Inter Office To:
Mr. J. D. Boydston Mr. J. B. Condon Mr. A. R. Hall Mr. J. R. Houser Mr. J. J. Kaniewski Mr. L. M. Long Mr. S. P. Manzella Mr. J. J. O'Connor Mr. H. Perez
Mr. L. Perez Mr. J. N. Post Mr. G. L. Powdrill Mr. J. P. Quinlan Mr. T. R. Rokos Mr. T. L. Snider Mr. M. E. Walker Mr. G. W. Williams
Transmission and Chassis Division Osnsrtl Offlcs
October 13, 1983
cc: Mr. A. W. Alexandrowicz Mr. M. B. Leyda
Mr. T. B. Coon
Mr. T. M. McCaffrey
Mr. R. L. Coosala
Mr. E. M. Nelson
Mr. M. R. Craig
Mr. A. E. Phelps
Mr. W. A. Gaines
Mr. R. L. Smith
Mr. A. Jurcisin
Mr. F. J. Vabic
Mr. E. C. Koops
Mr. K. W. Watler
From:
R. L. Smith
Subject:
Asbestos
Reference:
Mr. J. M. Poe's and Mr. R. S. Pomarolli's letter, dated September 12, 1983, recommended asbestos handling, training, tests, Insulation removal and repair, equipment, disposal, etc. (Attached)
Manufacturing Guideline No. G3-19, recommended vork practices for handling asbestos, dated September, 1981 (attached).
Manufacturing Practice No. 303, employe exposure to asbestos containing non-production materials, dated December, 1981 (attached).
The referenced letter Is being supplemented with the referenced Manufacturing Guideline and Practice to assist you in handling asbestos. Additionally, informa tion on enclosure bags for small asbestos pipe insulation repair/removal is also attached.
The enclosure bag described in the attachment has been approved by the Corporate Industrial Hygiene Activity. Use of these bags with the manufacturer's instructions and Industrial Hygiene Bulletin 4b should minimize exposure to asbestos fibers by employes during pipe insulation maintenance. It should be noted that this is a secondary procedure and that an approved respirator must be used even when using the enclosure bag.
8006 0430 PRODUCED BY FORD
f
Subject
Asbestos
-2- October 13, 1983
)
These bags are clear seven-mil polyethylene, 44" x 64", with asbestos caution labels, and have a tool pouch and Belf-contalned protective arms. They are packaged 10 per case at $120 per case.
If assistance is necessary, contact Robert M. Hric (313)-523-3941 or G. E. Brace (313)-523-4720.
RMH/HWS/bg Attachments
8006 0431
PRODUCED BY FORD
GENERAL INSTRUCTIONS FOR THE
PROFO-BAG
A special purpoM 7 mil dear poly bag (44 S3 standard site I printed with black catflkMi ligni and vt>fcztny attached Dupont Tyvefc*erm with law (torn Special tim can b ordered.
The** art general instructions lor the use of the Profo-Beg and it may be necessary to modify them in tome manner to fit the need* of your specific use or protect; i.e. the shape, location, temperature, space allowances, etc.
STEP 1: Cut the sides of the Profo-Bagto fit the tile pipe you will be working on. and insert the tools you will need into the attached tool pocket
STEP 4: Insert your arms into the armholes and gloves and proceed to remove the asbestos from the valve fitting and pipe. When the job has been completed turn on the HEPA-VAC to remove air from the bag.
STEP S: With the air being removed from the ProfoBag. Squeeze the bag tightly (as dose to the top as possible) and twist seal and tape closed to keep the asbestos materia) safely at the bottom of the bag Turn off the HEPA-VAC and remove the hose from the side port, taking care to seal the side port with " staples and tape.
STEP 2: Attach the Profo-Bag to the working area by folding the open edges together and sealing with staples and tape. (remember this sealed area will be supporting the weijht of the debris, additional support may be necessary.)
STEP 3; Seal the edges of the Profo-Bag around the working area with tape to lorm a tight seal. Slice open the side port to allow entry of the wetting jube and HEPA-VAC hose. Insert the nozzle from your portable sprayer and thoroughly wet the area to be removed. You may then insert the HEPA-VAC hose into the side port and seal around it with tape.
STEP 6: You may now cut and remove the Profo-Bag from the working area and place it into another plastic bag and dispose of it property
STEP 7; You may now proceed to HEPA-VAC your work area for any residual materials and seal the exposed edges with the proper sealants.
NOTE: The reference to the use of a HEPA-VAC indicates that the vacuum you use should have a filter effeciency of 99.95 at .3 microns or better
NON-WARRANTY: Sine* it is impossible for rhe rrunufecturer to know rhe wide witty of conditions under which this product mey be used, the seller mekts no werrenty of eny kind, express or implied concerning the use of this product The buyer essumes ell risks of use or htndling whether in eccordence with directiont or not
""SSJSnfitb
--.
CTTS ASBESTOS CONTROL TECHNOLOGY, INC.
> ' 1 ' I n
16 Wo. Hr> Ave. Maple SnwM. New >n*v 06051 # 16091 23V"90
. ..............
8006 0432 PRODUCED BY FORD
\
ASBESTOS PIPE PROBLEM?
seas
i
I
PROFO-BAG IT!!!
The new PROTO-DAG technology provide* a revolutionary method for stripping asbestos coverings from pipe*. Recommended in the EPAs newly* isssued asbestos control guidelines, the PROTO-BAG can eliminate the need for costly full-room containment and decontamination procedures. Perfect for those situations where a few runs of asbestos-covered pipe traverse an office space or a lunch room. Also useful for valve and pipe maintenance work in the chemical industry.
The PROFO-BAG is a flexible version of the special gloved and sealed 'safe box" units used In the pharmaceutical and medical industries. Made of seven mil polyethylene, the PROTO-BAG Is a portable sealed space, accessible by protective Tyvek sleeves and rubber gloves. Wil do many successive, three* foot sections of pipe. When full, the bag serve* as Its own disposal container.
Asbestos Control Technology, Inc.
P.Q. Box 38, Maple Shade, NJ 06052 * 609-235*1190
&
8006 0433
or a
^PRODUCED BY FORD
Inter Office To:
Mr. 0. D. Boydston Mr. J. B. Condon Mr. A. R. Hall Mr. J. R. Houser Mr. J. J. Kaniewski Mr. L. M. Long Mr. S. P. Manzella Mr. J. 0. O'Connor Mr. H. Perez
TrenemlMlon and ChaMla Division Oanaral Offlca
Mr. L. Perez Mr. J. N. Post Mr. G. L. Powdrill Mr. J. P. Quinlan Mr. T. R. Rokos Mr. T. L. Snider Mr. M. E. Walker Mr. J. Williams
September 12, 1983
cc: Mr. A. W. Alexandrowicz Mr. T. M. McCaffrey
Mr. T. B. Coon
Mr. E. M. Nelson
Mr. R. L. Coosala
Mr. A. E. Phelps
Mr. M. R. Craig
Mr. R. L. Smith
Mr. W. A. Gaines
Mr. F. J. Vabic
Mr. A. Jure is in
Mr. K. W. Watler
Mr. E. C. Koops
From:
0. M. Poe and R. S. Pomarolli
Subject:
Recommended Asbestos Handling, Training, Tests, Insulation Removal and Repair, Equipment, Disposal etc.
Reference:
Letter from Mr. Byrom to Plant Management, same subject, dated July 20, 1983 attached. Industrial Hygiene Bulletin #4, dated 8/22/83 attached. Industrial Hygiene Bulletin #4a, dated 8/22/83 attached. Industrial Hygiene Bulletin #4b, dated 8/22/83 attached.
It is the T & C Division's policy to utilize an experienced contractor to remove asbestos associated with renovation or demolition. Hiring of outside contrac tors should be consistent with the clearance procedure provided for in the Ford-UAW agreement.
DGO personnel are planning to obtain a blanket order for emergency removal of asbestos pipe and tank insulation at all T & C Division Plants.
To handle extreme emergencies (expected to be rare) using plant personnel, it is recommended that each plant purchase two (2) approved positive pressure respira tors, one (1) approved vacuum cleaner, and sufficient appropriate disposable clothing. Also, a minimum of three hourly employes and two of their salaried supervisors per shift should be completely trained in the preparation, removal, handling and disposal procedures. Unless there is specific evidence to the contrary, all insulation should be treated and handled as if it contains asbestos until proven otherwise. The personnel selected should be retrained on a yearly basis.
MB7-65
8006 0434
PRODUCED BY FORD
Subject:
-2- September 12, 1983
Recommended Asbestos Handling, Training, Tests, Insulation Removal and Repair, Equipment Disposal, etc.
The attached Industrial Hygiene Bulletins have recently been updated and published to help plants deal with the OSHA Asbestos Law. Please notify this office by October 31, 1983 of the salaried supervisor who will be responsible for enforcing the OSHA Asbestos Law in your plant.
If assistance is necessary, contact Robert M. Hric (313)-523-3941 or R. D. Byrom (313)-523-4720.