Document x1Z26rrmOdGwKw21yXNXD3QgQ

ABDOO136657 ABERDEEN CHEMICAL PLANT :ROUTINE CHEMICAL DOSIMETRY SUMMARY Month Of: July, 1983 Date Of Report: August 5, 1983 cc: JF, CRM, PEM,\EJp'RDJ, WFH, CRS, RAF, RAM, AHS T. Grumbles - Houston, brumwrVght, M.D.'"- Ponca City ALL SAMPLE RESULTS: Chemical VCM Lead Total Particulates < PEL No. % 90 94.7 9 100.0 2 100.0 > PEL(OVEREXPOSURES) No. % 5 5.3 0 0. 00 QVEREXP05URES: Job Class Reactor Operator . Chief Operator Reactor Operator .,Reactor Operator Exposure 1.3* ppm, VCM 1.4* ppm, VCM 1.5 ppm, VCM 2.4 ppm, VCM Source Employee overexposed while locating source of VCM leak in old unit. Employee overexposed while changing the Emission Re covery System filters. Employee overexposed while taking slurry samples in the new unit. Employee overexposed while observing the new unit re actor sewer line "bullseye" to see if 745 sewer~valye- was leaking (it was!). He detected the odor of VCM and left the immediate vicinity of the bullseye. ABDOO136658 OVEREXPOSURES - Continued Job Class Yard Operator Exposure 4.1* ppm, VCM *Respiratory protection worn. Source Employee overexposed while connecting/disconnecting VCM railcars at the un loading stations. rah