Re: . COST SHARING AGREEMENT FOR LCCC GROUNDWATER EXPENDITURES
Gentlemen:
The following is a summary of the meeting held on March 20 to further discuss cost sharing for the LCCC groundwater project.
In summary, Conoco accepts the principles and elements outlined in
Attachment I, with the exception of Items 4 and 5.
Item 4 was
discussed in terms of Conoco's offer to settle on a "cash-out"
amount prior to DEQ approval of a remediation plan. Item 5 was
tabled for later discussion.
Conoco presented a cash-out proposal "concept" document (Attachment II) for discussion. This was reviewed in terms of contents and relative dollar amounts. The document was recognized not to include a value for Vista's risk.
Vista noted that we felt manpower costs for the remediation system were significant for the 20 year remediation period and should be included in the "cash-out".
The next meeting was scheduled for Tuesday, April 11, 1:00-3 :00 p .m. at Conoco. Prior to that meeting, Vista will develop a proposed value for Vista risk, and review the dollar amounts and elements presented in Attachment II.
*
Thomas G. Grumbles, C.I.H. Environmental Quality Manager
dlj Attachment
cc: W. L. McClain, M. G. Hayes-LCCP
VVV 00G006973
DEFINITION OF CASH OUT
The receipt by Vista of a lump sum payment of money in exchange for a total release of liability of Conoco for future costs incurred to remediate any and all subsurface "groundwater" at the Lake Charles Chemical Complex.
ELEMENTS OF CASH OUT
1. Capital costs for: a. Recovery system (new equipment) b. Treatment system
2. 0 & M for: a. Recovery system b. Treatment system c. P & A costs
3. Value for Vista assumed risk
ASSUMPTIONS
1. 20 year remediation life
2. 5% inflation
3. 10% discount factor
4. Based on system initially approved for installation by DEQ based on feasibility study recommendations.
5. Vista obtains subrogation rights against consultants
6. Separate treatment system that considers available synergies
CASH OUT ADVANTAGES/DISADVANTAGES TO CONOCO/VISTA
1. Certain price for undefined actual project lifetime costs
2. Elimination of Conoco manpower and substitution of Vista manpower requirement for project management
3. Protection from and exposure to changing clean-up standards
4. Elimination of Conoco transactions with consultants-substitution of Vista
5. Adds another level of uncertainty for Vista APA claims based on scope of release. VW 000006979
LCCC Groundwater Project Buyout Costs
Summary
If Conoco continues to be involved in thia project at 70% cost for the next 5 years, 50% for the following 5 years, and 30/- for the following 5 years, and iO% for the last 5 years, it will cost an estimated 3=717,216 NPV (Net Present Value at 10% discount factor) for the next 20 years- This should be the starting point for negotiations. A risk factor needs to be included so the cost will go up by some amount. The major items anticipated to complete the project and estimated costs are discussed below.
Remediation Wei 1 InstalIation
ft design basis of 20 pumping wells in the 50--ft sand with an average pumping rate of 5 gpm each was used. It was assumed that 3 of the wells would be existing wells and IS would be new. Assuming 6--inch stainless steel wells, it would cost 5242,000 just for the well installation and the total project would cost in the neighborhood of 5300,000.
Rented i ati on Pumping System lostal 1 at ion
The system for the 2 current wells pumping the 30--ft sand cost about 510,000. For 13 more wells the cost was assumed to be 5180,000. Maintenance was assumed to be 5% of the capital cost per year with a 5% inflation factor.
Mossvilie Monitorinq Mel1s Instal1ation
It is assumed that 3 monitoring wells will in Mossville in the 30--ft sand. The total is estimated to be about 557,000.
have to be installed cost for this project
New Steam Strjpper Instal1ation and Operation
The installation of a new steam stripper to treat 100 gpm of groundwater is estimated to cost about 5320,000. No operating costs were estimated, but they are expected to be low because excess steam is available and the pumps required are low horsepower. Maintenance costs are estimated at 5% of the capital cost annually with a 5% inflation factor.
Plugging and Abandonment p-f Wells
Three steel ellsf (soon to be 4) and 5 PVC wells have been P$tA ' ed to date. Only a couple of tnore wells have obvious problems and will need to he P&A'ed. The PS*A cost (and possibly other casts associated with these wells) may btis rsCOvttrsd from GicM. An effort to eliminate wells not needed tor either recovery or monitoring could result in P&A of a maximum at 30 wells. Using a cost of 10 times the cost of the three wells already P&A'ed plus 10 percent gives *a cost of *50*000.
Hiscellanedcus Contractor Studies
*10,000 per year was added to cover the cast af additional studies by a groundwater consultant. Also, *10,000 per year analytical costs for outside laboratories was added. Prices go up over the years, but the amount of studies and analyses should decrease.
may
000006981 VV*
LCCC BROUNDHATER
Year
Pumpout
1O
2 130,000
3 9,000
4 9,450
5 9,923
6 10,419
7 10,940
5 11,487
9 12,061
10 12,664
11 13,297
12 13,962
13 14,660
14 15,393
15 16,163
16 16,971
17 17 , S1 9
IS 13,710
19 19,646
20 20,628
Total
NPV
233,130
PROJECT BUYOUT
stripper
New Wei 1s
O 337,000
320,000
0
16,000
16,800
17,640
13,522
19,448
20,421
21,442
22,514
23,639
24,821
26,062
27,365
28,734
30,170
31,679
s^3,26o
34,926
36,672
414,452
324,545
contractors
70,000 20,000 20,000 20,000 20,000 20,000 20,000 20,OOO 20,000 20,000 20,000 20,OOO 20,000 20,000 20,OOO 20,OOO 20,000 20,OOO 20,OOO
193,412
Conoco cost *717,216
-t- Vista cast -- Total NPV *448,323 *1,165,539