Document wrR1QE9QNQv292aby9B3Jjy23

INTERNAL CORRESPONDENCE UNION CARBIDE CORPORATION tec.-w:;a,. . :i >. o box a j-:-: '\l PLAINTIFF'S EXHIBIT A. F. Terry T. L. Collins P. D. Gossage C. P. Maxwel1 R. 6. Rowe, M.D. C. L. Ruddle R. E. Sergent October 7, 1986 HS&EA Industrial Hygiene Asbestos Exposure Monitoring - Building 726 Attached are the results of the Asbestos exposure monitoring performed on R. P. Hess and F. R. Creech on September 2, 1986 and September 3, 1986. They were monitored while stripping Asbestos from steam lines outside and inside of the Building 726 compressor room. R. P. Hess and F. R..Creech were equipped with 2 pair of Tyvek disposable coveralls, boots, gloves and a half-face respirator equipped with Willson R-12 HEPA filter cartridges. The outer pair of coveralls was removed and disposed before leaving the barricaded area. They went directly to the shower (781), decontaminated, removed inner coveralls and showered (clean shower), before reapplying street clothes. The monitoring results indicate that outside of the building, the level was below the Permissible Exposure Level (PEL) of 0.2 fibers/cc, established by OSHA for an 8-hour workday (TWAg). However, inside of the compressor room the exposure levels exceeded the TWAg limit of 0.2 fiber/cc. An 8-hour TWAg was established because the employees had no exposure to asbestos before or after the monitoring periods on each day. The high levels found inside of the building could be due to the hot surface of the steam line which may have precluded adequate wetting of the insulation. As we have recommended in the past, the steam lines should be shut off and allowed to cool when possible. When steam lines can not be shut off, it will require extra precautions in removing insulation to keep the asbestos levels down. UCC 024782 Asbestos Monitoring - continued -2- October 7, 1986 Please notify R. P. Hess and F. R. Creech of their monitoring results as soon as possible. Please have them sign and date this report and return to M. A. Patel at Building 701-330. If we can be of further assistance or if you have any questions, please call us on extension 4779 or 3750. WORK BY: APPROVED BY: -. Vance E. Stover Attachment VES:MAP:rab 1778P A* Manhar A. Patel UCC 024783 ASBESTOS EXPOSURE MONITORING Ccnp. ref. W2026 W2027 Date 9-2-86 9-2-86 9-3-86 9-3-86 Saiple Type/ Enployee Name R. P. Hess Sanplirtg Time 1 hr 12 min. F. R. Creech 1 hr 9 min. F. R. Creech 1 hr 15 min. R. P. Hess 1 hr 15 min. Air Cone. fibers/cc 0.346 0.100 1.428 2.642 TWg fibers/cc 0.0519 0.014 0.223 0.413 COMMENTS Collected while stripping asbestos frem steam line outside of 726 corrpressor roan Collected virile stripping asbestos from steam line outside of 726 coipressor room. Collected while stripping asbestos from steam line inside of 726 corrpressor room. Collected while stripping asbestos from steam line inside of 726 carpressor room. ASBESTOS Remissible Level 0.2 fibers/cc osm 1778P UCC 024784