Document xK96692per97N7MX4VME2e6m
DOW U.S. AREA CONSOLIDATE AUDIT PROGRAM
POWER II PLANT LOUISIANA DIVISION
ACTION PLAN
OCCUPATIONAL HEALTH AUDIT
ACTION ITEM
DUE DATE/STATUS
GENERAL INDUSTRIAL HYGIENE
1. Move the coffee pot in the warehouse.
Patot Daigle COMPLETE
2.1992 Report.
Marty Morrison
COMPLETE
GENERAL MEDICAL
1. PROCEDURE - Contact medical when an employee transfers into the block.
Marty Morrison, Gervey Smith 12/31/93 `i
RESPIRATOR PROTECTION
1. Update written respirator plan.
Marty Morrison
2. Conduct monitoring for ceramic fibers. Marty Morrison Include monitoring results in written report.Marty Morrison
3. Add monthly SCBA inspection to C-9. Gervey Smith
VENTILATION
12/1/93
11/15/93 5/94
COMPLETE
1. Document weekly check of lab fume hood. Marty Morrison COMPLETE
2. Evaluate sandblast cabinet for cyclone/dust collector.Patot Daigle-12/31
3. Post additional signs in warehouse associated with the type of welding rods used..
Marty Morrison
11/30
ASBESTOS
1. Move the packing material to the designated storage area and dispose of any
unnecessary packing.
Patot Daigle
10/31
2. Put a line on the floor designating the boundary of the storage area and move the
"Do Not Sweep" sign to the floor.
Patot Daigle COMPLETE
DO A 117544 CONFIDENTIAL
ACTION PLAN (cont.)
REACTIVE CHEMICALS AUDIT
ACTION ITEM
DUE DATE/STATUS
1. Establish a procedure to purge the generators of air to 2% oxygen before reintroducing
hydrogen.
Ronnie Daigle
COMPLETE
2. Review/amend disposal of fuel gas filters.Marty Morrison 11/15
3. Determine if syngas/fuel gas condensate are compatible with each other during upsets.
David Geoffroy
11/30
CHEMICAL EXPOSURE INDEX(CEI)
ACTION ITEM
DUE DATE/STATUS
1. Conduct 1 emergency drill simulating an in-block chlorine release at least once per year.
Gervey Smith
12/31/93
HAZARDOUS MATERIAL TRANSPORTATION REVIEW(HMTR)
ACTION ITEM
DUE DATE/STATUS
1. Give Hazcom training concerningchlorine.Marty Morrison COMPLETE
2. Give "First Alert" Training concerning chlorine cylinders. Bruce Cooper,Marty Morrison
12/31/93
SAFETY AUDIT
ACTION ITEM
DUE DATE/STATUS
EMPLOYEE TRAINING
1. Set goals for taking IPT modules. All
COMPLETE
2. Schedule the writing and answers for IPTs.Tommy Rozas 12/31/93
ACCIDENT/INCIDENT INVESTIGATION AND REPORTING
1. Become familiar with the "root cause" process. Gervey Smith 11/30/93
2. Track accident/incident data to determine needs for special emphasis.
David Geoffroy, Gervey Smith
COMPLETE
DO A 117545 CONFIDENTIAL.
ACTION PLAN (cont.)
SAFETY AUDIT(cont.)
ACTION ITEM
DUE DATE/STATUS
SAFETY SUGGESTION SYSTEM
1. Consider implementing a safety suggestion program separate from the use of unsafe
condition report form.
Gervey Smith
COMPLETE
AWARD/RECOGNITION SYSTEM
1. Re-evaluate the award program to encourage participation by more people.
Gervey Smith
11/1/93
CONTRACTOR SAFETY
1. Develop checklist that documents the pre-job safety conferences including small
jobs.
Patot Daigle, Gervey Smith
11/30/93
OFF THE JOB SAFETY
1. Develop a form that will track off-the-job safety. David Geoffroy, Gervey Smith
11/30/93
COMMUNICATIONS
1. Audit all forms of operational communications to insure their effectiveness.
Tommy Rozas
12/31/93
AUDITS
1. Promote the cross-audit practice. Gervey Smith
COMPLETE
SAFE WORK PRACTICES
1. Establish guidelines and timetables for training operators on the 401 job procedures.
Tommy Rozas
Done on a yearly bases and
will be completed in 1993.
2. Consider a documentation process to insure that all affected people stay up to date
on changes in procedures.
Tommy Rozas
11/30/93
DO A 117546 CONFIDENTIAL
ACTION PLAN (cont.)
ELECTRICAL RELIABILITY AUDIT
ACTION ITEM
DUE DATE/STATUS
Note: Bruce Cooper will follow up on electrical items.
1. Evaluate the need to rehabilitate the terminal enclosures, sandblast and paint
MP-1000(A & B).
12/31/93
2. Evaluate the need to rehabilitate the terminal enclosures, sandblast and paint
P2-1 Syn Bus PT enclosure.
12/31/93
3. Update grounding grid drawings to "as built". Show missing grounding wells as
grounding rods.
11/30/93
4. Replace the broken well cover.
11/30/93
5. Reseal terminal connections.
11/30/93
6. Repair/rehabilitate grounding wells having covers partially covered with concrete
and/or difficult to remove.
11/30/93
LOSS PREVENTION AUDIT
ACTION ITEM
DUE DATE/STATUS
ELECTRICAL SYSTEMS OPPORTUNITIES Note: Bruce Cooper will follow up on electrical items. 1. The replacement of the Fuji bushings has begun. Bus 300 was completed in August 1993. All the syn-bus tie breakers should be completed by the end of the year. Two buses are scheduled to be completed during 1994. The final bushing replacement will take place in 1995.
2. Cable bus overheating is being monitored. Plans are in progress to modify the existing cable bus system to allow more heat to escape. H-610 will require a new transposition section which has been ordered and is due to arrive in December. Additionally, all the hot cable buses will have their cable bus covers raised. There are presently three cable buses that are overheating; 14-402,14610, and 1-4304. All three buses should be modified by the end of the first quarter of 1994.
3. Modification to the relay protection system is in progress. The required changes will be coordinated with plant outages to allow access to different buses. These changes will be on-going in conjunction with the Fuji bushing changes.
4. The station service transformers for 100/200 are on hold until better economic conditions exist due to the high cost; Approximately $700,000.
Do A 117547 DO/VP 7DP/s/TTal
ACTION PLAN (cont.)
ACTION ITEM
DUE DATE/STATUS
FIRE PROTECTION OPPORTUNITIES
1. GT-300 louvers will be repaired at the next overhaul.Bruce NEXT OVERHAUL 2. Power 2 will follow the Dow guidelines for the phase out of HALON.
RECOMMENDATIONS:
1. The Power Tech Center will contacted concerning hand held HALON fire extinguishers.
Bruce Cooper
10/31/93
2. A champs work order was put into the system concerning "Update of the Power 2 Fire
Protection Plot Plan.
Patot Daigle
COMPLETE
3. Power 2 will contact Fire Protection Department to schedule a meeting discussing a
credible fire scenario for Power 2
David Geoffroy
11/30/93
FIRED EQUIPMENT OPPORTUNITIES Note: Bruce Cooper will follow up on fired equipment concerns. 1. The thermocouple runback and trip requirements have been completed on GT-200. These changes will be made on GT-100 during the next available outage.
2. Vibration trip logic changes are in progress. The changes will require software programming upgrades to the tri-sen systems. GT-200 changes will occur during the first available outage of 1994. The vibration system for GT-100 will have to be upgraded before the changes can be implemented. The GT-100 vibration upgrade project has been approved and is scheduled for completion by the end of 1994. The vibration logic changes will be implemented with the upgrade.
3. The compressor efficiency calculation program is due to be reviewed by the end of 1993.
4. Methods for monitoring generator shaft voltage are being investigated. Plans are to have a method in place by the end of the first quarter of 1994.
5. Procedures for the checkout of relay trip circuits are being written by the distribution department as the jobs come up. The procedures are provided to the plant for review prior to the start of the job. MOC also require that procedures be written.
RECOMMENDATIONS:
A copy of the Tech Center audit questionnaire was included in the audit documentation file. COMPLETE
DO A 117^8 CONFIDENTIAL
ACTION PLAN (cont.)
ACTION ITEM
DUE DATE/STATUS
CRITICAL INSTRUMENTS OPPORTUNITIES
Note: Bruce Cooper will follow up on critical instrument items. 1. The critical instrument test procedures are in the process of being updated and is expected to be completed by the end of the first quarter 1994.
2. The failure of tri-sen modules is currently being addressed with tri-sen. Tri-sen repair reports will now identify the component(s) which failed and whether it appears to have been caused by an external event which we can address and correct.
CRITICAL INSTRUMENTS RECOMMENDATIONS
1. Procedures are being updated to include testing from the sensing element through the
operating device where possible.
12/94
2. The procedures are being updated to include the proper settings for each instrument, as well
as, the equipment I.O.
12/94
EMERGENCY BLOCK VALVES OPPORTUNITIES
Emergency block valves are manually operated during each extended outage to ensure that they
are working properly. In the future, these functional tests will be documented and any corrective
actions required will be noted. Bruce Cooper
12/31/93
WAREHOUSE STORAGE OPPORTUNITIES
Building 3703 warehouse will be repaired/demolished as soon as the economic picture gets brighter.
PRESSURE VESSELS/RELIEF DEVICES
The recommendations outlined in the audit done earlier. A time schedule is being developed.
Ronnie Daigle, Wes Johnson
10/31/93
FLAMMABLE MIXTURES
The procedure for purging and checking for oxygen depletion prior to putting the fuel gas lines back in service on GT-100/200 is being developed.Tommy Rozas 12/31/93
MANAGEMENT OF CHANGE
The moc program has been reviewed to make it a more active program. COMPLETE
DO A 117549 CONFIDENTIAL
ACTION PLAN (cont.)
ACTION ITEM
DUE DATE/STATUS
insurance package
1. A "B" size scaled plot plan drawing will be obtained and include the F&E I calculation circles
on it.
Tommy Rozas
1/31/94
2. The insurance inlormation form will be completed and reviewed with loss prevention.
Tommy Rozas
1/31/94
DO A 117550 CONFIDENTIAL.