Document x469J80M9OmJVx7L8MO4Z06

C^/cA afid C/t&mtca& ESCAMBIA PLANT INTEROFFICE MEMORANDUM To; W. J. Stueben From: K. J. Femrite Re: Industrial Hygiene Monitoring Date: 16 November 1978 Copies: J. G. Tolar _ <^~R. L. Duggan^ S. J. Hardee VCM in PVC Plant Personnel monitoring for VCM consisted of an eight hour TWA and a fifteen minute ceiling exposure sample per man assigned to PVC operations. Laboratory and maintenance personnel were monitored by a single eight hour TWA sample. Ninety-two percent of the eight hour TWA samples analyzed this month were below the OSHA standard of 1.0 ppm for VCM exposure. Eighty-six percent were below the OSHA action level of 0.5 ppm. Exhibit I details VCM exposure and its frequency of occurrence during October. A statistical survey of the VCM personnel monitoring determinations from January, 1978, through October, 1978, was undertaken. The average VCM exposure and its standard deviation at the 95 percent confidence level was determined for each job in PVC operations. The results reveal that the outside/recovery operator is routinely exposed to VCM levels over the 1.0 ppm level each eight hour shift. The sune operator wears a fresh air mask 10-35% of the time during his work shift which significantly reduces the amount of VCM that he inhales. The results also reveal that the shift supervisor and the senior operator are occasionally exposed to VCM levels over the 1.0 ppm limit. Their exposures are probably due to them working in problem and or upset conditions, Exhibit II details VCM exposure levels versus job in the PVC plant. DMF in Chemical Cleaning Two determinations for DMF exposure show levels below 2 ppm for the DMF recovery operator. The eight hour TWA for DMF is 10 ppm. Results from a statistical survey of DMF monitoring determinations reveal the operator is exposed to DMF levels from non detectable to 10.5 ppm over an eight hour shift. The average and standard deviation of the exposure data at the 95 percent confidence level is 2.8 ppm 6.6 ppm. The DMF exposure determinations are wide ranging with only 20% of the determinations above the OSHA action level of 5.0 ppm. Exhibit II details DMF exposure for the operator. AP00032973 W. J. Stuebcn 16 November 1978 Page Two Ammonia in the AN Plant Personnel monitoring results for ammonia revealed levels below the OSHA action level of 12.5 ppm. The eight hour TWA for ammonia is 25 ppm. Samples were taken twice a week for six hours during the work shift. Exhibit-HI details ammonia exposure in the AN plant. * A survey of the prill tower operators exposure to ammonia was undertaken. Grab samples were taken in his work area where he was poten tially exposed to ammonia fumes. Samples were taken using length of stain detection tubes. The results show that the operator is exposed to 5 ppm or less ammonia in the permalene solution room. The operator is in the permalene room approximately 30 minutes to one hour each eight hour period. The operator is exposed to 30 to 70 ppm ammonia every time he enters the top of the prill tower. He spends approximately 30 minutes at the top of the prill tower 3 or 4 times an eight hour period. NO in the An Plant Four area monitoring samples for NO and NO in the wet bay area of the AN plant showed levels below 0.1 ppm for NO and The eight hour TWA limit for NO is 25 ppm while that for N02 is 5 ppm. Samples were taken 50 feet downwind of the nitric acid storage tank at ground level and on the second floor. CO in MeOH Synthesis The average of two eight hour TWA personnel monitoring samples for carbon monoxide for the methanol synthesis operator was 6.2 ppm. The eight hour TWA limit for CO exposure is 50 ppm. Allyl Compounds in ICR&D Laboratory Personnel exposure to allylchloride in the ICR&D laboratory continues to be a problem. The average of four determinations for allylchloride this month was 1.5 ppm. The eight hour TWA exposure limit for allylchloride is 1.0 ppm. All but one of the samples analyzed this month for allylchloride was above the OSHA action level of 0.5 ppm for allylchloride exposure. Personnel exposure to allyl amines continues to be minimal this month as the ICR&D laboratory has not started separatory distillations. Exhibit IV details allyl compound exposure in the ICRfctD laboratory. AP00032974 W. J. Stucben 16 November 1978 Page Three Amines Industrial Hygiene Method Development Development of gas chromatograph columns for analytical separations of butyl, propyl, allyl, and ethyl-butyl amines has been completed. Work that still remains to be accomplished is establishing desorption efficiencies, minor instrument fine tuning, and initial sampling for the amines. The ClC columns and what each column separates is listed below for all amine products. Column A Column B Monomormalbutylamine (MNBA) Dinormalbutylamine (DNBA) Mononormalpropylamine (MNPA) Dinormalpropylamine (DNPA) MonoalLylamine (MAA) Diallylamine (DAA) Monomethylamine (MMA) Efimethylamine (DMA) Trimethylamine (TMA) Monoethylamine (MEA) Diethylamine (DEA) Triethylamine (TEA) ^ Ethyi-normalbutylamine (EBA) Column C Isobutyronitrile (J.BN) Dimethylforxnamide (DMF) Column A - 1 5 ft X 2 mm glass packed with 10% CW 1500 + 3% KOH on Chromosorb W(HP). Column B - 10 ft X 2 mm glass packed with 4% CW 20M + 0.8% KOH on Carbopack B. Column C - 6 ft X 1/8 in stainless steel packed with 0.2% CW 1500 on Carbopack C. Methyl Chloroform in Maintenance Results for methylchloroform exposure in the compressor house and Area B maintenance shop show levels below 30 ppm. The eight hour TWA for methylchloroform is 350 ppm. Samples were taken using theGasbadge, collec tion system. The samples were analyzed by Gasbadge for methylchloroform content. Exhibit V details methylchloroform exposure in these areas. 1) Two synthesis routes are possible for EBA. analysis. 1. DEA + MNBA - EBA + TEA Columns A&B are required for the 2. MEA + DNBA - EBA + DEA AP00032975 KXlUlilT I PERSONNEL MONITORING FUJI VCM OSHA Standard: 1 ppm 8-honr TWA 5 ppm 15-minute Ceiling Exposure Fifteen Minute Ceiling Exposure Concentration Range / ppm - VCM 5 1. 01 - 5 0. 51 - 1 0. 0.- 0. 50 Frequency ^Percent} 0 .0 6 94 Total 100 Eight Hour TWA Concentration Range PPM - VCM 5 1. 01 - 5 0. 51 - 1 0. 0 - 0. 50 Total Frequency (Percent) 0 8. 6 86 100 Number of Samples Analyzed 0 0 2 *n 32 Number of Samples Analyzed 0 4 3 42 49 AP00032976 PVC/C11EM CLEANING Job VCM1 % of Time* DMF2 PPM Air Mask Used PPM AMS PPM TCE PPM DUST nifi/m3 Supervisor .41.6 Senior Operator .3* .9 Solution Operator ,Z .7 Control Rm. Operator .1* .3 Artisan Operator .2 .3 Dryer Operator .2 .4 Outside Operator 1.12.4 Maintenance Operator NED3 (lagging Operator NED3 Loading Operator NED3 0-10 0-10 10-35 0-10 0-10 0-10 10-35 NED* NED3 NED3 - 2.8*6.6 - - No Method tt H tt 1! ti No Method m ^" n n ii n n ii NED* NED 1) Avg. & std. dev. at 95% confidence level of 29 deter ninations from 1 /78 thru 10/78. 2) Avg. 4t std. dev. at 95% confidence level of 14 determinations from 1/78 thru 10/78. 3) Not enough data for statistical use. AP00032977 EXHIBIT III AMMONIA IN THE AMMONIUM NITRATE PLANT OSHA Limit: 25 ppm Date 10/13 10/13 10/13 '10/13 10/16 10/16 10/16 10/16 Job No. of Hours No. of Samples Average Ammonia Sampled Taken Exposure, ppm Wet Bay Operator (1) Wet Bay Operator (2) Wet Bay Operator (3) Dry Bay Operator Extra Operator Tower Operator Instrument Technician Shift Supervisor 6 6 2 6 6 6 6 6 3 3.9 3 ' 2.0 1 2.6 3 4.3 3 2.4 3 9.1 3 4.9 3 2.2 AP00032978 EXHIBIT IV ALLYL COMPOUNDS IN ICR&D LABORATORY OSHA Limit! Allyl Chloride-1 ppm Allyl Amines -None Date No. of Hours Sampled 10/2 ' 10/4 10/5 10/16 10/17 10/20 10/21 . 11 8 11.5 8.3 11 10 6 Allyl Chloride PPM 3.7 - 0.8 1.3 - 0.04 - Mono Allyl Amine PPM 0.06 - <.02 - <.04 oH a V Di Allyl Amine PPM < .02 - - - < .03 AP000I2979 EXHIBIT V METHYL CHLOROFORM IN MAINTENANCE TLU: 350 ppm Date Job Sampled. Methylchlorofo PPM S/16 S/26 8/16 8/16 8/16 8/20 8/20 8/20 8/20 8/20 9/7 9/7 9/8 9/8 Compressor house mechanic n ii it ii ti ti ii ii ii nit ii ii ti ii it ii n it Area B Mechanic ti n ii it it tt n ti ti it ii 7.0 7.0 7.0 7.0 7.0 5.7 6.0 6.0 6.0 6.0 TL5 7.5 6.5 6.0 , > ' 9.4 8.3 29.0 8.8 8.2 1.8 15.3 1.0 1.1 0.7 6.5 0.8 0.2 0.3 AP00032980 To Industrial Hygiene Report February 1994 B. G. Roberson M- Ward hT~J. smith \ From: R. L. Heath Monitoring was per-formed in B-Area during the month 0+ February. The results are on the -following pages. There were no alerts issued in February. The St. Gabriel plant borrowed our noise monitors during the month. W. A. Lowery requested a noise survey on the train engine to compere the noise levels with and without the windows and doors open. That monitoring was completed. To improve the dust monitoring, preweighed matched -filters are being used. Reba Heath AP00032981 Hygiene Monitoring During the month of February, hygiene monitoring was conducted for Noise < 1 sample), Ammonia (6), Chloroform Formaldehyde (5), and Respirable Dust (8). (3), Chemical-Area Completed Hygiene Monitoring <Action Level >Action Level Permissible Exposure Limit Noi se -B Area Maint l Ammonia -Wet BayVDry Bay 3 --Solutions 3 Formaldehyde -Wet Bay\Dry Bay 3 -Solutions 4 AP00032982 Year to Date Industrial Hygiene Monitoring Results Chemical--Area Action Level Action Level Permissible Exposure Limit Ammonia -AN Wet Bav -AN Solutions -NH3 Loading -NH3 Operator Asbestos -30 min -Duration -Area samples 3 3> l Benzene -#2 Amines Oper. Carbon Monoxide -Compressor House 2 Chloroform -AN Dry Bay Di ethanol Mi ns --NH3/MeOH Oper. Dimethylamine -Drum Filler -Bung Tightner -Unhooking Car Di methyl f orntMl de -Amines Loader -Drum Filler --Bung Tightner Fibers --Fiberglass -Ceramic -fiber Farmaoiide -Pilot Plant Oper. Formaldehyde --AN Solution Oper. -AN Dry Bay Oper. 3 ^ Hydrogen Cyanide -Pilot Plant Oper. AP00032983 year To Date Industrial Hygiene Monitoring Results Continued /ami cal -Area Action Level >Action Level Permissible Exposure Limit thanol [ -Truck Loader j -Tankcar Loader -Loading Qper. I jthyl amines [ -#1 Amines Oper. j -Drum Filler -Bung Tightner trogen Dioxide --Nitric Acid Loader iise -NH3/MeOH -Process -Maint -E*E j -Compressor House -Pilot Plant -HN03 j -Process I -Maint -I&E --AN -Process --Maint -IlcE -Amines -Process -Maint -I&E -Train Crew -Engine Qper --Switchman -Main Shop -Warehouse Receiving -Engineeri ng -Pilot Plant Office -Hydrogen -Process -Maint -l&E 1 3 I 2 AP00032984 Alert # Industrial Hygiene Alerts For FY94 Date E:<p 1 anati on AP00032985 Monitoring Activity December Benzene November Lead CO Noise Complete wOinDl ete Ccmolete No samples taken-pumps out tor calibration December Noise survey-B Area Noise Main Shop Complete Two samples taken January Noise HN03 area 3 in Maint. and 1 in process. TEA Drumming 4 samples taken DMA Drumming 2 samples taken DMF Drumming no samples DMF Loading no samples Ventilation B Area incomplete Formamide Pilot Plant incomplete HCN Pilot Plant incomplete Noise Pilot Plant incomplete AP00032986