Document wrOd8eJZ7wx1Rema4VoD1Zm1D

COMPANYMonsanto / uTIALfOM IK*MB tc*not E. E. Stewart, Kr bmjict r December 28, 1971 PCS SOURCE ec Messrs. A. E. Leisy R. M. McCutchan G. A. Hippe TO Mr. W. C. Engman in.i* oiv iII In our efforts to better define the magnitude and the source of PCB losses to the sewer, we are presently investigating three distinct areas where clues may be present. The three areas are: I. The presence of Arodor 1221 in sewer streams since 11/I/7l. II. Diversion of the sewer streams from the Aroclor Department at 4-Z. All department flow is directed to the north and not permitted to flow into the internal plant sewer system which exits at the 24" and 30" sewers. III. Slow versus fast sewer samplers. Information to date^in the' three areas can be summarized as follows: I. THE PRESENCE OF AROCLOR 1221 Prior to 11/3/71 the presence of Aroclor had not been reported by the laboratory to be in any of the sewer streams that were analyzed. Since 11/1/71, Aroclor 1221 has been present in the composite samples as listed below. Date (4-Z) Dept. 246 (2-A) 24" Sewer (1-B) 30" Sewer Inf. EtC. 11/3 11/7 11/10 11/14 11/17 11/21 11/25 11/28 12/5 12/8 12/12 12/15 12/19 12/22 * 618 ppb 134 ** 372 - A67 ^76 * 150 70 * 1533 * 43 - 0 0 0 0 0 20 27 0 29 0 14 16 12 47 0 31 395 ppb 376 225 611 60 53 30 166 252 0 0 0 0 0* 419 ppb 186 0 254 600 228 46 28 40 0 0 0 20 0 322 ppb 90 64 237 218 230 59 59 15 60 0 0 16 31 * Denotes when Aroclor 1105 was being produced during the sampling period. HONS 09*1939 W. C. Engman PCBSOURCE Page 2 12/28/71 WGK I. THE PRESENCE OF ARQCLQR 1221 (continued) 100 ppb in the Influent stream of the Waste Treatment Plant represents about 11# PCB/day to sewer. . Harry Campbell has examined past chromatographs in July, August, September, and October and reports "no definite observation of 1221 was noticedl This appears to have occurred on or about 11/3/71. " Harry reports, however, periods when there existed a fair to good possibility of the presence of Aroclor 1221 in past samples. He also stated there .was a good possibility of 1105 being present on 9/1 and 9/12. This coincides with short production runs of 1105. The data would indicate: A* PCB's called 1221 that are present are coming from the production department via 4-Z. B. The Department 246 sewer at 4-Z could be flowing from the plant via 1-B and not 2-A as we currently believe. ~ C. During the period when the department was producing 1105, about 20#/day of 1221 (?) were getting into the sewer. If we continue to produce 1105 it will not be possible to reach our goal of 1 #/day loss with the existing facilities. Additional scrubbing equipment will be required to reach goal. D. Further discrepancies in our present sampling tech niques are evident because the streams do not balance with regard to the 1221 analyses. . .II. DIVERSION OF SEWER FLOW AT DEPT. 246 (4-Z) FROM MAIN PLANT SYSTEM The west exit from 4-Z was boarded closed on 12/16 and most of the water flow has been directed to the north and then to the Treatment Plant via Monsanto Avenue. HUNS 096940 W. C. Engman PCB SOURCE Page 3 12/28/71 WGK II. DIVERSION OF SEWER FLOW AT DEPT. 246 (4-Z) FROM MAIN PLANT SYSTEM (continued) Date (2-A) 24" Sewer (l-B) 30" Sewer 12/5 12/B 12/12 12/13 12/14 12/15 12/16 Avg. to Date 12/19 12/22 12/23 Avg. 38 ppb 48 50 79 124 157 42 77 ppb 38 ppb 97 . 132 89 ppb IS 1 31 %,< 291 122 - 28 10 9 4' 66 ppb 9 ppb 19 __ 3_ 10 ppb i 2 _i/_ y To date the 24" sewer is running about the same but the 30" sewer indicates a reduction. Additional samples are being obtained before conclusions are made. Plans are to reroute the sewer back to its normal direction on 12/30/71 A more complete analysis will then be made. III. SLOW VERSUS FAST SAMPLING PUMPS Fast sampling pumps were installed at the 24" and 30" sewers at 2-A and 1-B. Data from the slow and fast pumps are being compared at these locations since 12/12. Date (2-A) 24" Sewer Slow Fast (1-B) 30" Sewer Slow Feet 12/10,11,12 12/13 12/14 50 ppb 79 124 169 * 431 231 _ 168 28 2217 * 10 4136 * * MONS 098941 W. C. Engman PCB SOURCE , . Page 4 12/28/71 WGK IU. SLOW VERSUS FAST SAMPLING PUMPS Date (2-A) 24 " Sewer Slow Fast 12/15 12/16 12/17, 18,19 12/20,21,22 12/23 157 42 38 97 132 252 366 126 * - 251 (1 -B) 30" Sewer Slow Feet 9 1132 * 4 330 9 1592 * 19 1226 3 15 * Denotes sample collector overflowed; thus, abnormal amount of solids present. On sample 2-A there is a ratio of slightly less than 3:1 when comparing fast with slow results. The data from 1-jB is too erratic for analyses. Plans are to install an isokinetic sampler at the Plant Treatment influent stream. After verification of the results by getting a traverse within the accuracy of the method, we will use the influent analyses as the criteria for judging how well in-plant controls are serving to attain our goal of 1 #/day. Expect the sampler to be installed by 12/31/71. To get isokinetic traverse week of 1/3/72, Edward E. Stewart /emi MONS 090942