Document x5EQ82eoNmmD59Z6YQQdJEnXG
UNITED STATES ENVIRONMENTAL PROTECTION AGENCY REGION 4
ATLANTA FEDERAL CENTER 61 FORSYTH STREET
ATLANTA, GEORGIA 30303-8960
SENT VIA ELECTRONIC MAIL
Mr. Tony Kilgore Corporate Environmental Manager Tamko Building Products 2300 35th Street Tuscaloosa, AL 35401 tony_kilgore@tamko.com
Dear Mr. Kilgore:
On July 27 and 28, 2021, the Environmental Protection Agency, Region 4 along with the National Environmental Investigations Center (NEIC) conducted Geospatial Measurement of Air Pollution (GMAP) monitoring at Tamko Building Products located in Tuscaloosa, Alabama. Enclosed is the final report generated by Region 4 for this activity (Enclosure). The results of the GMAP monitoring by NEIC will follow at a later date. All comments have been addressed and further clarification is as follows:
Comment 5 - This section has been revised to reflect the regulatory name of 40 CFR Part 63. Comment 8 - The results of the GMAP monitoring and sampling, which was conducted by
NEIC, will be provided as a supplement to Region 4's inspection report at a later date. Comment 9 - These sections are part of a generic report template and are documented as Not
Applicable (N/A). Comment 11 - This section is revised to indicate a high reading, which is why the GMAP
returned the next day. Results of NEIC's GMAP monitoring will be provided as a supplement to this report at a later date.
If you have any questions, please contact me at (404) 562-9206, or by email at HughesFairley.Rosalyn@epa.gov.
Enclosure
Sincerely,
ROSALYN HUGHES FAIRLEY
Digitally signed by ROSALYN HUGHES FAIRLEY Date: 2021.09.30 15:38:23 -04'00'
Rosalyn Hughes Fairley Environmental Engineer South Air Enforcement Section
ENCLOSURE INSPECTION REPORT
United States Environmental Protection Agency (EPA) Region 4 Air Enforcement Branch Inspection Report
I. GENERAL INFORMATION
Facility Name: Tamko Building Products
Location (Address): 2300 35th Street, Tuscaloosa, AL 35401
Inspection Date: July 27, 2021 - July 28, 2021
Type of Inspection (Full or Partial Compliance Evaluation): Partial Compliance Evaluation
ICIS-Air Number: AL0000000112500017
EPA Region 4 Investigator(s)/Inspector(s): Rosalyn Hughes Fairley, Environmental Engineer
EPA National Enforcement Investigations Center (NEIC) Investigator(s)/Inspector(s): Richard Helmich, Chemist
EPA Office of Enforcement and Compliance Assurance (OECA) Investigator(s)/Inspector(s): Nicholas Bobbs, Environmental Engineer
State/Local Investigator(s)/Inspector(s): Chrystal Strickland, Alabama Department of Environmental Management
Person(s) Contacted at Facility (Name and Title): 1. Tony Kilgore, Corporate Environmental Manager 2. Steve Griffith, Plant Engineer 3. Shyla Blackketter Dwyer, Assistant Director, EHS 4. Mark Tucker, Plant Environmental Engineer 5. Jeremy Baer, Assistant General Manager 6. Justin Allen, General Manufacturing Manager
Report Prepared by: Rosalyn Hughes Fairley
Project Name: Tamko Building Products Tuscaloosa ICIS/Project No.: AL00000001125000017-2021
Document Number: AEBFORM-012-R0 Title: Inspection Report Effective Date: May 14, 2019
Page 1 of 12
II. FACILITY INFORMATION A. Facility and Permit Information
Facility and Permit Information
Comments
1. Type of facility (e.g., chemical plant, refinery, cement manufacturer, etc.).
2. Air permit number(s) and type of permit (e.g., Title V, PSD, Synthetic Minor, etc.).
3. Air permit issuance date.
Roofing, Building Products Title V December 17, 2019
4. Air permit expiration date.
December 16, 2024
5. Facility classification (Major,
Major
Synthetic Minor/Conditional
Major, Minor).
6. Major source pollutants (if
VOCs, PM, SO2, NOx,
applicable).
7. Applicable regulations (e.g., State NSPS, 40 CFR Part 60, Subparts Dc; K; UU;
Implementation Plan, MACT
OOO; IIII; JJJJ
Subpart FFFF, NSPS Subpart
NESHAP, 40 CFR Part 63, Subparts
EEEE, etc.).
AAAAAAA
Title V
8. Types of air emission points (e.g., Tanks, Boilers, Roofing lines, Raymond Mills,
tanks, process vents, boilers,
Blowstills, Coating Heaters
etc.).
9. Types of air pollution control
Baghouses, Thermal Oxiders
equipment (e.g., baghouse,
scrubber, afterburner, etc.).
B. Process Description
The TAMKO Tuscaloosa asphalt roofing plant manufacturers roofing products. Asphalt is processed in the facility's refinery area through the oxidation of raw materials by blowing air
Project Name: Tamko Building Products Tuscaloosa ICIS/Project No.: AL00000001125000017-2021
Document Number: AEBFORM-012-R0 Title: Inspection Report Effective Date: May 14, 2019
Page 2 of 12
through it at elevated temperatures. The asphalt processed at the facility is primarily used in the facility's roofing manufacture process and may occasionally be sent off site to other TAMKO facilities. The residence time in the reaction vessels referred to as "blowstills" depends on the desired properties of the processed asphalt, such as softening point and penetration rate. The facility has five processing areas: the Refinery, the Raymond Mills, a line capable of producing laminate and 3 tab shingles; a laminate shingle production line; and saturated felt production line.
III. INSPECTION ACTIVITIES
Activity
Opening Meeting 1. Date and time entered the
facility.
Yes No NA
Y
2. Credentials presented to facility Y personnel (include name and title).
3. Conducted an opening meeting Y to explain the purpose and objectives of the inspection.
Comments
July 27, 2021 at approximately 4:04 pm CST
July 28, 2021 at approximately 8:20 am CST
Credentials were presented at the security gate and to Tony Kilgore and Steve Griffith upon entry at the main building. At the opening conference, NEIC explained the purpose of the Geospatial Measurement of Air Pollution (GMAP) vehicle. The GMAP would be used for surveying the facility site.
4. Discussed safety issues.
Y
5. Discussed which records to be Y reviewed.
Inspectors discussed Facility-specific safety and emergency procedures, including procedures for COVID-19 safety during the inspection.
No records were reviewed
Project Name: Tamko Building Products Tuscaloosa ICIS/Project No.: AL00000001125000017-2021
Document Number: AEBFORM-012-R0 Title: Inspection Report Effective Date: May 14, 2019
Page 3 of 12
Activity
6. Discussed the facility walkthrough and the areas to be observed in the facility.
Yes No NA Y
7. Discussed facility policy
Y
regarding photographs or video
(if applicable).
8. Discussed the use of the
Y
infrared camera, TVA, PID,
and any other equipment.
9. Discussed CBI.
Y
Records Reviewed at the Facility 10. The types of records reviewed, N
and the time period reviewed.
Facility Walk-Through Observations
Comments
NEIC explained that the vehicle planned to stay on the main facility roads and did not anticipate going into the process area with the vehicle. If there were readings that required additional information, such as confirmation and the location of emissions, an infrared camera would be used by the EPA inspectors. The survey would cover the facility including the landfill.
Inspectors indicated that videos may be taken with the infrared camera and that copies of the video would be sent to the company.
The NEIC explained the use and capabilities of the GMAP vehicle and the infrared camera. The use of Summa canisters was also noted as a possibility with the GMAP. . EPA inspectors indicated that any documents claimed to be Confidential Business Information (CBI) would be treated in accordance with regulations.
There were no records reviewed at the facility.
Project Name: Tamko Building Products Tuscaloosa ICIS/Project No.: AL00000001125000017-2021
Document Number: AEBFORM-012-R0 Title: Inspection Report Effective Date: May 14, 2019
Page 4 of 12
Activity
11. The process equipment observed and the associated operational rate observed (e.g., Furnace 1 production rate was 5 lbs/hr on 1/1/15, at 2:00 pm - permit requires max rate at 6 lbs/hr).
Yes No NA N/A
Provide the date and time the information was recorded by the inspector.
Identify the permit limit (if applicable).
An attachment may be used for a large amount of information.
Comments
This was a facility survey conducted using the GMAP vehicle and supplemented with the use of an infrared camera. This was not a process-based inspection.
Project Name: Tamko Building Products Tuscaloosa ICIS/Project No.: AL00000001125000017-2021
Document Number: AEBFORM-012-R0 Title: Inspection Report Effective Date: May 14, 2019
Page 5 of 12
Activity
12. The type of process parametric monitoring observed and the associated value observed (e.g., Furnace 1 flux injection rate was 200 lbs/batch at 1/1/15, at 2:00 pm - permit requires max rate at 225 lbs/batch).
Yes No NA N/A
Provide the date and time the information was recorded by the inspector.
Identify the permit limit (if applicable).
An attachment may be used for a large amount of information.
Comments
This was a facility survey conducted using the GMAP vehicle and supplemented with the use of an infrared camera. This was not a process-based inspection.
13. If process equipment or
N/A
parametric monitoring
equipment was not operating,
state the reason by facility
personnel why the equipment
was not operating.
This was a facility survey conducted using the GMAP vehicle and supplemented with the use of an infrared camera. This was not a process-based inspection.
Project Name: Tamko Building Products Tuscaloosa ICIS/Project No.: AL00000001125000017-2021
Document Number: AEBFORM-012-R0 Title: Inspection Report Effective Date: May 14, 2019
Page 6 of 12
Activity
14. The type of air pollution control equipment, the process equipment it is controlling, and the associated parametric monitoring value observed (e.g., baghouse pressure drop, temperature, scrubber flow rate, etc.).
Yes No NA N/A
(For example - RTO 1 controlling furnace 1, 1,500 degrees F on 1/1/15, at 2:00 pm - permit requires 1,400 degree F or higher).
Provide the date and time the information was recorded by the inspector.
Identify the permit limit (if applicable).
An attachment may be used for a large amount of information.
Comments
This was a facility survey conducted using the GMAP vehicle and supplemented with the use of an infrared camera. This was not a process-based inspection.
Project Name: Tamko Building Products Tuscaloosa ICIS/Project No.: AL00000001125000017-2021
Document Number: AEBFORM-012-R0 Title: Inspection Report Effective Date: May 14, 2019
Page 7 of 12
Activity
15. Continuous emissions monitoring devices and values observed. (e.g., CEMS, COMs, etc.).
Yes No NA N/A
Provide the date and time the information was recorded by the inspector.
Identify the permit limit (if applicable).
An attachment may be used for a large amount of information.
16. If air pollution control
N/A
equipment was not operating,
state the reason by facility
personnel why the equipment
was not operating.
Comments This was a facility survey conducted using the GMAP vehicle and supplemented with the use of an infrared camera. This was not a process-based inspection.
This was a facility survey conducted using the GMAP vehicle and supplemented with the use of an infrared camera. This was not a process-based inspection.
17. Capture and collection system N/A (enclosures and hoods) observations, if applicable (e.g., the magnitude and duration of emission escaping capture from the hood).
This was a facility survey conducted using the GMAP vehicle and supplemented with the use of an infrared camera. This was not a process-based inspection.
Project Name: Tamko Building Products Tuscaloosa ICIS/Project No.: AL00000001125000017-2021
Document Number: AEBFORM-012-R0 Title: Inspection Report Effective Date: May 14, 2019
Page 8 of 12
Activity
18. Ductwork transferring the emissions to the air pollution control device observations, if applicable (e.g., the magnitude and duration of emission escaping from the ductwork, holes or deterioration in ductwork, no deterioration observed, etc.).
Yes No NA N/A
Comments
This was a facility survey conducted using the GMAP vehicle and supplemented with the use of an infrared camera. This was not a process-based inspection.
19. Any existing unpermitted
N/A
emission points, new
unpermitted emission points, or
non-permitted construction
activities observed. (if yes,
describe in the comments
field).
20. Were any visible emissions
N/A
observed? (if yes, identify the
location and equipment).
21. Was a Method 9 reading
N
performed? (if yes, identify the
location and equipment).
This was a facility survey conducted using the GMAP vehicle and supplemented with the use of an infrared camera. This was not a process-based inspection.
This was a facility survey conducted using the GMAP vehicle and supplemented with the use of an infrared camera. This was not a process-based inspection.
22. Was the cause of the visible
N/A
emissions investigated and the
information documented?
Project Name: Tamko Building Products Tuscaloosa ICIS/Project No.: AL00000001125000017-2021
Document Number: AEBFORM-012-R0 Title: Inspection Report Effective Date: May 14, 2019
Page 9 of 12
Activity
23. Was a Method 22 performed for visible emissions? (if yes, identify the location and equipment).
Yes No NA N
Comments
24. Identify the cause of the visible N/A emissions as explained by facility personnel, if applicable.
25. Was the infrared camera used? Y If so, attach the video log (which includes the equipment ID, and the date and time the video was recorded) and videos to this report.
26. Was the TVA used? If so,
N
identify the equipment
monitored and the results.
Provide the date and time the information was recorded by the inspector. Include actual instrument readings for each piece of equipment monitored above the leak definition and/or where the infrared camera identified a release.
An attachment may be used for a large amount of information.
The infrared camera was used by NEIC and the video log and videos will be provided as a supplement to this report at a later date.
Project Name: Tamko Building Products Tuscaloosa ICIS/Project No.: AL00000001125000017-2021
Document Number: AEBFORM-012-R0 Title: Inspection Report Effective Date: May 14, 2019
Page 10 of 12
Activity
27. Was the PID used? If so, identify how the PID was used and the results.
Yes No NA N
Provide the date and time the information was recorded by the inspector.
An attachment may be used for a large amount of information.
Closing Meeting 28. Conducted a closing meeting. Y
29. Summarize any additional
N/A
information needed, if
applicable?
30. Accept a declaration of CBI, if N/A
applicable?
Comments
A rainstorm occurred on July 27, 2021, while conducting the GMAP survey. A brief meeting was conducted to arrange returning on July 28, 2021, to complete the survey. The closing meeting was conducted on July 28, 2021, at 9:30 am CST. The closing meeting was conducted with all the EPA inspector participants, the ADEM participant, and Tony Kilgore, Steven Griffith, Justin Allen, Jeremy Baer, Mark Tucker and Shyla Blackketter Dwyer.
Project Name: Tamko Building Products Tuscaloosa ICIS/Project No.: AL00000001125000017-2021
Document Number: AEBFORM-012-R0 Title: Inspection Report Effective Date: May 14, 2019
Page 11 of 12
Activity 31. Discussed observations.
32. Discussed next steps, if applicable?
33. Date and time inspection concluded. Miscellaneous
34. Include any additional observations, if applicable.
Yes No NA Y
Y
Comments
Day 1 observations - NEIC summarized what was done with the GMAP vehicle. High readings of VOCs were noted and due to the storm, the team asked to come back the next morning to complete the survey.
Day 2 observations - No high VOC readings were noted. Emissions were seen with the FLIR camera and the videos will be made available as a supplement to this report at a later date.
The inspection concluded on July 28, 2021 at approximately 9:50 am CDT
N/A
ROSALYN
Digitally signed by ROSALYN HUGHES FAIRLEY
HUGHES FAIRLEY Date: 2021.09.30 15:39:37
EPA Investigator/Inspector Signature: ______________-04_'00_' ___________________
TODD
Digitally signed by TODD GROENDYKE
GROENDYKE Date: 2021.10.01 EPA Supervisor Signature & Title: ______________11_:2_3:_26_-_04_'00_' ______________
____Chief, South Air Enforcement Section_______
Date Report Finalized: ___________________________________
Project Name: Tamko Building Products Tuscaloosa ICIS/Project No.: AL00000001125000017-2021
Document Number: AEBFORM-012-R0 Title: Inspection Report Effective Date: May 14, 2019