Document xDGB9MqXjgbp2wQNQXEyzbB1

DownloadRandom document
Remarks 4/26/2024 Universal PFAS restriction Overall Timeline and Important Milestones ECHA FFF restriction Scope Scope defined for RoI (exclusion WP2 and possible E-use WP7) Scope defined for Annex XV report (ongoing assessments can still lead to changes in scope i.e. substances/substance groups to be excluded, uses to be derogated etc.) 2nd round CfE Call for Evidence for specific information (15. July - 15. September) Assessment of CfE info only for specific information requested (15. September -15. October) Update of drafts of Annex A and Annex B specifically (15. October- End November) Annex XV report Part 2 (Annexes) Annex A. Manufacture and uses Annex B. Information on hazard, exposure/emissions and risk Phys-chem, Grouping Information on hazards Exposure/Emission Risk Annex C. Justification for action on a Union-wide basis Annex D. Baseline Annex E. Impact Assessment Use and function of alternatives Hazards of Alternatives Monitorability, Practicability Annex F. Assumptions, uncertainties and sensitivities Annex G. Stakeholder information Annex XV Report Part 1 (Summary) 1. Problem identified 1.1. Hazard, exposure/emissions and risk 1.2 Justification for an EU wide restriction measure 1.3. Baseline 2. Impact assessment 2.1. Introduction 2.2. Risk management options 2.3. Response to restriction scenario(s) 2.4. Economic impacts 2.5. Human health and environmental impacts 2.6. Other impacts 2.7. Practicability and monitorability 2.8. Proportionality to the risk (including comparison of options) 3. Assumptions, uncertainties and sensitivities 4. Conclusion Finalisation of dossier for submission Lay-out, text combining, proof-reading, final adjustments Unexpected delay, dossier submission Further points to consider Endnote to be used as citation tool Clarification of need of IUCLID dossier Legend WP0: blue WP1: green WP2: orange WP3: yellow WP4: grey WP5: purple WP6: WP7: red/brown First draft = 70 % ready Final draft = 90 % ready WP responsible for keeping deadline WP that need to First draft (70% Final draft Final deliver version) (90% version) Deadline May 21 WP2 and WP7 WP3, WP4 WP3, WP4, WP7 7/15/2021 10/31/2021 WP4 sub uses WP2 WP6 WP6, sub-WP4s WP3, WP4, WP5 WP4 WP4 sub uses 9/30/2021 11/30/2021 11/30/2021 11/30/2021 9/30/2021 11/30/2021 9/30/2021 9/30/2021 1/31/2022 9/30/2021 9/30/2021 9/30/2021 1/31/2022 9/30/2021 11/30/2021 11/30/2021 11/30/2021 11/30/2021 11/30/2021 11/30/2021 11/30/2021 11/30/2021 3/31/2022 11/30/2021 11/30/2021 11/30/2021 3/31/2022 11/30/2021 1/31/2022 4/15/2022 4/15/2022 4/15/2022 1/31/2022 4/15/2022 1/31/2022 1/31/2022 4/30/2022 1/31/2022 1/31/2022 1/31/2022 4/30/2022 1/31/2022 WP3, WP4 and WP6 4/30/2022 3/31/2022 3/31/2022 4/30/2022 WP7 WP4 WP0 WP0 WP0 4/30/2022 4/30/2022 4/30/2022 4/30/2022 4/30/2022 4/30/2022 4/30/2022 4/30/2022 5/30/2022 6/30/2022 7/15/2022 Jun 21 Jul 21 15.07.21 Aug 21 Sep 21 Oct 21 Nov 21 Dec 21 RoI entry Second CfE Submission Dossier preparation Conformity Check first draft first draft first draft first draft first draft first draft first draft first draft final draft first draft first draft first draft final draft first draft final draft final draft final draft final draft final draft final draft final final draft final draft final draft final final draft final final first draft final final final first draft final Jan 22 Feb 22 Mar 22 Apr 22 15.04.22 May 22 Jun 22 Jul 22 ier preparation Final dossier prep. First RAC/SEAC discussion Public consultation Proof reading, connecting loose ends, etc. Second RAC/SEAC discussion final final draft final draft final draft final final draft final final first draft final final final first draft final final final final final final draft final final draft final final final final final final final final final final final final final final 15.07.22 Submission