Document x58KQ0L38BwGOVx3wr2MJBd8G

INSULATION k I Tightening tie wire oround Insula* 1 lion on hooter bleed from turbine | High-pressure end ol turbine lor No. 2 unir wl.h Insu. larkm opplied. Cosing over insulation completes rhe Job Details of Whiling Plant Insulation | FifU loy*r of insulation on 14.In. reboot line. Totot thickness U 6 In. Table below gives schedule of thick" nesses chosen /or various temperatures and pipe sixes at Whiting. All high-temperature insulation is Koylo (hydrous calcium silicote) preformed for applies* lion on flat and curved equipment and pipes in the plant. Pipe insulation is nested; that is, out side diameter of first layer is a aitc that permit* second layer to fit snugly. Fat tening method varies with surface insu* laied,-wires, stud* and lath being used aa illustrated. Pipes and valves are fin ished with canvas and cement to give a smooth exterior, easy to paint and keep clean at all times. Expansion joints in pipe, duct and flat-surface insulation are ipecioUy con structed and carefully located to Insure freedom of movement without danger (o the insulation. Metal-corner beads pro tect block edges, give a neat and true finish of lasting quality. Though only high-temperature insula tion is illustrated here, a number of other materials are used in the 40-90 F range. Table below shows typical speci fications lor them. With Units No. 1 and 2 operating, and No. 3 nearing completion, experience proves the application methods Illus trated give good service. I Second layer, finish and expansion-' > |oint covering on the reheat lines | Insulation ond supports for moln ' steom ond reboot line*. Unit No. I Insutjtta TWtknsj to Virious Pipe Sbes end Ttmpsrilum _________ Pipe Mm'in Ineta, With High an/ Low Tsaiparotgra* --1 M4 -I !2-- 21-- 2V4 - h>9* l.. -- -- -- 7 2 2 n* IV* t IV4 2 --. -- -- tvs >14 -- -- -- Its 1 vs 2 1 2 in 1 2 ft* 2 2 iy, 214 J. s High Low _ >J4 __ 2 __ 214 f 2 114 214 IVt 2 1% 214 214 214 --... . loytr* of antitwaot covering (ve|| vetar v. .-in, vi ifii invar vsmo Cod sprar built up to o minimum of 14-In. tfilckflsit khoat-fliotot protoetba covering Atbeitos-cleth protective covering Waterproof cement One (oyer 1-in. hair felt tied or with jute tvino or No. >4 CoppemU *rr on 6-la. center*, Win. estate* cement; poultry oolting with Vi.In. voter* proof cemeof finlih ENGINEERING AND MANAGEMENT SECTION SSOOWWEERR REACHING IOFTT HEIOHTS with an oilcan Is o dangerous. Inefficient tube method. MBASURINO VALVES reiporidto pump Oder has strong temptation to skip hurriedly through and icurry bock to ground pressure, dating out grease.'at bearings Crane Lubrication Made Safe, Sure, With Centralized System By j A OORDON fervof Corporation : A CENTItALUED UJDE SYSTEM has the Job--hazardous to both oflcr and men lube supply at. one central point with on floor below. Problem of safety and tubes radiating out to lube points on affective lubrication has been neatly machine. In general, centralized ays* licked with a centralized system. terns show many advantages. Most ob System Details. Each crane In the vious la simply better lubrication-- plant haa a tingle bridge and two irol* proper quantity of lubrleant delivered ieya. The bridge alone baa 14 lube at the right time. points. Eaeh trolley haa eight polnta For some years, management at the . requiring lubrication. Thypin Steel Co In New York City The new centralized lube system con "farmed out*' their crane maintenance, sists of three hand-pumped greaae-dit- lubrication included, to an outside con penaing units, measuring valves; piping tractor. But they were concerned over ond tubing. One pump handles the 14 the safety angle as well os frequency points on the bridge, while the remain and thoroughness of lubrication. ing two units feed the two trolleys. ' Lubricating a crane is o hazardous The measuring.valves, between pumps and lube points, are fully adjustable far lubricant quantity, besides being equipped with a positive, easily seen indicator. Each trolley has two'measur ing valves, one valve serving four polnta Piping. The soft grease, NLCI No. 1, is carried from each pump unit through %-in. pipe serving aa a main feeder. Since the measuring valvea are hydrau lically operated, a 2-pipe system li used. Pressure is alternately applied u each feeder line. Main feeders are .tapped by %-ln. tubing, which earrics grease direct ta measuring-vafves. Lines from valves to lube points are %-in. tubing. ENGINEERING AND MANAGEMENT SECTION T9