Document wqZDdZ2gLbv0EjX49km88J564

I '?eetem Thigineering Dep't Garfield, ITtoil March. 15th, 1941 pn Mr. J. B, MacKenzie, Manager, American Smelting f: Refining Co., P.0. Sox 1111, 73. Paso, Texas PLAINTIFF'S EXHIBIT ASA-984 Bear Sir: 31ast Furnace tc Ventilating Baghouse I an enclosing herewith one set' of prints of the Material List covering this job. Ur. Marriott will bring with him two sets of prints of all the drawings. As soon as we complete checking these drawings, we will send you several sets of prints so that you can go ahead and get bids and let the contract for the concrete work and roofing. The structural steel, except as noted belov.', will be Included in the general Bteel contract to be let later. There will be a number of items which will be needed before we will have any contract for st.eel and consequently must either be furnished by you or else Included In the building contract atyour discretion. We have marked then, both on the drawings and material list, as being furnished by A.S.fe R.Co. and set by the building contractor. The3e Items are all shown together on the lower half of shee.t 5. All items on sheets 6 and 7 together with the 40-2" pipe shafts, I-3c. 3059-A on'sheet i-2, will be Included in the general steel contract except the item of 11 asbestos gaskets, 3G37-V, which will be left for you to furnish. with the exception of the 2" pipe shafts, all Items on sheets 1 to 5 which do not have a C.B. number opposite them, are being left for you to order. Tills includes the bags ana bailing v;ire on sheet r"3 (the fan, motor and starter on sheet #3 are the ones you now have), and all the things listed under the heading ''Miscellaneous" on sheet 4. I assume that you will Included In the building contract the wood lining stacks, the Flexboard, T.f- G. lumber and built-up roofing "ro'r the Baghouse Roof and the painting of the basements. That leaves the ordering of the starters for the 7- hp shaker motors, the Solenoid valves and all the other control equip ment, wiring, switches, piping, etc. required for the automatic control of the dampers and shaking'for you to furnish. I would like to have copies of the orders so that we would know what was used If we have another similar job some time in the future. Yours truly, cc:FCStryker R'Thjrlish ^ C. C. Burt ASARCO ELP 0001123