LABORATORT COMMITTEE MEETING JULX lith, 1957
Messrs:
R. W. Higgins E. E. Harden H. B. Speelaan ' H. E. Levis
E. v. *ix
R. B. Abell
Gentlemen:
Meeting was celled to order at 10:30 A.M., July 11, 1957 is the Aurora Conference Boon. The next seeting will be held September 5th, 1957 at the same place.
ACTION TAKEN ON REGULAR AGENDA.
1. E3-A - Hot Strength Testing.
Bob Higgins visited Hayes Laboratory of H. W. in Pittsburgh last month and his recommendations are: <
\
1. Build furnace outside with its own flue. 2. Make single purpose, simple unit.
Earl Davis OK'd rise of Kexcn Premix equipment on finding that we had previous operating emparlance and were planning to have the bumar and preaim as does together as possible.
\
John Hosbein will be here during the vselc of July 15th and we vill try and iron out ell details of this project and proceed with it.
2. E4-B - Cold Impact Teat Program.
No Action.
3. E7-B - Tile Abrasion Test Program.
Procedure report submitted by R. Bruce Abell. This needs Borne dressing up to be incorporated in an Engineering Department data book consisting of:
1. Test Furnace Data (1950 - 1951) 2. Cold Tension Tests (EB & HB9) 3. Abrasion Teats A. Cold Impact Tests 5. Hot Strength Tests
A. E8-B - Comparltiva Competitive Testing,
Quigley Insulag tests are cow completed xcspt question of relative wet adhesion to ateel va. Pyroscat. Work in progress on A. ?. Green castable Block Mix ve. our "Easy Seal" and Sehlijdler vermiculite block.
5. E12-A - Rev Thenolayer 'Tell Model
Completion of modal is row scheduled for 'feel: of July 22nd. Ksw Decrete chute has teen submitted to Engineering Department.
6. E13-3 - Low Cost X Factor Equipment.
Ro progress to report.
7. EU-8 - Model of American Arch Light Veight Insulating Refractory call.
\
8. Pl-A
This model -.as started on June 26 1 27th but K. T. Deris and R. V,
Higgins made design.revisions during erection ta^facilitate construct
ion permit various wall thicknesses using from Ay to 9" of insulating
firebrick. We axe now going to finish the model using 4^ and 9*
depth tile along with the present >>5/4" shapes. The overlap on the
H315 tile by the insulating firebrick was decreased so that it would
cot interfere vita the castings or hangers which support the K315 tile.
Karl Davis is working up the new design drawing-5 on the besis of the
model revision.
..
- Block Insulation Research.
coking.
received one complaint on this and to keep it frcm happening again the following steps are to be taken.
1. burnish hot plate to ovu tender and test a larger number of samples for sl. king as they come from the oven.
2. Work cu inorganic binds:-. 3. Try to eliminate asbestc : from block# 4. Set manufacturing specif `.cations for plant#
3. "I. *V. Hacdlcabiliiy To: iting.
1. Brop taster - So action due to vacation shut down of plant.
2. Tumbler test - We di3cuasod this proposed specification and okayed it from our point of view*, tfe have the' equipment for this test.
C. Block Machine Improvements.
1. Slitters St Crosscut - Row in use, still need some adjust ment but we are working on this problem.
2. Positive Drive System. - Preliminary design sketches have been completed and a summary of our needs issued by E. V. His on 7/9/37. Howard Spcelaan will take drawings and summary to fabricators in Indiana for bids on this project
3. Vacuum Removal System. - This is under consideration along with the redesign of the block machine. Ths half pound of -.rater par board foot mentioned in last month's meeting is over ar.d above what our regular driers take out. Test dab or. this is included in Dan Rix*a report of 7/9/57.
4. P.I.V. Unit. - Thi3 unit is being installed now and will b? run for the first time during week of 1/15/51
rage 2
9, P2-A - Slug Tree Wool and Shot Reduction.
We etill require a constant feed of wool to the granulator to enable the alug cleaner to work right. Our plans are dow to install it dur: the vacation shut down. The water cooled beat resisting cast steel divider is working above expectations. We now get a regular six stn Belt which wasn't possible with our other dividers.
10. D2-B - 1
Submitted was Ed Marden's trip report dated 7/2/57 on hia 6/15/57 trip to Texas City pertaining to Pyroscat gurr.ed on a tank and his report dated 7/2/57 covering his 6/25/57 trip to Tulsa concerning the Refr&ctall Company vet gun testa.
PMlllpa Petroleum vaa considering Quigley Insulag and Pyroscat for their Sweeney, Texas Job. Ed Warden1a reports and letters were help ful in obtaining this order for Pyroscat to be installed by Thorpe Insulation Co. of Houston, Texas.
11. D4-A - Utility Finish.
*1. Navy Specifications
Work in Progress
2. Finish for highly absorbent block
Work in Progress
3. Palming qualities vs. One Coat
Work in Progress.
12. D12-8 - Hew Type Block Insulation Heseareh.
Ho Action.
New Projects,
H5-A - Findlay Silica Caatable.
This information vas requested by Mr. Pete Merkle of our Detroit office for use on an all silica construction for glass tanka.
INACTIVE FF0J2CTS.
1. E6 - Hot Impact. 2. E9 - New Refractory Hanger. 3. P3 - Rust Inhibited Insulating Cement. A. D1 - Decretee. 5. D3 - Castables 60, SO, 100, 120# Classes. 6. D5 - Thinsuliner 4 Thinsuliner S. L. 7. B9 - Costing Materials - Waterproofing. 8. D13- Eonding Cement.