Document x1aM6wZX6aom7e9GEqLeOqQeb

DownloadRandom document
SunCoke will expend vast sums installing new controls to meet MACTJloor EPA takes the position that "I rlequiring the consideration of costs in setting the MACT floor would conflict with the plain language of CAA."' `' Under Loper Bright, that interpretation is not entitled to deference. But even assuming EPA's interpretation of the statute is correct, it increases the need to ensure in the first instance that EPA (1) has considered all the data and (2) properly wields legal authority to set the MACT floors. That is especially true where, as here, EPA is establishing floors for multiple HAP emission limits for the first time. This drives SunCokc to develop first of a kind applications to control these HAP emissions. When the EPA does not or cannot consider the costs of the regulation it imposes on stakeholders, a regulate-now-and-determine-legality-later approach is certain to inflict irreparable harm. The I.C. Circuit has stayed one of EPA's new rules when it was based on bad data and industry would be irreparably harmed complying with "expensive" regulations before the error could be corrected. [ [9 Installing additional controls to meet the requirements of the Final Rule will be exorbitantly "expensive."[2() As an initial 'natter, SunCoke must spend significant time and money evaluating how to comply with the new floor limits. This would require substantial testing to collect the data that EPA did not in its rulemaking regarding the sources and the emissions, as well as engineering, modifying additional equipment, and other efforts. Because of the agency's truncated timeline-- and because EPA forgot to include new HAP surrogate limits and work practice standards in the Proposed Rule SunCokc has not yet been able to determine the total cost of installing the new controls. As SunCoke explained in its comments, the rule as proposed would severely impact SunCoke's Jewell coke plant, costing it at least S474.9 million in capital investments and $66 million (not 54.7 million) in annual costs, if it is feasible to install the necessary controls at all. [2[ SunCoke has a year of testing before it can know whether it can meet many of these limits. In the case of l II II 11g, SunCoke will need a year of testing because of unknown issues it can have, based on its experience installing PAC at Granite City Operations and Middle Town Operations. Testing potentially impacts the SO,/12CiD operation requiring a second spray dry absorber and an expanded baghouse costing over an extra S15-20 million. Beyond the costs associated with identifying and developing these new controls, SunCoke will incur yet more costs by limiting production during installation SunCoke will inevitably suffer opportunity costs during this downtime. The D.C. Circuit has held that revenues forever lost because of unauthorized agency action amount to irreparable harm. [22 All told, these errors will cost SunCoke many millions of dollars. SunCoke can never expect to recover these costs, no matter the outcome of the litigation pending before the D.C. Circuit. 89 Fed. Reg. at 55710. Pordwni Comm, Ass 'n t, E P1,665 F.3d 177,189 (I) C Cir 2011) i?c SunCoke will submit detailed declarations explaining the financial impact of the new controls required to ensure compliance with SunCoke's motion for a judicial stay" In re NIT Conn , 26 F.4th at 990-91 - 32 - Sierra Club FOIA 2025-EPA-04883 ED_018388_00000109-00092 SC_EVERSPLIT0005766