Document wqGE2qQV8pzQ4BqrxQ5v482Yd
UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
WASHINGTON. D.C. 20460
2 9 MAY 1976
OFFICE OF ENFORCEMENT
Mr. W. B. Papageorge JUN ^ Manager, Product Acceptability Process Chemicals Division Monsanto Industrial Chemical Co. 800 N. Lindbergh Boulevard St. Louis, Missouri 63166 Dear Mr. Papageorge:
An Environmental Protection Agency (EPA) inspection team recently visited a facility operated by your company to obtain infor mation concerning the handling of PCB materials. The inspection was conducted under authority of section 308 of the Federal Water Pollution Control Act (FWPCA), as amended, 33 U. S. C. 1318, and section 114 of the Clear Air Act, as amended, 42 U.S. C. 1857C-9. Enclosed is a copy of the plant visit report prepared by the inspec tion team which records its findings with regard to the handling of PCB materials at your facility.
It is possible that EPA will receive public requests for release of the information contained in the enclosed report. Such requests will be handled by EPA in accordance with provisions of the Freedom of Information Act (FOIA), 5 U.S.C. 552, and EPA regulations issued thereunder, 40 CFR Part 2. EPA is required to make this inspection report available in response to FOIA requests unless the Administrator of this Agency determines that the report contains information charac terized as confidential commercial information or methods and processes entitled to protection' as trade secrets. Pursuant to the FWPCA and the Clean Air Act, effluent and emission data may not be considered confidential information or trade secrets subject to exemp tion from mandatory disclosure requirements of the FOIA.
OSM 012511
STLCOPCB4002436
~2-
In order to facilitate the Agency's timely response to any public inquiries, while giving due consideration to your company's right to request confidentiality, please provide the following information:
1. Notice of any factual inaccuracies that you find in the report which you believe should be corrected. Although the report itself cannot be altered or modified in responding to FOIA requests, we would appreciate your comments concerning any facts which you believe to have been recorded inaccurately.
2. Any information, except effluent and emission data, contained in the report which you believe to be commercial confidential information or trade secrets entitled to exemption from the mandatory disclosure requirements of the FOIA.
Your comments should be addressed to Mr. Blake Biles, Enforcement Division (EN-342), Environmental Protection Agency, 401 M Street, S. W., Washington, D. C. 20460, and should reach this address not later than 14 days after your receipt of this letter. Failure by your firm to submit within that period of time a written request that information be characterized as confidential or privileged will be treated by EPA as a waiver by your company of any claims for confidentiality regarding information contained in the PCB investigation report.
Thank you for your cooperation in responding to our inquiries concerning PCBs.
Sincerely yours.
Enclosures
Assistant Administrator for Enforcement
DSW 012512
STLCOPCB4002437
" -1
UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
* . pCB Inspection, Monsanto Kruimirich Plant, subject: Sauget, Illinois.
DATE: March 9, 197'
FROM:
Chief, Air Surveillance Branch, Surveillance and Analysis Division
TO: Carl Bremer, Member, Lake Michigan Toxic Substances Committee
A preliminary survey was made of the above installation to identify
;and sample point sources of potential PCB emissions to the atmosphere.
;The sampling and analysis v/ere carried out at this source to furnish
information to arrive at a further decision that may require an intensive
jtesting program to quantify the PCB emissions. The sample analysis
revealed the following:
.
SAMPLING LOCATION
NO. OF SAMPLES
PCB CONCENTRATION uq/H
Steam Ejector - Ground Level, Site #1
Steam Ejector - Top Level, Site #2
2
2
/
* 3A - 27.5 3B - 33.9
3A - N.A. 3B - N.A.
Calculated Storage Tank Emissions
Virgin Product
.
Product Loading and Waste Storage
.r?.7 Kg/year
0.02 Kg/year
Monsanto has performed a stack test at the Sauget location quantifying the PCB emissions to the atmosphere. Stack-sampling and other reports describing process and sampling methodology used at this site are attached
* 3A - Right Side of sampling train - 3B - Left Side i
1
CPA fem 1320-4 (R.*. 4*72)
DSW 012513 STLCOPCB4002438
^
UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
subject: Emissions of PCB from the Incinerator at Monsanto - date: February 11,-1976 Sauget, Illinois.
from:
R. Edwin Zylstra, Technical Advisor, Special Projects Section
xo- Chief, Air Surveillance Branch
'
On January 27-28, 1976 sampling was conducted at the Krummrich Plant of Monsanto in Sauget, Illinois to determine emissions to the air. -The samples were taken near the exits of the steam jet ejectors of the non-fractionating distillation process. The exits of the fractionating distillation steam ejector were not sampled, because of inaccessibility. The incinerator used to destroy waste PCB's was not sampled because Monsanto had tested the stack and the results were made available to us.
.
jI have reviewed the test procedures and the data from three stack
tests and I feel that the test results accurately indicate the quantity
of PCB being emitted into the atmosphere from the incinerator. The Monsanto
procedure for stack testing the incinerator for PCB and particulate is
- ' shown in Appendix A.- The method is a modified EPA Method- 5. The front
half is identical to Method 5 and consists of a sample nozzle, a heated
probe, and a heated glass'fiber filter. The back half is as follows: 1.
Fjrst impinger empty; 2. Second impinger with 150 ml. of N, M-dimethyl
formamide; 3. Third impinger with 75 ml. NaOH solution and 75 ml. Na2S03
solution; 4. Fourth impinger with 200 g silica gel. Sampling is
performed the same as Method 5. To determine the PCB emissions the sample
ts handled as follow:
,
.
IV Probe, nozzle and filter are rinsed with hexane. The rinse is mixed with any condensate from the first impinger and then analyzed for PCB by means of electron capture gas chromotograph.
. 2. ''
The NN dimethy formamide in the second impinger is analyzed for PCB by means of electron capture gas chromotograph.
The table shows the results of stack tests for PCB on the incinerator performed by Monsanto. Emission ranged from .00001 to .000248 lbs/hr. Computer printouts of data collected and the results of the last three tests performed were supplied to us for evaluation. The calculations were checked and no errors were found. Monsanto*^ and our computer printouts are in Appendix B .
or '
(HUFfon-l 120.6 (R*. 4.72)
DSW 012514
STLCOPCB4002439
STACK TESTS Oil MOKSAIITO PCS IUCINERATOR
Tho .following tests v.-cre r.ado using a modi ficatior. of Illinois EPr\ Method S and both flow and concentrations were determined.
Date
PCB conc in ng/tn^
Flow m^/min.
LbA
7/25/73 0/7/73 8/16/73 8/24/73 10/2C/73 11/7/73 11/20/73 11/28/73 8/23/74 9/12/74 5/23/75 10/1/75
0.0063 0,0107 0.0176 0.0166 0.0077 0.0056 0.0119 0.0013
0.0149 0.0289 0.0300 0.0182
63.5 94.8 .06.5 .06.8 48.3 58.1 63.8 66.7' 71.1 51.1 44.5 92.2 .
Z. ? / Z.H K,
2.1* < Hi a
A ./ 4 ' '.'Ha !.'/** /. 5 Fa
}. 1(x l. IX>
OSW 012515
STLCOPCB4002440
APPENDIX A MONSANTO PROCEDURE FOR STACK TESTING FOR PCBs
DSW 012516
STLCOPCB4002441
INCINERATOR STACK TEST FOR PCJ3' S AND PARTICULATES
SCOPE: This procedure determines the amount of PCB's and particu
lates present in the incinerator stack gas.
*
EQUIPMENT: 1. R.A.C. portable stack ga3 sampler
a. sample box
b. unbilical cord 25 feet (2 each)
c. nozzles 0.250 or 0.375
d. clamps (10 each) 23/ip Fisher 5~B85F
e. 3' combination probe and pitot tube (glass)
f. glass connectors (4 each)
g. 500 ml Grecnburg-Smith impinger (A each)
Fisher Scientific Company, St. Louis, MO
cat. no. 9-257> or equivalent. The fourth
impinger is modified by replacing the
standard tip with a 1/2 inch ID glass tube
extending to one-half inch from bottom of
impinger flask.
'
0) Cf
2.. Glass orifice to regulate air flow' thro*ugh pi tube. (2each) Can be made from broken thermos,i
3. Thermometer 0-220?
4. Thermocouple and potentiometer
5. Nomograph
6. Clip board
7. Air Pump (Dyna pump)
3, Stopwatch (2 each)
9. Tape ruler
10. 3 way plug
11. Stopcock grease
12. 50 ft. of 5/8" rope.
13? . Adjustable wrenches ( 2 each)
FOR PARTICULATE TEST ADD:
'
1. Cyclone and Erlcnmcyer flask
2. Clamp3 2 each 28/15
012517
STLCOPCB4002442
5H
5? Glass fiber filter holder 4. Glass fiber size 7.0 Cii (Fisher eat. no. 9-07210
Dry in oven and leave in desiciator.
DSW 012518 STLCOPCB4002443
REAGENTS:
a. Sodium Sulfite, Fisher Scientific Company, St. Louis, Missour
Cat. No. S-450 in unstandardized solution. Weight 65 grams; dissolve in water and make up to 1 lptcr.
b. N,N-Dlmethyl Formamide, Fisher Scientific CO., St. Louis, Missouri, Cat. No. D-119.
c. .Sodium Hydroxide 50/* solution, Fisher Scientific Company, St. Louis, Missouri, Cat. No. SO-S-254, in unstandardized solution. Add 52.4 ml to 500 ml distilled water and make up
* 'to a lcter. '
d. Hexane; nonograde (Mallinckrodt Chemical Works, St.- Louis,
Missouri, Cat. No. 4159)
j
e. Silica Gel Grade 953 Darison Code 958-08-08-226 Davison
Chemical; Baltimore, Maryland, 21205,
f. ' Crushed ice.
DSW 012519
STLCOPCB4002444
9
SAMPLING PROCEDURE:
l
'
.
** '
1. Measure stack diameter and determine minimum number of samplin,
points needed.
.
`
` ' I
.
2. Measure stack temperature
'
'' .
' 5.' Determine percent moisture. This may be found from previous
tests.
;
f`
''
i . 4. Place sample box on duorail and assemble impingers. Leaving ; the first impinger empty. Pill the second impinger vrith 150
ml of DMF solution. Add 75 ml in NaOK plus 75 ml in Na2S03 in the third impinger. The last implnger will contain 200 g
silica gel in a modified impinger. (Weigh silica gel for watei . determination later),
5. ' Place the cyclone and glass fiber filter 'in the hea`t chamber
and connect to impingers.-
:6. Connect vacuum line of umbilical cord to inlet of meter box
and outlet of las.t impimger. Plug up the inlet to the filter
holder and puli 15 in. Hg vacuum to check for leaks. Leakage
rate should not exceed 0.02 C.P.M.
*
,
"7. * Connect glass probe- to cyclone.
.
. .'8. Complete all connections on umbilical cord.
'
J9. Purge air through pitot tube using tubing which is attached to umbilical cord and connect to air pump.
110. Pack ice around impinger and add water.
.
111, Make a traverse'.of stack on one side to determine velocity and
. `stack pressure. Be sure you have balanced draft gage before
you take your readings.
4 .
:J2. Heat probe and chamber in box to a temperature of 10 higher
than the stack temperature.
.
312. Record temperature at gas meter, (inlet and outlet.)
314,
3GR5,
Use Nomograph to determine nozzle size and isokinetic sampling
rate. '
.
..
t
.
Record gas meter readings.
.
`
MT5. As `soon as heat chamber in sampling box is up to temperature
. start'your test.
. ,
*`
. *.
. DSW 012520 .
STLCOPCB4002445
SAMPLE TRAIN OPERATION
1.; For each run, record the data required on the example sheet ' shown in Figure 1-2.
2. Determine the time required at each sampling point. A
_ . minimum time of one hour is required for this test.-
,
3. ,
To begin sampling, position the nozzle at the first traverse' point with the tip pointing directly into the gas stream.
Immediately start the pump and adjust the flow to isokinetic conditions. Sample for at least 5 minutes at each traverse point; sampling time must be the same for each point. .
4. Record temperature at gas meter inlet and outlet, ' about one
" minute before it is time to change traverse points... Also
be; sure to read temperature'of last impinger.-.
i ' '
-
5. Add more ice during test to keep the temperature of gases
. ' leaving the last impinger as low as possible .and preferably
; at 70 F or less.
6. Turn off pumps at the conclusion of sample run and record
final reading.
.
..
.'
'
-Remove probe -from stack and disconnect from impingers. Take ` piobe and impingers and prepare them for lab analysis.
8* Measure the increase in volume of each impinger plu3 the
'
.. increas.e in weight of the silica gel to determine percent water.
Rinse probe and cyclone with hexane and pass rinsing through
glass fiber filter. Mix this extract with the water (condensate
from the firstimpinger, .
'
ID*
H,
Carefully remove the filter pad plus rubber washer and dry in oven then place in desicator before weighing for particulates.
i
Collect all washings and give to lab for analysis.
.
12, Upon receipt of analysis from lab, record results in grams on sheet shown in Figure 1-1 and complete for computer run.
v 33ISCUSSION:
.
DSW 012521
.
3Chc collection system in this tC3t may also be used to determine ' ther components of the stack gas. The ones of most interest would
be HC1, H3PO4, and Cla. To do this have the lab save all aqueous layers from washing used in preparing the solutions for PCD analysis Sake the aqueous layer from the first impinger (water condensate)
and run for MCI. and HaPO* analysis. Analyze the dimethyl fornamidc
Jjrom the second impinger for Cla and II3PO4 and the NaaS03 impinger
.for Cla.
i t r n i <
* * * ' '
<**?*t
w i* t
STLCOPCB4002446
1. | ff] Number of sets of data
. ' . ..
.
Cl-2) '
'
2 ( 1 Number c-bonponents to be analyzed
'"
.
f i_?1........................................
........................................
.................................
'
3 i'i/lali/j )-? l/fi lilVl~7l.il I I; 131<31 ~TPl.y,l I 1/ Salt 1/ U-tel/;lA|Ttolg| hlrU-lcitd I I
(X-X2) Date
. (13-20) Time
(21-4,l|) Stack Sampled
nj
[?I3I)I
(^5-^8)Scu rce OpMo.
m
IMZllJl! i,, E Zones
I a17 nU;
(49~50) . (5l-56)StackDiair.. (57~6l)Bar.
in. (62~66)Nozzle
fTTT
(67"72'Stack V/idt
LilHAjJl
(1-5) Process V/t.
' tPl^l^ 1/^liOlSl IPl-rlRlW\*\'J\R\ I 1 I 1 l:t I i 11 I I 1 1 "| ~f 1 I T
(6-40) Units of production per hpur
(1-50 Sampling dene by:
pA }
*
<-
\V/J!~|\lz/-
L
i--
...
<
i
1 JL
s fgi;,!-il |A)!g!r^li)l0l (Atjg1 Vh iPUilfl L4-U/li?l 1/x'IaIx>IS 1^131 lyUili:,l)l>vlc-I.Sl/?l5
(l--';3) Sampling Method - indicate modifications*
X \-S o\L
PS
Correction Factors Decrec.frrj/. j CEntigrade or.
FAhrenheit
M /I,\o\a
(51-50 Orifice
(55-58)- Pitot
(59-60)
'.
(61-64) T'eter
las Analysis in Mole-Fractions (Identify Component -Z If present by M.V7, and name or formula)
i Ignolalfl-M.lflal?) I5l. I/Mrl l~I?i |d|] I M I I I I M.fel I rioTHSl
Mg I i [ i
(1-5) 02 (6-10) No (11-15) 002.(16-20) CO (21-25)H20 (26-30) Z (31-34)MV.'Z (35-43) rare of Z
Moisture determination by absorption on Accarite and weighing
'/i;n f>!?l 1C-F- ifl/l. iVn 1 \o\-\o\u^ 1/1^171. i?lr
7bl/t-M/l
Leak test on Sampler
kbl:?l GT5T79Q"
(l-6)SanpleVol. (7-ll)Totnp. (l2-15)Press (16-23) Tare v/t.. (2>44-31) Cross wt. Gf2-36 j CF- at (i7-4T)Tre3
STLCOPCB4002447
Analysis for Components
Pi irj.
Ti
r ;<i? + 0
1K
*
*6 iaik. 1 | i /. 'v! LJ i I
*0 i\/ o
i-II)Name of Cor.p. ! (12-15)
A#.: tfc*. - 36>'S"` M,W*
1 c /i 0 . b
a 0
Ho * /*
o
/
7"
4
.?\JW
9 $ /i o o *
.<3 0 0 /
0 i>iJ
/9
(26**35)C?roae Wt.(j)
' :' *
0> V ty / 7!^ // r7 ! M ii
i
(3647>`Kow Ua&rninid *
DSH 012522
'
1
*-- 0 wMp
--fitot Velocity Head.
staci* Temp. Deg.
1 'i
K? f*-7^
(9M-nS )
\f ! 1 i /bl\ol
1/ f7l \) i3 b 7l4W bb
Stack * Press inches h2o
( PS 0 iJ/bb 0k W*
lime at Meter
T emp.
end of Volume at VJ= Wet
Inlet at
ZONE
end D= Dry
end
Min .
ZONE
DeG
ZON-E
f )oT_?-n b0
C(ohuV.Mfo4.tLn./'zT_oTTfvOtrr":ck>\
b to .'ML i> UrU'. :)
THI
\i t/
vi*
b b
Outlet at end
ZONE THO
' i) b 'Glib
At start of
ZONE In Kg
PHI . / ^ 5,- u/n
Mn Mil
At end * of ZONE In Kg
pj'2 .
"ressui* f% ac:'Oi
Orifi(:e
HO v\
rrrr 1/ \o \o
O'. !/!'; o j W\o\> Wa 0 \. ?bb
1I1 1
IsL \>t?\0 } !V oi :0 bbl. l/k5 l\q\o\. b b 0
:CM* II'ob /ja b!. b b oi
/bb 7b b 7b b
ilLf .\c cr. 0 1 Vi U `0 i^7l- b :WVl 0 ! i
U\/ .\o XiW- / / &&'.> fj V~ 1. b vri. 0 i- i
3ir .rj r
0 a:`/w0
1 _ai (,\9
i
l'(s.
-C 0
ro\o\c/\zl
b \o
:7^i^ 6 i i ! :7:7i-!^ J -' ! !
i I ;i slyiL _Ll & 7icb
p>. iriyi^ 1 | /!-_!<- /!0
J(r<?'.!/!3 l!a M* tab o\. tatata
__j`7L ?;. l/l/.'b
0 \o 0 , bbb
73 9 V!? /
r> A<\ VffCr'jt * 0A 9
7 Cs
\ 0 - o ro\j\. b Q.G` o f>t>kX b
6 ii |! i; !' w0 i M f
JTT j?!- \)\cb .o\-1 Ci9\0
;> i; IvSc> "^VVi- 0 y i : i 11 i-
0
i i:
9
0 $<M. lb " . IT
tic1- 0 /ob\. 1M :ii
\&a\. 0 MM
!
;i.1;:
! j
i i r 3ns s lo1 i f ! ILL
CH1OooDooI0"s/OUUU00>)
i: 1 ri i 1i ii i I
j! ii1 1
-i i! I r i L___j ! ! ill!
1 ii i
1 i! 1 I!
j! <i
! i :l i !
"
ii j- jt
: l i
I i i : 1 i1! !1
;1ii
--\-- T|1
1l j !
: 'I
1 1 1 j 1 11 ii Nl1 ' T
il ii
1 1i t
*
*11
i
ii ii
1 * i- 111
i '
11 ; !
`
--' --1ij--'- ii j
j
: 11 i *i * I ii i' ! i!
. I1
'! i< j1
:> i1
i i i-j
fi i, .! !
! ; ; ?. I
: ! i * :j . ti
1 iIM 1 Ml!
N ! i 1 iiji i*_L_ i!Mi ** 1
i! is
: in Ml!'
i ! i : i
I MM t: 1II i *n , !
i! i- i
1
ri
i j !1 i Ml !
' . i * f
i IL
' ,r
t ,* >> *
-
"'
' '
i !iti
!1ii
Mil i! i i
!!i
i
i
ii 11
*
!1!
l1
' i
i
. . 1! 1 i
i; . . ii
|
i i!
MM *i ii iMI
i
i1 ii i
:I! ! 1 1
i }
ii1 !
jli 1
MM I ! !
! i i ii
M ! i TTTT
.1r !i i 1 !
i m..'1 ! i M 1 ! i i TTi
ij i i !i i1!
!:M i; :
iu
i' ! - ncu 012523
.1.1. i1
r r' -S ......W.....*.....*....., -
APPENDIX B STACK TEST COMPUTER PRINTOUTS
DSW 012524
STLCOPCB4002449
5#
-j.ilt0 INDUSTRIAL CHEMICALS CO.
'
'I
. FHUMMRICH PLANT SAUGcT.IL 62201. 10 NO. 63 1?I AAC
E LLPT 12 1974
START tike i:00 PM
SAMPLED- INCINERATOR
SOURCE OPERATION NO.
>L./NG DONE uY NEIL SULLIVAN ANO EO nEUKANN
I'
'
J(i'G METHOO-EPA METHOD ,'(5 * DMK ANO NA2S03 IKP1NUERS
I
jation of emission rate of
ArPARTICULATE
BjP.C.B.
.
CrriCL
0*.H3P04 WEIGHT PaTE= 772.00 POUNDS PEP HOUR
:sult:
1j
/ACTUAL CFM AT
/STD CFM
DRY STD CFM
/
/ STACK CONDITIONS/ AT 70 DEG .F AND 29 .92 IN. HG/
ZK VOLU ME
1903.1
1803. 8
1711.6
oil
T.MIST. OR GAS CONCENTRATION IN wET & DRY STACK GAS AT STD CONDIT io;
:?0>/fc'NT
a: a:
GRAINS PER
CUBIC FT ` 0.070B
0.0746
BJ B:
i
C: c:
'o.oooo 0.0000
0.0307 0*0323
LBS; PER MILLION CUBIC FT
10.]163 10.6611
0.0016 0.0019
4.3616 4.6176
LBS. PER MGS. PER PARTS
1000
CUBIC
PER
.BS. GAS meter
MILLION
0.1331 16P.04M6 134.9248 IN WET G A*
0.1374 170.7756 142.1910 IN DRY GAi
0.0000 0.0000
0.0289 0.0304
0.0028 IN WET GA< 0.0029 IN DRY GAS
0.0576 0.0595
70.1866 73.9665
46.4306 IN WET GAS 48.9313 IN ORY GA
y:
0.08?7 11.6131
0.1554 169.2287 46.6235 IN. WET GA
d:
0.0671
12.4493
0.1604 199.4194 49.1344 IN DHY GAS
SSJON RATE:
LBS. PER
-.POJJENT HOUR AJ 1.0948 ys 0.000? C: 0*4742 ys 1.2785
GRAMS PEH SEC.
0.1379 0.00V0 0.G597
0.1611
LBS. PER UNIT OF PRODUCTION
0.0014
0.0000
0.0006
0.0017
DSW 012525
STLCOPCB4002450
MONSANTO INDUSTRIAL CHEMICALS CO.
6^
M.fi. KRtlMMRlCH PLANT SAUGET.IL 62201. 10 NO. 63 )21 AAC
DATF. SEPT 12 1976
START T IN i: 00 PM
STACK SAMPLED- INCINERATOR
SOURCE OPERATION MOl *31
FIELD DA TA:1I
ORIFICE CONSTANT K=D.506 PITOT TEMPS. RECORDED IN Fa DEGREES METER CORRECTION FACTOR^ 1.02
|
TUHE
FACTOR
FS=
0.03
GAS ANALYSIS: 2=N0NE
' MOLECULAR WTOFZ=
MOLECULAR WT. OF STACK GAS = 29.60
ORY MOLECULAR WT. OF GAS = 30.02
'o.O
02 N2 C02 CO H20
Z VOL
TW PV i
0.106 0<802 0.09? 0.0 0.051_ 0.0" 60.630 100.20 29.66 63.
PARTICULATE.
determined BY
pra
"DETERMINED DY
,,Cl' '
DETERMINED BY .
H3P06
DETERMINED BY
_wy weight ;____
tiY WEIGHT.
BY WEIGHT
`
BY WEIGHT
s *
=.
G5A"*
0.0000 GRAMS#.0.0316 GRAMS 0.2200 GRAMS
.LEAK TEST ON EOUIPMENT=0.001 CFM AT 15.00 IN.HG -BAROMETER^ 29.64 IM.HG* STACK DIAM* 19.000 INTT NOZZLE DIA.M * 0.375
_ VEL STACK STACK TIME VOLAT CONO METER TEMP MEIER PRESS FLOwM
HEAD TEMP PRESS A TEND t'NO TEMP
START FIN OR IF I
-ZONE HP
TS H20 ZONE ZONE
IN OUT HO HG H20
0 G.O
95.0 0.8 o.o 935.30 D
90.0 90.0 0.0 0.0 O.U
1 0.060 95.0 o.a 8.0 939.71 64.0 98.0 90.0 0.0 0.0 1.16
2 0.080 95.0 0.8 16.0 944.74 64.0 106.0 91.0 c.o 0.0 1 .58
3 0.095 95.0 o. 24.0 950.22 65.0 11) .0 92.0 0.0 o.o 1.85
4 0.095 95.0 0.8 32.0 955.71 65.0 lll.d 96.0 0.0 0.0 1 .5t
5 0.065 95.0 0.8 40.0 960.50 63.0 106.0 95.0 0.0 0.0 1 .2U<
6 0.080 95.0 0.8 48.0 965.28 64.0 1 10.0 98.0 0.0 0.0 1 ,58<
7 0.090 95.0 0.8 56.0 970.65 65.0 113.0 97.0 0.0 0.0 1,75<
8 0.090 95.0 0.8 62.0 975.93 68.0 116.0 97.0 0.0 o.o 1.75<
OSW 012526
STLCOPCB4002451
MONSANTO INDUSTRIAL CHEMICALS CO
V/.G. KRUNNRICH PLANT SAUGET.IL 62201. 10 NO. 63 121 AAC
DATE SEPT 12 1974
START TIKE l:oO PH .
.
STACK SAMPLED- INCINERATOR
SOURCE OPERATION NO. 031
CALCULATION ANi) EVALUATION:
'
THE ISOKINETIC CONSTANT HC/HP FOR Tills EQUIPMENT IS 23.6264
THE TAOLE BFLOv/ SHOWS.FOR EACH ZONE.THE SETEK VOL.. AND THE A VO. .-;f TEK
AND PRESS. IN ABSOLUTE UNI'IS. FROM THIS IS CALCiJLATFl) THE EQUIVALENT VC
STACK CONDITIONS AND DIVIDED 8Y TIME TO GIVE THE FLOW IN THE NOZZLE. Tr
compared with the isokinetic flow rate, calculated from the stack velo Cl
PERCENTAGE DEVIATION IS RECORDED.
sample/stack/avg. ZONE time VEL. METER
1 8.0 13.8 29.7 2 8.0 16.0 29.8 3 8.0 17.4 ?9.8 4 8.0 17.4 29.8 5 8.0 14.4 29.7 6 8.0 16.0 29.8 7 8.0 16.9 29.8 8 6.0 16.9 29.6
TOTAL 62.0 16.1 29.8
press/ avg. temp/sample vol./sample
stack me ter ST ACK MET ER STACK ACKJal 29.7 S52.0 555.0 4.4 A.6 0.60
29.7 5S6.3 555.0 5.0 5.4 0.68
29.7 560.0 5S5.0 5.5 5.9 0.73
29.7 562.0 555.0 5.5 5 . H .. 0.73
29.7 S61.5 .555.0
4.0 5.1
0.64
29.7 562.3 555.0 4.8 5.1
0.64
29.7 564.5 555.0 29.7 565.3 555.0
5.4 - 5-7 5.3 5.6
0.71 0.93
.29.7 560.5 S55.0 .40.8 . 43.3 0.70
rate /p.c. ISOKIN DEV .0.64 ~6.34
07a -B.it 9 0.80 --8.67 . 0.30 --8.6 3 0.66 -3.83 0.7 4--13.60 0.78 -6.SI 0.76 i9.39
0.74 -5.75
T AV AV AV AV AV 1 1 AV AV AV
TOTAL SAMPLE VOL. CORRECTED FROM STACK CONDITIONS TO $T0 CONDIT10NS=
41.06 CtmiC FT-. OF WET GAS
TOTAL SAMPLE VOL. CORRECTED TO DRY SiO CONDITIONS =
3ft.96 CUtnC FT.
DSW 012527 STLCOPCB4002452
MONSANTO INDUSTRIAL CHEMICALS Co.
w".g', KRUMMRICH PLANT SAUGET.TT 6?2dir"~l6'NO:"63'T?7"aaC
OATE OCT 1 19/S
START TIME 1:JO PM
.
STACK SAMPLED- INCINERATOR....................
..SOURCE OPERATION NO.
SAMPLING DONE BY NEIL SULLIVAN AND ED HEUMANN
"
. 831 _
""
SAMPLING METHOO-EPA METHOD 5 . DME AND NA2S03 ..IMP IMGERS___________________ _
DETERMINATION OF EMISSION RATE OF
`
A:PARTICULATE____ * BJP.C.B.
C! CL2
PROCESS WEIGHT RATE=_ 0.90 ..THOUSAND POUNDS PER HOUR
TEST RESULT: .
''
/ACTUAL CFM AT
/STD CFM
. DRY STD CFM
/ STACK CONDITIONS/ AT 70 DEG.F AND 29.92 IN. HG/
STACK VOLUME
3749.6
3257.1
2353.4
OUST. MI ST *OR GAS CONCENTRATION IN WET_4 DRY .STACK .&AS_AT...S.TD. CONDITIONS.
GRAINS
LBS. PER LBS. PER MGS.. PER PARTS
PER
.,. MILLION. .
COMPONENT CUBIC FT CUBIC FT
. 1000,...... .. CUBIC_____ .PER.
LBS. GAS METER
million
A*
0.0725 10.3620
0.1494 165.9835 138.2010 IN WET GAS
------- M.______ ____ 0.1.0 04. 14.3408 ____ 0.1836_._22'J.71fl3 . l9l.?679 IN DRY. GAS
B*
0.0000
0.0011
0.0000
0.0182
0.0018 IN WET GAS
0.000.0 ........0.0016 ..... 0.0000 _____.0.0252.. ... 0.0024 IN DRY GAS
c*.
"....-C* . ..
0.0079 0.0110
EMISSION rate:
j l
1.1335 1.5687
0.0163 . 0.0201
10.1570 25.1290 .
6.1749 IN WET GAS 8.5460 IN ORY GAS
LBS. PER COMPONENT HOUR
_____ Al______... 2.0250 B* 0.0002 C* 0.2215
GRAMS PER SEC. ... 0 2551.
0.0000 0.0279
LBS. PER UNIT OF PRODUCTION
... . 2.2450 0.0002 0.2456
OSW 012520
STLCOPCB4002453
W.G. KKUMMRICH PLANT SAUGET IL 6*201. 10 NO. 63 121 AAC '......
DATE OCT 1 1975
. ST ANT TIME I; 30 PM
STACK SAMPLED- INCINERATOR................................... SOURCE O3ERATI0n NO.
.'..I 031 .
field data: ............................ . ____________________ __________________ _
ORIFICE CONSTANT K=0.506 PITOT TU13E FACTOR FS= 0.83
TEMPS. RECORDED .IN FA DEGREES___________________________________
METER CORRECTION FACTOR^ 1.02
1
I'
GAS ANALYSIS:. ZsMONE. . ____ _______MOLECULAR. W.T_..0.F_.Z=____ 0A0.
MOLECULAR WT. OF STACK GAS = 26.83
ORY MOLECULAR WT. OF GAS =s 30.22
02 N2 C02
CO H20
Z VOL
TW PW WC
0.068 0.818 0.114 0.0 . 0.277 0.0 30.200 .70.89 29.90244.6
PARTICULATE
DETERMINED BY
BY WEIGHT
= ' 0.2002
P,.c.B<DETERMINED OY. . _ BY WtttfttN.... =____________________ 0.0000
CL2
DETERMINED BY
BY TITRATION =
0.0219
GRAMS GRAMS. C GRAMS .
LEAK TEST ON EQUIPMENTS.005 CFM AT_ .15.00, IN.HG............... BAROMETER* 29.90 IN.HGt STACK DIAMs 19.000 IN.: NOZZLE DIAM = 0.37S
. VEL STACK STACK TIME VOLAT COND METER TEMP METER PRESS Fl.OV/ME
HEAD TEMP PRESS AT END END TEMP
START FIN OR IF ICi
ZONE: hp 0 0.0 1 0.200 2 0.300
...3 0.340
4 0.330
s o;i7o 6 0.230
TS 149.0 149.0 149.0 149.0 149.0 149.0 149.0
H20 -0.4 -0.4 -0.4 -0.4 -0.4 -0.4 -0.4
ZONE ZONE 0.0 428.50 . 8.0 431.84
16.0 435.82 24.0 .439.97 32.0 444.11 40.0 447.29 48.0 450.84
0. 51.0 51.0 53.0 55.0
53.0 54.0
IN OUT HG HG
64,0. .64,0......0.0. . .0.0 68.0 64.0 0.0 0.0 74.0 64.0 0.0 0.0 .80.0. 65.0 0.0 0.0 80.0 66.0 0.0 0;0 74.0 66.0 0.0 e.o 80.0 .66.0 ... 0.0 0.0
H20 0.0 0.650 0.960 1.100 1.070 0.569 0.7'.0
7 0.300 149.0 -0.4 56.0 454.84 56.0 83.0 68.0 B 0.270 149.0 -0.4 64.0 458,70 58.0 82.0 68.0
0.0 0.0
0.0 0.960 0.0 0,870
DSW 012529 STLCOPCB4002454
W.G, KUUMMOICH PLANT SAUGET , H. 62201. 'll) NO. 63 1?1 AAC
DATE OCT 1 1975
START TJHE 1:30 PM
.
)
stack sampled- incinerator . ------------------------ SOURCE O^FRAT[On no. n-n
CALCULATION AND EVALUATION:
` "J|--
THE ISOKINETIC CONSTANT HO/HP rOR THIS EOUIPMFNT IS 11.0114 THE TABLE BELOW SHOWS,FOR EACH ZONE,THE METER VOL.'AND THE AVG MFtcp
AMD PRESS. IN: ABSOLUTE UNITS. FROM THIS IS CALCULATED The 'eouI VALF'ii '<
STACK CONDITIONS aNO DIVIDED HY TIME TO GIVE THF F*OW IN THE NO/7LE T
COMPARED WITH: THE ISOKINETIC FLOW RATE CALCULATED. FROM THF STACK VFi'nr
PERCENTAGE DEVIATION IS RECORDED.
...........
'
SAMPLE/STACK/AVG. PRESS/ AVG.. . .TEMP/SAMPLE VOL.,/SAMPLE RATE /P.c.
ZONE TIME VEL. METER STACK meter stack METER STACK actual ISOKIN ofv "
I
8.0 27.6 29.9 29.9 525.0 609.0
3.3 . 5.5
0.69 1.27-46.07
_2.__-- 8.0. 33.8 ..30.0. ..29.9 527.5 609.0.... .4.0. . 6.5 ... 0.81,. 1.56-47.74
3
8.0 36.0 30.0 29.9 530.8 609.0
4.2
6.7
0.84 1.66-49.10
4-
a;o 35.5 30.0 29.9 532.8 609.0 4.1
6.7
0.84 1.63-48,65
5..-.. a.o 25.5 29.9 29.9 531.5 609.0 .. 3.2
5.2
0.64 1.17-45,00
6
8.0 29.6 30.0 29.9 531.5 609.0
3.6
5.8
0.72 1.36-47.19
7
8.0 33.8 30.0 29.9 534.3 609.0
4.0
6.5
0.81 156-40.1A
.. a..,, .. 8.0_ .32.1. ,30.0 ,,,29.9 535.3. 609.0 ___ 3*9. . ,6.2. -.0.78 ' 1.48-47.35
total
64; 0 31.7 30.0 29.9 S31.1 609.0 30.2 49.0
0.77 1.46-47.55
'1
1
1
!i
!
T AV AV AV AV AV T T
<>
"AV
AV
. 1i
TOTAL SAMPLE VOL. CORRECTED FROM STACK CONDITIONS TO STD CONDITIONS*
42.59 CUBIC FT. OF WET GAS
t
TOTAL SAMPLE_VOL._ CORRECTED TO .DRY" STD_CONOlTIONS
30.78 CUBIC FT.
DSW 012530 STLCOPCB4002455
MON 5 AN I'0 INDUSTRIAL CHEMICALS CO.
'A'
v.fi. tfWUMMRICH i\aNT SAUGET.1L 62201. 10 NO. A3 121 A AC
CATE r!AY 23 197Sj START TIME 10 : iO AM
RTACK'^^Jiltv^lNClNEMA fOH STACK
SOURCE OPERATION MO.
SAILING DOME BY NEIL SULLIVAN AND ED H
. 831
SAMPLING METHOO-EPH METHOD 5 6 L)MK AND NA2S03 IMPInGERS
DETERMINATION -OF EMISSION PATE OF
A:PART ICULATE
D.p.C.y.
' C:HCL
0: CL2
PROCESS V,'EIGHT PATE= 1.00 THOUSAND POUNDS PEP HOUR
TEST RESULT:;
`
/actual. CFM AT
/STD CFM
DRY STD C"M
/ STACK CONDI TIC. 3/ AT 70 DEG .F AND 29 .92 IN.
STACK VOLU.-IE
'17)1.6 .
1649. 0
1569.5
/ MG/
DUST* MI ST, OR GAS CO'.JCENTRATION. IN WET L 0 NY STACK gas at s':; V- J
.
COMPONENT A: A:
GRAINS i PER
CUBIC FT 0.0522 0.0549
LBS. PFR MILLION
CUBIC FT
7.4602 7.A3H3
'
LHS. PER 1000
LOS. o A 5 0.0962 0.U991
H G 5. PER C: >;:c
: z ; 119. ;> 0 0 s 125.SSA0
PARTS PE'-; MILL IOr,' 99. '.9 H6 104.5420
I;; WET o IN DR r A i
to m
B:
0.0000
0.0016
0.0000
0.02S7
0.0025 IN WET G'.s
8:
0.0000
0.0017 ' 0.0000
0.0270
0.0026 IN DRY GA 5
C:
0.0027
0.3787
0.0049
6.0656
4.0126 IN KET GAS
C:
0.0028
0.3979
0.0050
6.3/31
4.2160 IN DRY GAG
0:
0.0021
0.2970
0.0038
4.7SA0
1.61A1 IN .WET g a :
0:
0.0022
0.3121
0.0039
4.9991
1.7001 IN DRY \3 3
EMISSION RATE:
LBS. PEW COMPONENT HOUR .
M 0.7331
B: 0.0002 C: 0.0375 0: 0.0294
GRAMS PER SEC.
0.0930 0.0000
0.0047 0.0037
LHS. PER UNIT OF PRODUCTION
0.73R1 0.0002 0.0375 0.0294
OSW 012531
STLCOPCB4002456
HONSAN 10 INDUSTRIAL CHEMICALS CO.
'
W.G. K'RUMM'RICH PLANT SAUGET.IL 62201. ID NO. 63 121 AAC
DATE. MAY 23 1975
START VI ML 10:30 AM
STACK SAMPLED- INCINERATOR STACK
SOURCE 03ERATI0n no
d31
FIELD OATA:
.
ORIFICE CONSTANT K=0.506 PITOT TUtiE FACTOR FS = 0.83 TEMPS. RECORDED IM FA DEGREES METER CORRECTION FACTOR^ 1.02
GAS ANALYSIS: Z = NO\'F
MOLECULAR WT OF Z= 0.0
molecular v:t. of stack gas = 30.00
DRY MOLECULAR WT. Or GAS = '30.60------ ------------------------- 1--------------
02 N2 CO? CO H20 Z VOL
TW . Pw WGt
0.028 0.324 n. 148 0.0 0.04b 0.0 45.63C 114.40 29.64 44. V:
PARTICULATE
P.C.B.
HCL
CL2
-
DETERMINED PY
DETERMINED ry DETERMINED p.y DETERMINED i3Y '
KY WEIGHT KY WEIGHT KY WEIGHT
KY WEIGHT
0. 1517
o.oooo 0.0077 0.0060
grams
gram;-r - GR/.-V.-* GRAMS
LEAK TEST ON OUIPMRNT=0.004 CEM AT 15.00 I.N.HG HAOMETER= 29.64 IN.HG? STACK DlAM= 19.000 IN.: NOZZLE DIAM = 0.375
VEL STACK STACK TIME VDLAT COND MiE TER `TEMP METER PRESS 1rl G'.'-'E T
HEAD TEMP PRESS ATENO END TEMP
START FIN lOR 1riCE
ME UP
TS H20 ZONE 70NE
IN OUT HG HG H20
0 0.<>
86.0 0.8 0.0 926.60 0
86.0 86.0 0.0 0.0 0.0
L 0.080 66.0 0.8 8.0 932.60 0.0 106.0 94.0 0.0 0.0 1.920
?. 0.090 86.0 0.8 16.0 938.71 0.0 122.0 104.0 0.0 0.0 2-160
* 0.060 66.0 0.8 ?4.0 944.48 0.0 132.0 \04.0 0.0 0.0 1.4?0
4- 0.060 66.0 0.8 32.0 950.04 0.0 134.0 108.0 0.0 0.0 1 4 50
5 0.9S0 86.0 0.8 40.0 955.74 0.0 128.0 110.0 0.0 0.0 1.200
6 0.070 86.0 0.8 48.0 960.50 0.0 134.0 112.0 0.0 0.0 1 . 700
7 0.070 86.0 0.8 S6.0 967.85 0.0 134.0 114.0 0.0 : 0.0 1.700
a 0.070 86.0 0.8 64.0 972.23 0.0 134.0 118.0 0.0 0.0 1.700
DSW 012532 STLCOPCB4002457
MONSANTO INDUSTRIAL CHEMICALS CO.
I
W.G. KHlJMMRiCM PLANT SAUGET.JL 62201. ID NO. 63 121 AAC
DATE MAY 23-1975 :
START TI ME 10:30 AM
-- ..........
STACK SAMPLED- .INCINERATOR STACK
SOURCE OPERATION.NO. 831
CALCULATION AND EVALUATION.*
THE ISOKINETIC CONSTANT HO/HP FOR THIS EQUIPMENT IS 26.7938
THE TAHLE fJELOW SHOWS * F OR EACH 20NE,Tl!E METER VOL. AN!) THE AVG. MEIER 7G:
AND PRESS. IN ABSOLUTE UNITS. FROM THIS IS CALCULATED T HE "lQU I VaI.L ' V V.,c.
STACK CONDITIONS AND DIVIDED mY TINE TO GIVE THE FLOW IN THE NU/2LE. THl: COMPARED V.'ITri THE ISOKINETIC. FLOW RATE CALCULATED FROM THE STACK VcLOCIT: PERCENT AGE DEVIATION IS RECORDED.
SAMPLE/STACK/AVG.
ZONE TIME
-l- H.O 2 8.0 3 H.O A 8.0
5 8.0 6 8.0
7 8.0 8 8.0
VEL. METER 15.7 29.8 16.6 29.8 13.6 29.7 13.6 29.7 12.A 29.7 14.7 29.8 14.7 29.8 14.7 29.0
TOTAL -- 64.0 14.5 29.8
PRESS/ AVG. STACK M EVER
29.7 553.0 29.7 566.5 29.7 575.5 29.7 579.5 29.7 5 80.0 29.7 581.0 29.7 583.5 29.7 585.0
?9.7 575.5
temp/samjle vol./Sample RATE /P.C. STACK meter STACK ACTUAL ISCK1N L..V 546.0 6.0' -6.4 0.80 0-72 ]C.2J 546.0 6.1 6.3 0.79 0.77 3.33 546.0 5.8 5.9 0.73 0.63 17.-'-9 546.0 5.6 5.6 - 0.7 o 0.H3 12.'-3 54 6.0 5.7 5.8 C. 7? 0*57 2 o.: 546.0 4.8 4.6 0.60 0.68-1 i . > 546.0 7.3 7.4 0.9? -0.68 38.74 546.0 4.4 4.4 0.55 0.68-13./2
546.0 45.6 46.5 0.73 0.67 9.04
T AV AV AV ' AV AV T T AV AV AV
TOTAL SAMPLE VOl. . CORRECTED FROM STACK CONDITI OMS TO STD CONDITIONS*
44.83 CUBIC FT. OF WET GAS
TOTAL SAMPLE VOL . CORRECTED TO DRY STD CONOITI ONS =
42 .67 CUBIC FT
DSW 012533 STLCOPCB4002458
ii.s. !;;:vuu)::ti:.:taj.
ri-:t:t-r11;:
rt'::-11>:: v
Air. j j':v,:ii.r.A:;i;;: ii'tAKC':
nr.i.'j nUPivrvf
stack ti::;t ivivu:.'
co: it'AKV________ ______________________________________
stack niiiTa^icATin;; vr:c r:r;;:: :kavo!:
ru:i '.Mn.iKK__________
;uTi: ov nu;: r.ent.
.07/.
1. Amount oT water cnlltctcr! (:iil.\ll iters) * Voluc.e of water vapo,- collcctcJ (ST!') "
43.3r2.0.,''52./i
2. Dry can r.etcr volume .it -.xter com! it ions (cubic /ret) 40. '3
H.irii!ictric .'icssuro (inches of nercury) 29.94
Average orifice pressure .Iron (Incites of vntcr) " l.f-ne
iAverage r.ctur temperatere -
100 *F
~
3. Can nntcr volume .at 5TP (dry cubic feet) "
33.7.7.
4. Percentage of moisture In c*'3 stream "
5,1 7.
5. Percent composition of gas stream:
Oryijcn..........................
t!ltro?en...............
Carbon Dioxide... Car).on Kono.ui Jtt..
1-0. f-X\
9.2n': , OPy.
G. Porco:ita,-,c of excess .air " 100.25Z
7. Dry Molecular weiphr o' ;;.a 3 Croesi (lb./lb-mole) - 20.89 Uct nolccul.nr weight of gas stream (lb./lb-role) " 20.,'
0. PitTit tube coefficient (dimensionless)
..03
. Jluniicr of pitot tube readings " n
Average of square roots of velocity pressures *
Average j;ih stream temperature ("T)
O't*"
Cnu ntrc.ait velocity (ft/sne) " lfi.163
Pitot tube readings:
.2-332
. .06 .03 .00 .03 .05 .03 .09
9. Stack dimensions, circular tilth diameter (feet) 1.33
.
Stack area (square feet)
1.96
Volumetric flow at STP (cubic fcct/m.in)
1710
.00
If). Nnzr.le dimeter used for sanplinj; (inches) " .373 Samplin'", tine (rtinutra) - *2.00
' Ueiqltt of particulate Matter collected (itilllprm) *
.03
11. Particulate concentration (ib./SCK) * .n'V'sa'in Particulate concentration (^rnin/SCF) _ .000013 Particulate concentration corrected to 50 7. excess air (lb./CF) " .oooa-'oo Pnrticulntc conccntrntinn covrnctoJ to 50 7, excess air (-rnin/cr) . oo/yiif
/
12. Isokinetic rate (2.) " 92.15
,
13. ITaan emission rate (lb./hr)
.00
Date /Ot/. / . / 97 6
Signature
(f^Xowr>
OSW 012534
STLCOPCB4002459
u.r.. i r.urnx'iiu;; .v-kmcy p.gcio:: v
Mr.
:;y,,\:ic;i
vnxa w'r.).;: si:crto::
svacx ti:;;v r.i:vi::'f
wrAiK____:o:;~a::to___________________
stack i)<r::rriric.vno:T "co T::r.T:!!:oA"-o':_______________
r.iri jiLTi.'.Kis.__________
7},v:i; nr r.ir:
yi.
s'5<
1. Ar.w.int of water collected (ni.llll?tors) " Volunc or water vapor collected (3iT)
4'..70 2..11673
2. Dry gas '.\eter volunc at i-etcr coalitions (cubic feet) 43.63
Dnror-.ctric pressure (inches of mercury) " 23.64
Average orifice pressure drop (inches of watec) 1.640
Average nctor tov-perature
11A *F
.
3. Cao ncter volur.e nt ST? (dry cubic feet)
41.G7
4. Percentage of nolrturo in gas stream
4.G1 7.
5. Percent composition of gas strea-.:
..
! 0:<ygen........................... 2.302
Nitrogen..................... C2.4C"
Carbon Dinnida... 14.SC!: '
j
Carbon IIono::idc..
. 002
6. Percentage of excess air 14.77"
7. Dry rolceular weight of gas otrean (lb./lb-nolc) - 30.46 Wet jiolecular wuight of gar. strea'. (lb./lb-r.olc) . 29.F.7
0. Pitot tube coefficient (dii'.unsienlcss) " .S3
Hunber of pitot tube readings * S
Average of square roots of velocity pressures " .2612
Average gas strain tenperatuve (*'.')
8(.*F
Gas otrea.; velocity (it/sec)-" li.53n
Pitot tube readings:
-
.03 .09 .06 .06 .05 .07 .07
9. Stack dinen3ion9, circular with din-eter (feet) " 1.5-0
Stack area (square foot)
1.96
Volunctrlc flow at S7P (cubic feet/r.in)
1560
.07
MO.
Hassle dinnatcr used for snnpling (inches) " .375 Swipling tine (r.inutes) " 64.00 Hoigilt of particulate ratter collected (rilllgrar.) -
.03
Ml.
Particulate Particulate Particulate Particulate
concentration (lb./GCF) " .mo^ono concentration (grntn/OCF) - .0000x3 concentration corrected to 50 7. cseen air concentration corrected to 50 7. cuccsn air
(lb. /CP) (gnla/CF)
' .onooooq " .OOOOOO
112. Isokinetic rate (E) 106.64 13.' t*aso emission rate (lb./br)
.00
'
Dntc_ Signature
1*
DSW 012535
STLCOPCB4002460
C0'.i:'.\:;v______ Monsanto____________ ____________
st,U'.;; i:):rriricATIo::
i ci\\cv.niov
ru:i ____________ dati: o? uu;: Pet. 1,107 r>
1. Amount of water collected (nilliliters) * Volume of water vapor collected (ST") "
244.41 11. 594.41
2, Dry gas neter volur.c at neter conditions (cubic feet)
30.20
Barometric pressure (inches of mercury) " 2?.90
Average orifice pressure drop (inches of eater) = .350
Average neter temperature ** 71 "F
3. Cas neter volur.o at S7P (dry cubic feet) "
30.13
4. Percentage of moisture in gas stream " 27.75 "
5. Percent composition of j;as stream.:
iOxygen........................ 6.30" Nitrogen................... Cl.r."!-
Carbon Dioxide... 11.402 Carbon Uonoxidc.. .00"
6. Percentage of excess air ** 45.06"
7. Dry molecular weight of gas strenn (lb./lb-mole) 30.09 '.Jet molecular weight of gar. strenn (lb./I!.-role) 26.73
3. Pitot tube coefficient (dimensionless) .33 .Number of pitot tube readings " C ' Average of square roots of velocity pressures Average gas stream temperature (D ** 143? Gas stream velocity (ft/sec) => 31.323 Pitot tube readings:
.513?
.
.20 .30 .34 .33 .17 .23
50
.27
5. Stack dimensions, circular with diameter (feat) = 1.53
Stack area (square feet)
1.96
Volumetric flow at ST? (cubic fcct/nin) *
2352
ID. i.'ozle diameter used for sampling (inches) " .375 ,, Sampling title (minutes) = 64.00 Weight of particulate natter collected (milligram) -
,02
U. Particulate concentration (lb./SC?) .OQ^OOOD
.
Particulate concentration (grain/SCP) .000011
*
Particulate concentration-corrected to 50 " excess air (lb./C?)'* .0'X}'">'>D0
Particulate concentration corrected to 50 7. excess air (grain/C7) .ng/vail
12. I.sokluctic race (7.) 51.23 11. Hass emission rate (.lb./hr)
.00
0SW 012536
Date EA^S^JJJ7_L n
STLCOPCB4002461
0>
MONSANTO INDUSTRIAL CHEMICALS CD.
V.G. KRIJMMRICH PLANT SAUGETIL 62201. ID NO. 63 121 AAC
DATE MAY 23 1975
START TI ME 10:30 AM
STACK SAMPLED- I-NCTNERaTOR STACK CALCULATION ANU EVALUATION:
SOURCE 0?EAT ION. NO. 631
THE ISOKINETIC CONSTANT HO/HP FOR THIS EQUIPMENT IS 24.7938
THE TABLE BELOW SHOWS,FOR EACH ZONE,THE METER VOL. AND THE AVG. METER TEMP.
AND PRESS. IN ABSOLUTE UNITS. FROM fHTS IS CALCULATED ThE EQUIVALENT VOL. l
STACK CONDITIONS AND DIVIDED BY TIME TO GIVE THE FLOW IN THE NOZZLE. THIS I
COMPARED WITH THE ISOKINETIC FLOW RATE CALCULATED FROM THE STACK VELOCITY.
PERCENTAGE DEVIATION IS RECORDED.
sample/stack/avg. press/ avg. temp/sam^le vol./sample hate /p.c.
ZONE TIME VEL. meter STACK meter STACK meter STACK ACTUAL ISOKIN OEV
-l- -- H.O -15.7 - 29.rt -29.7 553.0 546.0 -- 6.0- --:6.4 -----0.80' 0.72 10.23
2 H.O 16.6 29.8 29.7 566.5 546.0 6.1 6.3 0.79 0.77 3.38 3 0.0 13.6 29.7 29.7 575.5 546.0 5.8 5.9 0.73 0.63 17.49
4 8.0 13.6 29.7 29.7 579.5 546.0 -5.6 5.6 * 0.70 0.63 12.42
5 6.0 12.4 29.7 29.7 580.0 546.0 5.7 5.8 0.72 0.57 26.08
6 a. o 14.7 29.8 29.7 5H1.0 546.0 4.8 4.8 0.60 0.68-11.06
7 6.0 14.7 -29.8 29.7 583.5 546.0 7.3 . 7.4 0.9? - 0.68 36.74
ft 8.0 14.7 29.8 29.7 585.0 546.0 4.4 4.4 0.55 0.68- 18.72
TOTAL
i ' .
*
o
-- 64.0 14.5 29.8 29.7 575.5 546.0 -45.6 46.5 0.73 0.67 (.
T AV AV .AV ' AV AV T T AV AV AV
TOTAL SAMPLE VOL. CORRECTED FROM STACK CONDITIONS TO STD cOhOITIONS*
44.83 CUBIC FT. OF WET GAS
-
TOTAL SAMPLE VOL. CORRECTED TO DRY STD CONDITIONS * .
42.67 CUBIC FT.
DSW 012537 STLCOPCB4002462
Monsanto industrial cmemicals^.co.
. .............. ,;_j___
______ __________ .
W.G."kHUMMRICH PLANT SAUGET.IL 62201. ID Np7 63 1?1 AAC
DATE OCT I 1975
START TIME 1:30 PM
STACK SAMPLED- INCINERATOR ................................ SOURCE OPERATION NO.' SAMPLING DONE OY NEIL SULLIVAN AND ED HEUMANN
~ 831
SAMPLING METHOD-tPA METHOD 5 . DMF AND NA2S03. IMPINGE.RS_.
- r
.*
DETERMINATION of emission RATE OF
'
a: PARTICULAR
BTP.C.B. '
, CSCL2
PROCESS WEIGHT.RATE*____0.90. .THOUSAND..POUNOS..PER HOUR.
TEST RESULT: .
!
>
/ACTUAL CFM AT
/STD CFM
DRY STD CFM
/
/ STACK CONDITIONS/ AT .70 DEG.F AND 29.92 IN..HG/
STACK VOLUME
3749.6
3257.1
23S3.4
OUSTMISTtOR GAS CONCENTRATION IN WET .6 ORY..STACK 3AS AT ..STO CONDITIONS
GRAINS .
.... PER ____
'COMPONENT CUBIC FT
A* 0.0725
_AS _
0.1004
LBS. PER LBS. PER MGS. PER PARTS
MILLION............ 1000..............CUBIC______ PER
CURIC FT LBS. GAS METER
MILLION
10.3620
0.1494 165.9835 138.2010 IN WET GAS
14.3408
0.1836 229.7183 l9l.?679 IN DRY GAS
0.0000
0.0011 - 0 0000
..B* . . . .. 0.0000 . .. 0.0016. ... 0 0000
0.0182
0.0018 IN WET GAS
0.0252____ 0.0024 IN DRY GAS
C.J
0.0079
1.1335
JC?L......... 0.P110
.... .1.5687.
0 0163 18.1570
6.1749 IN WET GAS
_Q .0201 . . 25.1290 . 8.5460 IN DRY GAS
EMISSION RATE:
LBS. PER
COMPONENT' HOUR
M:, . 2.0250
fft: ,
0.0002
C3: 0.2215
GRAMS
LBS. PER UNIT
PER SEC. OF PRODUCTION
0.2551........... .. . 2.2450
0.0000
0.0002
0.0279
0.2456
DSW 012538 STLCOPCB4002463
........................................................................- -- -..135,
W.G. KRUMMRICH PLANT SAUGET *IL 62201 . ID NO. 63 121 AAC
DATE OCT l 1975
START TIME 1:30 PM
STACK SAMPLED- INCINERATOR
SOURCE OPERATION NO.
831
FIELD DATA: _______________________ ____________ ______ ____________ ____
ORIFICE CONSTANT K = 0.506 PITOT TUI3E FACTOR FS=* 0.B3 TEMPS. RECORDED IN FA DEGREES- : METER CORRECTION FACTOR= 1.02
GAS ANALYSIS :..Z=NONE______ *.______MOLECULAR_ WI_0L2=____ 0.0. MOLECULAR- WT. OF STACK GAS = 26.83 DRY MOLECULAR WT. OF GAS = 30.22
02 N2 C02
CO H20
2 VOL
TW PW WGT
0.068 0.818 0.114 0.0 0.277 0.0 30.200 .70.09 29.90244.61
PARTICULATE P.C.B. CL2
DETERMINED BY . DETERMINED BY
DETERMINED BY
BY WEIGHT (* = .BY T3TINVPTON ....= BY TITRATION =
0.2002 0.0000 0.0219
GRAMS GRAMS GRAMS
a. o
LEAK TEST ON EQUIPMENT = 0.0 05 CFM AT.. 15.00 . IN.HG BAROMETER* 29.90 IN.HG5 STACK DlAM* 19.000 IN.: NOZZLE DlAM s 0.37S
VEL
STACK STACK TIME VOLAT COND ... METER .TEMP METER PRESS FLOWMETEf
HEAD TEMP PRESS ATEND END TEMP
START FIN ORIFICE
ZONE HP
TS
0 0.0 149.0
" 1 0.200 149.0
H20 ZONE ZONE -0.4 0.0 420.50 -0.4 8.0 431.84
IN OUT
D 64.0 64.0 51.0 68.0 64.0
HG
0.0 0.0
HG H20 0.0 0.0 0.0 0.650
2
3 "" 4
s
6
7 8
0.300 0.340 0.330
o;i7o 0.230 0.300 0.270
149.0 149.0 149.0 149.0 149.0 149.0 149.0
-0.4 -0.4 -0.4 -0.4 -0.4 -0.4 -0.4
16.0 435.82 24.0 439.97
32.0 444.11 40.0 447.29 48.0 450.84. 56.0 454.84 64.0. 458.70
51.0 74.0 53.0 80.0 55.0 80.0 53.0 74.0 54.0 . 80.0 56.0 83.0 58.0 62.0
64.0 0.0 65.0 ...0.0 66.0 0.0 66.0 0.0 .66. Q..._0.0 68.0 o..n 68.0 ' 0.0
0.0 . 0.0
0.0 0.0 . 0.0 0.0 0.0
0.960 1.100 1 .0/0 0.569
0.740
0.960 0.870
DSW 012539
STLCOPCB4002464
W,G.-KKUMMRICH PLANT SAIJGET,1L 62201. 1U NO. 63 1?1 AAC
5^'
OAT E OCT 1 l`>75
ST APT TIME 1 s 30 PM
'
STACK SAMPLED- INCINERATOR................ ......... _..... . . SOURCE O^ERATION. NO. . 03i
CALCULATION ANO evaluation:
-
_
THE ISOKINETIC CONSTANT HO/HP FOR.THIS EQUIPMENT IS 13.0114
.
THE TAHLE BELOW SHOWS,FOR EACH ZONE,THE METER VOL. ANO THE AVG. METER TF*
ANO PRESS. IN ABSOLUTE UNITS. FROM THIS IS CALCULATED THE EQUIVALENT VOL
STACK CONDITIONS AND DIVIDER BY TIME TO GIVE THE FLOW IN THE NOZZLE. THf<
COMPAREO WITH THE ISOKINETIC FLOW RATE CALCULATED FROM.THE STACK VELOCITY
PERCENTAGE DEVIATION IS RECORDED.
I`
. ..SAMPLE/STACK/AVG. PRESS/ AVG. TEMP/SAMPLE. VOL./SAMPLE RATE ./P.C.
ZONE TIME VEL. meter STACK METER STACK meter STACK ACTUAL ISOKIN'DEV i 8.0 27.6 29.9 29.9 525.0 609.0 3.3 , S.5 0.69 1.27-46,07
__ 2____ 8;0_ 33.8, .30.0 29.9 527.5 609.0. . 4.0 ....6.5. .0.81. 156-47,7 A 3 8.0 36.0 30.0 29.9 530.0 609.0 4.2 6.7 0.84 1.66-49.10 4 8;o 35.5 30.0 29.9 532.8 609.0 4.1 6.7 0.84 1.63-43.66
.5. . 8.0. 25.5,, 29.9 29.9 531.5 609.0 . 3.2 . .5.2 . 0.64 .1,17-45,00
6 8.0 29.6 30.0 29.9 531.5 609.0 3.6 5.8 0.72 1.36-47. 19 7 8.0 33.0 30.0 29.9 534.3 609.0 . 4.0 6.5 0.81 1.56-43.14 8 8.0 .32.1 30.0 .29.9 535.3. 609.0. ___3,9. ___ 6.2 .._.0.7&< 1.48-47.35
TOTAL 64;0 31.7 30.0 29.9 531.1 609.0 30.2 49.0
1
0.77 1.46-47.55
T AV i. AV AV AV AV T T AV AV AV
TOTAL SAMPLE VOL. CORRECTED FROM STACK CONDITIONS TO STD CONOITrONS=
42.59 CUBIC FT. OF WET GAS
-
TOTAL SAMPLE VOL. CORRECTED TO. DRY STD.CONDITIONS. =______ 30.78 CUBIC FT.
DSW 012540 STLCOPCB4002465
&
Facility:
Monsanto Company
W.G. Krummrich Plant
Route 3
'
Sauget, IL 62201
Date of Inspection: January 27, 1976
Participants
Monsanto
Paul Heisler Clarence Buckley
U.S. Environmental Protection Agency
' Edwin Zylstra
John Connell
Charles Miller
Background:
:
''
.
.<
,
Monsanto is the sole manufacturer of PCB in the United States. figures for the first nine months of 1975 are listed below:
.
Production
! ` Aroclori . . 10A116_
.1242 1254
Thousands of Pounds
' 10350 5120
`6980
Starting during the latter part of 1972, the only use for PCB compounds ts tn the manufacture of transformers and capacitors.
Process:
The chlortnator is charged with, biphenyl and ferric chloride (catalyst) arid then heated. Vaporized chlorine is fed into the chlorinator. The contact time varies from 12 to 36' hours, depending on the type of Aroclor to he produced, which determines the degree of chlorination. The vapor from the chlorinator (HC1 containing PCB) goes to the scrubber where it ts washed with liquid Aroclor, The gaseous HC1 is sent to the purification section.of the plant. The crude Aroclor goes to the Blower tank where
it is blow with dry air for several hours. The air is scrubbed vrith water and vented to the atmosphere through a demister, the crude product ts sent to a storage tank where a few tenths of 1% of alkali is added to react with any remaining hydrogen chloride or ferric chloride.
OSW 012541
STLCOPCB4002466
- 2-
53^
The method of distillation of the rav/ Aroclor varies 'depending upon the product to be produced._ For types 1254, 1242, and 1221, the process is the same. Each is distilled in a vacuum still, the condensate being the finished product and the bottoms being the Montars which are sent to incineration. For Aroclor 1016, the crude aroclor is distilled in a
vacuum distillation tower. The steam from the steam jet ejectors is partially condensed; the condensate being discharged into the plant discharge sump and the vapor exhausted to atmosphere. The overhead from the distillation tower is the product 1016 and is sent to storage. The bottoms are sent through another chlorination and distillation cycle. The overhead from this still is the finished product and the bottoms are the Montars which are sent to incineration. The three possible places where PCB can escape into, the atmosphere are: vapor from jet ejectors, exhaust from the scrubber; and surface area evaporation (in general).
.
All aroclors are stored at 150F with a layer of nitrogen on top of the
liquid.
' .'
Incineration:
..
There are three points in the process that go to the incinerator: Montars, bottoms from separator sump, collection from all drip pans. In addition waste material from the users of PCB is sent to Monsanto to be destroyed. The type and concentration of these waste are unknown but it Is estimated that they contain about 90% PCB. The amount of contaminated waste disposed of for the first nine months of 1975 is listed below:
,-
Customer returns, records exists Monsanto, records exists * Total receipts Destroyed by incineration
Thousands of Pounds
1109 322
1431 2808
The-liquid waste stream is steam atomized and fed into the fire box. The feed is incinerated at a temperature above2200F with natural gas used for combustion with 5% excess oxygen and a retention time of 2-3 seconds. The gases go through a quench pot, the exhaust of which passes through a venturi scrubber and then through a packed tower which is irrigated by the weak muriatic acid originating from the quench pot. The exhausts are vented to atmosphere through a demister and are monitored.
'
)
DSW 012542
STLCOPCB4002467
3
Loading and Unloading: The majority of the PCB components and the products made using PC8 are liquid and are transported in bulk or in steel drums. Bulk shipments are made in railroad tank car and tank trucks. Waste material shipped in from other locations in 55 gallon drums or tank trucks are unloaded into a concrete pit; the material in this pit is periodically pumped to one of four 20,000 gallon incinerator waste feed tanks. The waste material that Is shipped in by rail truck is unloaded into a 500,000 gallon storage tank and is pumped into the feed tanks when required. In the truck or railcar loading area, drainage is directed into a small concrete pit which is periodically pumped into the bastns located in the manufacturing area. Relief valve lines and atmosphere vent's are routed through catch tanks or are redirected to underground settling basins.
DSW 012543
STLCOPCB4002468
.OPTIONAL POAU HO, 1* mat uu roinoN cs* (m crr) uin.#
UNITED' STATES GOVERNMENT
Memorandum
to : Gerald F. Regan, Chief, Air Surveillance
Branch ;
'"
DATE: March 5, 1976
FROM :
subject:
i i
i
Technical Advisor, Special Projects Section
Air Surveillance Branch
\ i'
Calculation of PCB Air Emissions from Storage and
Dispensing Operations at the Krummrich Plant of Monsanto
Potential air emissions from the storage and dispensing of PCB were
calculated based on information supplied by Monsanto. The results
of these calculations are:
`
Storage tanks for virgin product
- 597.kg/year
Product loading
- 0.0184 kg/year
Storage and handling waste aroclors *- 0.00066 kg/year
Attachment (Calculations)
R. Edwin Zylstra
DSW 012544 Buy 13.S. Savings Bonds Regularly oil the Payroll Savings Plan
STLCOPCB4002469
-
Clarence Buckley of Monsanto estimated that storage and loading
operations at the plant would displace the following volume of
headspace gases:
1. Storage tanks 635,000 ft3
2. Loading
*60,000 ft3
-
Calculation of emissions:
From Fig. 2.2 from the Draft Mitre report the vapor pressure of Aroclor 12-42 is 3 mm Hg at 100C and 10"* at 21 C. The aroclors are
Stored at 100C. It may be assumed that the temp, in the tanks being loaded would be approximately 70F (21C).
From Dolton's law of partial pressure:
Bx Px where Bx proportion by volume of a gas component P mix.
'
Px partial pressure of gas component and P mix. absolute pressure of gas mixture.
Bx - 3 - 0.0039 or 3900 ppm at 100C 1 7^0 1
To change ppm to mg/M3 use the following formula:
mg/M3 ppm x
mol, wt.
molecular /oiume
.
mol. wt. * 261
molecular volume ** 30.62 liters/mol. at 100C
mg/M3 3900 x 261
- 332*2
30.62" *
Emissions from storage tanks: Emissions kg/year * Vol. of gas displaced/year x concentration
of PCB
Kg/yr - 635000 ft3 X .0283 m3 X 332*2 x 1 kg ftS' '"10 mg
kg/year 597.*
Emissions frbm loading operations:
Bx - Px P mix.
760 1.3 x 10"7 or .13 ppm
mg/M^ .13 x
261
2*.0*
- t.*l mg/M3
DSW 012545
*
STLCOPCB4002470
1
-2-
Emi ssions!:
!
Kg/yr. '|
**60,000-x .0283 X l.**l X
1 kg
106 mg
Kg/yr. 0.0)8**
I
i Emission's from handling of waste aroclors:
Total waste material received into plant as reported by Monsanto for 9 mos. of 1975 " 1 ,**31 ,000 lbs. Assume that all this material is received and stored at 70F and that it displaced an equal volume of tank headspace gas at 70F.
Volume of produce = 1 ,**31 ,000 lbs. x
1 gal.
,
,
; "5 lbs. x 3*785 litei
i gal-
1
X103 mers. .
,,3
'
The concentration would be the same as In the loading operation that is l.*H mg/M3.
Emissions:
Kg/yr. **71 M3 x 1.** mg/M? x 1 kg 10b mg
Kg/yrj. * .00066
i
i
i j
DSW 012546
STLCOPCB4002471
UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
SUDjCCT: pctJ Monitoring - Monsanto, Krummrich Plant, Sauget, DATE: fffQ j 10?$
Illinois. )i !
. `
* "'
FROM:
Charles Miller/Ed Zylstra/John Connell, Technical Advisors, SPS
!`
Gerald F. Regan, Chief, Air Surveillance Branch
On January 27, 1976, the SPS field team (Miller, Zylstra, Connell) performed ambient air monitoring for PCB's at the Monsanto Krummrich
Plant, Sauget, Illinois. Although Monsanto presently manufactures PCB's at this facility, production of PCB's is to be gradually phased-out.
'I :
'
After a brief discussion and orientation period with Monsanto officials,
ASB and ILDO personnel toured the PCB manufacturing area including'the
incinerator facility. The "plant" area where PCB's are manufactured is not an enclosed structure per se. It is an open structure constructed of
steel grating (floors, stairs), safety railings, a maze of piping, collection and reaction vessels, valves, etc. all of which are completely exposed to
. the elements. Mr. Claire Buckley of Monsanto was assigned as escort for
ASB personnel.
..
Only two locations were deemed appropriate as sampling sites for PCB's. Other possible sites were inaccessible or had recently been tested by Monsanto - ie. - the recent incinerator test results were furnished by Monsanto. These two sampling locations, the cleaning of glassware, equip
ment used, sampling procedure, samples obtained, etc. is described below:
Site Location 1 (SEG) - Steam Ejector - Ground Level.
.
This steam ejector pipe terminated just above a grate which covered a recessed concrete trough in the floor at ground level. For collection of the samples, the SPS field team usfed the glass bubblers, Y-connector with reducer coupling, U-tube, cold trap and vacuum pump. The H-frame base, ^nd 2x4 manifold support and glass manifold were not used. Sampling was performed for a one-hour period, 1046 - 1146 hours.
: Site Location #2 (SET) - Steam Ejector - Top Level or 2nd Level Above Ground.
These twin steam ejector pipes (somewhat of a candy-cane configuration)
terminated out beyond the 2nd level safety railing. Sample collection was
performed using the same equipment as at Site Location #1 and included the
tH-frame base, one section of 2x4 manifold support, and one section of
glass manifold. Sampling was performed for a one-hour period, 1205 - 1305
:hours.
.
HfPAffwrw 11370.6 (. 6-72)
DSW 012547
STLCOPCB4002472
The'following narrative defines the process for cleaning of the
sampling glassware, the actual preparation for sampling, and handling
of the samples collected in the bubbler train.
,
The ASB, SPS field team cleaned all PCB monitoring glassware via the following procedure:
1. Thoroughly wash all glassware with a solution of PCB free detergent.
The concentration of the detergent is determined by the manufacturer's
i Instructions.
'
.
!
'
2. ,Rinse thoroughly with tap water.
''
I.
*
.
3. ' |Rinse thoroughly with distilled water.
.
4. Rinse thoroughly with acetone (reagent grade or better).
5. Rinse with hexane, rinse each bubbler three times with 50 ml. of
hexane for each rinse and discard.
'
6. Wrap all small glass parts in aluminum foil and ensure proper sealing, . crimping of the foil. Seal all ball joints of the bubblers with aluminum foil (alternately, appropriate ball joint fittings - sealed
on one end and thoroughly cleaned - may be clamped in place instead of using aluminum foil; the purpose of the above is to prevent contamination of the now PCB free glassware).
Upon determination of a sampling site location, the sampling equipment supportive framework is set-up and all glassware bubbler box, pump, etc. are positioned. The sampling procedure is as follows:
1. Remove seals (foil or ground joints and clamps) from the bubblers.
2. - Place 300 ml. hexane into bubbler #1, shake, pour into bubbler 2, Shake, pour into bubbler //3, shake, pour into a sample bottle appropriately designated as a reagent blank. This procedure is performed for both sides (A.and B) of the sampling train.
DSW 012548 STLCOPCB4002473
3/. Pour hexane, 400 ml., 200 ml., and 300 ml. Into bubblers 1, 02, and #3, respectively.
' 4. Connect the entire sampling system - U-tube, manifold, reducer
coupling, Y-tube, U-tubes betv/een each bubbler and the copper tee
(containing hypodermic needles - one for each side), the quick -
disconnects betv/een the tee and the cold trap and betv/een the cold
trap and the vacuum pump. Ensure that all ball joints are tightly
clamped. Do not use any lubric^nt/sealing compound on the ground
glass ball, joints.
.
5. (Fill the plywood box (containing 4 of the six bubblers) and`the |cold trap with crushed dry ice.
' 6. , Start the vacuum pump; note the time and vacuum gage reading; sample
. , for one-hour.
..
7, At the conclusion of the one-hour sampling period, note vacuum gage
reading, tightly double the rubber hose betv/een the copper tee and
the qutck-disconnect thus stopping air flow, pull both disconnects
apart, and release the previously clamped or kinked rubber hose;
. .shut off the vacuum pump. \'
..
' 8. Disconnect the Y-tube from the train.
i`
.
9*. Disconnect the bubbler U-tubes and the rubber hose - glass connection from last bubbler to the copper tee on one side of the train.
10, Pour the absorbing solutions from one side of the train (3-bubblers) `tnto one sample bottle appropriately identified. All sample bottle
. ' screvi caps must have Teflon,liners. Absorbing solutions and rinses . from each, side of the train must be in separate sample bottles - 1
Bottle per side of train,
11, Introduce'approximately 50 ml, of hexane into bubbler #1, shake, pour tnto bubbler #2, shake, pour into bubbler if3, shake, and pour into the appropriate sample bottle from Step 10 above. Repeat this with
` another 50 ml. portion of hexane. Repeat for the second or other side of the sampling train.
DSW 012549 STLCOPCB4002474
.4
12.
.
13. '
Introduce 300 ml hexane Into bubbler #1, shake, pour Into bubbler #2, shake, pour into bubbler 3, shake, and pour into another
appropriately identified sample bottle. This is also a reagent
blank.. Repeat for the other side of the train.
i
The bubblers can now be properly filled with the designated amounts of hexane (400 ml., 200 ml., 300 ml.) for the next sampling period. If additional sampling is not required, the equipment (glassv/are)
must be wrapf-sd/sealed as defined in Step #6 of the cleaning procedure.
Ocj- Ttmm Kallgren
Torrez Zylstra Connell
DSW 012550 STLCOPCB4002475
Jfl
The tabic below defines the various samples collected at the Monsanto
PCB manufacturing facility:
DATE 1/27/76 1/27/76 1/27/76 1/27/76 1/27/76 1/27/76 1/27/76 1/27/76 1/27/76 1/27/76 1/27/76 1/27/76
LOCATION
R1 e' agent Blank, Pre (SEG) Ri e' agent Blank, Pre (SEG)
Sample (SEG)
Sample (SEG)
\
'
Reagent Blank, Pre (SET)
Reagent Blank, Pre (SET)
Sample (SET)
Samp. le i(SET )
*
Reagent Blank, After (SEG) Sample
Reagent Blank, After (SEG) Sample
Reagent Blank, After (SET) Sample
Reagent Blank, After (SET) Sample
ASB DESIGNATION 3A-T27-1 3B-T27-2 3A-T27-3 3B-T27-4 3A-T27-5 3B-T27-6 3A-T27-7 3B-T27-8 3A-T27-9 3B-T27-10 3A-T27-U 3B-T27-12
LAB. N'0. 76-13656 76-13657 76-13658 76-13659 76-13660 .76-13661 76-13662 76-13663 76-13664 76-13665 76-13666 76-13667
OSW 012551
STLCOPCB4002476
i STLCOPCB4002477
DSW 012553
STLCOPCB4002478
U/S. environmental protection ackkct ,
REGION V, CENTRAL RECIONAL I.AUORATOH?
lore w. persuing noad, ciucaco, Illinois Gor.oo j Data
DATA TRANSMITTAL SLIP
Feb. 26, 1976
TO: *
. Chief, Air Surveillance Branch
Survi. & Anal. Division
DATA IDENTIFICATION Data - Sample Numbers 13652--13667
REMARKS
FEB 2 7 1976
MR SURVEILLANCE BRANCH
EPA, REGION V
FROM Or9
& 2C>A __________________________________
VDATA COORDINATOR, CENTRAL REGIONAL LABORATORY
DSW 012554 STLCOPCB4002479
Monsanto-Sauget, Illinois
Sampling Location
Site Si Steam Ejector-Ground
Level (SEG)
Site Si Steam Ejector-Top
Level-(SET)
Sample No.
Critical
Orifice Flowrate ra^/hour
Reagent Blank Values
Before & After Each Sample ug/saraple
Average
Reagent Blank Values ug/sample
Sample Values ug/sample
DifferenceSample
Minus Ave. Blank Value
Final Value
ug/m3
76-13658 3A-0.71402 76-13659 313-0.63602
7.0 / 16.8 4.7 / 3-3
76-13662 3A-0.71402 N.A. / N.A. 76-13663 313-0.63602 12.1 / 8.4
11.9 4.0
.
31.5 25.0
10.3
72.5 N.A.
19-6 21.6
27.5 33.9
DSW 012556
' 'Monsanto
Interpretation of the data chart:-
Column 1- Sampling Location - corresponds to the preceding narrative defining sampling sites.
I. Column 2- Sample Numbers - assigned by ASB and for use by the ana
lytical laboratory.
Column 3- Critical Orifice Flowrate (m3/hour) - calibrated flowrate of
the critical orifice utilized on each side of the sampling train.
I
Column 4- Reagent Blank Values - Before and After Each Sample (ug/
sample - defines the analytical results determined for each reagent
blank.
.i
.'
'
.
Column 5- Average Reagent Blank Values - simply the average of the two
values in the preceding column.
.
Column 6- Sample Values (ug/sample) - analytical results of the samples submitted.
Column 7- Difference - Sample Value Minus Average Blank Value - defines a value representing only the sample.
l '
Column 8- Final Value (ug/m3) - defines the final or actual value of PCB's obtained at the particular sampling location; determined by divid ing the true sampling air flowrate into the corrected value (Column 7).
DSW 012557 STLCOPCB4002482
` Monsanto
Comments:
'
It Is unfortunate that Reagent Blank Values (before and after sampling) are not available for all such samples that were submitted for analysis. Additionally, the loss of one sample (76--13663) occurred as a result of a manufacturing defect (stress/strain) in the particular sample bottle.
At this point in time, the only meaningful conclusion that can be made
is that the manufacturer of PCBs has and maintains significantly
superior control of atmospheric emissions during PCB manufacture than
does the user or consumer who utilizes PCBs in the manufacture of a PCB
containing product. However, the amount of PCBs released is still
significant and should be greatly reduced by more stringent controls.
However, at this point in time, Monsanto has publicly declared that PCB
m,anufacture will
be
gradually
reduced
and
eventually
phased
out.
.
Ip comparing the data for the Sauget and Bloomington monitoring efforts,
!t is noteworthy that the accord or agreement between the Sauget reagent
blanks and sample values (at the same site) is much improved even though
the basic equipment-absorbing solution, sampling and analytical procedures,
and length of sampling period were identical.
DSW 012558 STLCOPCB4002483