Document x19VDn2wVqq8p18G5XJ1KpaL1

LA5QRATQ3I COMMITTEE MZZTT2IG MARCH 7th, 1957 Messrs: E. R. Harden IL V. Higgins H. B. Speelman H. E. Lewis - Absent E. V. PJLz R. B. Atell C. V. Haunt - Absent E. McDonald - Absent Gentlemen: Meeting was called to order et 10:30 A.M. on 3/7/57 in the Aurora Conference Room. The naxt meeting will be held on March 28 in the same place. ACTIOS TAKES. 1. E3-A - Hot Strength Testing. Progress report issued 2/22/57. Details of main part of hydraulic test system finished and out for bids in four places. Ve have requested these bids be returned no later than March 18 so we can proceed with this project as' rapidly as possible. Our tentative schedule sow is to finish detailing etc. by the end of March and get our bids in as soon as possible. Ve are sett ing May 15 as a tentative erection date for thiB furnace. Furn ace structure bids (Electric design) received two of three bids. One of 221.00 and one of 229.00. On the test structure ve also received two of three bids, one of 389.00 and one of 217.00. Ve bad some discussion on the consents put forth by A. ?. Green on this type of testing and also discussion on caking a core versatile furnace structure so that at a later date part of the furnace can be used for the Insertion of a test panel of one of our constructions. It was decided to disregard outside construction of this unit as we were unable to obtain bids on it. Ve are proceeding on the basis of doing the work ourselves. Other than the actual test apparatus we need to foraulate a test procedure, to be dons by J. V. Hosbein, R. V. Higgins, and R. 3. Abell. Priority of this project is herewith changed to A. 2. IA-3 - Cold Impact Test Program. Ve are proceeding with the last portion of this Test procedure using Thor tile and the Eethlehsr. Steel dips comparing the re sults with those obtained using I3H castings. Priority changed to 3, P^ge 2 3. S6-C - Hot Impact Teat. Ho Action. See Minutes lO/i/56. A. E7-3 - Tile Abrasion Test Program. All samples submitted to date are finished. Work on correlating the results is in progress. 5. E8-3. - Comparative Competitive Testing. Work in progress on J. M. 678, Blazecrete and other insulating and fireproofing materials. 6. 19-C - New Design Refractory Hanger Tils. No Action. See minutes of 12/20/56. 7. no-c - Hydrogen Atmosphere Investigation. Ho Action. See ainutes 2/7/57. 3. ZL2-A - New-Model Thermolayer Wall Construction. Construction of the model started 2/28/57 and finished to orig inal print on 3/4/57. Seventeen step by step photos sucaitted to R.'J. H. Considerable discussion c.f block sizes, as related to this construction, by H. B. Speelran. He stated that they would ha unable to furnish the 3ize r.ov being used (6 x 15 x 1^*) as a standard size. 15s block vould necessitate extra handling and excessive waste. 2. S. Harden stated tkt the pouring re cess in the shelf tile must be either centered or lengthened to facilitate the Dacreta pour on this unit. r While the model is complete as called for in the original draw ing, further requests frca the engineering department necessitate extra tile which are on order from Mexico Refractories. When these are received we will proceed with the completion of the model. 9. H3-3 Low Cost I Factor Test Equipment. Discussion of ideas on this project by Z.R.Marden. He will furnish sketches of bis ideas in this discussion by next meet ing. Priority Change to 3. 10. Fl-A - clock Insulation ?.s; eareh. A. In addition to a slower dumn rate ire are investigating equip ment to speed delivery of ly* block to same rata as other sizes. 3. A:raiticg details on ASTM handleatillty test from chairman of ASTH committee Cl6. t 3"--56 10. Pl-A - Slock Insulation Research. - Continued. C. Block Machine laprovensnt. 1. Slitter & Cross Cut Saws sov promised 07 machine shop for week of March 13 delivery. Slitter caws completed acd 2. V. Bis is to izspect then on 3/8/57. 2. Link 3elt engineer has details of positive drive trans mission for study. Vacua pus? discussion in progress at Aurora Pump. 3. Installation of trie equipment i3 dependent upon produc tion picture at time of delivery. H. ?2-A - Slug Free VTcol and Shot Reduction. 12. ?3-C * 0 ny Slug cleaner on upright conveyor in operation now hut not doing too complete a lob due- to certain poor components in the system and also limitations imposed by design of present building struct ure. ?.ust Inhibited Insulating Cement. Prioritv Ckargsd zroa A to C - See footnote- marked . ;9CT2Z3. Heat transfer information on fecrete ?0* was cot available to Hr. Harden on his last visit to Sunb:..i. Mr. Higgins is to ask Mr. X. 7. Hlmmlizger to get this inf:-.nation for us. The result of tests ru.-i at Sunbeam was that Deere be "30" dusted in the fire and the customer is now going to use our regular Decrete 40 in this application. This completes this portion of this project and it will therefore be placed on the inactive list 'until further problems arise. Change priority to C. i-pro scat. Change Priority to C.* 15. E3-C IS. LA-A - Castables 0, 80, ICO, 125# Classes. Ho Action. utility Finish. Change priority to C.-> Mr. Lewis wants a similar product to Utility applicable on 'Thermobe3tos" or ary ether absorbent material.* Mr. Harden has been unable to alter our present Utility to meet demand. Suggest placing this under new project entitled "Finish for Highly Absorbent Materials" j/Dli-S. 17. C5-A - Thinsuliref Ceaeat. Change to C priority.* ' 1 i'S.gB 4 13. i/9~C Coating Materials - tetirprcofing. Inactive. 19. 3312-C Curtain '/.'all Costings. Inactive. 23. D12-C Rev Type Block Insulation. Change to B priority. 21. D13-A Bonding Csaent. Still trying to improve formulation to compete with Sodiua Silicate, Asbestos nictures of competitors and to lowar our production costa, have these formulas now under test. ".uw FBDJICT. ZH-B - Build Model of Insulating of American Arch. hory 'fall Design From Carl Davis R. U. B.' is to obtain material an: design for further work. -o Gi taste projects ell laboratory work rcrussted to date has been finished ar.d reports submitted. Uutil further problems - ..iso they will be placed on an inactive status. Rote: Ve revised our priority and Barking system ..t this meeting to the following extent. Aoii'.u projects will ha75 either as A or 3 priority, when they are placed in C priority thoy become inactive until further work is required and they will then be reassigned a priority at that tics. Respectfully submitted, ?3A:lp sc: ZLlran Hcsbsia Pollen ? situ R. 2. Abell