conversion project completed.
1980 ... Acrylonitrile Exposure Reduction project completed. Ethylene plant shut down, dismantling. Started up GCWDA regional disposal facility for hazardous solid waste.
1981 ... Evaluation of coal utilization. Benzene Exposure Reduction project completed. Benzene pipeline from Shell and Exxon put on line. 8.7 acres south of plant leased. C02 line from Air Products to Methanol completed.
1982 MAJOR PROJECTS
AN conversion to Nitto catalyst. Demonstration of phthalic anhydride energy conservation and debottlenecking projects. Install packing in EB/SM splitter column. Start-up of IDA II.
SC 17703
STC 108*004
LAM025958
W .f.. JL'HI
PROCESS TFCHNOLOflr *
OIWECTOH
W .H . STANTON DISTING UISHED
* FELLOW
*
2
&D
C
a:
WJ
*fftt
*
a
<
cru.
e
2 C-"T~2o?
2*
S
a>oUaL
2c
X
Uab2J
nI>T-
foftt_
ff*tt
SC 17704
e
ft ---aor>t*rc/i*ywr?z i*/>caa<oji:5.f-. *t*
x
^a
ft Q7* *fftt
ft r ft
c ir
c
iJ
STG 1084005
i /u\nn9RQR9
V
*r
f*t
-MNp<,iA'.0f- ( ijSI *
- --------------------- --
I
|___
*
*
r,.
l
vrn
*
.
s
* uSiI'
ACT
T
Process Technology Department
Texas C ity A u g u s t, 1981
^nj ,s. .v\
piRQp ftmr-m
STG 1084006
LAM025960
SC 17705
MONSANTO CHEMICAL INTERMEDIATES COMPANY MANUFACTURING DEPARTMENT TEXAS CITY TE*AS JULr 15 19A1
i
4*!
SC 17706 ST6 1084007
LAM025961
6cock Plow
SAFETY IN FO R M A TIO N
SC 17707 STG 1084008
LAM025962
afety graining and
Accident
Reduction Techniques
Correction
I I
Commitment
Motivation STG 1084009
i Prevention !
I
l
Training
1 Identification
Communication
SC 17708
LAM025963
J^onsanto for
Safety and JJealth April 1981
SC 17709 LAM025964
OMMUNI CAT I ON
c u PGRADES
LANT
FACE-TO-FACE COMMUNICATION:
AFETY
s WARENESS
A F EOR
MPLOYEES
IN ONE-ON-ONE SAFETY MEETINGS BETWEEN ALL EMPLOYEES AND THEIR IMMEDIATE SUPERVISOR
EMPLOYEES WILL RECEIVE:
MONSANTO SAFETY POLICY CERTIFICATE COFFEE CUP OPPORTUNITY TO DISCUSS SAFETY IN PRIVATE WITH THEIR SUPERVISOR
OVERALL THEME:
COMMUNICATION OF INDIVIDUAL, SUPERVISOR AND TEAM RESPONSIBILITY FOR SAFETY
sc 17710
$TG 1084011
LAM025965
Monsanto, Texas City
Safety Organization
POLICY FORMULATIONS
& DECISIONS
SC 17711
STG 1084012
LAM025966
PLANT MANAGER
33 GROUPS 150 MEMBERS
supv/hourly opn's/maint
8 MEMBERS
PLANTWIDE
hourly
INPUT
4 hEMJERS
LABS AND BENCH UNITS
9 MEMBERS
OFFICE WORKERS
SC 17712
STC 1084013
LAM025967
TEXAS CITY SAFETY PHILOSOPHY
WHERE SAFETY STARTS
<^A/{onano <zSafzt\j ^PoUcjj
.Safety is a primary responsibility of cstry employs at the Qtexos City
Plant
Che company recognises its obligation to proaibe e&rry rmploye a safe aub hraltMul place in fuhicb to bark. Co this enb, curry reasonable effort toil! be mob* in tlje interest at acribent preumtion, fire protection anb health peesemation. <AH employees are obligateb to perform their assigneb buties safely by follotoing establishrb safe barking praccbmes, using proper safety equipment, aub by reporting anb correcting unsafe acts or conbitians.
s* 2^__ ^
TEXAS CITY SAFETY POLICY This policy covers all employees at the Texas City plant. All of the plant organizations-- line, staff and formal safety-oriented organizations--are designed to fulfill the spirit and the letter of this policy.
ROLE OF MANAGEMENT AND THE INDIVIDUAL - Management Is fully respon sible for initiating and admi
nistering an effective safety program. Each employee must fully accept the responsibility for his safety and that of his co-workers by conscientiously observing safe work practices and cultivating safe working habits in himself and his fellow workers. Thus, the manage ment and the individual workers are mutually involved in a continuing effort to eliminate acts and conditions which could lead to accidents, fires, or to be injurious to the health of anyone. The Plant Manager, although responsible for the entire safety program, assigns respon sibilities for the administration of program details.
SC 17713
STG 100*01*
LAM025968
SAFETY TRAINING
A KEY ELEMENT IN ALL JOB TRAINING - Safety training is an integral part of job training, and as such. Is
the responsibility of the supervisory staff. Job training Is incomplete unless It considers and properly addresses the hazards of the job. Unless a way has been developed to do a job and do it safely, the plans for the job and the training of the employees to perform the job Is Incomplete. In addition to the on-the-job safety training, plantwide safety training programs are conducted. They are the responsibility of the Safety and Housekeeping Action Committee (SHAC); however, joint accountability for the effective plant training program Is shared by the Loss Prevention and Safety Department.
SAFETY PERFORMANCE
INJURY STATISTICS - Injury and illness rates In specific categories are developed on a plantwide basis and are broken
down by department, crafts or operating areas to provide indicators of safety performance in large and small work groups throughout the plant. These safety statistics are developed and plotted on a weekly, monthly and annual basis to show the responsible supervisors where their area performance stands in relation to their own history and to plantwide performance goals. Plant safety goals are established by general management for the plant as a whole.
SAFETY PERFORMANCE REVIEW AND CONTROL - Injury and illness records are reviewed weekly, monthly,
quarterly and annually in every review of overall plant performance at every level. Significant deviations require explanation as to cause and appropriate corrective or preventive actions. The greater the deviation from expected performance, the higher in the organization the deviation will be reviewed.
SUMMARY
At Texas City, safety is an integral part of our everyday work. Job training is not complete until the person performing the work knows how to do the job safely. Work planning is not complete until the safety considerations are satisfied. Work execution requires prior review of the possible hazards and necessary actions required to meet them safely. Safety performance is a primary consideration in the evaluation by supervisors of employee job performance. Safety perfor mance is reviewed at regular Intervals along with all other aspects of the job or work in progress. All employees are involved in safety considerations in the work place. Safety performance Is reviewed by management at every level and is a key element in judging managerial performance and control. Safety is not a thing apart. It is an integral part of our way of doing business.
SC 17714
jTG 108*015
LA/VI025969
INJURY RATES/CCASES) RECORDABLE, LOST WORKDAY, AND DAYS AWAY
5 - YEAR COMPARISON AUGUST 1981
3.5 ---------------------------- ---------------------------- ---------------------------- ---------
3.0
INJURY RATE INJURIES PER 2 0 0 ,0 0 0 M A N - HOURS-
STG 1084016
1977
RECORDABLE RATE
1978
1979
LOST WORKDAY RATE
SC 17715
1980
DAYS AWAY RATE
1981
LAIVI025970
m
1880 INSPECTIO N STATUS
SC 17716
ft STC 1084017
LAM025971
1980 MCI SAFETY AND HOUSEKEEPING INSPECTION TEXAS CITY PLANT
SEPTEMBER 23 THRU 25, 1980
RECOMMENDED FOR FURTHER CONSIDERATION
1. Two departments, 35P, 954, had 30-40% of their relief valve tests overdue.
STATUS:
Dept. 35P--All relief valves which were on the delinquent list of 1/81 were checked during the major shutdown in 2/81. This department is currently in good shape in relief valve testing.
Dept. 954--Relief valve program was updated and all
valve inspections are up-to-date. A problem exists with the reporting system' that is currently used for this department. Many relief valves are spares
and are not checked until prior to being put in service. These show up as delinquent on the status report. Work is under way to correct this
situation.
2. Although the "breaking into" procedure is being followed, we do have a concern relative to the optional use of a special work permit in the plant. For example, the HCN, phthalic anhydride, AN and PE polymerization units required special work permits and other departments did not. This can lead to confusion among the mechanics relative to whether a per mit is required for work in a given department.
STATUS:
PMSB decision on 7/23/80 that work permits be used on a unit or job option basis. This was recon sidered by SAC and discussed with operating and maintenance supervisors. On 11/11/80, SAC recon firmed that the 7/23/80 PMSB decision should not be changed.
3. The fire protection systems for Docks 3,4 and 5 did not
include "monitor coverage" or a readily available fire water supply. We understand that an evaluation is under way to improve the protection.
STATUS:
Meetings were held with Safety and the final report with recommendations will be issued by R.T. Hammann by October 1, 1981.
4. In our discussion with contractors, they had an apparent healthy attitude relative to their safety responsibility but had trouble recalling what action they should take if they heard a fire alarm or an evacuation signal.
SC 17717
STG 1084018
LAM025972
1980 MCI Safety and Housekeeping Inspection Texas City Plant--September 23 thru 25, 1980 Page 2
STATUS:
Extra effort in communications has been under way. Heavy emphasis on this is included in safety training. Contractors were issued plant fire code stickers which attach to safety hats. A video tape is being prepared by Capital Projects for use with contract personnel in learning plant safety practices.
5. Some of our conversations, particularly in the Maintenance Department, indicated that personnel may not be getting full value out of your safety meetings. Most of the mechanics that we talked to were confused about the content of the last meeting.
STATUS:
In order to provide for more informal craft safety meetings that promote better participation and interest, we have changed our system to alternate each month between the regular total craft safety meeting and the decentralized zone/area meetings.
6. We endorse the program under way for respiratory protection and the individual respirator quantitative fit program that will be implemented shortly.
STATUS:
Extensive quantitative respirator fit testing was completed early this year. Measurements were made on a total of 719 people within the last year.
7. We do have a concern about the reliability of the breathing air system and what appears to be the lack of an automated alarming device to alert personnel of the problem. Otherwise, this system is an excellent one.
STATUS:
The breathing air system is presently monitored utilizing a continuous analyzer. All units are notified directly from personnel in the Utility
Department if an alarm sounds indicating con tamination in the breathing air system.
Work is now under way on a project that will result in a completely new and isolated system for the breathing air system. This project is expected to be completed in October. The new system will be one of the best in the industry.
8. The Monsanto Industrial Emergency Care Attendants are an important well-trained group. Better identification of the personnel in the group and publication of their availability on shifts could provide more prompt response and care until the ambulance arrives.
SC 17718
STG 108*019 LAM025973
1980 MCI Safety and Housekeeping Inspection Texas City Plant--September 23 thru 25, 1980 Page 3
STATUS:
Signs have been installed at appropriate locations throughout the plant. These signs not only designate that Emergency Care Attendants are in the area but also list the names of those attendants.
STATUS OF FOLLOW-UP ON RECOMMENDATIONS OF THE 1980 INSPECTION TEAM
1. Where oxygen cylinders are stored with acetylene or other flammable gas cylinders, install approved barriers to isolate the oxygen.
STATUS:
These cylinders are stored in the same dock at Stores but not together. A safety rule we follow for oxygen cylinders and other oxidizers is as follows:
Oxygen cylinders in storage shall be separated from fuel gas cylinders or combustible materials a minimum distance of 20 feet or by a non-combustible barrier of at least 5 feet high having a fire resistance rating of at least one-half hour.
Since there isn't enough room at the present cylinder dock to build a barrier and the oxygen cylinders are stored 20 feet away from the flammable gas cylinders, no action has been taken. This conforms to 0SHA Standards.
2. Audit the storage of flammables in the control labora tory to insure the use of proper containers and storage areas.
STATUS:
Flammable storage cabinet was installed. Retained samples, some of which are flammable, are stored in refrigerator and wooden shelves at ambient temperature. A new refrigerator has been installed for storage of these retained
samples.
3. Consider instituting a procedure that requires the installation of a fire extinguisher on all mobile equip ment .
SC 17719
ST6 1084020
LAM025974
1980 MCI Safety and Housekeeping Inspection Texas City Plant--September 23 thru 25, 1980 Page 4
STATUS: This is standard procedure and mobile equipment is now equipped with extinguishers.
4. Fully communicate the hose inspection and testing proce dure to ensure compliance.
STATUS:
Action Plan--SHAC prepared a bulletin board announcement. Objective: Plantwide compliance to be confirmed by First Quarter 1981 Guest Housekeeping Inspections.
This was done. Publicity being repeated in third quarter 1981.
5. Consider expanding the training for hourly personnel (particularly mechanics) to imprne their knowledge of the hazards and handling precautions for the toxic materials that they work with.
STATUS:
Plantwide craft safety training has been con ducted on AN burn hazards and NSI hazards. In addition, the new MICS system has process
hazards information as a part of work data on the CRT. This is available for all craftsmen.
6. Reemphasize the lockout procedure to insure full compliance.
STATUS:
Action Plan--All departments reviewed lockout procedure for compliance. In addition, we identified some conditions that require special attention (i.e., when maintenance removes lock before work is completed--shift change).
/br
SC 17720
STG 1084021
LAM025975
T O U R G UIDE
SC 17721
STG 1084022
LAM025976
TOUR GUIDES
Chairman N.Coppedge
J.Love
First Day:
TUESDAY A.M. - October 13
Methanol; Acetic Acid; Acrylonitrile
McClellan
Stone
TUESDAY P.M. - October 13
Gatewood
Zone 1 Office; EthylbenzeneStyrene; Control Lab; Material Handling Office; Docks; Primary Treatment - North 68 Storage; Electric Shop; Stores
McClellan
M.Whalen Oden Carothers
J.Zelle Bretz Oden
Second Day:
WEDNESDAY A.M. - October 14
Shops; Garage; Water Treating; Power 2; Hydrogen Cyanide Complex
WEDNESDAY P.M. - October 14
AN Loading Rack; Warehouses; Zone 2 Office; CED Office & Shops; Capital Projects Area Lactic Acid; Oxo-AlcoholEsters; Phthalic Anhydride; Polyethylene facilities; West Gate; South 22 Storage
Carothers Bretz
Gatewood Oden
McClellan
Stone
Stone
McClellan
Third Day:
THURSDAY A.M. - October 15
Personnel Building; LockersSafety Supply; Main Gate; Cafeteria; Dispensary; Fire Station; Office Annex; Main Office; Research Buildings
McClellan
Carothers
Bretz
SC 17722
Gatewood
STG 1084023
LAM025977
SC 17723
ST6 1084024
LAM025978
SITE MAP
SC 17724
STG 1084025
LAM025979
SC 17725 1064026
LAM025980
INSPECTION TOUR SCHEDULE
FIRST DAY: TUESDAY. OCTOBER 13
Arrive Texas City (Personnel Building Training Room) Coffee and Rolls Inspectors Meet Staff
8:00 a.m.
PRESENTATIONS
1. Overall Texas City Safety Program
J. A. Glass (Arnold) Loss Prevention & Safety Supt.
2. Plant Manager's Safety Board (PMSB) and Safety Advisory Committee (SAC)
G. W. Daues (Greg) Supt. of Mfg., Polyethylene
3. Safety and Housekeeping Action Committee (SHAC)
J. J. McClellan (Joe) Mfg. Supt., HCN Complex
4. Plant Manager's Comments
G. L. Tromblee (Gene) Plant Manager
5. Inspection Kickoff
K. D. Oden (Ken) Group Supv., Process Technology
6. Discussion
Distribution of Safety Equipment
Coffee Break
8:25 a.in. Minutes
10
10
10
5 5
10
15
BEGIN INSPECTION
SC 17726
9:30 a.m.
STG 1084027
LAM025981
Tuesday, October 13, cont'd
Page 2
DEPTS. 44-45-56 METHANOL
9:30 a.m.
Methanol, CO, and H? are produced by steam reforming of natural gas and COg. CO and are^used in the production of oxy-alcohol and acetic acid.
Val Bolton Irvin Cole Don Carter Craig Johnson
(Coppedge, McClellan) (Love, Stone) (Whalen, Oden) (Zelle, Bretz)
COFFEE BREAK (Acetic Acid)
10:00 a.m.
DEPT. 50 ACETIC ACID
10:15 a.m.
Acetic acid is produced from carbonylation of methanol. This area includes catalyst preparation and product distillation facilities.
Byron Johnson Frank Weis Bobby Moore Yankee Wilson
.
(Coppedge, McClellan) (Love, Stone) (Whalen, Oden) (Zelle, Bretz)
SC 17727
STG 1084028
LAM025982
Tuesday, October 13, cont'd
Page 3
DEPT. 51 ACRYLONITRILE
10:45 a.m.
Two reactor trains and a single purification train are used to produce acrylo nitrile and hydrogen cyanide as a by-product. Ammonia and propylene are used as raw materials.
M. T. Devore Don Rosson Loyd Archer Hap Ferguson
(Coppedge, McClellan) (Love, Stone) (Whalen, Oden) (Zelle, Bretz)
CARS to MAIN OFFICE
11:45 3 fn
CAFETERIA CONFERENCE ROOM (Tray Lunch)
12:00 p.m.
CARS to ZONE I OFFICE
12:30 p rn
ZONE I OFFICE
12:35 p ni
Offices and conference room used by maintenance personnel for styrene process.
Sam West Rodie Santarelli Jimmy Gibbs J. W. Paschal
(Coppedge, Gatewood) (Love, McClellan)
(Whalen, Carothers) (Zelle, Oden)
SC 17728
STS 1084029 I AIVin7RQft3
Tuesday, October 13, cont'd
Page 4
DEPT. 15 DEHYDROGENATION
12:45 p.m.
Synthesis area for dehydrogenation of ethylbenzene to crude styrene.
Allen Lamb Hugo Darden Earl Moore George Bryan
(Coppedge, Gatewood) (Love, McClellan) (Whalen, Carothers) (Zelle, Oden)
DEPTS. 14-16 STYRENE - EB DISTILLATION
Dept. 14 - Ethylbenzene purification facilities Dept. 16 - Styrene purification facilities
Louis Rooks Larry Young Allen Lamb Jim Gore
(Cappedge, Gatewood) (Love, McClellan) (Whalen, Carothers) (Zelle, Oden)
1:05 p.m.
SC 17729
STG 1084030
LAM025984
Tuesday, October 13, cont'd
Page 5
DEPT. 13 ALKYLATION
1:35 pm
Ethylbenzene is produced by the reaction of benzene with ethylene in the presence of an aluminum chloride-organic catalyst complex.
Morgan Holder Roger Lubojasky Carroll Smith Rudy Willis
(Coppedge, Gatewood) (Love, McClellan) (Whalen, Carotners) (Zelle, Oden)
CONTROL LABORATORY
1*55 p.m.
Laboratory facilities needed to conduct required analyses for production and shipment of petrochemicals from Texas City plant.
John Kilfoy Myrna White Fay Johnson Wilma Elgamal
(Coppedge, Gatewood) (Love, McClellan) (Whalen, Carothers) (Zelle, Oden)
COFFEE BREAK (Material Handling Office)
SC 17730
2:15 p.m. STG 1064031
LAM025985
Tuesday, October 13, cont'd
Page 6
MATERIAL HANDLING OFFICE BUILDING
2:35 p.m.
Offices for supervision of distribution operation, materials handling foreman and clerk.
Grace Warren Joe Cantrell Glen Vogtman
Frank Bales
(Coppedge, Gatewood) (Love, McClellan) (Whalen, Carothers) (Zelle, Oden)
BARGE & SHIP DOCKS (1,2,3,4,5)
2:45 p.m.
Barge and ship loading/unloading facilities for raw materials, products, used at and produced by Texas City plant.
(Pick up Cars)
Tom Hartnett Mike Westmoreland Daye Glass Dante Paganucci
(Coppedge, Gatewood) (Love, McClellan) (Whalen, Carothers) (Zelle,Oden)
PRIMARY TREATMENT, AMMONIA TANK, NORTH 68
3:25 p.m.
Facilities for primary treatment of all plant aqueous waste streams. Ammonia storage tank provides raw material for AN manufacturing facilities at Texas City and Chocolate Bayou.
Gene Sprock Dan Moore Bill Wooley Jack Hutchison
(Coppedge, Gatewood) (Love, McClellan) (Whalen, Carothers) (Zelle, Oden)
SC 17731
STG 1084032
LAM025986
Tuesday, October 13, cont'd
Page 7
ELECTRIC SHOP
3:50 p.m.
Consists of central shop facilities and offices for power distribution, electrical maintenance and maintenance engineering personnel.
Mat Mathison
(Coppedge, Gatewood) (Love, McClellan) (Whalen, Carothers) (Zelle, Oden)
STORES
4:00 p.m.
Stores include the shipping and receiving docks, storage bins of inventory items, and offices.
Tom Crump Terry Grubbs John Catching Kathryn Woodard
(Coppedge, Gatewood) (Love, McClellan) (Whalen, Carothers) (Zelle, Oden)
END of FIRST DAY of INSPECTION
SC 17732
STG 1084033 LAM025987
SC 17733 STG 1084034
LAM025988
SECOND DAY: WEDNESDAY, OCTOBER 14
Page 1
SHOPS BUILDING
8:10 a.m.
Central Shops consists of facilities for pipe fabrication and plate and exchanger, machine, and paint shops. . Building also includes training rooms and various maintenance office.
Howard Jackson Bill Recknor Joe Haskovec Andy Devris
(Coppedge, Carothers) (Love, Gatewood) (Whalen, McClellan) (Zelle, Stone)
HOURLY SAFETY COMMITTEE PRESENTATION COFFEE BREAK (Shops Building, 2nd Floor)
9:10 a.m.
SOUTH MAINTENANCE BUILDINGS, INSTRUMENT SHOP 4 GARAGE
9:25 a.m.
Building includes carpenter-insulator shop, instrument department shop, field maintenance offices, and garage facilities.
Art Rich Jack Goodson Raymond Guidry Sherman Jones
(Coppedge, Carothers) (Love, Gatewood) (Whalen, McClellan) (Zelle, Stone)
Sam Scarcella - Instrument Shop
SC 17734 STG 1084035 LAM025989
Wednesday, October 14, Cont'd
Page 2
WATER TREATING - PLANT AIR
10:05 a.m.
Treatment of raw Brazos River water for plant use and generation facilities for breathing, instrument, and general plant air.
Dan Bowers Jim Uptmor Harry Mercantel George Orum
(Coppedge, Carothers) (Love, Gatewood) (Whalen, McClellan) (Zelle, Stone)
POWER 2
10:20 a.m.
Facilities for steam generation and boiler feed water treatment.
Nick Monroe Donis Shotwell George Orum Harry Mercantel
(Coppedge, Carothers) (Love, Gatewood) (Whalen, McClellan) (Zelle, Stone)
SC 17735
STG 1084036
LAM025990
Wednesday, October 14, Cont'd
Page 3
DEPTS. 19-25-27-29 (HCN-TBA-LN-ACY)
10:30 a.m.
Manufacturing facilities for tertiary butylamine, lactic acid, and acetone cyanohydrin.
Jasper Jennings Bill Taylor Mike Sweeny Janet Townsend
(Coppedge, Carothers) (Love, Gatewood) (Whalen, McClellan)
(Zelle, Stone)
CAFETERIA CONFERENCE ROOM (Tray Lunch)
11:15 a.m.
AN LOADING RACK
11:45 a.m.
Rail car handling facilities for acetic: acid, methanol, TBA, sulfuric acia. IBY, and ACH.
Conrad Berg Jerry Hudspeth Rusty Wilson Charlie Loney
(Coppedge, Bretz) (Love, Oden) (Whalen, Stone) (Zelle, McClellan)
SC 17736
STG 1084037
LAM025991
Wednesday, October 14, Cont'd
Page 4
WAREHOUSE A-B-C
12:05 p.m.
Three warehouses containing spare parts, valves, hoses, electrical cable, flamable liquids, paints, insulation supplies, sample bottles, etc.
Tom Crump Terry Grubbs John Catching Kathryn Woodard
(Coppedge, Bretz) (Love, Oden) (Whalen, Stone) (Zelle, McClellan)
ZONE 2 OFFICE Offices for west plant maintenance personnel.
Jack Richards Charles McClanahan Alvin Berry Andy Kuehl
(Coppedge, Bretz) (Love, Oden) (Whalen, Stone) (Zelle, McClellan)
12:20 p.m.
sc 17737
STC 1084038
LAM025992
Wednesday, October 14, Cont'd
Page 5
CED OFFICES & SHOPS
12:35 p.m.
Offices, warehouses, and shops for Central Engineering Department.
Bill Nappier George Lavayen Jeff Peterson
(Coppedge, Bretz) (Love, Oden) (Whalen, Stone) (Zelle, McClellan)
CAPITAL PROJECTS AREA
12:55 p.m.
Area includes offices, a shop and fabrication area, and tool room.
Ben Arnold Calvin Wills
Gino Inman David Spence
(Coppedge, Bretz) (Love, Oden) (Whalen, Stone) (Zelle, McClellan)
SC 17738
LAM025993
STc 1084039
Wednesday, October 14, Cont'd
Page 6
DEPT. 33 LACTIC ACID
1:15 p.m.
Manufacturing facilities for pharmaceutical grade lactic acid from lactonitrile.
George Williamson Rodger Roulette George Chesnut Lester Congor
(Coppedge, Bretz) (Love, Oden) (Whalen, Stone) (Zelle, McClellan)
DEPT. 48-56 0X0-ALC0H0L - PHTHALATE ESTERS
1:35 p.m.
Oxo-alcohol area uses CO + H~ blend gas and olefins as raw materials. Phthalic anhydride and oxo-afcohol are used to manufacture phthalate ester.
Jose Gaviria J. T. Shipley Norbert Novak Vernon Fields
(Coppedge, Bretz) (Love, Oden) (Whalen, Stone) (Zelle, McClellan)
SC 17739
STG 1084040
LAM025994
Wednesday, October 14, Cont'd
Page 7
DEPT. 53 PHTHALIC ANHYDRIDE
2:10 p.m.
Manufacturing process which uses BASF technology to convert air and ortho xylene to phthalic anhydride.
Steve Monel a Jeff Soley 01af Omenson Carl Richardson
(Coppedge, Bretz) (Love,' Oden) (Whalen, Stone) (Zelle, McClellan)
COFFEE BREAK (Polyethylene Conf Rm)
2:30 p.m.
POLYETHYLENE CONTROL LAB
2,55 p.m.
Laboratory facilities for providing analytical data for the production of HDPE.
Roland Williams Tommy Stewart Mary Ann Moore Joe Alessi
(Coppedge, Bretz) (Love, Oden) (Whalen, Stone) (Zelle, McClellan)
sc 17740
STC 1084041
LAM025995
Wednesday, October 14, Cont'd
Page 3
DEPT 35F POLYETHYLENE
3:05 p.m.
Manufacturing area that converts HDPE powder from the polymerization unit into finished product pellets.
Ray Burkett Gerald Berry Ken Gore Judge Hadley
(Coppedge, Bretz) (Love, Oden) (Whalen, Stone) (Zelle, McClellan)
DEPT. 35P POLYETHYLENE
3:25 p.m.
Manufacturing process which converts ethylene to solid high density poly ethylene via a Ziegler catalyst polymerization.
Riley Townsend John Townsend Wendell Youngdoff Leroy Vornkahl
(Coppedge, Bretz)
(Love, Oden) (Zelle, McClellan) (Whalen, Stone)
Sc 17741
STS 1084042
LAM025996
Wednesday, October 14, Cont'd
Page 9
HIGH DENSITY POLYETHYLENE PACKOUT & WAREHOUSING/BULK LOADING
3:50 p.m.
Packaging, storage, and loading facilities for high density polyethylene product.
Ralph Anderson Hy Treaccar Tom Hartnett Ben Munday
(Coppedge, Bretz) (Love, Oden) (Whalen, Stone) (Zelle, McClellan)
WEST GATE
4:05 p.m.
Major plant entry gate with facilities for producing employee identification cards.
Fred Herzog Martha Ray
(Coppedge, Bretz) (Love, Oden) (Whalen, Stone) (Zelle, McClellan)
SC 17742
STG 1084043
LAM025997
Wednesday, October 14, Cont'd
Page 10
LOCKER BUILDING
4:15 p.m.
Building contains lockers, showers, and dressing rooms for employees.
Weldon Nonnenmacher Louis Decker Gordon Dillon Steve Lawless
(Coppedge, Bretz) (Love, Oden) (Whalen, Stone) (Zelle, McClellan)
SOUTH 22 (in Cars) END of SECOND DAY of INSPECTION
4:25 p.m.
SC 17743
ST6 1084044 I & M09KQQQ
INSPECTION
Sc 17744 STG 1084045
LAM025999
PERSONNEL BUILDING
THIRD DAY: THURSDAY. OCTOBER 15
Group A Inspectors: Coppedge, Love
Page 1 8:00 a.m.
Building contains personnel offices, training facilities and a video tape lab.
Nancy Wilbanks 61enda Meisetschlaeger
(Coppedge, McClellan) (Love, Carothers)
LOCKER BUILDING NO. 1 & SAFETY SUPPLY
8:20 a.m.
Building houses separate lockers, showers, and changing rooms as well as the safety supply store.
Ken Milner Gordon Dillon
(Coppedge, McClellan) (Love, Carothers)
SC 17745
LAM026000
STG 1084046
Thursday, October 15, Cont'd
Page 2
RECEPTION OFFICE & GUARD HOUSE
8:40 a.m.
Major plant entry gate with offices for locksmith, supervisors, and plant receptionist.
Glendora Hill Fred Herzog
(Coppedge, McClellan) (Love, Carothers)
FIRE STATION
9:00 a.m.
Two buildings which house the Texas City plant's fire fighting facilities.
Jim White Ham Hamilton
(Coppedge, McClellan) (Love, Carothers)
SC 17746
STG 1084047
LAM026001
Thursday, October 15, Cont'd
Page 3
PROCESS TECHNOLOGY SAFETY COMMITTEE PRESENTATION OFFICE SAFETY COMMITTEE PRESENTATION COFFEE BREAK (Cafeteria Conference Room)
9:30 a.m.
DISPENSARY
10:00 a.m.
Provides facilities for emergency first aid and for monitoring employee health.
Betty Culbreth, RN Tony Ozarchuk
(Coppedge, McClellan) (Love, Carothers)
CAFETERIA
Main plant cafeteria.
Adele McCoy Laverne Chandler
10:10 a.m.
(Coppedge, McClellan) (Love, Carothers)
SC 17747
LAM026002
STS 1084048
Thursday, October 15, Cont'd
Page 4
MAIN OFFICE (2nd and 3rd floors)
10:20 a.m.
Main office building for manufacturing, distribution, environmental, safety, and marketing personnel.
2nd Floor: 3rd Floor:
Betty White Evelyn Harrison Honda Garza Bea Soto
(Coppedge, McClellan) (Love, Carothers) (Coppedge, McClellan) (Love, Carothers)
RESEARCH NO. 1
10:45 a.m.
This building houses analytical labs and bench scale reactor systems.
Dave Truitt Ernie Dupuis
(Coppedge, McClellan) (Love, Carothers)
SC 17748
LAM026003
STS 1084049
Thursday, October 15, Cont'd
Page 5
OFFICE ANNEX (1st floor)
Group B Inspectors: Whalen, Zelle
8:00 a.m.
First floor of this building contains, offices, technical library,and computer room.
Jim Sheehan Mary Caban
(Whalen, Bretz) (Zelle, Gatewood)
OFFICE ANNEX (2nd floor)
8:30 a.m.
This floor contains office facilities for accounting, mechanical & materials technology, MIS department with computer facilities.
Stella Martinez Lois Standley
(Whalen, Bretz) (Zelle, Gatewood)
SC 17749
LAM026004
ST6 1084050
Thursday, October 15, Cont'd
Page 6
FIRE STATION
9:00 a.m.
Two buildings which house the Texas City plant's fire fighting facilities.
Jim White Ham Hamilton
(Whalen, Bretz) (Zelle, Gatewood)
PROCESS TECHNOLOGY SAFETY COMMITTEE PRESENTATION OFFICE SAFETY COMMITTEE PRESENTATION COFFEE BREAK (Cafeteria Conference Room)
9:30 a.m.
RESEARCH NO. 2
10:00 a.m.
The AN, styrene, and ARMS bench scale reactor systems are operated in this building. The analytical Instrument development department is located upstairs.
John Thorman Lee Owens
(Whalen, Bretz) (Zelle, Gatewood)
SC 17750
LAM026005
I STG 1084051
Thursday, October 15, Cont'd
Page 7
RESEARCH NO. 3
10:30 a.m.
This building houses the offices for the ARMS personnel with crafts and main tenance offices and shops located on the first floor.
John Thorman Lee Owens
(Whalen, Bretz) (Zelle, Gatewood)
Group A & B Inspectors
CAFETERIA CONFERENCE ROOM (Committee Caucus)
11:15 p.m.
CAFETERIA CONFERENCE ROOM (Seated Lunch)
12:15 p.m.
RESEARCH 2 CONFERENCE: ROOM Committee Report to Expanded Staff
1:00 p.m.
END Of INSPECTION
2:00 p.m.
SC 17751
STG 1084052 LAM026006
NOTES
SC 17752
LA A/1026007
ST6 1084053
SC 17753
STG 1084054
LAM026008