Document xGybgRDGkOyyZyvxqwvmYQYE
PROCESS SAFETY AND LOSS PREVENTION AUDIT Page 1_______________________________________________
Prepared by:Trov Creel Date: 10/15/93 Reviewed by:Steve Parker Date: 10/22/93
A=Dow Rule or Regulation B=Good Practice/Training CsHazard Analysis
VII. AUDIT QUESTIONS AND ANALYSIS
I Operating Discipline \
REFERENCE: Operating Discipline Standard for The Operating Units of Dow U.S.A.
1. Yes Q No [X] Have you filled out the plant self-evaluation forms to
assess your plants progress on Operating
Discipline?
Please provide these forms at the audit meeting.
Section II
Process Technology Documentation
Section V
Process Risk Management
Section VI
Operating Procedures
Section VII
Process Control
Section VIII
Operational Reliability
Section IX
Dynamic Process Information
Section XII
Industrial Hygiene
Plans: Complete bv end of 1993 (self-evaluation).
A/B 2. Who has primary responsibility for the plant's Operating Discipline? Shift supervisor and safety coordinator.
A/B 3. How is the written portion of the Operating Discipline program maintained? (Have this available at the audit meeting.) It is located on the Vax and we are in the process of setting up a
program to review at least annually.
A 4. Process Safety Information (OSHA 1910.119, Paragraph d)(Review the Operating Discipline Self-Evaluation on Process Technology Documentation, Process Risk Management, Industrial Hygiene.)
10/22/93 Confidential JFM:jl/8
Dow
023^48
DO A
IAL
PROCESS SAFETY AND LOSS PREVENTION AUDIT Page 2
a. Is information included pertaining to the hazards of the chemicals used or produced by the process, and does the information include at least:
YES NO X Toxicity Information X PEL'S X Physical Data X Reactivity Data X Corrosivity Data X Thermal and Chemical Stability Data X Hazardous effects of inadvertent mixing of different materials that could forseeably occur? NOTE: MSDS's meeting the requirements of 29 CFR 1910.1200(g) may be used to the extent they contain the information required.
b. Is information included concerning the technology of the process, and does it include at least:
YES NO X A block flow diagram or simplified process flow diagram? X Process Chemistry? X Maximum intended inventory? X Safe Upper and Lower Limits? X An evaluation of the consequences of deviations? ( f the original technical information no longer exists, it may be cleveloped in conjunction with the PHA.)
c. 1 s information included pertaining to equipment in the process, ind does it include at least:
YES NO X Materials of Construction? X Piping and Instrument Diagrams (P&ID's)? X Electrical Classification? X Relief System Design and Design Basis? X Ventilation System Design? X Design Codes and Standards Employed? X Material & Energy Balances for Processes Built after 05/26/92? X Safety Systems (e.g., interlocks, detection or suppression systems)
10/22/93 Confidential JFM:jl/8
Dow
00 A 023949 confidential
PROCESS SAFETY AND LOSS PREVENTION AUDIT Page 3
A 5. Operating Procedures (OSHA 1910.119, Paragraph f) (Refer to Operating Discipline Self-Evaluation on Operating Procedures)
Yes [X] No n Do written operating procedures exist for each covered process? Do the procedures provide clear instructions for conducting activities safely?
Do the operating instructions address, as a minimum, steps for each operating phase, including?
YES NO X Initial Start-up? X Normal Operations? X Temporary Operations? X Emergency Shut Downs? X Conditions Requiring Emergency Shut Down? X Assignment of Shut Down Responsibility to Qualified Operators? X Emergency Operations? X Normal Shut Down? X Start-ups following a turnaround or emergency shut down?
Yes [X] No Q Are operating procedures readily accessible to employees who work in or maintain a process?
Yes [X] No [] Are operating procedures reviewed as often as necessary to assure that they reflect current operating practice?
A/B 6. Yes [] No [X] Does the plant have a training process to keep people current on Operating Discipline?
Plans: In the process of setting up a program for refresher training.
10/22/93 Confidential JFM:jl/8
023950
DO A CONFl
DENTIAL
Dow
D*)-
filix
DO A 0 2 3 9 5 1 CO NFIDENTIAL
PROCESS SAFETY AND LOSS PREVENTION AUDIT Page 4
I Process Hazard Analysis!
Process Hazard Analysis (PHA) is required by the OSHA PSM Standard 1910.119, Paragraph e). This section of the Process Safety and Loss Prevention Audit along with the Reactive Chemicals Review, Chemical Exposure Index Review, Fire and Explosion Index, Hazardous Materials Transportation Review and others, constitutes Process Hazard Analysis for existing Dow facilities.
FLAMMABLE MIXTURES/COMBUSTIBLE DUSTS
C 1. Yes Q No [X] Are flammable/combustible materials stored in your plant?
C 2. Yes [X] No [] Are flammables loaded/unloaded in your plant? Vehicular Fuel only
A 3. Yes [X] No [] Partly [] Are flammable materials processed in open, freely ventilated structures? (LPP
2.1.2.)
Plans-
B 4. How do you prevent flammable mixtures in the vapor space of process tanks, storage tanks, rail cars, tank trucks, etc.? (LPP 10.2) Cells and tailgas are monitored for H2/CI2 explosive mixtures. Air and/or nitrogen is used to control concentrations in safe ranges. Plans;
C 5. Yes [X] No [] In process equipment operating under vacuum conditions, has the hazard of air introduction been evaluated?
(Example: Packing leaks on vacuum pumps, vacuum conditions resulting from temperature change associated with shutdowns, normal low pressure operations, etc.) Plans;
B 6. Yes [X] No Q Do you monitor system pressure and/or oxygen content in low positive pressure applications?
Plans:Oxvgen analyzers are present in our Hydrogen Processing
Trains
10/22/93 Confidential JFM:jl/9
DO A 023952 CONFIDENTIAL
Dow
PROCESS SAFETY AND LOSS PREVENTION AUDIT Page 5
C 7. Yes D No [X] a. Do you have a flare system? Yes Q No [X] b. Do you have a TOX, THROX?
If yes to either of the above, how do you prevent backflashes in the system?
Yes Q No Q NA[X] Are temperature sensors utilized in conjunction with flame/detonation arrestors?
Plans:
How do you avoid flammable mixture within the header? (LPP 14.2.7) Not applicable.
Yes \\ No Q NA [X] Is your flare tip on a maintenance schedule?
How do you insure that you have a flame?
C 8. Yes [] No [X] Does the plant/process have potential combustible dust flammability concerns? (LPP 11.1)
If yes, answer the following questions:
Yes [] No [] NA [X] Have reactive chemical tests been run on the possible dust mixtures?
Yes [] No [] NA [X] Does the plant have static electricity guidelines and programs? (LPP 3.6)
Yes [] No [] NA [X] Are regular electrical continuity checks made for solids handling systems? (LPP 11.1.3)
Yes Q No [] NA [X] Are there plant procedures and action taken to prevent an accumulation of dust to build on structural beams, surface of equipment, etc.?
Yes Q No 0 NA [X] Where dusts exist, have alternate methods of handling or isolation been considered?
10/22/93 Confidential JFM:jl/9
DO A 023953 CONFIDENTIAL
Dow
/ .
if! <1
On' Mh<O\i zUoJ <i H-
u_
oz o co
PROCESS SAFETY AND LOSS PREVENTION AUDIT
Page 7______________________
_______________
I Process Hazard Analysis 1
FACILITY SITING - DRAINAGE
REFERENCES: LPP 2.4, LPP 7.6.3.
B 1. Yes Q No [X] NA Q If one or more fire protection systems are activated, will flooding occur in the process area?
If so, where? Details: Chlorine has a deluge oun for hvdroaen stack fires &
sprinkler system in the C-52/62 area.
B 2. Yes [X] No Q Can trenches, ditches, sewers, etc., back-up into the plant?
If so, where? East/West trench (C-40'sl at Chlorine and in the Cathode wash area at Cell Service.
Plans: Installation of a new outfall trench (construction starts in 12/93) will address flooding in the C-40's area. No plans for the Cathode wash area.
B 3. Yes D No [X] Would a fire in trenches, ditches, sewers, etc. expose the plant?
If so, refer to LPP 2.4.4. for cover recommendations. Details: Hvdroaen trenches are covered with orating and a constant
water flow is maintained
A 4. Yes [X] No [] Are all sewers trapped to prevent vapor backup? Plans: Cell Effluent Hydrogen Traps. Nitrogen padded cell effluent
sump.
A 5. Yes [] No [] NA [X] Are tanks containing liquid with flash points less than 140~F diked or impounded? (LPP 7.6)
Plans:
Yes [X] No [] Don't Know [] Are diked walls liquid-tight? (LPP 7.6) Yes [X] No [] Are they tested? Details: During rains the diked areas fill with rain water and must be
drained periodically
A 7. Yes [X] No [] Are tanks located far enough from dike walls so that a leak will not spray over the wall. (LPP 7.6.2.)
Details: Chlorine Storage spheres. Plans: No plans in near future.
10/22/93 Confidential JFM:jl/10
Dow
DO A CONFIDENTIAL
PROCESS SAFETY AND LOSS PREVENTION AUDIT Page 8
A 8. Yes [X] No Q Is area drainage generally directed away from the process equipment?
Rate your drainage system: Excellent Q Fair [X] Adequate but Needs Improvement Q
Plans: East/West Trench Upgrade. Closed Loop cooling (Wet Comp.1. Elimination of RW/freon condensers.
B 9. Yes [X] No D Are drainage areas including ditches clean and free of obstruction/debris? (LPP 7.6)
B 10. Yes [X] No[] Does your plant have secondary containment? Yes [X] No Q If so, are there written procedures covering operation, especially during emergencies? Details: Plant is surrounded bv the crown of the road which circles the block. Both facilities have SPC and SPCC Plans.
A 11. Yes [X] No Q Do you have a written plan for handling spilled materials?
Details: SPC and SPCC plans developed for both Chlorine and Cell Service. Plant Library contains information on the proper handling of material used or manufactured in the plant
10/22/93 Confidential
JFM:jl/10
DO A 023956 CONFIDENTIAL
Dow
A I
DO A 0 2 3 9 5 7 CO NFIDENTIAL
PROCESS SAFETY AND LOSS PREVENTION AUDIT Page 9______________________________________________
BE
I Process Hazard Analysis T
WAREHOUSE STORAGE
Warehouse - An attached or detached building for storage of raw materials, finished products or maintenance items or equipment.
REFERENCES: Minimum Requirement, LPP 12.4.
C 1. Yes [X] No Q Not Required Q Are warehouse areas protected with fire protection or detection systems?
Plans: Fire Extinguishers only.
What is the warehouse inspection practice? Visual inspections bv operations, staff, and material controller.
C 2. Yes [] No [X] Are pallets stored within the warehouse? (LPP 12.4.3) Plans:
B 3. Yes [X] No [] Are empty pallet stacks less than eight (8) feet in height? (LPP 12.4.3.)
Plans:
B 4. NA [X]
Where does sprinkler and fire fighting water drain?
(LPP 12.4.4)
Plant drainage system.
Plans:
C 5. Diesel Powered [X] Gasoline Powered [X] LPG Powered [] List types of fork trucks. Chlorine: (11 Clark. (21 Yale - both aas-
powered. Cell Service: m 60001b Clark (oasL (2) 12001b Clark. m 10.0001b Clark.m 30.0001b Tavlor - all diesel.
C 6.
Where is fuel storage for the fork truck located? (LPP 12.4.5) There is no storage for fork truck fuel at either facility..
Plans:
C 7. Yes D No [X] Are flammable or combustible liquids dispensed or drummed in the warehouse area? (LPP 12.4.5)
Plans: All flammable materials are stored in a flammable locker which is labeled as such.
10/22/93 Confidential JFM:jl/11
Dow
DO A 023958 CONFIDENTIAL
I _ ft-* i (Mj-
0lT', _<tj
O00' M(-
OONi ZLU
<r
o
m
L.
OZ
QO
<J
PROCESS SAFETY AND LOSS PREVENTION AUDIT Page 11
j Process Hazard Analysis]
EQUIPMENT/BUILDING LOCATIONS AND FIRE RISK
REFERENCES: Minimum Requirements, LPP 2.2. and 12.2.
A 1. Yes 0 No [X] Do buildings and process structures meet the minimum separation distances as calculated by the
F&EI (LPP 2.2?)
C12 plant has one conflict- Building #26Q3.
Yes [X] No Q If minimum distance is not met, is the area protected? Plans for areas of concern:
A 2. Yes [X] No [] Has the construction for occupied buildings in high hazard plants been evaluated per LPP 12.2.?
Yes [] No [X] Are there significant areas of concern? Plans:
B 3. Yes [X] No [] Are buildings of non-combustible construction? Yes [X] No [] Are temporary buildings (trailers) located to avoid exposing other critical facilities? Plans: CI2: Category A buildings Cell Service: Category "0" buildings
B 4. Describe your building's air supply system. Review monitoring and emergency procedures regarding flammable and/or toxic releases. (LPP 12.1) CI2 control room: Remotely located blowers provide fresh air flow. Air tightness of control room has been improved by better sealing of the building. Air dampers have been replaced and
the bottled air supply system has been improved.
Yes [X] No 0 Can the air supply be shut down in an emergency?
Yes [X] No Q Do you monitor the air intake for flammable/toxic material?
Plans: CI2 monitors on intake of air blowers to alarm against use during spill conditions.
A 5. Yes [X] No Q Are penetrations of fire walls properly protected? (LPP 3.5.6) Plans: Dow Corning Fire Stop is used.
A 6. Yes [] No [X] Are fire doors inspected periodically and fusible link systems tested for closing (LPP 10.13)?
10/22/93 Confidential JFM:jl/12
Dow
D0 A 023960 CONFIDENTIAL
PROCESS SAFETY AND LOSS PREVENTION AUDIT Page 12
Plans: No fire doors in CI2 or Cell Service
10/22/93 Confidential
JFM:jl/12
as
D0 A 023961 CONFIDENTIAL
Dow
Sheltering Ch ck Sheet for Building 2601
Date
Tine
Name t
1. [ ]Ye*[ ]No
Lab Blower door has been closed and unit shutdown if possible. You can shutdown unit with switch locate on the right side f hood in the lab. (Palmer, Hood)
2. [ ]Yes[ ]No
Air conditioner/heater unit AC-26-1 has been shutdown. Location is on the wall in the main hall next to men rest room. (Daigle, Smith)
3. [ ]Yes[ ]No
Air conditioner/heater unit AC-26-2 has been shutdown. Location is in the change house next to air conditioner unit. (Daigle, Heins)
4. [ ]Yes[ ]No Air conditioner/heater unit AC-26-3 has been shutdown. Location is on the south wall in the conference room. (Himel, Jones)
5. [ ]Yes[ ]No
Air conditioner/heater unit AC-26-4 has been shutdown. Location is in the west wall next to the outside door of lab. (Palmer, Hood)
6. [ ]Yes[ ]No Announce not to turn on air conditioner units or lab hood. (Creel, Hood)
7. [ ]Yes[ ]No Assemble all the people in building 2601 in the hallway by secretary office. (Creel , Hood)
8. [ ]Yes[ ]No
Obtain emergency radio located in printer/mail room and establish communication with Safe Permit Writer and Contr 1 Room. (Use Instrument Channel to communicate with Safe Work Permit Writer) (Creel, Hood)
9. [ ]Yes[ ]No Outside door to Lab has been secured and checked for leaks.
(Palmer, Hood)
10. [ ]Yes[ ]No Outside door of change house on west side secured and checked
for leaks. (Heins, Daigle)
-
11. [ ]Yes{ ]No Outside door of change house on south side secured and checked for leaks. (Heins, Daigle)
12. [ ]Yes[ ]No Outside door leading out of Conference room taped, secured, and checked for leaks. (Haney, Hull)
13. [ ]Yes[ ]No Outside door next to Secretary's office taped, secured and checked for leaks. (Haney, Hull)
14. []Yes[ ]No Building 2601 outside door on north side taped, secured, and checked for leaks. (Palmer, Hood)
15. [ ]Yes[ ]No Communicate to Safe Work Permit Writer (if on duty or Shift Supervisor if Safe Work Permit Writer is not on Duty) the name of people who are sheltering in Bldg. 2601 and contractor's company name. (Creel, Hood)
16. [ ]Yes[ ]No Communicate to Safe Work Permit Writer (if on duty or Shift Supervisor if Safe Work Permit Writer is not on Duty) the people name and company that have sign into block but hiwe not signed out. (Creel, Hood)
17. [ ]Yes[ ]No After all clear has been announced has building been return to normal. (Do rs open, Air Conditioner Units back in service, etc.) (Everybody)
"OVER
D0 A 023962 CONFIDENTIAL
V
r> ^
V0 <L
O' v-1
CNi Z
O ui D <T t-<
PROCESS SAFETY AND LOSS PREVENTION AUDIT Page 13_______________________________ _______
I Process Hazard Analysis]
HUMAN FACTORS
(Technical systems and equipment designed so they can be used safely and efficiently by humans.)
A 1. Yes[X] No Q During a Process Hazard Analysis (i.e.; Project Review, Management of Change Review), are human factors considered? (For Example: "What if the operator adds material B instead of material A?")
Plans:
B 2. Yes[X] NoQ Is adequate information about process conditions (normal and upset) displayed in the control room?
Plans: Process Information and area perimeter analyzer information is available
B 3. Yes [X] No Q Are the displays visible from all normal areas in the control room?
Plans:
B 4. Yes [X] No Q Are automatic safety features provided to cope with a process upset when either a rapid response or complex information process is required?
Plans: Load reduction and automated process trips are handled____ through integrated inst. systems. Upcoming wet compressor Mods conversion project will greatly enhance existing____ features.
B 5. YesO No[X] Must any instrument, display, or control be disabled or bypassed manually during any phase of the
operation? Plans: Note: This is really only true for maintenance work on critical
instrumentation, valves, etc.
B 6. Yes[X] NoO Are alarm set points and process computer software protected from unauthorized change?
How: Alarm setpoint changes require supervisor's approval and process computer software changes require computer manager's approval. Management of Change forms and Mod5 code change forms required for setpoint and software changes.
B 7. YesO No[X] Are critical inputs to the process control computer protected from incorrect entries?
Plans: Mod5 control program development is in progress for critical
10/22/93 Confidential JFM:jl/13
Dow
DO A 023964 CONFIDENTIAL
PROCESS SAFETY AND LOSS PREVENTION AUDIT Page 14
systems in the plant. Protection against incorrect entries will be included. Currently, critical entries require an observed validate entry.
B 8. Yes [X] No Q Are there unnecessary nuisance alarms? Plans: GPI vax tool is used to track alarms on Mod5 systems. The tool is being used to help reduce nuisiance alarms.
B 9. Yes[X] No G Is all equipment (vessels, pipes, valves, instruments, controls, etc.) clearly and unambiguously labeled in the field?
Plans: Note: Piping is not labeled inside this plant.
B 10. Yes [X] NoQ Do shifts communicate the process status (batch conditions, process abnormalities, equipment out of service, active work permits, etc.) to each other?
How: Shift relief, log books, and operational notes.
B 11. Yes [X] NoQ Are checklists used for critical procedures? Plans: In progress. New checklists are being generated for critical procedures. These procedures are located on a single computer system and are available to those authorized for
access,
B 12. Yes [X] No G Do the people developing and reviewing procedures analyze the job for hazards and identify the hazards in the procedure?
Plans: Procedures are developed bv operating teams consisting of 2 or more members. These folks are familiar with procedure scopes and have developed extensive procedure requirements
B 13. Yes [X] No G Are operating personnel able to read and understand process control programs?
Plans: Note: There is definitely room for improvement here both from an understanding point of view and also from using consistent programming techniques to avoid confusion
B 14. Yes [X] No Q Are operating personnel trained in using the process information computer?
Plans: Through hands on training and tailgate sessions. Documentation for process information is available.
10/22/93 Confidential JFM:jl/13
Dow
DO A 023965 CONFIDENTIAL
DO A 0 2 3 9 6 6 CO NFIDENTIAL
PROCESS SAFETY AND LOSS PREVENTION AUDIT Page 20
I Process Hazard Analysiil
HAZOP
C 1. YesQ No [X] Do any of your unit operations have an F&EI of 159 or higher or a C.E.I. of 299 or higher, or meet the criteria for conducting a HAZOP as outlined in the Process Risk Management Guidelines for Facilities and Distribution?
Plans:
B 2. Where a HAZOP Review has been performed (please list areas studied), what is the status of the recommendations from the HAZOP study?
Process
Process Unit
ADDITIONAL RISK EVALUATION
C 1. Yes [] No [X] Has any additional risk evaluation or quantitative risk assessment been done in your facilities?
Plans:
B 2. Where an additional risk evaluation has been done, provide a summary of the results and the status of recommendations.
10/6/93 Confidential JFM:jl/15
Dow
I/- - C/^c t
to e ^ T
CD -J
VC On(M' *-1 o
U-
o^ o o
PROCESS SAFETY AND LOSS PREVENTION AUDIT Page 22_____________________________________________
I Mechanical Integrity 1
ELECTRICAL SYSTEMS
REFERENCES: Minimum Requirements, National Electric Code, LPP 3.1
A 1. Yes [X] No Q Is the electrical area classification plot plan up-to-date? (LPP 3.1)
Last Reviewed Date: 2/92 for Chlorine. Cell Service is not classified. Plans:
B 2. Yes Q No [X] Are there any instances where the electrical installation is in conflict with the electrical classification plot plan?
Plans:
B 3. Yes [X] No Q For Classified Areas: Are electrical enclosures properly assembled; i.e., all doors closed, bolts in place and tight, conduit seals in place and intact? (National Electric Code) (LPP 3.40)
Plans:
B 4. Does your plant have: Yes [X] No [] `Redundant Electrical Power Supply? Yes [X] No [] `Redundant Feeds? (Chlorine only)
Yes [] No [X] Diesel Generated Power Backup? Plans: `Some plants have redundant feeds but single transformers.
B 5. Yes [X] No Q Is switch over automatic? (LPP 3.4)
Last Date Exercised: 9/93 during lightning strike. Switch over was successful, with no loss of equipment.
Plans: There is a UPS system for critical inst/elect control systems
A 6. Yes [] No [X] Are there major cable trays routed through flammable liquid areas where pooling resulting from spills can occur? (LPP 3.2.5)
Plans:
B 7. Yes Q No [X] Do you have fire protection on any of your major cable trays, (i.e., water spray, drainage, routing, fire retardant materials)? (LPP 3.2.7)
Explain: Not Applicable
B 8. Yes [X] No Q Considering possible unit fire exposures, are all cable wall penetrations appropriately sealed with approved fire stops? (Urethane is ncl an approved fire stop.)
(LPP 3.2.6)
10/22/93 Confidential JFM:jl/17
Dow
DO A 023969 CONFIDENTIAL
PROCESS SAFETY AND LOSS PREVENTION AUDIT Page 23
Plans: Dow Corning Fire Stop product is used.
B 9. Yes [X] No Q Are grounds in place and tests up-to-date? Last Test Date: Testing complete at CI2 - 9/93 Plans:
B 10. Yes [X] No Q Has your plant participated in an Electrical Audit? Date of Last Audit: 9/93 for CI2. Cell Service audit scheduled for later this year.
Please review status of recommendations: The audit recommendations will not be published until 11/93.
10/22/93 Confidential
JFM:jl/17
DO A 023970 CONFIDENTIAL