Document wqbd8jJ0NeNEBanaXXb8ZXRBV
FRA7.FR PAINT COMPANY. 2475 Hubbard Avenue Detroit, Michigan
SCHEDULE I
TRADE NAME 1 CATEGORY: COLOR! CUALITY:
1002 Pure Exterior House Paint Exterior - Ready-mixed White First
Figment 1 64^ 55% Leaded Zinc Titancx A Asbestine
Lb.
675 . 157
237
Vehicle: 26^ Stainless Raw Linseed
Oil Heavy Bodied Linseed
Oil " Drier Tuf: entire Mineral Spirits
4?0
32 .34 ' 12
28
Calculated Yield Manufacturing Loss Actual Yield
%
1665
Yield in Gallons
Unit Cost
Total Cost
Weight per
gallon finished product.
Laboratory record
15.6 lbs.
.0725
48.94
.15 23.55 .01 2.37
Storage & handling cost
through loss - \%
.135
66.15
74.56 .75
* .143
4.58
.07 2.38
.10 1.20
.015
.42
Storage & handlingl cost
through loss - 3% .
74.73 2.24
106.7 2.6
104.1
152.58
Cost Analysis: Material cost per gallon Direct labor cost per gallon Factory overhead per gallon Bulk cost per gallon Complete package cost per gallon, including filling charge Factory cost in package per gallon
1.47 .12 05
1.64
-.15
1.83
PRICES
(a) To a company owned or controlled outlet (b) To an independent wholesaler (c) By company owned or controlled outletto retail customer (d) To an independent retailer (Dealer) (e) To other (Industrial)
(Contractor)
None
None
3,15 2.63
2.68' 2.55
N 5119