Document wr0474E4Qmb3RLe6VR8Lvvw73

! DOW CHEMICAL U.S.A. LOUISIANA DIVISI N PLAQUEMINE, LOUISIANA 70764 604 389-0000 INDUSTRIAL HYGIENE REPORT POLYETHYLENE "A" NOISE ABATEMENT FILE NO. 101=11=3------------------- DATE August 22. 1975----- AUTHOR __ Des----------------------------- ~7zrw^CHECKED DATE March 11, 1976 SUMMARY The Poly "A" Block has completed six noise abatement projects since April, 1974 and more projects are either in progress or in planning. Some very satisfactory results have been achieved thus far. The projects, results and cost are listed in the report. DISTRIBUTION R. Langner 1803 Bldg., Midland K. Swank 1803 Bldg., Midland AN OPERATING UNIT OF THE DOW CHEMICAL COMPANY 011558 CONFTOnVTTAL DOW CHEMICAL U.S.A. August 22, 1975 LOUISIANA DIVISION PLAQUEMINE. LOUISIANA 70704 BOA 087-4321 C. Halphen cc: B. G. Shamburger L. L. Devillier NOISE ABATEMENT A, Sources normally producing sound levels of 90 dB(A) or above in Polyethylene block. *1. BAG 301 and 501 . *2. BAC 801 and 802 3. BAC 4A, B, C, and D 4. BAC 4E and F 5. BAC 2A and B " 6. BAC 3A and B 7. BAC 7A and 7B (HMB 107 - 110) 8. BAC 7C and 7D (HMB 111 - 114) 9. S-lll thru S-114 (source - primary extruder motors X-101 - X-104) 10. BAC 1C and ID 11. C 202 and C-201, C-141 and C-241, C-144 and C-133 (Bldg. 802) 12. P-154E 13. C-101 thur C-109 (Bldg. 803) 14. AC-5 15. C-501, 502, 541 and 531 (Bldg. 809) 16. BAC 51A and B (*) Poly "B" Equipment B. Noise abatement projects completed since April, 1974. 1. Project: Sound wall around BAC 4C and D dB(A) before 100 average dB(A) after 91.8 average Cost * $1,010 2. Project: Sound wall around BAC 801 dB(A) before " No change dB(A) after Cost $1,157 Side walk on west side of office area (Bldg. 807) 35 feet from BAC4C & D area dB(A) before 90 dB(A) after 84 AN OPERAT1NQ unit OP THE DOW CHEMICAL COMPANY 3. Project: Sound wall around BAC 4E and F dB(A) before * 96.2 average dB(A) after 91.0 average Cost - 1500 estimate 4. Project: Forklifts - reduced the RPM's by reducing the tension on the governor spring. dB(A) before dBA after #143 #163 #164 #165 95 90 91-92 92 91-92 86-87 88-89 87-88 Cost no charge by vendor 5. Project: Replaced sweeper with an 85 dB(A) sweeper. No data available on noise levels. Costs: The cost difference of a sweeper without 85 dB(A) requirement and a sweeper with the 85 dB(A) requirement was $1,400. 6. Project: Removed extruders X-117, X-118 and X-119 and replaced with X-120 and X-121. This helped to drop the dB(A) level to below 90 dB(A) in bldg. 804. Cost - cannot be determined. C. Noise Abatement Projects Planned 1, Project: Replace steam drives with electric drives on all secondary compressors C-101 - 109 and C-501 -C-502. This project is still in planning stage, no cost available. 2. Projects: a) Place intake and discharge silencers on blowers BAC 4C and D. b) Eliminate 4A and 4B c) Install one new blower d) All blowers to have silencers. Cost: Estimated $15,000 D. Lee Polyethylene "A" afz ^D0' OllSAO CNFrOF NTTAl