Universal PFAS restriction Overall Timeline and Important Milestones
ECHA FFF restriction
Scope Scope defined for RoI (exclusion WP2 and possible E-use WP7)
Scope defined for Annex XV report (ongoing assessments can still lead to changes in scope i.e. substances/substance groups to be excluded, uses to be derogated etc.) 2nd round CfE Call for Evidence for specific information (15. July - 15. September) Assessment of CfE info only for specific information requested (15. September -15. October)
Update of drafts of Annex A and Annex B specifically (15. October- End November)
Annex XV report Part 2 (Annexes) Annex A. Manufacture and uses Annex B. Information on hazard, exposure/emissions and risk
Phys-chem, Grouping Information on hazards
Exposure/Emission Risk
Annex C. Justification for action on a Union-wide basis Annex D. Baseline Annex E. Impact Assessment
Use and function of alternatives Hazards of Alternatives
Monitorability, Practicability Annex F. Assumptions, uncertainties and sensitivities Annex G. Stakeholder information Annex XV Report Part 1 (Summary) 1. Problem identified 1.1. Hazard, exposure/emissions and risk 1.2 Justification for an EU wide restriction measure 1.3. Baseline 2. Impact assessment 2.1. Introduction
2.2. Risk management options 2.3. Response to restriction scenario(s) 2.4. Economic impacts 2.5. Human health and environmental impacts 2.6. Other impacts 2.7. Practicability and monitorability 2.8. Proportionality to the risk (including comparison of options) 3. Assumptions, uncertainties and sensitivities 4. Conclusion Finalisation of dossier for submission Lay-out, text combining, proof-reading, final adjustments Unexpected delay, dossier submission
Further
points to consider
Endnote to be used as citation tool Clarification of need of IUCLID dossier
Legend
WP0: blue WP1: green WP2: orange WP3: yellow WP4: grey WP5: purple WP6: WP7: red/brown
First draft = 70 % ready Final draft = 90 % ready
WP responsible for keeping deadline
WP that need to First draft (70% Final draft
Final
deliver
version) (90% version) Deadline
May 21
WP2 and WP7
WP3, WP4 WP3, WP4, WP7
7/15/2021 10/31/2021
WP4 sub uses WP2 WP6 WP6, sub-WP4s
WP3, WP4, WP5
WP4 WP4 sub uses
9/30/2021 11/30/2021 11/30/2021 11/30/2021
9/30/2021 11/30/2021
9/30/2021 9/30/2021 1/31/2022 9/30/2021 9/30/2021 9/30/2021 1/31/2022 9/30/2021
11/30/2021 11/30/2021 11/30/2021 11/30/2021 11/30/2021 11/30/2021 11/30/2021 11/30/2021
3/31/2022 11/30/2021 11/30/2021 11/30/2021
3/31/2022 11/30/2021
1/31/2022 4/15/2022
4/15/2022 4/15/2022 1/31/2022 4/15/2022
1/31/2022 1/31/2022 4/30/2022
1/31/2022 1/31/2022 1/31/2022 4/30/2022
1/31/2022
WP3, WP4 and WP6
4/30/2022 3/31/2022 3/31/2022
4/30/2022
WP7
WP4
WP0
WP0 WP0
4/30/2022 4/30/2022 4/30/2022 4/30/2022 4/30/2022 4/30/2022 4/30/2022 4/30/2022 5/30/2022
6/30/2022 7/15/2022
Jun 21
Jul 21 15.07.21 Aug 21 Sep 21 Oct 21 Nov 21 Dec 21
RoI entry Second CfE
Submission
Dossier preparation
Conformity Check
first draft
first draft first draft first draft first draft first draft first draft first draft
final draft first draft first draft first draft final draft first draft final draft final draft
final draft final draft final draft
final draft
final final draft
final draft final draft
final final draft
final final first draft final final final first draft final
Jan 22
Feb 22 Mar 22 Apr 22 15.04.22 May 22 Jun 22
Jul 22
ier preparation
Final dossier prep.
First RAC/SEAC discussion
Public consultation
Proof reading, connecting loose ends, etc.
Second RAC/SEAC discussion
final final draft
final draft final draft
final final draft
final final first draft final final final first draft final
final final final
final
final draft
final
final draft
final
final final final
final
final final final final final final final final
final
15.07.22 Submission