To F rom Date Subject onC. CcU J.D. Burns J.D. Minott February 3, 1972 Environmental Health Report Continental VCM Plant V. A) . Status of Active Budget Items 1). Primary Treatment System Revisions The steam stripper system was started up on January 8, 1972 and has been operating essentially full time since then. EDC levels from its effluent are averaging about 50 ppm. Plant effluent EDC levels have averaged around 500 ppm so long as the stripper is working well. The stripper bottoms cooler was put in service on January 8 also, and has decreased the plant effluent temperature by a few degrees compared to pre-stripper operating data. 14,700 gallons of slop EDC were hauled from the T_2 pit last month. This has essentially emptied the pit and weekly checks are now being made to determine slop EDC production with the steam stripper in service. 2). Secondary Waste Treatment System The pH control system has been operating well all month with a control of 7 + 0.5 pH units except for a few short plant upsets. Some 50% caustic solution (about two days operation) was required in addition to the regular slop caustic material. Caustic consumption continues to be lower than originally predicted, but slop caustic generation has also decreased, requiring some use of purchased 50% caustic. Rainy weather has again delayed completion of the secondary system. All basins are now completed, all underground piping is done, all power and light poles set, plus all underground conduit is installed. Power is connected to the switchgear panel. The main remaining jobs are: fencing, final grading and shelling of roads, some instrument work, pulling wires to the aerators and light poles, and completing the sludge pump piping. The basins are 15% full, due to rainwater, and will be completely filled with plant effluent as soon as the fencing is completed. Probable startup is by February 21, 1972, if the weather remains good. CCR 000060702 B) . Current Developments 1). Analytical Work The first set of special effluent water samples were sent to Ponca City R&D for special EPA permit data. Four more sets will be sent in the next two months. Problems on the Cd analysis have prevented making a better'Cd balance across the plant, but the Ponca City samples will give this data also. EDC tests on the T-l pit liquid (scrubbing water from the C-500 vent gas scrubber) show about 500 ppm EDC. This liquid is now the main EDC source in the plant effluent, since the steam stripper is removing almost all in its feed. Analysis of the C-500 vent gas is continuing to show that most of the acidity is due to CI2 not HCl or HOCl. The trailer-mounted gas chromatograph unit, which is analyzing the C-500 vent gas, has not been able to measure the low HCl levels and is not sensitive to Cl2> so it cannot be used to cross-check the above results. 2). EPA Interim permit Letter A preliminary reply to the EPA has been sent to the Legal Depart ment and Saddle Brook for review. A final, revised copy should be mailed out by February 10, 1972. The revised copy will be attached to next monthps pollution report. Work is underway to obtain all the data required for the five questions asked in the EPAfs original letter (appended to last months report). Full scale plant tests have been made on the cooling tower, both on low chrome and non-chrome, non-zinc water treatment systems and preliminary results look good. Ponca City R&D has started on the special analysis requested in the EPA letter. 3). C-590 Vent Stack Afterburner Preliminary work has started on estimating an afterburner for the main plant vent stack. Proposed state air quality regulations require an ''afterburner or approved equal device" on all vents containing appreciable ethylene fumes. It is expected that these state regulations will be approved by the federal government around July 1972 and that a plant air quality improvement inplemantation schedule will be re quired around January 1973. Two vendors have been contacted for equip ment quotes and plant estimating work will start in May 1972. It is expected that a project estimate will be available in July 1972. State regulations will probably require a solution to the C-500 vent problem no later than January 1975. John D. Minott Senior Process Engineer bs cc: LNV"DOP-RDG-RHG"PLF"GDJ CCR 000060703 C-500 VENT STACK ANALYSES January 1972 Date IN PPM BY VOLUME EDC VCM EtCl Other Organics Ortho Total tolidine Acid as ci2 HCl Total Oxidants Total Chlorides 1/5/72 - 325 2469 246 1/12/72 7208 2900 2998 11,805 1/19/72 10213 2041 12352 3695 1/26/72 7707 466 1714 5851 2222 3457 938 617 3086 7407 2790 1481 1556 - 444 3284 2222 617 667 oo Nt IN VOLUME % CO o2 ch4 C2H6 C2H 1.67 1.70 1.60 1 .23 0.46 3.8 0.55 4.6 0.47 4.7 0.12 6.9 0.26 Tr 0.88 0.03 0.47 Tr 0.16 Nil 0.75 0.48 1 .14 2.21 o o 70 O o o o O' o o 000060705 VCM EFFLUENT WATER. ANALYSIS MONTH OF January 19 72 parameter Temperature - F Flow - gpm PH Acidity Phenolphthalein Alkalinity, M0. Color Turbidity Total Solids Total Dissolved Solids Total Suspended Solids Total Volatile Solids ' Chlorides as Cl Sulfates as S0A Ammonia as N Total P0/L as P04 Ortho ?04 as P0A COD BOD (5 day) Forma tes i E0C VCM Ethyl Chloride Ethylene Chlorhydrin : Misc. other Organics Iron as Fe Copper as Cu Chromium as Cr Zinc as Zn MS______________________________ i Mn 1 Co i Ca ! Ni ` Na 5 Cd 1 1/2/72 80 330 7.3 66 1750 110 65 16.560 13.050 ' 3510 1 910 7400 160 60 6.0 2.0 3360 1560 672 _____ 2294 21 14 583 316 33 0.55 11 .5 1.6 14.0 1.2 l .0 > 750 ; 2.0 4200 0.15 1/9/72 * 86 | ' 285 1 7.0 1 35 1375 73 400 15.596 14.730 866 2410 2600 220 72.6 4.0 1.0 2080 1165 662 574 ! ! 1 : : : i i 1 f i i i 1 ; 2 5 553 85 30 0.30 9.0 2.3. 15.0 : : ! i i 1.5 5.4 7000 : f i 1.2 6600 0.16 ! .1 ` 1/l6/72 93 370 ____ZjJj______ , 82.5 1180 35 150 17 .7.70 15,130 2040 4080 2200 250 76 3.0 1 .0 2800 1062 680 1438 Tr 20 283 282 30 0.10 1.8 2.6 12.0 0.9 1.9 12f 0 1.5 18000 0.25 1/23/72** 91 1 200 7.1 17.5 725 60 130 24,624 22,680 1944 120 4300 250 61 4.8 0.8 3056 1/30/72** sqV j 150 i 7.4 23.5 * 3C0 20 220 21 ,988 20,484 . 1514 ' 1144 4300 300 52.5 3.28 0.05 2000 741 535 17 8 852 182 16 0.50 1.4 1.0 13.0 1 .35 4.7 4000 5300 0.12 639 : 292 7 9 444 138 11 .5 3.1 2.7 1.4 20.0 1,2 : 1.4 *i 4940 ; 5.0 4100 ; ' 0.19 Notes: 1). * Steam stripper started up just before this sample 2) . ** These two samples were taken during low and no chrome cooling tower tests, 1/23/72 during a low chrome test and 1/30/72 during a no chrome, no zinc test. State Regulations 96F Maximum 6.0 to 8.5 * 12 ppm * 31 pnm No TLM data * 0.05 ppm as Cr 0/, * Represents TLM^10 Air and Water Sampling Steam Strip per Startup Slop EDC Re covery Secondary Waste Treat ment System C-500 Pre scrubber Re pairs Jan 1972 -Apr 1972 Environmental Project Schedule Jar y 1972 July 1972 installation Startup Laboratory Testing en Measure Quantity Installation Test Recovery___________ design of PermAh.ent System ---- Construction Startup <Efficiency Tests <_------y ^---------- Install Efficiency. Tests New Nozzle Oct 1972 i an 1973 Copper Removal System Operating Test 1>r ocess Improvements H-103 Vent Re frigeration Unit Siocess Design,___ "STartup *PurcKa Jing Mechan--i-c--a>l Desigi ^Installation Cooling Water ^EstabTfsh Base C? Level with Secondary System Treatment Changes n n 73 < Evaluate Reducing Agents C-500 Vent Odor Problem Reduction of Ef fluent Water Rate O Cow LeVel Chrome Testing o o identify Odor Component^ Concentration Oo' process De- sign-------------------- -- ---------- -- > o -4 o Recover Coiidensate from R-304 Vent a [Eliminate-Wa'ter Drains at Water Temperature T.C 1 s RecirculatejWater'on Standby Air Compressor Interoffice Communication To From Date Subject Distribution Below J.D. Burns February 28, 1972 Environmental Health Reports (conoco For those of you who publish monthly environmental health reports, it may be useful to include graphs of key measurements of pollutants in both air and water effluents. Distribution: W.J. Gallagher - Hammond K. E. Lyon - Trainer J. McCleskey - Baltimore J.P. 0*Connell - Newark D.O. Popovac - Lake Chas. VCM. L. N. Vernon - Lake Chas. Petro M. Smith - Aberdeen G. Tillson - Oklahoma City CCR 000060707