Document x6Lkz6NG3v81gp8r0oOkw6wQ
DATE: SUBJECT: FROM: THRU: TO:
UNITED STATES ENVIRONMENTAL PROTECTION AGENCY REGIONS
77 WEST JACKSON BOULEVARD CHICAGO, ILLINOIS 60604
JUN 1 9 2019
CLEAN AIR ACT INSPECTION REPORT Scepter, Inc., Bicknell, Indiana
Sarah Clark, Environmental Engineer AECAB (IL/IN)
Nathan Frank, Section Chief AECAB (IL/IN)
File
BASIC INFORMATION
Facility Name: Scepter, Inc. (Scepter)
Facility Location: 6467 N Scepter Road, Bicknell, Indiana, 47512
Date of Inspection: April 30, 2019
EPA Inspector(s): 1. Sarah Clark, Environmental Engineer 2. Linda Rosen, Environmental Engineer
Other Attendees 1. Tim Venderley, Plant Manager, Scepter 2. Tammy Haug, Senior Environmental Manager, Indiana Department of Environmental Management (IDEM)
Contact Email Address: tvenderley@scepterinc.com
Purpose of Inspection: Assess compliance with the Clean Air Act
Facility Type: Secondary aluminum production facility
Regulations Central to Inspection: National Emission Standards for Hazardous Air Pollutants (NESHAP) for Secondary Aluminum Production, Federally Enforceable State Operating Permit (FESOP), Indiana State Implementation Plan
Arrival Time: 8:16 AM Departure Time: 11: 15 AM
Inspection Type: C:sl Unannounced lnspect10n D Announced Inspection
OPENING CONFERENCE
l:8l Credentials Presented l:8l CBI warning to facility provided
The following information was obtained verbally from Mr. Venderley unless otherwise noted.
Process Description: Scepter receives aluminum scrap and dross, consisting of 10-80% aluminum, from commercial customers and processes this aluminum in one of three natural gas-fired rotary furnaces to produce 'recycled melt ingots' or RSIs, also referred to as sows. Aluminum scrap includes turnings, siding, auto shred, and bailed used beverage cans. Salt (sodium chloride) and potash (potassium chloride) solid fluxes and chlorine gaseous flux are added to the melt to remove impurities. The top layer of the melt is skimmed and returned to the process for further processing. Leftover settled impurities or 'salt cake' are cleaned out of the furnace and processed in a salt cake cooling system, a water-cooled rotary barrel device that cools and breaks apart the salt cake. Scepter owns an aluminum can shredder, but Scepter has not operated the shredder since 2017 because Scepter now only accepts bailed cans. Each furnace and the salt cake cooling system are controlled by dedicated baghouses. Ammonia gas is injected into the hood of each furnace to neutralize the pH of the exhaust; then, the exhaust passes through a cooling tower; after the cooling tower, but before the baghouse, lime can be injected into the exhaust stream. Waste salt cake and baghouse dust are sent to a Scepter-owned landfill for disposal.
Staff Interview: Scepter operates 24 hours per day, seven days per week. 71 hourly and salaried employees work at this facility. Scepter functions as a toll processor, where, usually, incoming material is returned to the same customer after processing. Scepter may, for example, handle the oily scrap that their customers cannot handle. Scepter currently has approximately 20 regular customers.
The following parameters are monitored for each furnace baghouse: inlet temperature, differential pressure (dP) across each module, bag leak detection system (BLDS), ammonia injection rate in standard cubic feet per hour (scfh), and pH. The inlet temperature setpoints, which are based on the latest dioxin/furan (D/F) testing, are 237 degrees Fahrenheit (F) for the Furnace F3 baghouse, 272F for the Furnace F4 baghosue, and 257F for the Furnace F5 baghouse. The baghouses operate under positive pressure. The dP is automatically continuously monitored, automatically recorded every 10 seconds, and manually monitored and recorded once per day. The dP range is 3-10 inches of water column (in H2O). The BLDS system experiences
Page 2 of6
some false alarms; there is a 15 minute-delay after an alarm begins sounding before the furnaces are shut down and the cause of the alarm is investigated. The ammonia is injected at 50 scfh. The pH is read upstream of the baghouse and is compared to the city water pH. Lime may be injected intermittently. Lime usage is not monitored, but Scepter can estimate lime usage based on the weight of the lime silo. Hood velocity studies are conducted armually.
TOUR INFORMATION
EPA toured the facility: Yes
Data Collected and Observations: We observed an example RSI (Photo 1) and incoming aluminum materials, including dross, turnings, rims, drive shafts, auto shred, and shredded foil (Photos 2-5).
Next, we observed the salt cake cooling system (Photos 6-13). Here, hot salt cake is fed into the right side of the cooling system and cool salt cake exits the left side, sorted by size. This cooling system has two exhaust ventilation pick-up points: a hood with heat resistant curtains on the right (over the inlet) and a duct which draws from the partially enclosed outlet, where the cool salt cake is sorted into three size grades. While the salt cake tumbles inside the system, cool water circulates around the outside without contacting the salt cake. EPA observed particulate emissions which were not captured by the hood on the inlet side.
At the time of our inspection, Furnace 3 was down for cleaning. EPA asked Mr. Venderley if any furnaces would be charging soon, and he responded "probably not." We observed Furnace 4 in operation, where Mr. Venderley explained the process was 'almost done,' with 'maybe just a reheat left' (Photos 14-19; contains confidential business information (CBI)). The hood was constructed of both heat resistant curtains and metal. Later we observed Furnace 4 tap (Photos 24-28; CBI).
We observed the scale used to weigh aluminum scrap and dross (Photo 20) and the salt/potash blender, where salt and potash are situated on load cells and a hopper is used to dispense precise amounts of potash and salt fluxes (Photo 21). We observed the furnace label for Furnace 3 while it was down for cleaning (Photo 22); however, because Furnace 4 was operating and the area was hot, we observed the furnace label for Furnace 4 from a distance (Photo 23).
We observed Furnace 5 as it had just finished tapping (Photo 29; CBI), and, behind the furnace, we observed the furnace label for Furnace 5 (Photos 30). Here, we observed that the area was dusty, and we observed a tear in the heat resistant curtain (Photo 31, CBI).
Outside, we observed the salt cake cooling system baghouse, exhaust duct, and steam vent (Photos 32-33). Mr. Venderley informed EPA that the dP gauge was located at the top of the baghouse.
We observed two tanks of anhydrous ammonia and the associated ammonia flow meters (Photos 34-35), which read 86 scfh for Furnace 3, 116 scfh for Furnace 4, and 80 for Furnace 5. EPA asked Mr. Venderley why ammonia was injected while Furnace 3 was down for cleaning; he
Page 3 of6
later informed EPA that Furnace 3 was undergoing fan balancing work during which the ammonia to was turned on temporarily. He said that safeguards are in place to prevent the injection of ammonia unless the baghouse is drawing exhaust. Inside a control room for Furnaces 3 and 4, we observed a laminated sheet of instructions for checking the pH and reviewed an ammonia system calibration check sheet which had data for April 29 and 30 (Photos 37-39). We observed the followrng values on the pH momtors: city water was measured at 6.93 pH, Furnace 4 was operating at 8.78 pH, and Furnace 3 was operating at 9.04 pH.
For the baghouses controlling Furnaces 3 and 4, we observed that the super sacs felt very full. Additionally, we observed that the stacks on the baghouse associated with Furnace 4 appeared corroded compared to the stacks on the baghouse associated with Furnace 3. At the base of the cooling tower, we observed a duct for 'blender air,' which Mr. Venderley explained is used to cool the exhaust stream (Photos 36, 40-47). He said that the damper has a maximum range of 50%, but that the damper only opens to approximately 35%.
Inside, we returned to Furnace 4. We were too late to observe flux addition, but, after Mr. Venderley spoke with the operators in the control room, we were able to observe the charging of dross (Photos 48-58). At this time, while inspector Rosen photographed dross charging, inspector Mr. Venderley showed inspector Clark the Furnace 4 and Furnace 5 baghouse dP values, which he had captured on his phone while in the control room. The Furnace 4 baghouse modules were operating at 5.8, 5.6, 3.5, and 4.1 in H2O and the Furnace 5 baghouse modules were operating at 6.1, 6.4, 6.5, 6.4, 6.4, and 6.0 in H2O.
Photos and/or Videos: were taken during the inspection. Photos of the furnaces and furnace hoods were claimed as confidential business information (CBI). These photos are identified accordingly in Appendix A.
Field Measurements: were not taken during this inspection.
RECORDS REVIEW
1. Anunonia system calibration check sheet
CLOSING CONFERENCE
Requested documents: Most recent PM/HCl/D/F stack test (full report) for each furnace Most recent D/F stack test (full report) for each furnace (if not included above) From January 1, 2019 until April 30, 2019, for each furnace baghouse: o inlet temperature, 3-hour average; o BLDS, alarms and output; o dP reading, daily and data lot output; o Anunonia flow rate, 3-hour average; and o pH reading, daily
Page 4 of6
Copies of corrective actions (e.g., malfunction sheets) from January 1, 2019 to April 30, 2019
Latest operation, monitoring, and maintenance plan (Mr. Venderley confirmed that there is only one plan)
Quarterly FESOP reports from January 1, 2018 through April 30, 2019 Semiannual "MACT" reports for 2018 Safety data sheets for all fluxes Most current ventilation study (CBI, will include in mailing)
SIGNATURES
Report Author: -~"'-'-""""""""'--'~"""'....,L"'=---- Date:
ft:ob:--/1,;
J/._ /!
Se6tion Chief: -"/~""-'"--'~.,_l~---'-,"'4-I-.L'd.../4,,-"'-""-------- Date:
{q/f/1 ;;!al'\ i.r,/t1I /201t
Page 5 of6
Facility Name: Scepter, Inc. Facility Location: 6467 N Scepter Road, Bicknell, Indiana Date of Inspection: April 30, 2019
APPENDICES AND ATTACHMENTS
1. Appendix A: Digital Image Log
Page 6 of6
Facility Name: Scepter, Inc. Facility Location: 6467 N Scepter Road, Bicknell, Indiana Date of Inspection: April 30, 2019
APPENDIX A: DIGITAL IMAGE LOG
1. Inspector Name: Linda Rosen and Sarah Clark
3. Company/Facility Name: Scepter, Inc.
5. Number of Images: 58
2. Date(s) of Inspection:
April 30, 2019 4. Street Address, City, State:
6467 N Scepter Road, Bicknell, Indiana 6. Archival Record Location:
CD-R labeled as "Scepter, Inc. Bicknell, IN, Inspection Photos, 4/30/2019"
Image Number
File Name
1
P4300039.JPG
Date aud Time (EDT)
4/30/2019 9:22
2
P4300040.JPG 4/30/2019 9:22
3
P4300041.JPG 4/30/2019 9:23
4
P4300042.JPG 4/30/2019 9:26
5
P4300043.JPG 4/30/2019 9:26
6
P4300044.JPG 4/30/2019 9:31
7
P4300045.JPG 4/30/2019 9:31
8
P4300046.JPG 4/30/2019 9:34
9
P4300047.JPG 4/30/2019 9:35
10
P4300048.JPG 4/30/2019 9:35
11
P4300049.JPG 4/30/2019 9:36
12
P4300050.JPG 4/30/2019 9:37
13 P4300051.MOV 4/30/2019 9:38
14
P4300052.JPG 4/30/2019 9:39
Latitude and Longitude
38.771107, -87.328908
38.771152, -87.32884 38.771152, -87.32884 38.771333, -87.33036
38.771352, -87.330355
38.772218, -87.330203 38.772013, -87.330167
38.771833, -87.330443
38.771833, -87.330443 38.77128, -87.330342 38.771435, -87.330155
38.771462, -87.330345
NIA
38.771462, -87.330345
Appendices Page 1 of 4
Description of Image RSI
Incoming dross Incoming turnings Incoming aluminum pipe Incoming siding Salt Cake Cooling System Salt Cake Cooling System Salt Cake Cooling System Salt Cake Cooling System Salt Cake Cooling System Salt Cake Cooling System Salt Calce Cooling System Salt Cake Cooling System
Furnace 4 (CBI)
Facility Name: Scepter, Inc. Facility Location: 6467 N Scepter Road, Bicknell, Indiana Date of Inspection: April 30, 2019
15
P4300053.JPG 4/30/2019 9:40
16
P4300054.JPG 4/30/2019 9:41
17
P4300055.JPG 4/30/2019 9:41
18
P4300056.JPG 4/30/2019 9:42
19
P4300057.JPG 4/30/2019 9:43
20
P4300058.JPG 4/30/2019 9:45
21
P4300059.JPG 4/30/2019 9:48
22
P4300060.JPG 4/30/2019 9:49
23
P4300061.JPG 4/30/2019 9:50
24
P4300062.JPG 4/30/2019 9:53
25
P4300063.JPG 4/30/2019 9:54
26
P4300064.JPG 4/30/2019 9:54
27
P4300065.JPG 4/30/2019 9:56
28
P4300066.JPG 4/30/2019 9:56
29
P4300067.JPG 4/30/2019 9:58
30
P4300068.JPG 4/30/2019 9:59
31
P4300069.JPG 4/30/2019 10:00
32
P4300070.JPG 4/30/2019 10:01
33
P4300071.JPG 4/30/2019 10:05
34
P4300072.JPG 4/30/2019 10:09
38.771945, -87.33003
38.771992, -87.329982
,R 77199?
-87.329982
38.772112, -87.329832
38.771918, -87.329657
38.771573, -87.33021
38.771637, -87.330273
38.771717, -87.330222
38.771717, -87.330222
38.772038, -87.329847
38.772038, -87.329847
38.772038, -87.329847
38.772038, -87.329847
38.772038, -87.329847
38.772038, -87.329847
38.772038, -87.329847
38.772038, -87.329847
38.772038, -87.329847
38.77186, -87.330535
38.772093, -87.330353
Appendices Page 2 of 4
Furnace 4 (CBI) Furnace 4 (CBI) Furnace 4 (Col) Furnace 4 (CBI) Furnace 4 (CBI)
Scale Potash and flux scale loader
Furnace 3 label Furnace 4 label Furnace 4 (CBI) Furnace 4 (CBI) Furnace 4 (CBI) Furnaces 3 and 4 (CBI)
.
Furnaces 3 and 4 (CBI) Furnace 5 (CBI) Furnace 5 label Furnace 5 (CBI)
Salt Cake Cooling System baghouse Salt Cake Cooling System exhaust
duct and steam vent Anhydrous ammonia tanks
Facility Name: Scepter, Inc. Facility Location: 6467 N Scepter Road, Bicknell, Indiana Date of Inspection: April 30, 2019
35 P4300073.JPG 4/30/2019 10:10 38.772085, -87.33037
36
P4300074.JPG 4/30/2019 10:13
38.772068, -87.330473
37 P4300075.JPG 4/30/2019 10:16 38.772107, -87.330355
38 P4300076..TPG 4/30/2019 10:16 38.772107, -87.330355
39
P4300077.JPG 4/30/2019 10:17
38.772107, -87.330355
40
P4300078.JPG 4/30/2019 10:18
38.772165,
-87.330198
41
P4300079.JPG 4/30/2019 10: 18
38.77218, -87.33024
42
P4300080.JPG 4/30/2019 10:19
38.772197,
-87.330267
43 P4300081 JPG 4/30/2019 10:19 38.772202, -87.330288
44 P4300082.JPG 4/30/2019 10:20 38.772217, -87.330323
45
P4300083.JPG 4/30/2019 10:21
38.772222, -87.33033
46
P4300084.JPG 4/30/2019 10:21
38.772222, -87.330332
47
P4300085.JPG 4/30/2019 10:25
38.772228,
-87.330223
48
P4300086.JPG 4/30/2019 10:29
38.77179, -87.32951
49 P4300087.JPG 4/30/2019 10:29 38.771832, -87.329492
50
P4300088.JPG 4/30/2019 10:30
38.77197,
-87.329522
51 P4300089.JPG 4/30/2019 10:31 38.771915, -87.329442
52
P4300090.JPG 4/30/2019 10:31
38.77192, -87.329643
53
P4300091.JPG 4/30/2019 10:31
38.77192,
-87.329643
54
P4300092.JPG 4/30/2019 10:32
38.771907,
-87.329518
Appendices Page 3 of 4
Anhydrous ammonia gauges Furnace 3 baghouse pH procedures pH procedures
Ammonia System Calibration Check Sheet
Furnace 3 baghouse super sacs Cooling tower for Furnace 4 Baghouse
Furnace 4 baghouse Furnace 4 baghouse stacks Furnace 3 baghouse stacks Furnace 3 and 4 baghouses/super sacs Furnace 4 baghouse blender air Furnace 4 baghouse blender air Furnace 4 charging dross (CBI) Furnace 4 charging dross (CBI) Furnace 4 charging dross (CBI) Furnace 4 charging dross (CBI) Furnace 4 charging dross (CBI) Furnace 4 charging dross (CBI) Furnace 4 charging dross (CBI)
Facility Name: Scepter, Inc. Facility Location: 6467 N Scepter Road, Bicknell, Indiana Date of Inspection: April 30, 2019
55 P4300093.JPG 4/30/2019 10:32 38.771907, -87.329518
56 P4300094.JPG 4/30/2019 10:35 38.771865, -87.329465
--
:JI
?4300095.JPG 4/30/2019 10:35
38.771865.
-87.329465
58
P4300096.JPG 4/30/2019 10:36
38.77186,
-87.329473
Furnace 4 charging dross (CBI)
Opening to warehouse by Furnace 4 Onen1ng to v,arehonse hy Furnace 4
(CBI) Opening to warehouse by Furnace 4
Appendices Page 4 of 4