Document x1O6xqzo7xw9ZQKaBYwqYXvM1

CHEVRON U.S.A. INC. ENGINEERING DEPARTMENT EL PASO, TEXAS Specification No. EP-470-S January 27, 1983 (JKW) Page 1 of 21 CONSTRUCTION OF STORMWATER BASINS AND PUMP STATION WASTE WATERJREATING PROJECT PHASE III EL PASO REFINERY SECTION 1.0 - SCOPE OF WORK 1.1 GENERAL - CONTRACTOR shall provide all material, utilities, tools, construction equipment, labor, including supervision and insp^tion, and all items of a consumable nature (listed in Specifications EG-1048 ancFEG-1049) that are required for construction of two High Density Polyethylene (HDPE) lined storm water basins, pump station, and related facilities, as detailed by thisiSpecification, including the drawings and other attachments listed in the Appendix,-except as otherwise provided in Section 4.0, at COMPANY'S El Paso Refinery, El Paso, Texas. This work includes but is not limitedrto: All earthwork associated with the construction of two HDPE lined basins and basin access roads (includes construction dfTone new basin and modifications to the existing basin); relocation of oily silt.from bottom of existing lined basin to refinery land farm; removal and disposal of hypalon liner, steel overflow pipes, and pump suction pipe from existing basin; rerfgyal of oil contaminated subgrade under existing hypalon liner (if any); installation of below grade piping (welded steel, PVC, and reinforced concrete pipe); all concrete work including construction of pump paving slab, overflow channel, pipe collars, and pump suction sumps; surfacing basin access roads with crushed rock, also grading roads where necessary prior to surfacing; oil stabilization of newly graded slopes; fabrication and installation of steel platform and stairs; procurement and installation of HDPE liners. Chevron BB 014997 CHEVRON U.S.A. INC. ENGINEERING DEPARTMENT EL PASO, TEXAS Specification No. EP-470-S Oanuary 27, 1983 (3KW) Page 2 of 21 SECTION 2.0 - GENERAL PROVISIONS COMPANY REVIEW AND APPROVAL COMPANY'S approval of or agreement to the performance of certain items of con struction work or the furnishing of certain material and equipment by CONTRACTOR as required in this Specification, or otherwise obtained for the work hereunder, shall in no way relieve CONTRACTOR from the full responsibility for the performance of such work, for thre^adequacy of such material and equipment or for the sole responsibility for the work performed under this specification. CONTRACTOR shall obtain such approval or agreement through COMPANY'S Representative, or in a manner previOTsly approved in writing by COMPANY'S Representative. " OTHER CONTRACTS COMPANY reserves the right to let Other contracts or perform other services in connection with CONTRACTOR'S work hereunder. CONTRACTOR shall afford others equitable opportunities for theintroduction and storage of their materials and the execution of their work and shall properly coordinate its work with theirs PLANT REGULATIONS Prior to commencement of work, CONTRACTOR shall become familiar with the plant regulations included in Addendum No. 1 to this specification entitled, "Additional Provisions for the Performance of Work". These regulations apply to all contractors performing work on COMPANY'S premises. CONTRACTOR shall be responsible for compliance with theserxegulations while on the premises of COMPANY. PERMITS cr CONTRACTOR is required to obtain all State and local permits, other than those called out as provided by COMPANY ITTthe specification, if any. SALVABLE AND NON-SALVABLE MATERIAL 2.51 All salvable material and equipment shall remain the property of COMPANY, except those materials supplied by the CONTRACTOR not incorporated in the finished facility. Declaration of items as salvable or non-salvable shall be made by COMPANY Representative. 2.52 All salvable material shall be removed by CONTRACTOR to El Paso Refinery Storehouse area. This shall be handled as "new" material and not damaged so as to be unserviceable. -- Chevron BB 014998 CHEVRON U.S.A. INC. ENGINEERING DEPARTMENT EL PASO, TEXAS Specification No. EP-470-S January 27, 1983 (JKW) Page 3 of 21 2.53 All items declared by the COMPANY Representative to be non-salvable shall become the property of CONTRACTOR and be disposed of outside COMPANY'S premises. Non-salvable material does not include excavated material which will be disposed of on COMPANY premises. '2-6 SURVEYING J 2.61 CONTRACTOR shall perform fill surveying necessary from base lines and bench marks established by COMPANY. The accuracy for all grades, elevations, and plumbing of anj; structures and location of facilities described in the specification shall be the responsibility of CONTRACTOR. 2.62 CONTRACTOR shall preserve^all permanent survey monuments and bench marks. In the event CONTRACTOR disturbs any permanent monuments or bench marks, they shall be replaced by a land surveyor acting under COMPANY'S instructions; replacement cost shall be for CONTRACTOR'S account and may be deducted from the sums due or to become due CONTRACTOR. 2.7 SAFEGUARDING WORK AND PROPERTY '2.71 CONTRACTOR'S operations shall be so conducted that a minimum of damage and inconvenience is caused to-other refinery facilities, the public, or to owners and tenants of adjoining-property affected by the work. CONTRACTOR'S work plan shall be approved by the COMPANY Representative before work begins. , 2.72 CONTRACTOR'S work and equipment shall be guarded by barricades, delineators, trench covers, etc. Lights shall be installed at idle machinery, or at other obstructions on roads-and accessible areas from sunset to sunrise. 2.73 CONTRACTOR shall install temporary roads approved by the COMPANY Representative, as necessary tQTnaintain access to existing operating and maintenanace facilities while construction is proceeding. 2.74 Repair of damage to barricades and to rope, wire or fenced delineation of COMPANY facilities shall be the responsibility of CONTRACTOR. When CONTRACTOR after due notice, fails to restore any barricade or delineation during the course of the work, ^COMPANY may perform this work and deduct the cost from the sum due or to become due CONTRACTOR. 2.75 CONTRACTOR shall supply knowledgeable flagmen as necessary to ensure safe traffic control. Flagmen shall be located at positions approved by the COMPANY Representative. Chevron BB 014999 CHEVRON U.S.A. INC. ENGINEERING DEPARTMENT EL PASO, TEXAS Specification No. EP-470-S January 27, 1983 (JKW) Page k of 21 2.8 GUARANTEE Irrespective of whether COMPANY has inspected or approved any of the work hereunder, CONTRACTOR guarantee!; that all of the materials and labor furnished hereunder by CONTRACTOR shall bsrfree from defects in materials and/or workmanship for a period of one veatfexcept for the HDPE liner installation which shall be guaranteed for a period of two years) from the date of the Acceptance of the Facility by COMPANY. Any such materials and/or workmanship found to be defective during said one (or two) yL period and any damage caused by such defects or the repair or replacements! them shall be replaced by CONTRACTOR at his sole expense with materials and workmanship that are satisfactory to COMPANY. COMPANY will notify CONTRACTOR of such defects in writing and CONTRACTOR shall promptly thereafter replace the defective materials and/or workmanship and repair any damage-caused by such defect or such replacement. If CONTRACTOR does not commence Td pursue with diligence the replacement of defective materials and/or workmanship, or damage caused by such defect or such replacement, COMPANY may replaoedefective material and/or workmanship and repair any damage, and COMPANY shall deduct from any sums due or to become due CONTRACTOR or CONTRACTOEtshall reimburse COMPANY for all of COMPANY'S expenses in replacing such defective material and/or workmanship and repairing such damage. 2.9 TEMPORARY CONSTRUCTION FACILITIES 2.91 CONTRACTOR shall provide and install all necessary temporary facilities including, but not limited to, ti rooms, locker rooms, toilets, office and storehouse. All temporary installations shall be subject to approval by COMPANY prior to installation^ 2.92 In addition, CONTRACTOR shall provide all necessary temporary equipment and material including, but noirlimited to, shoring, concrete forms, bracing, ladders, scaffolding, staging, drop cloths and tarpaulins. 2.93 CONTRACTOR shall maintain ail temporary facilities, material and equipment in a safe and adequate manner and remove them immediately upon completion of the work requiringtheir presence. 2.10 MISCELLANEOUS Accommodations, meals and transportation of all CONTRACTOR'S employees shall be the responsibility of the CONTRACTOR. 2.11 WORK SPACE AND STORAGE AREA- COMPANY will assign space for CONTRACTOR'S office, work space and storage area. -= Chevron BB 015000 CHEVRON U.S.A. INC. ENGINEERING DEPARTMENT EL PASO, TEXAS Specification No. EP-470-S January 27, 1983 (JKW) Page 5 of 21 SECTION 3.0 - PERFORMANCE OF WORK 3.1 CODES . T All work described in this specification'shall be performed in strict conformance with the codes and industrial standards hereunder. 3.11 All applicable municipal codes^ilaws, and ordinances governing the work. 3.12 The latest edition of ANSI CodeTfor Pressure Piping, ANSI B31.3 Petroleum Refinery Piping and the AISC JJpde of Standard Practice for Steel Building and Bridges, the AWS Code for^Welding and Building Construction, D 1.0-69. 3.2 SCHEDULE -- 3.21 CONTRACTOR shall maintain~S"detailed construction schedule for all phases of work and shall conform withThe commencement and completion dates set forth in the Facing Sheet of this,,Agreement. The schedule shall indicate start of construction, job progress and completion date for each portion of the work. CONTRACTOR shall submit this construction schedule to COMPANY within one week aftgr the date of this Agreement and shall resubmit a revised schedule each week until construction is completed. COMPANY will retain the prerogative to alter the schedule without advancing the job completion date at any time to facilitate or maintain refinery operations. 3.22 It is understood that the CONTRACTOR'S compensation, as provided for in the Facing Sheet of this Agreement, includes all overtime payments, premiums, bonuses or other extras required to meet this schedule, and that CONTRACTOR shall not be entitled to additional compensation for these amounts except as otherwise provided. 3.3 SEQUENCE OF WORK Tlf 3.31 The existing hypalon lined basirrand pump station must remain in tact and in service until the new pond is complete and operable, at which time modifications to the existing pdffd may begin. Aside from this requirement, the sequence of work shall be asrmutually agreed between COMPANY and CONTRACTOR and shall be consistant with the facing sheet of the agreement. Chevron BB 015001 CHEVRON U.S.A. INC. ENGINEERING DEPARTMENT EL PASO, TEXAS Specification No. EP-470-S January 27, 1983 (JKW) Page 6 of 21 MATERIAL HANDLING AND CORRESPONDING PAPER WORK 3.41 CONTRACTOR shall use COMPANY Purchasing Department Form GO-111, to requisition material requirSi for the work hereunder. The form shall be submitted to COMPANY RepIIsentative at least 24 hours in advance of the time material is required. Only the COMPANY Representative can authorize the release of materials. The material shall be picked up by CONTRACTOR at the El PastnRefinery Storehouse. 3.42 CONTRACTOR'S requests foFwithdrawal of COMPANY-furnished material and equipment shall be based^on quantities shown on drawings or lists of materials furnished by COMPANY. CONTRACTOR shall obtain approval from COMPANY'S RepresentsTlve, in writing, before materials in excess of the quantities shown on the drawings or lists of materials will be issued. 3.43 CONTRACTOR shall be responsible for keeping all materials and equipment in good condition until the completed facility is accepted by COMPANY. 3.44 CONTRACTOR shall be held accountable for surplus materials furnished by COMPANY, items received from COMPANY and to be returned, and for shortages or damages to equipment and materials furnished by COMPANY. 3.45 CONTRACTOR shall promptlyj:heck bills of material or drawings for any errors which would result in shortages and shall, notify COMPANY in writing if there are any such errors or if the equipment and materials listed are insufficient to meet his anticipated needs. Delays caused by CONTRACTOR'S failure to disaver and promptly report such errors or that the equipment and materials listed are insufficient to meet his anticipated needs shall not necessarily constitute a basis for extension of time of completion under Section 3.2 oFa basis for reimbursement under Section 3.3 of the Terms and Conditions. ^ 3.46 Upon completion of the job, CONTRACTOR shall furnish COMPANY an inventory of all remaining equipment and materials which were furnished by COMPANY including the quantity, description, and the item number of each item. When directed by COMPANY, CONTRACTOR shall transport the remaining equipment and materials to such locations as designated by COMPANY. Chevron BB 015002 CHEVRON U.S.A. INC. ENGINEERING DEPARTMENT EL PASO, TEXAS Specification No. EP-470-S January 27, 1983 (JKW) Page 7 of 21 SECTION 4.0 - WORK AND MATERIAL BY COMPANY 4.1 WORK BY COMPANY The following items of work relatedjto the facility shall be performed by COMPANY: Installation of pump and motor; installation of above grade steel piping for pump suction and discharge lines; all electrical work; fabrication of aluminum silt weirs. 4.2 MATERIAL BY COMPANY COMPANY shall provide only such material as indicated on Construction Drawing Lists of Materials. ^ Chevron BB 015003 CHEVRON U.S.A. INC. ENGINEERING DEPARTMENT EL PASO, TEXAS Specification No. EP-470-S January 27, 19E3 (JKW) Page 8 of 21 SECTION 5.0 CONSTRUCTION This section amplifies the construction details for some portions of CONTRACTOR'S work. i 5.1 GENERAL 5.11 Equipment Location Construction drawings indicate~the locations of principal equipment and general plant arrangement. Location of minor structures are shown on the detailed construction drawings^ 5.12 Final Connections " If it is necessary for CONTRACTOR to make connection to any COMPANY facility already in service, CONTRACTOR shall request a date for making such connection in advance soithat COMPANY Construction Representative can schedule a shutdown. No work shall be done until a Work Permit has been issued. COMPANY Inspector must be present while work is in progress. ^ 5.2 PIPING __ 5.21 General --_ All piping shown on the construction drawings shall be installed by CONTRACTOR. Piping shall be pre-formed and laid in such a way that it will at all points conform to thelsupports or trench bottom and be located as indicated on the construction drawings. 5.22 Piping Material All piping shall be field fabricated by CONTRACTOR. COMPANY shall provide suitably coated steel pfpe and bare fittings. Carbon steel piping shall be furnished in double-random lengths beveled for welding. All PVC pipe shall be furnished in 20 foot lengths, along with the necessary elbows, flanges, cleaner and glue. 2L 5.23 Delivery and Hauling = Pipe to be furnished by COMPANY will be handled from storage by CONTRACTOR. Attention should be given to proper storage and stringing using sacks, pads or other methods to prevent damage to the coatings. Chevron BB 015004 CHEVRON U.S.A. INC. ENGINEERING DEPARTMENT EL PASO, TEXAS Specification No. EP-470-S January 27, 1983 (JKW) Page 9 of 21 5.24 Pipe Damaged in Shipment CONTRACTOR shall repair oTcut off, as specified by COMPANY, sections of pipe damaged in shipment ^hile being handled by COMPANY. CONTRACTOR shall receive^syment for this work as a Change. Pipe will be considered damaged in shipment only if CONTRACTOR notifies COMPANY of the damage sccthat COMPANY can inspect the damage before CONTRACTOR handles the pipe in any manner. Any pipe damage not previously called to COMPANY'S attention and revealed by field test or inspection will be repaired byjCONTRACTOR at his expense. 5.25 Loose Pipe and Short Pieces LB All pieces of pipe exceeding GJeet in length which are cut off when making tie-in welds or for other reasons shall be hauled ahead and welded into the pipeline by CONTRACTOR. 5.26 Vents and Drains on Piping =5 Vents and drains at all high arrdlow points in the piping which are required for complete venting or draining for hydrostatic test shall not be shown on construction drawings. Any such vents and drains shall be installed as necessary by CONTRACTOR.- Vents and drains installed for hydrostatic testing shall be plugged and seal welded upon completion of testing. 5.27 Preparation and Care of Pipe Wr Welding Interior; The inside of each length of pipe shall be thoroughly examined to make sure that it is free from dirt, animals or other obstructions. If obstructed in any way, the pipeShall be swabbed out before being incorporated into the line. = Ends; The ends of the pipe shall be thoroughly cleaned of rust, scale, dirt, grease, protective coating or crther foreign matter which might affect the quality of the welds. -- Beveling; The ends of unbeveled pipe produced by field cut shall be beveled to an angle of approximately 3JLdegrees to the plane at the end of the pipe before being welded into the line. The beveling shall be done in a workmanlike manner, and the finished cut shall be clean, free from scale and ground to correct toleranorif necessary. Chevron BB 015005 CHEVRON U.S.A. INC. ENGINEERING DEPARTMENT EL PASO, TEXAS Specification No. EP-470-S January 27, 1983 (3KW) Page 10 of 21 5.28 Unattended Sections: Open ends of sections of pipeline, when unattended, shall be effectively closed or plugged. " 5.29 Identifying Welder's Work: _ COMPANY shall assign identifying letters or numbers to each welder employed on the line and shall require each welder to "autograph" the welds he makes . The "autographing" of welds shall be done to the satisfaction of COMPANY.. 5.210 Connections in the Run of Existing Lines Tie-in welds which are required to be isolated by packing the interior of the line will be shown on the construction drawings or specified by the COMPANY Representative. ^ 5.211 Ditching _ Safety: CONTRACTOR shaiQIecome familiar with and adhere to the requirements of Engineeringjffrd Maintenance Instruction No. 2045 entitled "Trench or Ditch Excavations11 attached as part of Appendix A.04. Character: Ditching shall be of sufficient width and in such alignment as to permit laying the pipe therein without straining the pipe and without injury to protective coatings. The kqttom of the ditch shall be free of debris or any foreign material which, injCOMPANY'S opinion, might damage protective coatings, and it shall be so graded or padded that it will afford uniform bearing to the pipe throughout its length. A "padding" of three or more inches of loose backfilLwlll be considered desirable but will not be required in normal tillable soil. Such padding will be required wherever rock or hard clods are encountered in the bottom of the ditch. This padding may not contain clods or rocks if their diameter exceeds the thickness of the padding. All wood blocks usedjor support in the ditch shall be removed prior to backfilling. Backfill: In buried pipeline sections material removed by the ditching operation shall be redepositedias backfill and compacted to 90% relative density as described in ASTM D-l557. Rates of compaction tests for trench backfill shall be as per Subsection 5.58. Before backfill is placed however, COMPANY shall determine by survey, the location and elevations of piping which will be buried. CONTRACTOR shall give minimum 48 hour notice to COMPANY of pipeline availability for survey at all points along the route. Backfill shall not be made without authorization by the COMPANY Representative. " Chevron BB 015006 CHEVRON U.S.A. INC. ENGINEERING DEPARTMENT EL PASO, TEXAS Specification No. EP-470-S January 27, 1983 (OKW) Page 11 of 21 5.212 Buried Lines CONTRACTOR shall fabricate, install, coat bare surfaces including field butt welds in pipe and backfill all excavation for underground lines. CONTRACTOR shall apply suitable coating material on fittings and stub-ins (including heat shrinkable sleeves for field butt welds in straight sections of pipe). CONTRACTOR shall furnish any special equipment required to make coating applications in the field, such as the tool for heating the sleeves. A primer and tape system shall also be used. A 50% overlap of the tape is required. COMPANY shall furnish primer, tape and heat shrinkable sleeves as required. COMPANY shaii Inspect the quality of coating by testing coated pipe with either a Steajns, or Tinker and Rasor, holiday detector. COMPANY shall furnish the detector and perform the tests. CONTRACTOR shall space pipe support as to allow for spark testing of the wrapped joints. 5.3 CONCRETE WORK 5.31 Scope of the Work CONRACTOR shall provide and be responsible for all concrete work. 5.32 Methods Placing and curing concrete shall be in accordance with Specification EG850. 5.33 Properties ^ Ready-Mix concrete shall be iixraccordance with ASTM Specification C-94. Portland cement type V-A perlASTM Specification C-l50 and normal weight aggregate per ASTM Specification C-33 shall be used for all concrete. The proportioning of concrete mixture shall be as follows: Minimum compressive strength: 2500 PSI Maximum aggregate size: 3/4 inch Water - cement ratio: .55 Cement content: 545 Ibs/cu.yd. concrete Average total air content: 6% 5.34 Anchor Bolts Anchor bolts shall be accurately placed and securely tied to avoid movement during concrete placement. CONTRACTOR shall take care to preserve all liner to concrete anchor bolts in the existing lined basin as these may be reused to secure the new 80 mil HDPE liner to existing concrete structures. Chevron BB 015007 CHEVRON U.S.A. INC. ENGINEERING DEPARTMENT EL PASO, TEXAS Specification No. EP-470-S January 27, 1983 (JKW) Page 12 of 21 5.35 Special Techniques CONTRACTOR shall consult COMPANY'S Construction Representative before using such special techniques as, for example, pumping structural concrete. ^ 5.36 Concrete Samples ^ COMPANY may perform compression and slump tests on concrete. CONTRACTOR shall furnish samples taken in accordance with ASTM Specifications as may be requested for the following tests and inspections: 5.361 Compression Tests: Onf cylinder from each truckload of strucutral concrete placed. ^ 5.362 Slump Tests: Each truckload. 5.37 Slump Test The consistency of the concrete mix shall be such that it is plastic and workable. The consistency shall be determined by CONTRACTOR in advance of placing concrete by the standard slump test. The required slump shall be a 4 inch minimum ancT~a 6 inch maximum. 5.38 Hot Weather Requirements SSL Concrete deposited in hot weather shall not have a placing temperature that will cause difficulty from loss, of slump, flash set, or cold joints. Concrete temperature shall be less than 90 degrees F. 5.39 Water Stops Water stops shall be extruded polyvinyl chloride (P.V.C.). Durajoint type 5 or COMPANY approved equal. 5.310 Preparation of Concrete Surfaces Concrete surfaces which are tolbe lined shall have all rough edges and projections removed in the ara of lining. All cracks in the concrete shali be cleaned and filled with a sand-cement mortar. Extruded expansion joint material and joint sealers shallj?e cut off flush. The entire surface to be lined shall be cleaned of all foreign materials and swept thoroughly. Chevron BB 015008 CHEVRON U.S.A. INC. ENGINEERING DEPARTMENT EL PASO, TEXAS Specification No. EP-470-S January 27, 1983 (JKW) Page 13 of 21 5.4 DRAIN SYSTEM MATERIALS ~ Reinforced concrete pipe shail conform to ASTM Designation: C-76 Class III or better. Flexible joints shall be neopfene "O" ring gasket in accordance with ASTM Designation: C-433. 5.5 EXCAVATION AND BACKFILL 5.51 Earthwork shall be in accordance with applicable paragraphs of Specification EG-581. -FT 5.52 Examination of Site: CONTRACTOR has the responsibility for sampling and testing earth to be graded and shall have examined the site, compared it with drawings and specificaHBrrs, and satisfied himself as to the conditions under which work is to be performed. Following the job start, no adjustments in compensatiofTshall be made in behalf of CONTRACTOR for any extra expense to which he may be put due to failure or neglect on his part to acquaint himself with conditons of the site and any other work thereon, their approaches and possibilites. COMPANY shall make available for CONTRACTOR'S inspecfftn before the job start the report of soils investigation in order that data therein may be utilized in the work on site. 5.53 Calculation of Earthen Volumes: Volume of material to be excavated, filled or handled in any way shall be calculated by CONTRACTOR from topography data on specification drawings and/or from CONTRACTOR'S site examination. 5.54 Removal of Oil ContaminatedlSoil Soil at the construction site which has been contaminated with oil shall be subexcavated and stock piled at a nearby location designated by the COMPANY'S RepresentativeSCONTRACTOR shall be responsible for such subexcavating and stock pilings CONTRACTOR shall also be responsible for relocating the oiiy sludge in the bottom of the existing pond to an area inside the refinery designatedjsy the COMPANY'S Representative. Soil shall be considered "oil contaminated" in the event it does not meet the parameters set forth in Subsection 5.58 below as a result of its hydrocarbon content. 5.55 Removal of Hypalon Liner arid Steel Piping from Existing Basin CONTRACTOR is responsible=!or removing and disposing of the existing hypalon liner in its entirety. CONTRACTOR shall also remove and dispose of all existing steel overflow-and pump suction piping into existing lined basin. CONTRACTOR shall submit with proposal, the location of the disposal site for COMPANY review and approval. Chevron BB 015009 CHEVRON U.S.A. INC. ENGINEERING DEPARTMENT EL PASO, TEXAS Specification No. EP-470-S January 27, 1983 (JKW) Page 14 of 21 5.56 Preparation of Areas to be Filled CONTRACTOR shall clear and grub out all trees, bushes, brush, weeds and all other growth and shall haul such material off the property and dispose of it in a location arranged for by CONTRACTOR. Top soil shall be removed from ground surfaces to the satisfaction of the COMPANY Representative. After this, the ground surfaces shall be scarified a minimum of eight inches and compacted to 90% denistybefore fill is started. 5.57 Preparation of Areas to be Excavated Following clearing and grubbing, per Subsection 5.56 above, excavation work shall proceed in accordance with the specification drawings. Cut slopes remaining in borrow areas shall be straight and uniform. Cuts shall be planned to require excavatiorrof the entire slope face. The slope toe shall be cleaned of excess material and made true to line at the limit of excavation. 5.58 Fill Control and Compaction Certification Fill shall be placed in lifts that shall not exceed 12 inches in thickness after compaction and shall be compacted with rollers or mechanical tampers which provide uniform compaction through the full depth of the fill. All fill shall be compacted to a minimum of 90% of maximum dry density as determined by ASTM D-l557T7F111 material shall meet the following parameters as determined in accordance with ASTM D-442: Sieve Size Precent Passing 4 40 - 100 200 0-25 The plasticity index of all fill material shall not exceed 20. Tests of fill material shall be made at the following rates: 5.581 One field density per eVEry 10,000 squuare feet of fill, or a minimum of two per lift, according to ASTM D-1556 or ASTM D-2922. In addition, a minimum oirTwo field densities in each pond bottom at finished grade and a minimum of four field densities in each pond for sideslopes; locations to be designated by COMPANY'S project engineer. Field densitieslfor ditch backfill shall be performed at the rate of one at mid-depth and one at final grade for every 150 lineal feet of ditch. =t Chevron BB 015010 CHEVRON U.S.A. INC. ENGINEERING DEPARTMENT EL PASO, TEXAS Specification No. EP-470-S January 27, 1983 (3KW) Page 15 of 21 5.582 One moisture density ciarve for each type of fill material used according to ASTM D-1557. 5.583 One sieve analysis andione plasticity index for each type of material used, according to ASTM D-422, D-423 and D-424. CONTRACTOR is responsible for providing COMPANY with written certification through a recognized independent testing agency that the requirements of thETspecification have been met as to compaction and qualityof fill material used. 5.59 Use of Material to be Graded Z COMPANY shall designate earthen material on COMPANY'S premises, available for use as fill. Such material may or may not satisfy the requirements of this specification, consequently, it is CONTRACTOR'S responsibility to sample and test the material to verify that the requirements of this specification are met. Any additional earthen material required shall be the responsibility of the CONTRACTOR. 5.510 Foreign Material in Fill __ Concrete, asphalt paving, rockSj, etc., to be incorporated in the fill shall be blended into fill in pieces not'to exceed three inches in greatest dimension. This material shall not be placed in the first one (I) foot lift or in the final two (2) feet of fill. CONTRACTOR shall distribute the material in the fill and thoroughly tamp it into the surrounding soils. 5.511 Filling into Existing Slopes w Where fill is to be placed against natural or cut slopes of 4 horizontal to 1 vertical or steeper, the compacted fill should be placed on horizontal benches excavated into the slopes. Filled slopes shall be overfilled and cut back to a compacted surface. '=1 5.512 Water Fresh water shall be used where addition of moisture is required to meet soil compaction requirements. 'JLT 5.513 Subgrade Preparation for HOPE Liner The lining subgrade shall be smooth and free of all rocks, stones, sticks, roots, sharp objects, oily soil or. any substance which might damage the liner. The immediate liner subgrade shall consist of a Chevron BB 015011 CHEVRON U.S.A. INC. ENGINEERING DEPARTMENT EL PASO, TEXAS Specification No. EP-470-S January 27, 1983 (3KW) Page 16 of 21 minimum of four (4) inches dEfine grained sandy material free of any deleterious substance. The surface shall provide a firm, unyielding foundation for the membraneEwith no sudden, sharp or abrupt changes or breaks in grade. No standing/water or excessive moisture shall be allowed. The liner installation contraclbr shall certify to COMPANY in writing, that the surface on which the membrane is to be installed is acceptable. 5.514 Grading EE CONTRACTOR is responsibleJIor ail grading and shall grade areas shown on drawings to a tolerance of plus or minus 0.1 foot. OIL STABILIZATION Stabilization of earthen slopes, called for on construction drawings, shall be accomplished by applying three sprayed coats of cut-back or emulsified asphalt. The treatment shall consist of one application of cut-back asphalt as weather coats. Stabilization should be applied as soon as possible after grading to prevent erosion damage. Asphalt material shall be furnished by CONTRACTOR, hauled to site, and applied by CONTRACTOR?-1 5.61 Surface Preparation 5.611 Grading and Finish " ~ All earthen areas to becstabilized shall be of uniform grade, thoroughly compactedrand dressed to a smooth and even finish prior to the start of oiling. jSlopes shall be repaired with hand compacted fill as required to present a smooth, finished appearance. 5.612 Moisture Content The typical moisture aSTtent of all areas to be oil-stabilized shall be checked by the CONTRACTOR prior to applying penetration coat. Ideally, moisture content should be 5-6% by weight but in no case shall it exceed 10% by weight. Light spraying of water will be permitted to achieve this condition. 5.62 Penetration Coat PDO-K cut-back asphalt or equal shall be sprayed at a temperature of 75- 180F, as measured at time oEspraying. The rate shall be 1/4 gallon per square yard of surface or as necessary to obtain an initial penetration of 1/2" minimum into the `surfacedA second coat may be required to achieve minimum penetration. ^ Chevron BB 015012 CHEVRON U.S.A. INC. ENGINEERING DEPARTMENT EL PASO, TEXAS Specification No. EP-470-S January 27, 1983 (3KW) Page 17 of 21 5.63 Weather Coat Two coats of emulsified asphalt, type CRS-2 shall be sprayed at the rate of 1/4 gallon per square yard per application at a temperature of 75-160F, as measured at the time of spraying. 5.64 Application rr All sprayed coats shall be applied with care, avoiding holidays and runs, to insure that no thin or spongQpots occur that may lead to eventual erosion. Coating of slopes shall be carried three feet past the slope top and toe. CONTRACTOR shall complete all oil stabilization work prior to pond liner installation. 5.65 Curing Time ' Curing time for each coat, ingiuding the penetration coat shall be not less than forty-eight (48) hours, js 5.66 Adverse Conditions rr: All reasonable care shall be exercised when spraying earth stabilization materials to avoid spray drifQway from the immediate spray site. No work shall start unless authorized by COMPANY Representative. If the CONTRACTOR encounters adverse wind conditions during the course of the work, all spraying shall immediately be stopped. 5.7 HDPE LINER FABRICATION AND INSTALLATION Basin liners shall be fabricated and iffirtalled as per Specification EP-492-S entitled "Manufacture and Installation of HighLDensity Polyethylene Liners". 5.8 FABRICATION AND INSTALLATIONOF STEEL STRUCTURES CONTRACTOR is responsible for the fabrication and installation (including painting) of all steel structures. Fabrication shall be as per Standard Specification EG-398 entitled "Steel Fabrication". Installation shall be as per construction drawings. Ur Chevron BB 015013 CHEVRON U.S.A. INC. ENGINEERING DEPARTMENT EL PASO, TEXAS Specification No. EP-470-S January 27, 1983 (JKW) Page 18 of 21 SECTION 6.0 - INSPECTION AND TESTING 6.1 GENERAL - CONTRACTOR shall be solely responsible for thorough craft inspection during construction and for the quality ofThe work. COMPANY will make such inspection as COMPANY may desire in order to check the progress and quality of the work, to see that CONTRACTOR'S employes are properly qualified in their respective crafts, that workmanship is of an at^eptable grade, and that all requirements of this specification are being met. Sfich inspection or any other inspection or testing by COMPANY shall in no way relief! CONTRACTOR of full responsibiity for the work hereunder. -- 6.2 HYDROSTATIC TEST __ 6.21 CONTRACTOR shall hydrostatically test all lines after installation with all welded, screwed and flangedjpints exposed and accessible for wipe test by COMPANY Representative _Who must be given adequate advance notification of intent to test. COMPANY Representative must approve the hydrotest. 6.22 CONTRACTOR may, at his option, test sections of the pipelines in any length desired. CONTRACTOR shall supply all labor and equipment for such tests. Preliminary testing shall not relieve CONTRACTOR of the responsibility for the final hydrostatic proof test, or completion test, of the entire pipeline as covered herein. 6.23 With the line(s) placed in finafposition, and the maximum number of connections and fittings installed, CONTRACTOR shall fill the system with fresh water at minimum temperature of 60F. and shall apply the completion test in accordance with COMPANY'S Refinery Instruction 1501 attached in Appendix A.04.. 6.231 CONTRACTOR shall furnish calibrated test gauges and pressure recording instrumentsCTest pressure required will be computed by COMPANY and specified on construction drawings. 6.232 CONTRACTOR shall install tests gauges and instruments as directed by the COMPANY Representative. 6.233 Following completionjttf test, CONTRACTOR shall drain the lines as directed by the. COMPANY Representative and assure that piping is washed or blown cleamoT loose materials. Chevron BB 015014 CHEVRON U.S.A. INC. ENGINEERING DEPARTMENT EL PASO, TEXAS Specification No. EP-470-S January 27, 1983 (JKW) Page 19 of 21 6.24 Repair: If leakage is indicates!, CONTRACTOR shall locate it and make repairs to the satisfaction ofTGOMPANY, after which the test shall be repeated or the line accepted, at the option of COMPANY. CONTRACTOR shall bear the expense of repairs or retests necessitated by his faulty workmanship; COMPANY shalLbear the expense of repairs and retests occasioned by the use of faulty material supplied by COMPANY. WELDING INSPECTION 6.31 CONTRACTOR shall arrangefor welding qualification tests at his expense in accordance with Engineering"and Maintenance Instruction No. EP-2200 entitled "Qualification of Welders" attached in Appendix A.04. Welders shall be required to pass qualification tests before performing any operation. COMPANY reserves the rightJp require additional qualification tests during construction if it has any doubt about the competence of welders. COMPANY shall be allowed td_witness tests and to examine test coupons. If additional tests are required and passed by welders, cost of retesting will be borne by COMPANY; if failed^cost of retesting shall be borne by CONTRACTOR. 6.32 COMPANY may perform random radiography of welds in accordance with Section 7.0 of Specification No. EG-2505 to verify that the overall quality of workmanship is in accordance with COMPANY standards as set forth in Specification No. EG-2505. Welds so inspected shall be repaired or replaced by CONTRACTOR at no increase in CONTRACTORS compensation if the weld fails to meet said standards. All of COMPANY'S radiographs will be available to CONTRACTOR fdThis review and use to the extent he desires to verify that all requirements of Section 6.1 above are met. CHEVRON U.S.A. INC. ENGINEERING DEPARTMENT EL PASO, TEXAS Specification No. EP-470-S January 27, 1983 (JKW) Page 20 of 21 SECTION 7.0 - DRAWINGS, SPECIFICATIONS, AND INSTRUCTIONS 7.1 GENERAL _ --- 7.11 Work shall be in accordancejglth the drawings, specifications, and instructions listed in the attached Appendices which Appendices are a part of this specification. 7.12 The specifications indicate qualities of materials and methods of workmanship, and the drawings^indicate dimensions, quantities, positions and details of construction. 7.13 COMPANY will provide to CONTRACTOR one reproducible copy of ail pertinent standard drawings, standard specifications, construction drawings, and instructions. = 7.2 DRAWINGS 7.21 CONTRACTOR shall be responsible for promptly notifying COMPANY if there are any errors in the specification drawings and/or conflicts with existing facilities. CONTRACTOR shall submit any proposed change or suggested deviation from the^drawings to COMPANY for written approval before beginning fabrication 5Hd/or installation. 7.22 Upon completion of the Facility, CONTRACTOR shall mark a copy of each drawing to indicate any changes or deviations made in the actual installation. These marked drawings shall be turned over to COMPANY. 7.23 CONTRACTOR shall be responsible for verifying all dimensions of and for proper fitting up of tie-ins to~gxisting facilities or facilities to be constructed by CONTRACTOR, as shown on the design drawings provided by COMPANY. 7.3 STANDARD SPECIFICATIONS Cl Unless otherwise expressly provided in this Specification, (a) any data, specifications, material, and work orany other matter which is covered by this Agreement which the standard specifications require to be provided by COMPANY shall instead be provided by CONTRACTOR; (b) any provisions of the standard specifications requiring COMPANY RCinspect certain material or work shall mean that COMPANY has an option, rather-than the obligation, to so inspect such material or work. -- Chevron BB 015016 CHEVRON U.S.A. INC. ENGINEERING DEPARTMENT EL PASO, TEXAS Specification No. EP-470-S January 27, 1983 (3KW) Page 21 of 21 ENGINEERING AND MAINTENANCE INSTRUCTIONS/REFINERY INSTRUCTIONS In the engineering instructions, referlmce to COMPANY'S personnel shall be of no effect, and CONTRACTOR'S personnel shall perform all activities which are to be performed under the engineering instguctions, except as otherwise provided elsewhere in this Specification. CHIEF ENGINEER Chevron BB 015017 CHEVRON U.S.A. INC. ENGINEERING DEPARTMENT EL PASO, TEXAS Specification No. EP-470-5 January 27, 1983 (JKW) Appendix A.01 Page 1 of 1 A.01 - CONSTRUCTION DRAWINGS INDEX Drawing Number PD-08-33I40 PD-08-33161, Sheet 1 PD-08-33161, Sheet 2 PD-08-32542 PD-08-33164 PD-08-33189 PD-08-33191 PC-08-33188 PC-08-33187 PD-08-32990 PD-08-33195 PD-08-33197 PD-08-33199 PD-08-33200 PF-29265-4 ^ Title Plot Plan, 36 Acres dditions Sections and Details 36 Acres Additions Sections and Details 36 Acres Additions Topographical Layout 36 Acres Plan, Sections, and Details Concrete Pump Suction Sumps Section and Details Concrete Inlet Box Piping Plan, Section and Details Foundation Plan and Sections, Pump Paving Slab Plan and Section?^ Concrete Emergency Overflow Channel Layout, SectionsTEnd Details, T-804 Basin Plot Plan and Elevations T-809 Platform Layout and Details T-809 Platform Plot Plan and Elevations T-804 Platform Layout and Details T-804 Platform Lined Storm Surge Pond - Layout, Details, and Sections (For Reference Ohly - Not for Construction) Chevron BB 015018 Drawing Number GA-M99645-16 . GB-Q68922-14 GE-S99975-3 GB-M13966-11 CHEVRON U.S.A. INC. ENGINEERING DEPARTMENT EL PASO, TEXAS Specification No. EP-470-S January 27, 1983 Appendix A.02 -- Page 1 of 1 - A.02 - STANDARD DRAWINGS INDEX 7= Standard Handrails Standard AnchorJEoits Standard Guard Posts Standard Steel StSrs Title Chevron BB 015019 CHEVRON U.S.A. INC. ENGINEERING DEPARTMENT EL PASO, TEXAS Specification No. EP-470-S January 27, 1983 (JKW) Appendix A.03 Page 1 of 1 A.03 - STANDARD SPECIFICATIONS INDEX Specification Number EG-398-H EG-516-C EG-581 EG-850-C EG-851 EG-1048-A EG-1049-C EG-2505-H Title Steel Fabricatiofr Reinforcing StesT Fabrication Clearing, Grading and Earthwork Placing and Curing Concrete Concrete Proportioning and Mixing Small Tools and Equipment Supplies --r Fabrication of Steel Piping Chevron BB 015020 CHEVRON U.S.A. INC. ENGINEERING DEPARTMENT EL PASO, TEXAS Specification No. EP-470-S January 27, 1983 (JKW) Appendix A.04Page 1 of 1 A.04 - MISCELLANEOUS INDEX Instruction, Practice Number Refinery Instruction No. 1501 Engineering and Maintenance Instruction No. EP-2045 Engineering and Maintenance Instruction No. EP-2200 EP-492-S Product Data Sheet ^ Title Hydrostatic Testing of Refinery Equipment =Trench or Ditch Excavations Qualification of Welders ^Manufacture and Installation of High Density Polyethylene Liners -Soils Investigation ^Carboline 187 HFP Primer and Finish Chevron BB 015021