Document wr9mZ7zKrpnODRgwpj58v2ok6
UNITED STATESUNITED STATES ENVIRONMENTAL PROTECTION AGENCY
* *REGION 1
ENVIRONMENTAL
AGENCY5 POST OFFICEB OSSTQOUN,A RMAE ,0 21S0U9-I3T9E12
100
PROTECTION
Date:Dated as shown on electronic signature(s)
Subj:Inspection Report
Clean Water Act
Northeast Biodiesel
From:John (Jack) Melcher, Environmental Engineer
Digitally signed by JOHN
JOHN MELCHER MELCHER
Date: 2022.12.14 16: 06: 18-05'00 '
Thru:Damian Bednarz, Life Scientist
Digitally signed by Bednarz,
Bednarz, Damian Damian
Date: 2022.12.15 09:11:46 -05'00 '
To:File
I. Facility Information
A. Facility Name:Northeast Biodiesel
B. Facility Location:179 Silvio O Conte Dr
Greenfield, MA 01301
C. Facility Contacts: Rick Durepo
(413) 214-9017, rickd@northeastbiodiesel.com
D. NPDES ID No (s).: 3400086959 (ICIS ID for pretreatment)
MAD000283 (stormwater)
II. Background Information
A. Date(s) of inspection: November 29, 2022
B. Weather Conditions: Clear, cool
C. US EPA Representative(s):
John (Jack) Melcher
Damian Bednarz
D. State / Local Representative(s):
None
ED_019088A_00003856-00001
E. Federally Enforceable Requirements Covered During the Inspection:
40 C.F.R. Part 403-General Pretreatment Regulations for Existing and New
Sources of Pollution
40 C.F.R 122.26-National Pollutant Discharge Elimination System
(" NPDES ") regulation for the discharge of stormwater
F. Previous Enforcement Actions:
No EPA Clean Water Act enforcement actions are on record.
III. Type and Purpose of Inspection
EPA conducted an Industrial User (" IU ") Reconnaissance Inspection and to evaluate
compliance with the General Pretreatment Regulations at 40 C.F.R. Part 403 and to
evaluate potential to meet the definition of a " Non - Categorical " Significant Industrial
User, pursuant to 40 C.F.R. 403.3 (v) (1) (ii).
EPA conducted a Reconnaissance Inspection to evaluate compliance with the NPDES
regulation for the discharge of stormwater at 40 C.F.R 122.26.
IV. Facility Description
Northeast Biodiesel (the " Facility ") is a manufacturer of biodiesel fuel using waste
cooking oils.
V. Inspection
Unless otherwise noted, this report describes conditions at the facility / property as
observed by EPA inspector(s), and / or through records provided to and / or information
reported to EPA inspector(s) by facility representatives and as understood by the
inspector(s). This report may not capture all operations or activities ongoing at the time
of the inspection. This report does not make final determinations on potential areas of
concern. Nothing in this report affects EPA's authorities under federal statutes and
regulations to pursue further investigation or action.
The inspection was not announced in advance.
The EPA inspectors (myself and Damian Bednarz) arrived at approximately 13:20.
A. Opening Conference
I presented my credentials and explained the purpose of the inspection.
Mr. Durepo said that the Facility had partially re - started operations in May 2022 under
new management, including himself. Prior to May 2022, the Facility had shut down due
the Covid-19 pandemic in 2020.
1 Available at: https://www.ecfr.gov/current/title-40/chapter-I/subchapter-N/part-403?toc=1
2
ED_019088A_00003856-00002
B. Facility Tour
Mr. Durepo, Mr. Bednarz, and I viewed the production area.
Mr. Durepo explained the biodiesel production process. Used cooking oil, methanol, and
potasium methylate are combined in a reactor to create biodiesel and a glycerin
byproduct.
Mr. Durepo said that some biodiesel production facilities use a " washing " process to
purify the product, thereby generating wastewaters. Northeast Biodiesel, however, uses
filter columns with a resin to purify its product, which does not generate wastewaters.
Mr. Durepo said that no industrial wastewaters were generated at the Facility.
Mr. Durepo said that the Facility was in the process of updating its oil Spill Prevention
Control and Countermeasures
Mr. Durepo, Mr. Bednarz, and I viewed the area behind the Facility, shown in the photo
below:
2022/11/29 13:53
The area behind the building was covered by the roof, but open on the sides. The concrete
pad was graded inwards towards three catch basins. Mr. Durepo said that he did not
3
ED_019088A_00003856-00003
believe that any pipes were connected to the catch basins. I looked in a catch basin and
saw a small chamber below with a depth of one to two feet.
I observed a dark stain on the ground near the building. Mr. Durepo said that he did not
know why the soil was stained. I did not observe a connection between the stain and
surface water.
Mr. Bednarz and I departed at approximately 14:00.
4
ED_019088A_00003856-00004