BRANCHES DEPARTMENT - PLANT REQUISITIONS January 16, 1959
2233 Leesburg, Fla. #2031 - New Branch Installation Expense - sign erection, etc.
% l*,0U,,3lii/^
223$ Omaha, Neb. #6ol*7 - 1 Model C Shade Cotter, 1 Shade Merchandiser
59*50
2236 San Joee, Calif. #8019 - 1 5-Gallon Paint Conditioner
307.50
2237 Vallejo, Calif, #8066 - 2 Barrel Poops for dispensing linseed oil and turpentine
15.00
2238 Baltimore, Md. #5803 - $ units Studio Shelving, 2 Wrapping Counters, 1 Cashiers Dade 577.50
2239 S-herman, Tex, #-7--7-2--1* - 1 -Band- -track-
15.00 -
22l*0 Minneapolisj lttm, #391*7 - Paint interior, refinidi floors
190.C0
22i*l Shelby, N, C. #5781* - 2 U-tnbe 1*' Fluoreocent Fixtures
30.30
22li2 Houston, Tex, #7022 - Cost of installing a gas heater
9U.00
22l*3 Madera, Calif. #806? - Cost of constructing office area
253.00
223lU Hollywood, Calif. #850t* - 1 National Electric Adding Machine, plus taxes 22l*5 Eugene, Ore. #8601 - 1 Cashier's Chair
212.55 22.1*0
221*6 Vancouver, Waeh. #86lli - Repaint Branch wall sign
75.00
221*7 Concord, Calif. #8036 + Educate office to allow more pales area 22l*8 Ontario, Ore. #8007 - 1 #30 1-Gal. Paint Conditioner with Spring Base
150.00 12U.10
221*9 Burlingame, Calif. #8575 - 1 #33 5-Gallon Paint Conditioner 2250 Pocatello, Ida. #81*60 - Repair furnace
. 307.50 60.00
2251 Oak team, 111. #3858 - 1 Manager's Chair, 1 Cashier's Chair
-
2252 Santa Barbara, Calif. #8508 - 1* Display Tables, refirvish office furniture
2253 Ottumwa, la, #3816 - Branch Have Expense -- painting, electrical work, etc.
UB.30 61*2.00 5,825.60 --
225U Lexington, Ky. #1230 - Cost of renovating Wallpaper Dept.- painting, railing, etc. 508b80
2255 Myrtle Beach, S. C. #2032 - New Branch Installation Expense - carpentry, etc.
3,900.61
2256 Eureka, Calif. #8081 - 1 #33 5-Gallon Paint Conditioner
307.50
2257 Madera, Calif. #8069 - 1 #33 5-Gallon Paint Conditioner 2258 Oskaloosa, la, #381*8 - 6 Fluorescent Fixturee,6 Sets Stems & Canopies, 1 Pr. End
307.50
Plates, installation
236.50
2259 Cleveland, 0. #1172 - Emergency repairs to elevator
21*6.25
2260 Cleveland, 0. #1167 - Install Asphalt tile floor
275.62
2261 Winsted, Conn; #1*068 - New Branch Installation Expense - carpentry, painting, etc. U,896j7t^
2263 Sandusky, 0, #1199 - Remodeling Expense - power conveyor, painting, etc. *
3,280.1*5
2261* Clarksburg, W. Va. #1126 - Branch Move Expense - carpentry, electrical work, etc. 2,51U.85 2265 Atlanta, Ga* #2302 - 1 1959 Chevrolet Delivery "ruck, less discount, plus.lettering2,21*5.55
2266 Waukegan, 111. #3019 - Electrical work necessary for more economical operation
9lu00
2267 Oehkosh, Wise. #3183 - Paint ceiling (2 coats), wall and fixtures (l coat)
225.00
2268 McKinney, Tex* #7751 - Material to construct additional warehouse shelving
85.00
2269 Cullman, Ala* #2686 - 1 MMl*5-li-2l* Facia Sign, remove old and erect new sign 2270 Lafayette, La. #7395 " 1 142" Emblem, 1 1*' x I*' End Panel, Cost of replacing these
33iu20 69.60
22?1 Menphie, Tenn. #6313 - Snergency repairs to delivery truck 2272 Bristol, Va. #2220 - 2 new tires for branch delivery truck 2273 Middlesex, N. J. #1*021* - Co3t of illuminating facia sign
22?l* Gulfport, Mi s b. #7357 * 1 Glass Cutting Board 2275 St. Petersburg, Fla. #1328 - Repairs to delivery truck
56.05 5U.96 88.00
65.25 106.1*1
2276 Daytona Beach, Fla, #2331* - Paint and repair truck,. I* new tires
2277 Greeley, Colo, #61*35 - 1 Hand Truck
2278 Washington, D. C. #5870 - Cost of hoarding up garage-type door in rear of Branch
2279 Oklahoma city, okia, #6661 - 5 Sections 30" x 30" x 5'3" Steel Shelving
2280 Marietta, 0. #1160 - Paint ceiling, walls and fixtures (1 coat)
262.33 2I1.90
77.00
62.20
2611.00
2281 Detroit, Mich. #1196 - Paint ceiling, walls and fixtures (l coat) 2282 Birmingham, Ala. #21*80 - 1 Manager's Beak and Chair
360.00
110.90
2283 West Chester, Pa. #5876 - 1 Old Style Wrapping Counter
115.00
2281* Ft. %ers, Fla. #2366 - Remodeling Expense - electrical work, carpentry, etc. 2285 Detroit, Mich. #1857 - Paint interior walls (2 coats)
3,562.25 125.00
2286 Hamden, Conn. #1}696 -1 section Wall Shelving, 1 Display Table 2257 Bowling Green, Ky #271*7 -' Labor and materials to construct warehouse shelving
0007-SWP-000025510C
N 25090
BRANCHES DEPARTMENT - FUBT RS^PISIXIQIS
January 16, 19?9 (Continued)
2286 Pcmpton Lakes, N. J. #1*096 - 6 sections 18" x 36" x 7'3" Steel delving
76*7?
2289 Jackson, MLas. #7308 - |* tires for delivery truck
?5CO
2290 Vicksburg, Miss. #7367 <* 1 Reanor Heater, pipe and vent tubes
218.76
2291 Needham, Mass. #1*697 - Paint Interior
200 ,C0
2292 Beaver Falls, Pa. #1881 - Paint ceiling (2 coats), walls (1 coat), paint facia sign 32*6.00
2293 Colunibus, 0. #1112 - 8 ^sections 18" x 36" x 7'3" Steel Shelving
122.80
229U Broonall, Pa, #5022 - Remove maroon plexiglas from letters end replace with #21*15
red, change neon tubing from white to red
335.CO
229? ELvood, lad. #3286 - 1 #30 1-Oal. Paint Conditioner with Pedestal Base
130,10
2296 Brunswick, Ga. #21*19 - 1 #30 1-Gal. Paint Conditioner with Pedestal Base
130.10
2297 Long Beach, Calif. #8$c6 - Co6t of installing new elec, wiring for stick-out sign
55.7U
2298 Los Angeles, Calif. #8029 - Cost of installing heating equipment, overrun of
65.90
2299 Branches Dapt, - ?0 units Type "A" Studio Shelving, ?0 Display Tables ' 6,260.00
2300 Oklahoma City, Okla. #6321 - 2 Cashier's Desks, 2 Cashier's Chaire
2l*98o
2301 Redwood City, Calif. #8516 - Paint walls (2 coats) and fixtures (l coat)
255.CO
2302 NaEhville, Term. #2319 f Repairs to delivery truck, 2 new tires
219.62
2303 Saginaw, Mich. #1191 - 1 #30 1-Qal. Paint Conditioner with Pedestal Base, li-can Adaptai33<,60
230U Sayre, Pa. #181*7 - Paint walls (2 coats), trim and fixtures (l coat)
198,7?
2305 Sunnyvale, Calif. #8003 - Cost of erecting MK52 Stick-Out Sign, overrun of
127.50
2306 Kay West, Fla. #2690 - Labor 1 materials to construct warehouse shelving
7500
2307 Ft. Ifyers, Fla. #2366 - Remodel store front, including aluminum veneer, new door,etc. 800.00
TOTAL
#*8,583.56