Document x16M4DJZmrxN5R45mXb8krRkQ
JONES KILL REDUCTION PUNT
ASBESTOS SAMPLING SURVEY
SAMPLE # & DESCRIPTION
November 8, 1977
TIME (Min.)
As-I
Kelley, Rex, Machinist, Cutting 4,x7" Marinite Boards from 4'x8' sheet, using
band saw
15
As-2
Kelley, Rex, Machinist, Cutting 15" x 7" Marinite Boards from 4'x7" sheets, using band saw
15
As-3
Kelley, Rex, Machinist,
Cutting 15" x 7" Marinite Boards from 4'x7" sheets, using band saw* Changed band saw band*
^
As-4
Kelley, Rex, Machinist, Cutting 15" x 7" Marinite
Boards from 4'x7" sheets, using band saw; also set up to cut 5" x 7" boards from 4' x 7" sheet.
As-5 Kelley, Rex, Machinist, Cleaning for lunch
As-6
Kelley, Rex, Machinist, Drilling screw holes with pneumatic drill; uses vacuum to remove fibers*
Aa-7
Kelley, Rex, Machinist, Drilling screw holes with pneumatic drill, uses vacuum to remove fibers
As-8
Kelley, Rex, Machinist, Cutting large circles with drill press; uses vacuum to remove fibers*
15
3 15 15 15
FIBER CONC. , (Fibers/cc)
122.9
8-Hr. TWA 1
13.2
140.6
62.7
15.9 25.3
> 12.2
5.9
5.1
J
r
1 OSHA standard for asbestos fibers is 2.0 fibers/cc, 8-hour TWA. Celling value not to exceed 10 fibers/cc over any 15 minute period.
TXTINER RMC0004-59Q