Document wrnxVK85bn3zro5Y7EN6NXp64

RESEARCH AND DEVELOPMENT REPORT ANNISTON PLANT J OTHER LOCATIONS GENERAL OFFICE *W. G* Engman - WGK *p. 0. deGarmo - So. 2nd *A. E. Lcisy - WGK *A. Rasmussen - WGK *E. S. Tucker - So. 2nd D. Danna (2) *P. B. Hodges *F. J. Holzapfel R. M. Kountz *W. B. Papageorge *W. R. Richard *J. R. Savage KopoM No. ___________o______________ IJob No--------- 416-514_________ Dole___A_NANISpTrOiNl P1L5A. NT1971 J. T. Bell J. L. Corder J. L. Etheredge V. R. Haupt G. L. Jessee J. C. Landwehr/W. F. Taf G. W. Miller /E. G. Wri< Tula: Aroclor Pollution Study p.,,.nn,i: Ishmeal Ransaw and Andrew Nelson (J. L. Brown) PfobUm: ' Evaluate the removal of Aroclor from the Anniston Plant effluent by carbon adsorption Justification: Pollution Abatement Summary: In a 107 day pilot run, approximately 287,000 liters of waste water from the Aroclor sump were treated by passing through a series of four (4) packed-bed adsorbers (each adsorber was a five (5) inch diameter tube packed to a bed depth of 5.5 ft. with Pittsburgh's carbon type Filtrasorb 300). Test runs were made at 2 gpm/ft.2, 4 gpm/ft. and 6 gpm/ft.z flows. During the first 20 days.of this study there were periodic indications of breakthroughs2. This problem disappeared after backwashing was initiated on a periodic basis regardless of the pressure drop across the columns. The following conclusions may be drawn from this study: 1. , The Aroclor level of waste water containing average concentrations of 4,795 ppb1 of Aroclor 1221, 1,525 ppb of Aroclor 1242 and 95 ppb of Aroclor 1254 can be reduced to <10 ppb total Aroclor upon passing through the first carbon bed at a 6 gpm/ft. flow with an expected carbon loading capacity of 25* (based on the first column). 2. Backwashing frequency will have to be based on a factor other than pressure drop alone. This factor is necessary to pre vent the migration of small Aroc1 or-containing particles 1 ppb * parts per billion 2 Breakthrough indicated by effluent conccntrations>10 ppb Aroc1 or. Appendix sections not included. MONS 087485 Aroclor Pollution Study Research and Devveellooppmmeennt Report Summary: (cont'd.) 2. through the carbon bed. The backwash water contains an unacceptable Aroclor concentration; hence will have to be treated before disposal. 3. Based on an experimentally determined 25% loading capacity and 6 gpm/ft. flow, the capital cost for treating a 200 gpm and 600 gpm is $25,000 +_ 30% and $45,000 + 30%, respectively. This cost does not include pumps, engineering or other Indlrects. The total cost becomes $99,000 + 30% for 200 gpm flow and $129,000 + 30% for 600 gpm with the Inclusion of a carbon reactivation system. Recommendations: It Is reegmmended that Aroclor be removed from waste streams that contain 60 mg/1 or less solids and Aroclor concentrations not exceeding 10,000 ppb by adsorption in a fixed carbon bed. A study is presently in progress to evaluate the removal of Aroclor by adsorption on a less expensive adsorbent and then removing the adsorbent by flocculation. PR&D Chemist /dp MUNS 087486