Document x1M7a4jDe19OEmOBX325ZBqG6
Jane 20* 1973
Oft p) EXXfti tETPfSPJRt Instil lattes 7' few 'SeepwalT Pump
Hr. 6. toy fa Jr. Hebert Hears. Shipbuilding & ^rydocfc Co. 4101 Washington Avenue Ssprt %emP Vifgtela SSfiB?
gear Say*
This tetter will eonf?m my recast telephone convarsatfon with tea Jeegstr during whIeh I reported the difficulties m. had attempting to install the nevdsep#)* pssmp In the. mtm SgTTYSBSftB (Order He. 2S6-E*1). Tte Instal lation took plm at- horfslk Shipyard during the period fef SI * Jus ts 1973* with representatives of Sou Id and W. Bu Arnold ! attendance.
Tim deficiencies noted eons-1st of the fotlowingt
1- Hie top section of pump shafting was over SO" too short. A new shaft was manufactured.
2, The jack shaft m% too long and had a 1/8U whip te It. Me could mt straighten the shaft* aiwTaT new one had to te made..
3* The proper packing gland ms not received from W, B. Arnold and had to he manufactured.
The responsible service representatives were made aware of the above defteteiietes* and w@ are collecting the extra costs we incurred, When \m forward this cost Infmat ten to you* m request that you soak f@l ief from tte cognisant vendors te our behalf.
Wary truly yours.
SMWjkrr
't.M"if; -J-i&! - ' ".' J'"i-et*
IT K WcJM
EXX-MOR-008453