TENTATIVE OPERATING INSTRUCTIONS C, LIME SLURRY TANK
. 1. Synopsis
This tank is used to mix and store a slurry of lime in crude 1142 Arocldr. Crude 1142 is pumped batchwise from #1 intermediate storage to the lime slurry tank. Lime is added from bags batchwise and the slurry mixed with the agitator. The contents of the tank is circulated and pulse fed with a timing device into the line feeding #1 intermediate storage from the continuous blow tank.
2. Equipment
>
'
a. Lime Slurry Tank (Item 320)
b. Lime Slurry Pump (Item 352)
"
3. Equipment Function*
a. The function of the lime slurry tank is to mix
and store a slurry of lime in crude Aroclor 1142.
b. The function of the lime slurry pump is to
circulate the contents of the lime slurry
tank and pulse feed slurry into the feed
line to the #1 intermediate storage tank
.
from the continuous blow tank.
, 4. Control Loops Interlocks and Alarms
a. Control Loops
Flow (KIC-352-l) The function of this loop is to
control the flow of lime slurry into the crude
1142 line between the continuous blow tank and
the.#l intermediate storage tank. Control is
accomplished by a timing mechanism which opens
a valve in the feed line for a preset length of
time, then closes the valve and holds it closed
. for another preset length of time. A switch on
' the panel board is used to activate the timing
device and there are two dials on the panel
which are used to set the lengths of time the
valve is open or closed. '
.
.
b. Interlocks' - None -
-
c. Alarms - None
PCB-ARCH-EXT0374455
TENTATIVE OPERATING INSTRUCTIONS
C. LIME SLURRY TANK (contd.)
' .
5. Start-Up Instructions
.
' '
..
a. When Tank is Empty
1) Close the valves on bottom of tank and the
top of the tank in the line used to charge
. crude.
.
2) If it is not already running, start the #1
' intermediate storage pump. Make sure the
valve in the line to the still pot is closed
unless you want crude charged to the still
pot.
.
,
.
3) Open the valve in the feed line and charge
,
the slurry tank to 90$ on the level indicator
on the tank. Close the valve in the charge
line to stop feed.
4) .
If it is not being used for anything else, stop the #1 intermediate storage pump. If there is material in #1 intermediate storage tank, leave the pump running to circulate.
5) Open the valve at the bottom of the lime slurry tank and start 'the lime slurry
. circulating pump. Make sure the manual valves in the slurry charge lines are closed.
6) Start the agitator.
7) Open the valve in the water line to the Venturi
to suck off the fumes. Check, the pressure
.
gauge to see that there is no pressure on the
tank.
8) Open the lime chargingport and charge 9 bags
(450 pounds) of lime to the tank.
9) The lime slurry is now ready and whenyou
.
want to charge slurry, set the timers to
the~
correct settings, open the manual valves in
the 1/2" charging line and activate the. timer.
b. When the Tank Has a Heel .
1) Do not stop the agitator or pump.
2) Note the level in the lime slurry tank.
- ' 3) Recharge the .tank with crude .to 90$ as
covered above in paragraphs 5*
2), 3)j 4), & 7)
PCB-ARCH-EXT0374456
TENTATIVE OPERATING INSTRUCTIONS C. LIME SLURRY TANK (contd.)
'
.
''
'
b. When the Tank has a Heel (contd.)
.
4) For each 10$ of tank level charged, add one'hag of lime to the tank.
5) Continue to operate normally.
.
Note:
l) Unless there Is an equipment failure or an emergency, do not stop the agitator or circulation of this tank.
2) Always check the pressure gauge on top
the tank before opening the port for
\ adding lime. .
.
6. Normal Operations
During normal operations the following conditions
should exist:
a. Agitator running
b. Pump should be circulating
c. Timer should be activated
d. Level should be between 30 and 90$
e. Level should decrease about 10-15$ per
.
shift if chiorinators are running at 60$.
7. Shut Down Instructions
a. Emergency
1) Shut off the timer switch on control board.
2) If necessary, shut off:
a) Agitator b) Circulating pump c) Valve on bottom of tank
b. Normal - Short Time (Less than 30 Min.)
Shut off timer switch.
c. Normal - Long Time (More than 30 Min.)
l) Shut off timer switch
2) Notify premium operator to shut down
.
chlorinators.
.
PCB-ARCH-EXT0374457
Cl . ' VI. TENTATIVE OPERATING INSTRUCTIONS
..
C. LIME SLURRY TANK (contd.l
.. .
. .
d. Electrical Power Failure
1) Shut off timer switch on panel board when
'
power goes off.
2) When power is restored: . _ .
a) Start the agitator
b) Start the circulating pump
c) When the crude is flowing to #1
-intermediate storage, activate the
timer to start the lime slurry feed.
8. General Information
a. Keep circulating and the agitator on unless . there is an emergency or the tank is empty.
b. This tank should fill in a few minutes when
charging. Watch it closely.
.
c. Level should fall about 10-15$ per shift if operating normally.
d. Add one bag of lime for each 10$ recharged.
e. For a full sized column run it will be necessary
. to recharge the tank once during the run and
again at the end of the run.
f. Before charging lime^ open the Valve in the
water line to the Venturi; then check the
pressure gauge to see.if you have atmospheric
pressure or less.
g. If water or steam is used to clear plugged lines they must be blown dry.
9. Critical Control Points .
Control . Expected
Points
Readings
Deviation Limit and Effect
Correction
Level'
30-90$
20$ Minimum. Must maintain circulation and agitation to . insure against line pluggage.
Charge tank and lime as usual.
. ,
PCB-ARCH-EXT0374458
VI. TENTATIVE OPERATING INSTRUCTIONS
.
CTTlME SLURRY. TANK (contd.)
' .
.
9. Critical Control Points (contd.)
Control
Expected
Points Readings
Deviation Limit and Effect
Level 10-15$ per Change Shift
10$ per shift minimum. Must be sure lime is added to crude to protect against high chlorides and column corrosion.
10. Other Control Points
Correction
Set timer to open valve for longer period of time.
Pressure Some Vacuum
.
Atmospheric pressure or
less before charging to
minimize fuming when
opening lime charging
port. '
-
11. Trouble Shooting
Symptom Problem
Cause
1. Level not
dropping on In dicator
1. Circulating line plugged,
2. False reading on level indicator.
1. Lime settled in line.
2. Displacer stuck.
3. Tank is empty. 3. Level indicator
.
wrong.
Make sure you have water supply. If you have and still have pressure, open tank carefully since it may be' full of water. Check tracer.
Possible Solutions
1. Will have to clean line.
2. Shut off agitator and stick tank. If level indicator is wrong, recharge and try again. If stil-l bad call instrument man.
3. Stop agitator and stick tank. Ifempty recharge and start up. If it doesn't work call instrument man.