Document x5doXj8De98y19bp6bENodBYE
DATE: SUBJECT: FROM: THRU: TO:
UNITED STATES ENVIRONMENTAL PROTECTION AGENCY REGION 5
77 WEST JACKSON BOULEYARD CHICAGO, ILLINOIS 60604
OCT 2 5 2019
CLEAN AIR ACT INSPECTION REPORT Rolls-Royce Corporation, Indianapolis, Indiana
Manojkumar P Patel, Environmental Engineer AECAB (Ml/WI)
Sarah Marshall, Section Chief AECAB (MI/WI)
File
BASIC INFORMATION
Facility Name: Rolls-Royce Corporation, Indianapolis, Indiana
Facility Location: 2001 South Tibbs Avenue, Indianapolis, Indiana
Date of Inspection: August 28, 2019
EPA Inspector(s): 1. Manojkumar P Patel, Environmental Engineer
Other Attendees 1. Pravin Patel, Environmental Specialist, Environmental Sciences, Rolls-Royce Corporation 2. Eugene Jend, Safety Engineer, Test Operations, Rolls-Royce Corporation 3. Christopher Cissell, Environmental Specialist, Indiana Department of Environmental Management
Contact Email Address: pravin.g.patel@rolls-royce.com
Purpose of Inspection: National Emission Standards for Hazardous Air Pollutants for Engine Test Cells/Stands, 40 C.F.R. Part 63, Subpart PPPPP
Facility Type: Aviation Engine Manufacturer
Arrival Time: 9:00 AM CST
Departure Time: 4:00 PM CST Inspection Type: l2J Unannounced Inspection
D Announced Inspection
OPENING CONFERENCE
l2J Credentials Presented l2J CBI warning to facility provided
The following information was obtained verbally from the facility personnel unless otherwise noted. Process Description:
Rolls-Royce manufactures aerospace engine at Plant 8 located at 2001 South Tibbs Avenue and at Plant 5 located at 2355 South Tibbs Avenue, Indianapolis, Indiana. The facility has about thirty-five (35) test cells. These test cells are used in tesing different types of aviation engines with varieties of fuels such as jet fuel, diesel oil 32, ultra-low sulfur diesel, and natural gas. Most engines are tested for performance, power output, vibration, leaks, temperature, electronic controls, and thrust.
TOUR INFORMATION
EPA toured the facility: Yes Photos and/or Videos: were taken during the inspection. Field Measurements: were not taken during this inspection.
RECORDS REVIEW
EPA did not review any records on-site.
CLOSING CONFERENCE
Requested documents: The facility personnel took pictures on their camera due to the policy. EPA requested those pictures for the report. The facility sent pictures to EPA through electronic mail on August 29, 2019.
Page2 of4
SIGNATURES
Report Author: _ _ __J_(;.=J_:Jri:::C!~c~j=i===-,._____ _ _ Date: /o(J... f//7
Section Chief: --"/-- ~ /--'--"-v-z ._' - ~-"""-- ______ Date: ~ ~ d o /
Page 3 of4
Facility Name: Rolls-Royce Corporation, Indianapolis, Indiana Facility Location: 2001 South Tibbs Avenue, Indianapolis, Indiana, Facility City, Facility State Date of Inspection: August 28, 2019
APPENDICES AND ATTACHMENTS
1. Appendix A -Digital Image Log
Page 4 of 4
Facility Name: Rolls-Royce Corporation, Indianapolis, Indiana Facility Location: 2001 South Tibbs Avenue, Indianapolis, Indiana Date of Inspection: August 28, 2019
APPENDIX A: DIGITAL IMAGE LOG
I. Inspector Name: Pravin G. Patel, Rolls-Royce Comoration
3. Company/Facility Name: Rolls-Royce Corporation, Indianapolis, Indiana
5. Number of Images: 05
2. Date(s) oflnspection: August 28, 2019
4. Street Address, City, State: 2001 South Tibbs Avenue, Indianapolis, Indiana
6. Archival Record Location: "USB Flash Dive labeled as "Rolls-Royce CAA Inspection August 28, 2019"
Appendices Page 1 of 1