Document x5G1QGmrrYdmYNoxZm9Njm7gG
Region 6 - Enforcement & Compliance Assurance Division
INSPECTION REPORT
Inspection Date(s): Media Program: Regulatory Program(s)
Company Name: Facility Name: Facility Physical Location:
(city, state, zip code) Mailing address:
(city, state, zip code) County/Parish: Facility Phone Number Facility Contact:
1/27/2020 Water Brine - CWA
Edge Oil Company, Inc. Eric Lease 36.224712, -96.553143 (Sect. 10, T 20N, R 7E) Cleveland, Oklahoma 74020 123 S. Broadway Cleveland, Oklahoma 74020 Pawnee County 918-645-7694 Michael Edgerton
FRS Number: Identification/Permit Number: Media Identifier Number: NAICS: SIC:
N/A N/A N/A 21111 1311
Personnel participating in inspection:
Kent W. Sanborn
EPA 6 ECDWE
Environmental Engineer
EPA Lead Inspector Signature/Date
Supervisor Signature/Date
Kent W. Sanborn
Kent W. Sanborn
Digitally signed by Kent W. Sanborn DN: cn=Kent W. Sanborn, o, ou=6EN-WR, email=sanborn.kent@epa.gov, c=US Date: 2020.02.19 08:11:44 -06'00'
Date
GUY
TIDMORE Digitally signed by GUY TIDMORE DN: c=US, o=U.S. Government, ou=Environmental Protection Agency, cn=GUY TIDMORE, 0.9.2342.19200300.100.1.1=68001003655426 Date: 2020.02.28 10:20:14 -06'00'
Guy Tidmore
28 FEB 2020
Date
6ENFORM-019-8 (10/31/2019)
1
Section I - INTRODUCTION
Edge Oil Company, Inc. / Eric Lease Inspection Date: 01/27/2020
PURPOSE OF THE INSPECTION EPA Region 6 inspector K.W. Sanborn visited the Edge Oil Company, Inc. oil and gas facility located near Cleveland, Oklahoma on 01/27/2020 for an unannounced inspection. There were no representatives of Edge Oil Company, Inc. present for the inspection. The inspection was conducted by authority of the Clean Water Act and the Safe Drinking Water Act to determine compliance with the Environmental Protection Agency (EPA) regulations.
FACILITY DESCRIPTION This facility is located on the Eric Lease and is southeast of Hallet, Oklahoma.
Section II - OBSERVATIONS During the inspection, I observed that the tank battery was overgrown with vegetation. The secondary containment was inadequate due to the berms not being maintained properly.
Section III - AREAS OF CONCERN The facility was overgrown with vegetation and the secondary containment berms were inadequate.
Section IV - FOLLOW UP EPA water enforcement will conduct a follow up inspection in approximately 3 months and will refer this facility to the EPA R6 SPCC program.
Section V - LIST OF APPENDICES N/A
2
6ENFORM-019-8 (10/31/2019)