Document xL0ozg6B9pdYYpq1rR73x2DG

plaintiff-sexhibit BOND-364 March 13, 1975 TO: Julius Nemeth Brunswick, Ohio FROM: Henry Ruby Toms River, Mew Jersey Dear Julius: c The air sampling test was made by the mixer while making a mix of Ready-Mixed Joint Cement at the time he dropped in the asbestos and while it was being mixed in with the other ingredients. The dust collection unit was operating but I don't remember as to whether or not the vibrator was running. When the #2 line is running, they shut off the air to the vibrator because it deprives the #2 line of its required air. However I usually put the vibrator on at 4:PM and let it run until I leave. Thanks & regards BON - 00940