Document x17m256GowmXojowxpweY43dE
nF American - Steutduvd
HEATING
PLUMBING
..yU
Installation - Operation
and
Maintenance Manual
American
Gas Boiler STANDARD TYPE 1-G
APPROVED BY AMERICAN GAS ASSOCIATION Notice to Installer and Operator
This booklet must be affixed on or adjacent to the heating equipment.
American ^ ^taudand Radiator
CORPORATION
PITTSBURGH 30, PA.
ASSS 451*
09553
ERECTING DIRECTIONS A.mibicaw GAS BOILER TYPE 1-G
GENERAL DIMENSIONS
-H 0 h-
G) 1
NO. OF BOILER l-G-4 l-G-5 l-G-6
l-G-8 l-G-9 l-G-IO
NO. OF NO. OF SECTIONS BURNERS
43 54 65 76 87 98 10 9
B
57 H 59H 60^4 62H 63 k 65 65
0
6 7 8 9 9 10 10
L
19 23 27 31 35 39 43
09554
0 ERECTING DIRECTIONS Ananow GAS BOILER TTPE I-G
I
Caution
ERECTING
On hot water systems, expansion tank should not be installed in cold or exposed place. No valves of any type should be installed in piping between boiler and expansion tank. Sealing system at any time during operation may cause breakage of boiler or radiators.
"This appliance should be installed in accordance with the latest AGA Instructions For Installation of Gas Piping And Gas Appliances in Buildings. Reference should also be made to gas company regulations and local building, plumbing or other codes in effect in the area in which the installation is made."
Location
If water condition is encountered in basement, or if it has been neces sary to water-proof the basement floor, boiler should be mounted on concrete or hollow tile base at least 3 inches above floor level. Assembly of Sections
1. All reference to right or left refer to observer's right or left when facing front of boiler where manifold is attached.
2. Select right end section and place on block on floor, as shown in
Fig. 1. Clean nipples and nipple openings with kerosene or gasoline
and apply good lubricating oil Do not use paint or red lead.
3. Drive nipples squarely into section, using block of wood and
hammer. Each nipple must
project outside of finished
face of section 1/ir, inch more
than half its length. Use rule
or gage to insure that nipples
project outside of opening
equally all around. Most
nipple leaks are caused by tilted or cocked nipples.
1. Right End Section
2. Ground Rib
3. Nipples
4. Paint ground rib, around
Fie. 1--Right End Section
09555
2 ERECTING DIRECTIONS Amtbicw GAS BOILER TTPE 1-G
outside of section only, with red lead.
5. Place center section in position on nipples in end sec tion. Drive sections together with heavy block of wood striking section squarely as possible over nipple ports.
6. Place sections in upright
** -*--***
position as shown in Fig. 2
and support with suitable blocking. Sections should stand approxi
mately in their final position with Front facing correctly. (Note--Flow
tapping is toward rear of end section.)
7. Insert tie rods through lower nipple openings and tappings on end section and through cored hole below upper nipple port.
Place assembling blocks on lower rods across nipple ports as shown on Fig. 2 placing nuts and washers on all rods. Draw up evenly on nuts until sections make contact at ground joints. Bumping sections with heavy block of wood alternately at nipple ports during drawing up operation will facilitate assembly.
Apply oil or grease freely to tie rod threads while assembling sections to prevent stripping of threads on rods.
Paint ground ribs of each section with red lead and continue assem bling center sections one at a time. Shift blocking each time so that support is under the last section assembled.
8. Remove tie rods and place Left End in position. Insert lower tie rods through lugs on ends and upper tie rod through hole in sections. Draw sections together until ground joints are tight
Back off all tie rod nuts until they are finger tight only, to allow for expansion.
09556
ERECTING DIRECTIONS ftmrarm GAS BOILER TTPE 1-G
3
Testing
Before connecting boiler,
plug openings, fill boiler with water and subject to not less than 10 lbs. nor more than 30
1. Tit R)s
t. Cleanout Cover
Plates 3. Bonier Support
lbs. pressure. Inspect boiler
inside and outside for leakage
to insure against breakage
from handling and shipping.
Fie. 3--Section Assemblage
To safeguard accuracy of gage supplied with boiler do not install gage until after test of boiler. This
precaution of testing the boiler will simplify handling of any necessary
replacements or adjustments and assist in treating with claims against
transportation companies. After test, drain and remove plugs where required.
Assembly of Flatework 1. Screw short threaded end of brass studs into tapped bosses in re
cess between sections and attach cleanout cover plates (with asbestos rope gaskets) to front. See that asbestos rope gasket is on each plate and makes gas seal when drawn up tight.
Attach filler plates in like manner to back of boiler. Putty openings between plates and sections. Putty outside of sections at joints with boiler putty. Place burner support on lugs provided on end sections. Pig. 3 shows section assemblage with cover plates and burner support installed.
2. Fill grooves on back of burner access door frames with putty and attach frames to boiler using 3/8 -- 16 x 1" brass hex head cap screws and washers in four corners.
09557
4 ERECTING DIRECTIONS AMIB1CA* GAS BOILER TYPE 1-G
Assembly of Piping and Controls 1. Attach manifold brackets to front burner access door frame with
hex head screws.
2. Assemble sub-assemblies of manifold, manifold piping, automatic gas valve and gas pressure regulator or automatic pilot valve and attach to boiler. See that orifice spuds in ends of burner cocks or spud holders are screwed in tight and that orifices are drilled to size specified on tag attached to manifold. ( See Fig. 4)
Note: Arrow on automatic gas valve and gas pressure regulator or automatic pilot valve must point in direction of gas flow.
3. See that air shutter is assembled on each mixer tube, then place mixer tubes firmly on gas cocks or spud holders and burner support. Assemble main burners on tapered ends of mixer tubes so they are straight and level. (See Figs. 5, 6, 7 and 8).
Note: No. 50 thermocouple has larger diameter than No. 80 thermo couple.
Assembly of Jacket
1. Fill groove at top of sec tions with boiler putty and place canopy in position so that turned down edges are firmly imbedded in the putty to make gas seal. Smooth off excess putty.
1. Gas Pressure Rf9viator
Z Automatic Gas Valve
3. Manifold
4. Manifold Brackets 5. Burner Access Door
Frame
2. Assemble left and right
Fig. 4---Manifold and Piping
side jacket panels, fastening front and rear halves together with wash'
head screws passing through front half into caged nuts in rear ha
Attach panels to boiler section with washer head screws. (See Fig. 9
09558
ERECTING DIRECTIONS Ammicaw GAS BOILER TYPE 1-G
5
MS 4416
Fig. S--Burner and Pilot Locations
09559
6 ERECTING DIRECTIONS Amemcaw GAS BOILER TYPE 1-G
Ftc. 7--Burner No. 2 and Pilot Installation-Manual Ignition
09560
ERECTING DIRECTIONS Amthicaw GAS BOILER TYPE 1-G
7
3. Place front jacket panel in position, bottom of panel to rest in back of flange on cast iron panel frame. Flanges of front jacket panel to lap over end jacket panels. Be sure that jacket panel is pushed down so that it rests on rib of cast iron panel frame.
4. Attach rear jacket panel in similar manner.
5. Place four short vertical keys in position at ends of front and rear panel frames, inserting top of keys under flanges of front jacket panels. Attach keys to cast iron panel frames with washer head jacket screws.
6. Place top jacket frame in position, making sure that frame is down tight over top edges of jacket panels.
on lugs of end sections, one baffle at front and one at rear of boiler. Flanges must be toward burners and extend downward.^Placebumer access 3o& with Series and Num ber Plate on front frame and remaining door on rear frame.
8. Place drafthood firmly on flue outlet of canopy. Refer to Fig. 9 for assembly of boiler jacket.
09561
Steam Boiler Fie. 9--Jacket Assembly
Water Boiler
Steam Boiler
1. Assemble low water cutoff and water column piping as shown in Fig. 10 and attach to boiler as shown in Fig. 9. Assemble the working mechanism to the low water cutoff with gasket and screws (furnished in separate package). Make steam gage connection with nipple and tee to '4" tapping on upper part of low water cutoff. Connect steam control ele ment on automatic gas valve with steam gage tee using copper tubing and connectors. Fill tubing with water and screw steam gage into tee.
2. Connect safety valve to 2" tapping on
right end section near top with reducing elbow. Fic. 10--Low Water Cutoft
iw*-!
09562
ERECTING DIRECTIONS /Vmxbicak GAS BOILER TYPE 1-G
9
Water Boiler 1. Insert temp^.^ture bulb element of automatic gas valve in %"
tapping near top of left end section. (See Fig. 9). For more sensitive operation discard well before installing split nut and gland. Tube leading to bulb is installed under the jacket.
2. Connect combination thermometer and altitude gage to one inch tapping on left end section with nipple and reducing coupling.
3. Plug 2" tapping in right end near top unless relief valve is installed.
Connecting Controls (Electric Ignition) 1. Connect pilot lines from manual shutoff valve, shown in supply
piping arrangement. Fig. 14, to unions in line to pilot burner and electric ignition block on burner No. 2. Auxiliary pilot burners should be con nected to pilot burner line with Vs brass tee or elbow. See Fig. 12.
2. Connect No. 80 thermocouple from electric ignition pilot bracket to BASO 850 automatic pilot switch. Fasten automatic pilot switch to burner access door frame with two 10-24 x W round head screws.
3. Connect vent tube from gas pressure regulator to union lead ing to vent tube tip on pilot bracket. Be sure flame check is in place as shown in Fig. 11.
o ue&M uoncl or 8RA3S SC*NNC
MSCNT SCRRNIMC KCftc in ftccuuirofl
Fic. H--Flame Check
09563
10 ERECTING DIRECTIONS Amtbicaw GAS BOILER TYPE 1-G
1^2 34 5 678
(
1. Manual Shutoff Valve Assembly 2. "Push Button Lighter Box 3. Gas Pressure Regulator 4. Vent Tube
5. Saso Automatic Pilot Switch 6. Thermocouple Lead 7. Pilot Burner Bracket Assembly 8. Auxiliary Pilot Burner
Fic. 12--Control Connections
Fic. 13--Wiring Diagrams (Electric Ignition)
4. Wire according to Fig. 13. 5. Install front burner access door.
09564
ERECTING DIRECTIONS American GAS BOILER TTPE 1-G
MAM GAS L*
11
ALL PW1 SKMN 6CL0W SHUTOfT ALV NOT SIPAJCD BT AA4.SS CORP
valve not suppled err a.r&ss copp
Fig. IS---Control Connections
09565
12
Connecting Controls (Manual Ignition; Mfd., Nat. and Mixed G 1. Connect pilot line from manual shutoff valve, Fig. 15, ^"nion in
line to pilot burner. See Fig. 16. 2. Connect thermocouple from i
850 automatic pilot switch. Fasten automatic pilot switch to burner access door frame with two 10-24-Vi" round head screws.
m^c {itiMWi wtriVgveaag
Fic. 17--Wiring Diagrams (Manual Ignition; Mid., Nat. and Mixed Gases)
3. Connect vent tube from gas pressure regulator to union leading to vent tube tip on pilot bracket. Be sure flame check is in place as shown in Fig. 11.
4. Wire according to Fig. 17. 5. Install front burner access door.
Connecting Controls (Manual Ignition; Liquefied Petroleum Gases) A. Boilers with one pilot burner: 1. Connect pilot line from throttling angle cock on BASO auto matic pilot valve to union in line leading to pilot burner on burner No. 2. See Fig. 18.
09566
9 ERECTING DIRECTIONS Amikicax GAS BOILER TYPE 1-G
13
1. Manual Shutoff Valve 2. Baso Automatic Pilot Va*ve 3. Thermocouple Lead
4. Pilot Cock 5. Pilot Burner Bracket Assembly 6. Pilot Line
Fig. 18--Control Connections
2. Connect thermocouple lead from pilot burner bracket to BASO automatic pilot valve.
3. Wire according to Fig. 19. 4. Install front burner access door.
Fig. 19--Wiring Diagrams (Manual Ignition; Liquefied Petroleum Gases)
09567
14 ERECTING DIRECTIONS Amhhcaw GAS BOILER TYPE 1-G
B. Boilers with 2 or 3 pilot burners:
1. Connect pilot line from BASO 500 series valve in main gas line to BASO 808 series pilot valve. Connect pilot line from V6 inch tee at outlet of BASO 808 series valve to pilots. (If 3 pilot burners are installed, there should be 2 BASO 808 series valves in series). Connect a by-pass line from tee in main line to push button valve attached to tee on BASO 808 outlet. See Fig. 20.
1. Mamitf Shutoff Valve 2. Baso Automatic Pilot Valve 3. Pilot Line 4. By-Pass
5. Push Button Valve 6. No. 50 Thermocouple Lead 7. Pilot Burner Backet Assembly ft. No. 80 Thermocouple Lead
Fic. 25--Control Connections
2. Connect a No. 50 thermocouple from the pilot burner bracket on burner No. 2 to the BASO 500 series valve in the main gas line. Connect No. 80 (smaller diameter) thermocouples from remaining pilot burners to BASO 808 series pilot valves.
3. Wire according to Fig. 19.
09568
I ERECTING DIRECTIONS Amohcxv GAS BOILER TYPE 1-G
IS
4. Install front burner access door.
Connecting Controls (Manual Ignition; Liquefied Petroleum-Air Gases)
1. Connect pilot line from manual shutoff valve assembly, see Fig. 15, to electric pilot valve. Then connect pilot line from electric pilot valve to pilot burners. Attach bracket containing electric pilot valve and BASO 850 switches to burner access door frame with one 10-24 x 12 screw and one %-16 x 1" brass hex head cap screw which holds burner access door frame in place. See Fig. 21.
Fic. 21--Control Connections
2. Connect No. 80 thermocouples from pilot burner brackets to BASO 850 switches.
3. Connect vent tube from gas pressure regulator to union leading to vent tube tip on pilot bracket. Be sure flame check is in place as shown in Fig. 11.
09569
16 ERECTING DIRECTIONS Amimcjw GAS BOILER TYPE 1-G
4. Wire according to Fig. 22. 5. Install front burner access door.
Ftc. 22--Wiring Diagram (Manual Ignition; Liquefied Petroleum-Air Gases)
Filling System Caution: Never start boiler unless it is properly filled. (After boiler
is in operation make up water should be added slowly). Steam boilers should be filled until water is visible midway up gage
glass between try cocks. Fill open hot water system to 1/3 height of expansion tank, remove
rim and glass from gage and set movable pointer under automatic pointer. Replace rim and glass.
Fill closed hot water system until relief valve relieves. This must be less than 30 pounds pressure. If necessary, adjust relief valve setting. Remove rim and glass from gage and set movable pointer under auto matic pointer. Replace rim and glass.
Keep system filled. Pointers on gage should be even. If pressure ex ceeds 30 lbs. relieve at once by opening relief valve or drain cock.
09570
ERECTING DIRECTIONS Amuican GAS BOILER TYPE 1-G
17
Pilot Adjustment
Light boiler as u^ected in operating instructions and check for gas leaks. Adjust pilot flame to extend just over the top of the burner. Pilot rate can be adjusted with the screw underneath the cap on the pilot cock or with throttling cock, if provided in pilot line.
Normal Pilot Input for BASO Pilot Burners
fnDut Per Burner
Mfd. 1000
Nat. Mixed L.P. 1 LP-Air 1400 1200 1000 1 1000
Input Adjustment
After boiler is warmed up, shut off all other gas appliances connected to gas meter and time gas consumption. Adjust gas pressure regulator to give rated input indicated on nameplate.
Gas Consumption (Cubic Feet Per Hr.)
Input Rating (Btu per Hr.) Heating Value of Gas (Btu per Cu. Ft.)
To increase consumption, turn adjustment screw (beneath cap on pressure regulator) clockwise; to decrease, turn screw counter clockwise.
Main Burner Primary Air Adjustment
Adjust burner flame by opening or closing primary air shutter. Flame should bum quietly, show no yellow and should have a notice able inner blue cone. After adjustment, tighten screw to lock shutter in position.
OPERATING
Shutting Off (For All Gases) 1. Close manual shutoff valve (or Hand Shutoff wheel on top of automatic gas valve) and pilot cock. 2. Turn off switch in electric line to appliance.
09571
18 ERECTING DIRECTIONS Amtbicam GAS BOILER TYPE 1-G
Re-Lighting .^.ectric Ignition) 1. Set thermostat at lowest temperature. 2. Close manual shutoff valve and pilot cock. 3. Turn off switch in electric line to appliance. 4. Wait 5 minutes. 5. Turn on switch in electric line to appliance. 6. Open pilot cock. 7. Press button on lighter box until left pilot burner lights. 8. Open manual shutoff valve and Hand Shutoff wheel on top of automatic gas valve. 9. Press down manual control lever on automatic gas valve (main burners should light); then release (all pilots should stay lighted).
10. Wait 2 minutes. 11. Press plunger on BASO
automatic pilot switch. 12. Set thermostat at desired
temperature.
Valve 2. Pilot Cock 3. Push Button Lighter
Box
4. Automatic Gas Valve
Wheel 6. Manual Operating
Lever 7. Base Automatic
Pilot Switch B. Pilot Burner
Fie. 23--Control Arrangement
09572
$ ERECTING DIRECTIONS Auracjm GAS BOILER TYPE )-G
Re-Lighting (Manual Ignition; Mfd., Nat. & Mixed Gases) 1. Set thermostat at lowest temperature. 2. Close manual shutoff valve and pilot cock. 3. Turn off switch in electric line to appliance. 4. Wait 5 minutes. 5. Open burner access door. 6. Light taper and hold to left pilot burner. 7. Open pilot cock and light all pilot burners. 8. Close burner access door. 9. Wait 2 minutes.
10. Press plunger on BASO automatic pilot switch.
19
11. Open manual shutoff valve and Hand Shutoff wheel on top of auto matic gas valve.
12. Turn on switch in elec tric line to appliance.
13. Set thermostat at desired temperature.
1. Manual Shutoff Valve
2. Pilot Cock 3. Automatic Gas
Valve 4. Hand Shutoff Wheel
5. Manual Operating Lever
6. Baso Automatic Pilot Switch
7. Pilot Burner
Fic. 24--Control Arrangement
09573
20 ERECTING DIRECTIONS Amibica* GAS BOILER TYPE 1-G
Re-Lighting (Manual Ignition; Liquefied Petroleum Gases)
1. Set thermostat at lowest temperature.
2. Close manual shutoff valve and pilot cock.
3. Turn off switch in electric line to appliance.
4. Wait 5 minutes.
5. Open burner access door.
6. Open pilot cock.
7. Light taper and hold to left pilot burner.
8. Press push button valve (where there is only one pilot, press reset button on BASO valve), hold and light all pilot burners.
9. Hold 2 minutes.
10. Press reset button on all BASO automatic pilot valves then re lease push button valve (where there is only one pilot, release reset button on BASO automatic pilot valve).
11. Close burner accessdoor.
12. Open manual shutoff valve and Hand Shutoff wheel on top of auto matic gas valve.
4 14
T
13. Turn on switch in elec tric line to appliance.
14. Set thermostat at desired temperature.
1. Manual Shutoff Valve
2. Automatic Pilot Valves
3. Automatic Gas Valve
4. Hand Shutoff Wheel
5. Manual Operating
Lever $. Push Button
Valve 7. Pilot Burner
Fic. 25--Control Arrangement
09574
ERECTING DIRECTIONS Aanion GAS BOILER TYPE 1-G
21
Re-Lighting (Manual Ignition; Liquefied Petroleum-Air Gases) 1. Set thermostat at lowest temperature.
2. Close manual shutoff valve and pilot cock. 3. Turn off switch in electric line to appliance.
4. Wait 5 minutes.
5. Open burner access door.
6. Light taper and hold to left pilot burner.
7. Open pilot cock and turn knob on electric pilot valve to "Manual". Light all pilot burners.
8. Close burner access door.
9. Wait 2 minutes.
10. Press plungers on all BASO automatic pilot switches.
11. Open manual shutoff valve and Hand Shutoff wheel on top of auto matic gas valve.
12. Turn on switch in elec tric line to appliance.
13. Set thermostat at desired temperature.
1. Manual Shutoff Valve
2. Pilot Cock
3- AuVtoomlvaotic Gas
4 Hand Shutoff Wheel
S. Manual Operating Lever
8. Baso Automatic Pilot Switch
7. Knob 8- Electric Pilot
Valve
Pic. 26--Control Arrangement
09575
Pilot Goes Out If the pilot flame is extinguished, the automatic pilot will shut off the
automatic gas valve. If boiler is not operating correctly, call Heating Contractor or Gas Company service man. If boiler is operating cor rectly, relight as directed above.
Operation During Failure of Electric Power Supply In case of failure of supply of electric current, boiler will automati
cally shut off. Boiler will not operate automatically while electric power is off, however, boilers equipped with Detroit 569-VS (or VW) auto matic gas valve may be operated manually as follows:
1. If pilots are out, relight as directed for manual ignition. 2. When pilots are lighted, press down on manual control lever on automatic gas valve; main burners should light; press in hand resetting button to hold lever down, burners will remain lighted. 3. Caution--Shut off boiler before water temperature or pressure becomes excessive by pressing down on manual control lever until reset button is released, then release manual control lever. Bear in mind that operating the boiler manually is an emergency condition and that constant supervision is required to prevent the pos sibility of damage due to overheating. Never allow the boiler to operate under this emergency condition if it is to be left unsupervised for any length of time. 4. Valve is fully recycling and will return to automatic operation when electric power returns.
09576
ERECTING DIRECTIONS Amhicam GAS BOILER TYPE 1-G
23
CARE AND ATTENTION
In Fall before Starting Boiler Drain system sufficiently to remove sludge in bottom of boiler. Do
not drain more water than necessary to remove sludge. Then refill to proper level as directed above.
Care of Boiler while in Operation 1. Check water level regularly and add water slowly when needed.
2. This boiler is fired automatically.
3. Test safety valve on steam boiler at beginning of season and once a month thereafter:
a) Fasten cord or wire to valve lever. b) When pressure is up, stand safe distance away and pull cord.
(Steam should be released)
In Winter while Not in Operation
Drain entire system to prevent damage from freezing. Drain through drain cock, located at lowest point in system. Be sure boiler is com pletely drained.
In Summer while Not in Operation
Fill system as during heating season. Have boiler inspected by serv ice man before the start of the heating season. If necessary, remove front jacket and cleanout cover plates and clean heating element.
09577
24 ERECTING DIRECTIONS Amtbicjw GAS BOILER TYPE 1-G
I
General Care of Heating System 1. Keep radiators and convectors clean.
2. Keep system in good repair. It is advisable to have it inspected by your heating contractor at least once a year.
3. If a hot water radiator is hot at the bottom but not at the top, it indicates that air has accumulated inside and should be vented. To vent radiator: Hold small cup under air vent (Located near top of radiator), open vent until water escapes and then close.
4. Fill steam boilers only as directed. (See Caution.)
5. Fill hot water systems as follows: Open all radiator valves, but keep vents at top of radia
tor closed. Fill open systems till hands on altitude gage are even. If it is a closed system the water filling will stop automatically when proper pressure is reached. (Pressure should not exceed 30 pounds.) Then, begin ning with ground floor, vent each radiator as directed above. It may be necessary to add water during this operation to expel air from higher radiators.
6. If much water is added to system, it is advisable to heat system to a high temperature and vent again. This will make less venting neces sary during the winter.
7. Where an expansion tank is used, make sure that neither the tank nor its drain pipe is exposed to freezing temperatures. Never place valves in piping leading to or from expansion tank.
09578
ERECTING DIRECTIONS America* GAS BOILER TTPE 1-G
Note: All parts of this boiler have been carefully inspected and packed. In case of shortage, make sure that all parts have been re moved from shipping container and examine packing material thor oughly. If part cannot be found, report shortage to your dealer, giving boiler size, series number, date, inspector's number and packer's num ber. (See Parts List and Packer's Check Tickets).
Give boiler size and series number when ordering repair parts. BOILER SIZE.......................................................... SERIES NO. (SEE SERIES PLATE ON BOILER) DATE .......................................................................
American ,, Standard Radiator & ^anitarj
CORPORATION
PITTSBURGH 30. PA.
09579
A^EKiCAN-c^taKdai^d
HEATING
PLUMBING
%
Installation - Operation
and
Maintenance Manual
American
Gas Boiler
STANDARD TYPE 1-G
APPROVED BY AMERICAN GAS ASSOCIATION
Notice to Installer and Operator This booklet must be affixed on or adjacent to the heating equipment.
American q c$tandaffd Radiator ^ ^airitai^
CORPORATION
PITTSBURGH 30, PA.
ASS 45l REV 15-31)
09580