age. Tee
file 5/15/90
.
MEMORANDUM
eye
4 og Barice Barice
a cade
Barice Barice
T.
May 9 1990
_
TO
Plant Managearnsd Purchasing Agents
CC
.
"
FROM RE
E. C. Irby J. R. McGill B. J. Sasser L. C. Tropea
P. R. Laden B. J. Mallinger A. L. Adams
.
J. R. Marshburn
:
Homer M. Cole - Ind Hyg & Tox - 12
ASBESTOS DEMOLITION PROCEDURES
RARTARLERETAEREEREELELELELE CKRKKAKLETLELRLEKEERREARERER
e
Attached Reynolds recently adopted Asbestos
- Demolition Procedures These procedures will
-
apply to all contract fosr asbestos removal work and will be
incorporated into a Corporate Operating Manual The procedures '-
are detailed but necessary based on a recent incident
An asbestos removal company was doing demolition work at one of Reynolds Arkansas facilities A state inspector observed violations of asbestos regulations by the contractor's workers
The state contacted the Federal EPA which issued a notice of
violation The EPA threatened a lawsuit with a 632,025 fine and an injunction The state sought additional penalties
In this type of situation federal law potentially makes both Reynolds and the contractor jointly liable i.e. each liable for
the full amount of the fine The EPA took the position . that
Reynolds as the larger company was liable for the majority of the fine despite the fafactct the contraccontractor tor completely controlled the work and caused the asbestos violations
The case was eventually settled Reynolds paid 75,000
fine to the federal government and a 22,500 fine to the state
Reynolds also entered into an agreement with the EPA and the state that requires Reynolds to take additional precaution for future asbestos removal projects
Needless to say the EPA and OSHA are now looking over our shoulder make sure Reynolds takes these additional precau-
tions To avoid an expensive repetition this incident the attached procedures dealing with the selection and monitoring of asbestos demolition or repair should be implemented
immediately
Should you have questions regarding attached procedures please call Ed Ron Benton Ext 3795
the implementation of the
Marshburn Ext 4056 or
Attachment
.
Homer M. Cole
003610
RECEIVED
RECEIVED RECEIVED
HAY Ga ree
wv
o
COM
19.62.30
SUBJECT
ASBESTOS DEMOLITION REMOVAL
AND REPAIR PROJECTS
.
PAGE
:
EFFECTIVE
of 7 Draft
.
GENERAL .
It is Reynolds Metals Company's policy that all asbestos demolition
removal and repair work at company facilities strictly conform with
, applicable health and environmental laws and regulations Io ensure
'
..
compliance with this policy only contractors approved by Corporate
-. - ,. Industrial Hygiene Approved Asbestos Contractors may *?
perform
asbestos demolition removal and repair work
"
In addition their
.
work must be adequately monitored from the time the work commences
until wtdll,
completion
.
_
ct
ae
tee
2
ee
must - This procedure outlines the steps which company facilities
: follow when selecting and monitoring the work of asbestos demolition
-. removal and repair contractors
SELECTING ASBESTOS DEMOLITION REMOVAL CONTRACTORS
APPROVED ASBESTOS CONTRACTORS
-
--
ae
viveyy
Except as provided below in connection with certain exceptional
situations all asbestos demolition removal and repair work at
company facilities must be performed by Approved Asbestos Contrac-
tors Corporate Industrial Hygiene will maintain and provide lists
of such contractors to the Corporate Purchasing Department for
distribution to facility purchasing representatives In order to be
included on this list contractor must possess all required feder-
al state and local licenses and certifications and have a demon-
of strated history satisfactory performance in asbestos
oc .removal and repair projects .
demolition
EXCEPTIONAL CIRCUMSTANCES
company The use of
and repair work is
circumstances : -
employees to perform asbestos demolition removal
not encouraged and is restricted to the following ;
1
the time of performance is critical-
2
an Approved Asbestos Contractor cannot be retained on a timely
basis
-
7
.
.
003611
be,
ai,
oy
COM -
19.62.30
SUBJECT
ASBESTOS DEMOLITION REMOVAL
AND REPAIR PROJECTS
.
PAGE
2 of 7
EFFECTIVE
Draft
,
3 the quantity of asbestos or containing material in-
volved falls within the EPA's classification of small scale short duration job and
4
-:
the demolition or removal
material is not the primary of the work For example
removal of a valve which is
of asbestos or containing
purpose but is a necessary component
the work consists of the emergency
covered with asbestos insulationemergency
All employees performing this work must either have successfully completed an EPA approved asbestos supervisor's course or possess a
current state asbestos removal license They must also follow the
procedures outlined in the 27 1988. . Copies of this
Industrial Hygien-e
Industrial directive
..
Hygiene Directive dated July are available from Corporate
.
.
UNLISTED CONTRACTORS
If all of the above conditions are applicable but qualified company
employees are not available facility may utilize a contractor
who is not on the list of approved contractors provided- the
contractor
1-
has a demonstrated history of satisfactory experience in asbes-.
tos demolition removal and repair project
2
possesses all required licenses and certifications and
3
. completes and submits an Asbestos Demolition
Plan Questionnaire prior to commencing work describing how
work will be performed
Copies of this questionnaire
available from Corporate Industrial Hygiene
Work the
are
To the greatest feasible extent the contractor's work shall be
monitored in accordance with the monitoring requirements set forth on
pages 5 through 7
1
An EPA small scale short duration job involves any a pipe repair of friable asbestos of less than 20 linear feet b repair and removal of friable panel of less than 10 square feet
c limited renovation projects of any amount of friable.
asbestos and d pipe valve repair or replacement taking less
than four hours or involving less than 20 linear feet
-003612
SUBJECT
ASBESTOS DEMOLITION
AND REPAIR PROJECTS
-
REMOVAL
COM PAGE
EFFECTIVE
19.62.30
3 of 7 -Draft -
AWARDING CONTRACTS
aan Contracftosr asbestos demolition removal
_ only
or repair may be
awarded
1.
to Approved Asbestos Contractors
.*
|
if the contractor has submitted all of the required
tion with its proposal and
.
documenta-
3
if the contractor's proposal
-
quirements discussed below
complies with
the award
re-
. -, Requests for proposals and
i
= below
-2.. 00.
+
Loy
selection of
.
.
contractors are discussed -
-
-*
*
. :
o
.*
tt
REQUESTS FOR PROPOSALS
= 4
Requests for proposals in connection with removal and repair projects may only be sent
asbestos demolition
to Approved Asbestos
Contractors The scope of work must be included with the request for
proposal and must clearly identify the type amount and location of
the asbestos and include
any additional relevant
information
regarding the project
e
-
The request for proposal must also include all applicable contract
documents including the additional asbestos abatement provisions .which theCorporate Purchasing Department has distributed to purchas-
-
ing managers and buyers Any exceptions to these contract documents must be approved by the Law Department before contracts are awarded
In addition prospective contractors should be directed to
all proposed subcontractors in their proposal and should be
that they may utilize only subcontractors who are listed by
as Approved Asbestos Contractors
.
identify
advised
Reynolds
Prospective contractors should also be directed to submit the following documentation with their proposals
.
1
A completed
Asbestos
Demolition Contractor
Performance Questionnaire This questionnaire is available from
Corporate Industrial Hygiene If the contractor intends to use
any subcontractors each proposed subcontractor must
also
complete
tractors wish to
and return the questionnaire Contractors and " subcon-
must complete this questionnaire for each project they be considered for regardless of their status as an
Approved Asbestos Contractor
:
Ae
a
sb
COM
19.62.30
SUBJECT
..
ASBESTOS DEMOLITION
AND REPAIR PROJECTS
REMOVAL
.
.
-
-* PAGE
7 .
EFFECTIVE
4 of 7 Draft
a . A completed Asbestos Demolition Contractor Work
.
Plan Questionnaire describing how the work will be performed
Copies of this questionnaire are also available from - Corporate
Industrial Hygiene .
:
-
Pate.
*
3 The contractor's contractor's detailed work plan for the project This work
plan is in addition to the information submitted on the Work
.
4 MEd2ers lt
- Plan Questionnaire
. .
on
ee -
=
Copies of all required contractor and supervisor - licenses for
.the contractor and each proposed subcontractor
5.
,6
tt
Documentation showing the training and qualifications of
individual who
Loo
project
ae
-
-
will be
--
collecting air ,
-.
samples
hn
.
for
.
the the
ld
. Documentation showing that the laboratory which will be used to
analyze air samples is either EPA approved AIHA_certified
-
. -
7
.
. .
If the contractor will be using a negative air filtration
system evidence that the contractor has obtained a license from
GPAC Inc. the holder of the patent on
fans used to create negative air pressure
the
filtered
~
. exhaust
SELECTING CONTRACTORS
003614
AWARD REVIEW - Before awarding a contract the facility must
.carefully review the contractor's proposed work plan and its complet-
ed Work Plan Questionnaire to ensure that its work will comply with
all applicable federal state and local laws and regulations . Included in this requirement is compliance with EPA's National
Emission StandardSafety for Hazardous Air Pollutions NESHAP
. Occupational Safety and Health Administration's regulations
and the
pertain-
ing to asbestos removal
The award review must be performed
either by a company employee who has successfully completed an EPA
approved asbestos supervisor's course
outside consultant
or by
a previously
.
approved
OUTSIDE CONSULTANTS - Corporate Industrial Hygiene will maintain a
list of outside consultants who are approved to perform award
reviews and monitor contractor performance
This list will be
supplied to Corporate Purchasing for distribution to
facility
purchasing representatives
Even though a consultant has been
approved by Corporate Industrial Hygiene there can be no business
affiliation between a consultant and any prospective contractor contractor
OTHER APPROVALS -T The facility must ensure that all approvals
~
quired by any other applicable procedures have been obtained
re- :
SUBJECT
. .
ASBESTOS DEMOLITION AND REPAIR PROJECTS
.
REMOVAL
COM
_
PAGE
EFFECTIVE
19.62.30
5 of 7
-
Draft
_ MONITORING CONTRACTOR PERFORMANCE _
The facility where the work will be performed
monitoring the contractor's work to ensure
is responsible
.
;.
for
;
1. it complies with all applicable federal state and local laws
.
.
and regulations and
.
2
the approved work plan is being fully carried out
The Monitor must be either a company employee who has successfully -
completed an EPA approved asbestos supervisor's course or a previous-
. ly approved outside consultanats defined above
When
same
nel
entering the contractor's
safety precautions as are
an
~
a
:
work area the Monitor must follow the required for the contractor's person-
FREQUENCY _.
The monitoring must start as soon as the contractor enters the work
site and must continue until the final clearance air sampling has been successfully completed It is imperative that the Monitor be at
the work site and monitor the contractor's performance as frequently
as the facility deems necessary to ensure that the contractor com-
plies at all times with all applicable laws and regulations ing to asbestos removal
Dertain-
-
?
If monitoring is not performed on continuous basis it must be
performed at least once daily for glove bag operations and at least
twice daily if there is a containment area If the monitoring is not
continuous it should be performed at different times each day in order to limit the contractor's ability to predict when it will
*
Occur
.
.
DAILY AUDIT REPORT
Each day the Monitor must complete either the company's Asbestos
Demolition Contractor Performance Audit Report or an
alternative document previously approved by Corporate Industrial
Hygiene The Audit Report identifies the specific items and areas to
be checked by the Monitor each day Copies are available from
e ns Corporate
of all of
Industrial Hygiene Upon completion of the project the Monitor's project reports must be forwarded to
copies Corpo-
rate Industrial Hygiene for permanent retention
PR
+
viet
SUBJECT
ASBESTOS DEMOLITION AND REPAIR PROJECTS
REMOVAL
COM PAGE
EFFECTIVE
19.62.30
6 of 7 Draft
INDEPENDENT CONTRACTOR RELATIONSHIP
In order not to jeopardize the independent
between the contractor and the company the
1. tell the contractor how to perform the
contractor relationship
Monitor shall not
work or
*
2
exercise
any
control
over
the
contractor's
,
employees
Except when immediate action or attention is imperative the-
must direct all communications to either the contractor's
manager or its project representative
Monitor
projec.t.
IMPROPER WORK PRACTICES
The Monitor must immediately direct the contractor to stop any work
_
7
practice or situation such as a breach in a containment barrier
inadequate worker decontamination or a breakdown of the negative air
machines which the work place
work to resume
could result in therelease of asbestos fibers into
or environment
The Monitor should not permit the
until the contractor has corrected the practice or
situation All such incidents must be documented in the Monitor's
daily monitoring log
WORKER CERTIFICATION
wee
employee = -No individual whether an
of the contractor or any subcon-
-No
tractor
should be permitted to
perform any work in connection
with
the project until the contractor submits documentation to the Monitor
- which
1
documents that the individual has
months been .
the last 12
and
medically examined within
2 indicates whether the examining physician detected a medical
condition that would place the individual at an increased risk
of health impairment from exposure to asbestos
No individual who would be placed at an increased impairment from exposure to asbestos may perform any tion with the project until the contractor also
Monitor
risk of work in submits
health
connec
to the
6
1
evidence that the individual has been fit tested with negative
te
pressure respirators within the last six months and
aot.
2
a physician's written opinion that there are no limitations on
oe
the individual's use of respiratory protection ie
003616 ~F
SUBJECT
ASBESTOS DEMOLITION REMOVAL
AND REPAIR PROJECTS
-
COM
.
.
PAGE
19.62.30
7 of 7
EFFECTIVE
Draft
. : In addition no individual should be permitted to perform work on the
project until the contractor submits a copy of the individual's
asbestos worker license
If the state in which the work is being
performed does not require asbestos worker licenses the contractor
must submit evidence that . the individual has successfully completed
an EPA approved asbestos worker training course .
-
.
SAMPLES
+
The Monitor must collect at least two area air samples each day -
at the entrance of the clean room and another at the exhaust of the ~
,
negative air machines If a regulated area has been established the .
Monitor must
- -collect at least one air sample daily at the
boundary between the regulated area and the normal work area
If any air sample reveals asbestos levels at or above 0.1 cc the Monitor shall direct the contractor to stop the demolition removal or repair work immediately The Monitor shall not permit the work to resume until the contractor has modified the project work practices to reduce the asbestos air levels to less than 0.1 cc
FINAL INSPECTION
-. ~~
After the asbestos demolition removal or repair project including
final cleanup has been completed the Monitor must conduct a visual
inspection of the work area This inspection must take place before final clearance air sampling and must include entry into the work
area to visually check for contamination on surfaces from which containing material has been removed
Additionally the Monitor must inspect for
containing material
other surfaces
which hainspev ct hae ve been
any asbestos
caught on
or asbestos-
equipment Or
ton
Once the work area has passed the Monitor's visual inspection the final clearance air sampling must be performed The project will be deemed to be complete when aggressive air sampling shows airborne
asbestos levels of 0.01 cc or less
If there are any questions inspection the Monitor Industrial Hygiene
concerning the daily monitoring should promptly consult with
-
or final