Document wq9R5vQzwNGqgmoYB6pBY4QaJ

INSULATION SECTION 1977 Edition [SECTION: TITLE: y-Bishop-Clear Lake-Pampa INSULATION 004670 7E 8/1/77 SV. '.a. i M FOREWORD SECTION PREPARATION The Insulation Section was prepared by Ray Hea'ron, Clear Lake; Weldon Wallace, Bay City; Jim Beasley, Bishop; and Jack White, Pampa. DISTRIBUTION Each plant will be supplied three copies of the Insulation Section. Use one of these copies to reproduce your required number of copies. The Clear Lake Plant will be responsible for distribution to Chemical Company Purchasing and other Company Divisions requesting copies. PROCEDURE FOR REVISIONS AND UPDATING To keep this section open for improvement and the dissemination of new Engineering know-how, it is important that methods for additions or revisions to the Standard be readily available. The attached form letter should be used whenever feasible. These will be reviewed by the Insulation Standards Committee and presented to the Plant Engineering Superintendents at their meetings for final acceptance. All holders of the Insulation Standard will receive the revised material and new publications as they become available. SECT! ON: INSULATION LANH3E CHEMICAL COMFANYtTtleT 004671 race 3/1/77 ! ii .-.v. :.c. .Name *c Lcciiionj Ray Hearon - Clear Lake ne ano L.ocj:on) "SAMPLE FORM LETTER" JOATE 1 j fi'EFc^c.NCc NO SUBJECT: Recommended Revisions to Insulation Section (1) State changes or additions you feel with improve or uodate this section. (2) State justification. J cc: Plant Engineering Superintendents Bay City Bishop Clear Lake Pampa 8/1/77 iii 004672 CRITERIA FOR WRITING INSULATION SECTION 1. Provide conformity of insulation between Chemical Company Plants to allow Chemical Company Purchasing to obtain the most economical agreement with the suppliers and applicators of insulation. 2. Provide a training manual for the Engineer becoming involved with insulation. 3. Establish guidelines for the application of insulation materials in the Chemical Company Plants. iip StCT 1 CM: INSULATION ELAN ESS CHEMICAL COMPANY TlTLI: 004673 Oa t z 8/1/77 7. WO* Page V- Ml SCOPE M2 INSULATING MATERIALS - HOT SERVICE M2.1 CALCIUM SILICATE (KAYLO) , M2.1.1 DESCRIPTION l M2.1.2 SERVICE M2.1.2.1 Temperature Range 'M2.1.2.2 Components Insulated M2.1-3 THICKNESS M2.2 MINERAL WOOL M2.2.1 DESCRIPTION M2.2.2 SERVICE M2.2.2.1 Temperature Range M2.2.2.2 Components Insulated M2.2.3 THICKNESS M2.3 CELLULAR GLASS - (FOAMGLASS) M2.3.1 DESCRIPTION M2.3.2 SERVICE M2.3.2.1 Temperature Range M2.3.2.2 Components Insulated M2.3.3 THICKNESS M2.4 FIBERGLASS M2.4.1 DESCRIPTION M2.4.2 SERVICE M2.4.2.1 Temperature Range M2.4.2.2 Components Insulated M2.4.3 THICKNESS SECTION: INSULATION r:i3HlANH3E CHEMICAL CCUPANY7777TT~ MATERIALS Mr 004674 at- j Page ~ S/1/77 1 1 M2.8 HIGH TEMPERATURE SERVICE M3 INSULATING MATERIALS - COLD SERVICE M3.1 CELLULAR GLASS - (FOAMGLASS) M3.1.1 DESCRIPTION M3.1.2 SERVICE M3.1.2.1 Temperature Range M3.1.2.2 Components Insulated M3.1.3 THICKNESS M4 WEATHER BARRIER MATERIALS M4.1 ALUMINUM M4.1.1 DESCRIPTION M4.1.2 SERVICE M4.1.2.1 Moisture Barrier M4.1.2.2 Components Jacketed . M4.2 MASTIC M4.2.1 DESCRIPTION M4.2.2 SERVICE M4.3 OTHER MATERIALS M5 ACCESSORIES M5.1 JOINT SEALER M5.1.1 DESCRIPTION M5.1.2 SERVICE M5.2 GLASS CLOTH M5.2.1 DESCRIPTION M5.2.2'SERVICE SICT1CN: INSULATION ^3ELhNS-E CHEMICAL COMPANY T:7LI: MATERIALS [ 004675 Oats j Page 8/1/77 ! 3 Riv. No. j . Ml SCOPE This section describes the minimum requirements for the purchase of exterior thermal insulation materials for pipe, instruments and equipment. A summary of this section is attached in Table 7. M2 INSULATING MATERIALS - HOT SERVICE M2.1 CALCIUM SILICATE (KAYLO) M2.1.1 DESCRIPTION Insulation shall be a rigid hydrous calcium silicate pipe covering of sectional or segmental form. The insulation shall contain an inhibitor to reduce the possibility of stress corrosion cracking of stainless steel. CAUTION--calcium silicate containing asbestos will not be used. M2.1.2 SERVICE M2.1.2.1 Temperature Range - Calcium silicate is .normally used for components operating in the temperature range of 451F to 1000F. M2.1.2.2 Components Insulated - Calcium silicate is used for the insulation of carbon steel and alloy piping and equipment. M2.1.3 THICKNESS Table 1 gives the insulation thickness for operating temperatures between 450F and 1000F. When economic calculations dictate a multi-layer situation, it is recommended a Kaylo/fiberglass combination be used rather than two Kaylo layers, as long as the interface temperature is below 450F. This- allows a reduction in total thickness for equivalent heat recovery and a more favorable LTROA. The two material zone is indicated in Table 1. When using the'Kaylo/fiberglass combination, it should be specified that the Kaylo thickness* be applied as two, 1-1/2" thick layers in accordance with A3.1.1. SECT 1CN: INSULATION ^SSEIANSSS CHEMICAL COMPANY T!TLS: MATERIALS 004676 Days 8/1/77 Rev. Mo. Page 5 M2.4 FIBERGLASS M2.4.1 DESCRIPTION The insulation shall be sectional pipe covering of 6# density or rigid sheets and blankets of 3# or 6# density fiberglass. M2.4.2 SERVICE M2.4.2.1 Temperature Range - Fiberglass is used for components operating in the temperature range of 90F to 450F. . M2.4.2.2 Components Insulated - Fiberglass may be used for piping, instruments, and equipment. M2.4.3 THICKNESS Table 4 gives the insulation thickness for components insulated with fiberglass. M2.5 INSULATING CEMENT M2.5.1 DESCRIPTION Insulation shall be a high temperature mineral wool type insulating cement such as Ryder Thermokate #1-MWP or equal. M2.5.2 SERVICE M2.5.2.1 Temperature Range - Insulating cement is used for components operating at temperatures of 71F and above with upper limits depending upon the material used. M2.5.2.2 Components Insulated - Insulating cement is ' used for the insulating of irregular surfaces such as pumps, turbines, valves, flanges, etc. Insulating cement is also used to fill voids and smooth the surface of fabricated elbow covering. M2.5.3 THICKNESS The thickness of insulating cement shall be as shown for mineral wool in Table 2. For irregular surfaces use the thickness shown for 36" diameter. SECT ICN: INSULATION -SESELANHSS CHEMICAL COMPAMYfTITLE: MATERIALS 004677 I 8/1/77 S.'v irags 7 M2.8 HIGH TEMPERATURE SERVICE For services in the 1800 to 2300F range, Babcox and Wilson "Kaowool" 8-lb density blankets or equal should be used. Insulation thickness should be determined with vendor assistance and/or use of the T-2013 program at CCCTC. M3 INSULATING MATERIALS - COLD SERVICE M3.1 CELLULAR GLASS - (FOAMGLASS) M3.1.1 DESCRIPTION Insulation shall be a rigid cellular glass material in flat block, beveled lags, or pipe covering of sectional or segmental form. M3.1.2 SERVICE M3.1.2.1 Temperature Range - Cellular glass is used for components operating in the ambient to -350F range. M3.1.2.2 Components Insulated - Cellular glass shall be used for .the following: a. Piping, instrument or equipment with a diameter of 36" or less. b. Equipment with diameters greater than 36". c. M3.1.3 THICKNESS Irregular surfaces. Table 6 gives the thickness of cellular glass insulation for piping and equipment operating from ambient to -350F. M4 WEATHER BARRIER MATERIALS M4.1 ALUMINUM M4.1.1 DESCRIPTION Aluminum jacketing material shall be 5005 or 3003 alloy with H-14 temper. Sheets or rolls shall be 0.016" thick with 3/16" corrugations or 0.020" thick smooth. Jacketing both with and without attached moisture barrier are used. Aluminum elbow covers shall be 0.020" thick. 004678 its SECTION: ^S3ELANES5 CHEMICAL COMPANY TITLE: IMS ULATICN MATERIALS OA 7 8/1/77 NO. Pace 9 V' ^ ^ DURABLE VINYL-ACRYLIC MASTIC COATING FOR ALL THERMAL INSULATIONS DESCRIPTION VI-CRYL is a tough, durable, and tire-resistive mastic coating for all types of thermal insulations and masonry surfaces. It is very thixotropic - it looks heavy but spreads easily. VI-CRYL is available in a variety of standard and special fade-resistant colors. USES VI-CRYL is unsurpassed for the mechanical protection and weatherproofing of thermal insulations both outdoors and indoors: in hot. cold, and dual-temperature service. However, since VI-CRYL is a 'breathing' coating (vapors under pressure will pass through it) it should only be used over insulations in lowtemperature. or dual-temperature service: when the insulations themselves are vapor barriers, or where a complete vapor barrier system is applied to the insulated surface either before or after the VI-CRYL is applied. VI-CRYL in its Metallic Gray color is the ideal companion product with CHILDERS Aluminum or Stainless Steel Jacketing or STEEL JAC. VI-CRYL gives superior mechanical and chemical protection to any irregular shape or surface where the application of CHILDERS METAL JACKETING SYSTEMS is impractical. ADVANTAGES In the wet state. VI-CRYL is non-flammable and non-toxic. It is freeze-thaw stabilized, and its special formulation allows for application during most times of the year - even under some subfreezing conditions. It contains no solvents that will attack insulations or facings. It is surprisingly easy to apply. The cured film of VI-CRYL is tough, yet flexible and resists most common chemicals and many solvents. It is fire-resistive - its flame spread index being within the range of acceptance of governmental and industrial agencies. APPLICATION VI-CRYL is easy to apply by Trowel. Palm. Brush or Spray (use CP-11 series). Its thixotropic consistency yields a smooth, attractive finish, even over rough substrates: it readily bridges gaps and imperfections. VI-CRYL is normally applied with a fabric membrane or metal mesh reinforcement. SEE REVERSE SIDE OF THIS SHEET FOR DETAILED APPLICATION DATA. CERTIFIED That this product meets the requirements of NFPA Standard 90A; Is Non-Combustible in accordance with NFPA National Fire Code 220 (b); Meets Dry Film Fire Hazard requirements of GSA. COLORS White Metallic Gray Black Blue Green Yellow Red Tan TROWEL 10 10-1 10-2 10-3 10-4 10-5 10-6 10-7 SPRAY/BRUSH 11 11-1 11-2 11-3 11-4 11-5 11-6 11-7 WET WEIGHT 10.2 to 10.8 lbs./gal. AVERAGE NON-VOLATILE 64% SERVICE TEMPERATURE RANGE (Temperature to which dry coating is subjected) Minus 40F to 180F Constant (250=F - Intermittent) APPLICATION TEMPERATURE RANGE 10F to 125F DRYING TIME To touch - 3 hours Through -12 hours (Drying time will vary depending upon film thickness, temperature and humidity. See other side for details.) COVERAGE 15 sq. ft./gallon optimum - varies with substrate and membrane, (see reverse side of sheet for detailed application data and instructions.) THINNER or CLEAN-UP Clean water WATER VAPOR PERMEABILITY - ASTM E-96 2.0 perms for 1/16 inch dry film FIRE HAZARD CLASSIFICATION (ASTM E-84. U.L. Tunnel Test) Flame Spread 20 Fuel Contributed 0 Smoke Developed Surface 0 */ inch cement-asbestos board Fire Hazard Classification of solvent Non-Flammable 004679 yt |-V'l I fc-> OUOVJC.O i tzu IIVJN: TOr MAiailU i-iNISHES MASTIC FINISH over insulation shall be VI-CRYL. CP 10- as manufactured by Childers Products Company. It shall be applied in two coats, the first coat being a tack coat applied at a rate of 50 square feet per gallon, and while still wet a layer of Chilglas #10 open weave glass cloth membrane shall be embedded with all fabric seams overlapped a minimum of 2 inches. A finish coat at a coverage of 25 square feet per gallon shall be applied, fulling covering the cloth membrane and applied so that the minimum dry film thickness is 1/16 inch. There shall be no voids or holidays and the mastic shall be trowelled, sprayed or wet-brushed to a smooth even finish. All adjoining uninsulated surfaces must be completely waterproofed and flashed: either by extending the VI-CRYL and fabric membrane a minimum of 4 inches onto the adjoining surface, or. if that surface will attain temoeratures in excess of 180F, use CHILJOINT CP 70 as the flashing compound. | NOTES TO SPECIFYING ENGINEER: 1. Fabric membranes of Dynel, Nylon or other suitable materials may be substitute d for open weave glass cloth without affecting the application. For areas subject to severe mechanical abuse use CHILGLAS #5 G'ass Cloth. 2. If Chicken Wire. Hardware Cloth, or other metal reinforcements are to be used in lieu of fabric membranes, they should be applied prior to application of mastic, and then two coats of the VI-CRYL applied in sufficient thickness to completely cover the metal mesh. 3. The above specification is for weatherproofing and protection of insulation in HOT SERVICE: or for COLD or DUAL TEMPERATURE SERVICE where the insulation and/or the insulation system forms an adequate vapor barrier prior to the application of the VI-CRYL. Where this is not the case, the following additional steps are recommended: ALTERNATE FINISH FOR INDOOR COLD SERVICE: -^ After the VI-CRYL has dried completely, apply CHILDERS CHIL-PERM, CP-32 at 50 square feet per gallon, making sure the surface is completely covered. ALTERNATE FINISH FOR OUTDOOR COLD SERVICE: After the VI-CRYL has dried completely apply a uniform coat of CHILDERS CHIL-MASTIC. CP-20 to a minimum thickness of 1/16 inch (25 square feet per gallon) by spray or brush. APPLICATION GUIDE AND SUGGESTED PROCEDURE 1. USE OF MATERIAL VI-CRYL looks much heavier than it is - it is thixotropic - use it the way it comes WITHOUT THINNING! VI-CRYL is Freeze-thaw stabilized so that it will withstand a number of cycles of freezing. However, it is best to keep it stored over long periods of time in a heated area. For spray application. VI-CRYL must be kept at minimum 50F just prior to spraying to achieve optimum results. 2. THE CONDITION OF THE INSULATION TO BE COATED: The best coating in the world can be no better than the surface it is going over. KNOW THE TYPE AND CONDITION OF THE SUBSTRATE! VI-CRYL is a 'breathing coating', which means that it will allow reasonable amounts of water (in the form of vapor - a gas) to pass through it in a reasonable period of time. However, excessively wet insulation on equipment operating at elevated temperatures will cause excessive water vapor pressure, and therefore blistering of the finish. It is best to make sure that the insulation is nearly dry before application of a finish. If this is impossible, vent plugs or other relief should be incorporated to allow the release of excess water. To obtain proper bonding, very dusty surfaces should be primed with a solution of CP #52 diluted 50% with water or one part of VI CRYL diluted with 8 parts of water. The presence of moisture in systems operating in Cold Service can completely destroy the effectiveness of not only the finish, but the entire insulation system. They MUST BE DRY. 3. HAND APPLICATION Large flat areas are best covered by application with trowel or stiff brush. Smaller, irregular surfaces such as fittings are more readily covered by brushing or 'palming'. A smooth finish may be obtained by 'wet-brushing'. 4. SPRAY APPLICATION VI-CRYL is readily applied with Mastic Pumps and Air-Atomized or Airless Spraying equipment. The airless spray technique is generally considered more satisfactory - it is faster, neater, and gives a better more uniform finish. The most common pump in use is the 30:1 using a tip with cross section radius between .033" and .055" depending upon fan size and output desired, (a .751 tip would be the most common). Hose diameters would begin at '/j inch and increase depending upon the distance the material is to be pumped. Reverse-A-Clean tip is recommended for the spray gun. A pump in the range of 9:1 is used in the conventional method. The gun should have a W inch nozzle and air cap. To operate this equipment there should be air available at a minimum of 75 cfm and 100 psig. Water should be pumped through the system before spraying the VI-CRYL. Ram plate or follower plate should be used in spraying VI-CRYL. Most manufacturers of mastic spray equipment maintain nearby service facilities to aid in the solution of any technical problems which arise with their equipment. CHILDERS cooperates with these companies in solving individual spray problems. 5. DRYING AND RECOATING Second coats of VI-CRYL should be applied within one hour after the first coat, for maximum bond. Most of the volatile in VI-CRYL is water and the rate at which the film will dry varies with any of a number of factors: The thickness at which the VI-CRYL is applied: heat: humidity: wind; and the absorption by the substrate. It is dangerous to recoat VI-CRYL with a vapor-barrier finish or subject it to rain, snow or overflow of liquids unless it is dry. CHILDERS PRODUCTS COMPANY P. O. BOX 505 BRISTOL. PA. 1 <*Z07 PHONE 2?5.y^?.7600 / C-sle ADDRESS: ,,CHll?RO** 15LEX NO. 343408 PLANTS AT: Cleveland. Ohio Houston. Texas Los Angeles, Calif. Windsor, Ontario, Canada - NDITIONS: Recommendations mode by this comoany ond its moresentatives o^e bosea upon test data, experiments ond experience believed to be reliable, o auarantcc of accuracy is mode, however. All products are sold subject to she warranty appearing below, and upon the condition that the buyer will make * own tests ond assume the rcsoonsioility for *hc suitability of the proauct under n?s application ond service conditions. Statements maac herein as to Overaqe. aryinq, performance, applicability, and other proocrties will vorv 'ijcordina to tne noturc of he surfaces to which the product is applied, aoolicoon technique and service conditions. Because of the conditions over wmen .,e hove no control {including shippina. sloroae and hanaitng), we in no event ssume liability beyona the purchase price of our products involved and r'axc as a conaiuon of sate that we will refund the purchase price or replace "aterials proven to be defective ond reported wtihin 60 days of delivery. t:o representative of manufacturer and/or seller has autnonty to alter or extend ^*e conditions. 004680 1 --5M--69CP 10 M5 ACCESSORIES M5.1 JOINT SEALER M5.1.1 DESCRIPTION Joint sealer shall be an aluminum gray vapor barrier sealer such as Benjamin Foster's No. 30-45 or an asphalt base sealer such as Lion Nokorode "Low Temp". M5.1.2 SERVICE Joint sealer shall be used on all butt edges of single layer insulation or outer layer of multi-layer applications. M5.2 GLASS CLOTH M5.2.1 DESCRIPTION Glass cloth shall be 10 x 10 thread count or 10 x 20 thread count asphalt impregnated glass cloth. M5.2.2 SERVICE The 10 x 10 glass cloth is used to reinforce mastic weather barriers. The 10 x 20 thread count cloth is used to reinforce mastic vapor barriers in cold service. M5.3 WIRE NETTING M5.3.1 DESCRIPTION Wire netting shall be 1" HEX pattern, 20 gauge monel, 316 stainless steel, or galvanized poultry netting depending upon environmental conditions. M5.3.2 SERVICE Wire netting is used to reinforce insulating cement when thickness of 1-1/2" or greater is required or when used as reinforcing/hold-down for block or mat insulation on large flat surfaces. SECTION: INSULATION SSSLANESS CHEMICAL COMPANMtTtTI MATERIALS 004681 8/1/77 1 M5.4 BANDS M5.4.1 DESCRIPTION Bands shall be 3/8", 1/2", or 3/4" wide x .020" thick stainless steel with matching double prong seals. M5.4.2 SERVICE M5.4.2.1 Aluminum Jacketing - 3/8" wide bands on 9" centers are used to secure all aluminum jacketing. M5.4.2.2 Pipe Insulation - Bands 1/2" wide are used on 9" centers to secure insulation on pipe greater than 12" in diameter and equipment with a diameter of 36" or less. M5.4.2.3 Vessel Insulation - Bands 3/4" wide are used on 12" centers to secure insulation on equipment or pipe with a diameter greater than 36". M5.5 WIRE M5.5.1 DESCRIPTION Wire shall be 16 gauge stainless steel or galvanized. MS.5.2 SERVICE Wire is used on 9" centers to- secure pipe insulation on lines through 12" diameter. Stainless steel wire is used .at high humidity locations and galvanized wire is used at low humidity locations. M5.S SCREWS M5.6.1 DESCRIPTION Screws shall be No. 8 x 1/2" long cadmium plated or aluminum slotted HEX head or pan head sheet metal screws. MS. 6.2 SERVICE Sheet metal screws shall be used on 6" centers to secure aluminum pipe or equipment jacketing at low humidity locations. On vertical equipment' surfaces at all locations, screws are used at the horizontal laps. 004682 ' iSSCT: CN1 . INSULATION 2323HLAN33 CHEMICAL CO.VIPANYtTtli: MATERIALS j 3/1/77 ! 12 1 M5.7 WELD PINS M5.7.1 DESCRIPTION Weld pins shall be 12 gauge minimum 304 or 316 stainless steel and of sufficient length to project through the insulation being secured for attachment of speed clip. M5.7.2 SERVICE Weld pin spacing is optional depending on service and type of insulation. Project engineer should specify. Generally, spacing should never exceed 2'0" c-c. At edges and projections such as nozzles, spacing should be closer. MS.8 SPEED CLIPS M5.8.1 DESCRIPTION Speed clips shall be push-on type of 30 gauge sheet metal of.either round or square type. They shall be a minimum of 1-1/2" diameter or 1-1/2" square. M5.8.2 SERVICE All weld pins shall be topped with speed clips. If weld pins and speed clips are used in conjunction with wire netting, the weld pin should protrude through the netting with the speed clip on the outside of the netting. M5.9 CHIL-SPRINGS M5.9.1 DESCRIPTION Chil-springs shall be either 4" or 2" long, T-302 stainless steel material with a 600F service temperature. As manufactured by Childers Products Co. or equal. M5.9.2 SERVICE Chil-springs are used in stainless steel securement bands on large diameter equipment to allow for expansion or contraction. One Chil-spring should be used about every 50 feet of strapping if excessive expansion/contraction is expected (i.e., >2" growth). SECTION: INSULATION CHEMICAL COMPANY TITLE: MATERIALS 004683 Oate j ?=: S/1/7T ! 1 V. NO. j [ TABLE 1 -P IP IN G & EQUIPMENT TEMPERATURE RANGE VS THICKNESS CALCIUM S IL IC A T E , CALCIUM SILICATE/FIBERG LASS * F ir s t Number = C alcium S ilic a te T h ickn e ss, 1 s t L a ye r (To be a p p lie d as tw o, I V la y e rs ) Second Number = F ib e rg la s s T h ickn e ss, 2nd Layer * A ll C a lciu m S ilic a t e R e q u ire d in t h is R egion Becau.se In te rfa c e T em peratures E lim in a te F ib e rg la s s O u te r L a ye rs H* to <T\ CO O to CD to O to to o CD J--1 CT> H to M O CD CTv ^ to to H * H-* o t--* *T3 p CH W rr Cn 1 M Z a a CO CO (O CO CO CO Co co <o CO CO CO CO CO CO to to to to to cn O o o O o o O o o o o o o o o o Cn cn cn Cn o cn o CO CO to CO CO CO CO CO CO to to to CO CO to to to co * 21 Cn Cn U1 o o o o o o o o o o o O cn cn u, u, o Cn CO CO CO CO CO CO CO CO (O CO Co to CO CO to CO CO co to cn 2l 25 2i 21 21 21 21 21 cn O H* j-1 H (-* H H H* !- cn o o o o o o o o o cn o KA** vT .JT sif" .r r Or* cn CO CO CO CO CO co co CO co CO CO "CO CO CO CO to CO CO to cn o 21 M 2i 2i M H* 21 H* 21 H* 21 h- 2i--1j 21 M 2i H cn cn o o o o o o o cn o o KATM .jr kT kT Jf- > .jr kT cn CO CO Co CO CO CO to Co CO CO Co CO to CO CO to CO CO co cn J-5 o 2to> 21 h- 2i J~* 21 M 21 J-1 2tol 2i f--1 2i H* 2i H 21 H 2> H* o o o o o o o o cn OH t JT Jr kT kT Jf- Jr- o f: z M CCDD CO CO Co Co . CO CO CO CO CO Co co to to to to CO CO CO to -j 21 21 2i 2> 21 21 21 21 21 21 21 21 2i o <5> o to to to to to to to to to H1 M I-* o o o o o o o r r o TJ cn Ci cn cn cn cn CO CO CO CO CO CO CO CO to to co CO to Co * o o o o o o 2to1 2TOl 2i to 2to1 21 to 2> H* 21 M 2i M o o o o o o cn o kT or* iJf- cn c\ (Ji cn. cn cn cn on cn CO (O CO CO to to CO CO to CO CO ra * - * 4 + * 21 21 2i 21' 2i ' 21 21 o o o o o o o O o o to to H* M H o o o o o T ur ijT* or- cn o a* o cn o cn o cn o cn o cn o a\ o CTi O cn o cn o cn 6 cn cn cn Cn CO 2to1 co Etol CO o CO o to o o CO o cn cn <7> a\ cn cn on cn cn cn cn cn cn cn to CO to to CO h- o o o o o o o o o o o o o o o t2o1 2to1 2(--11 o o o o \_ / Y_ /V /o 1 i `i o 2J O n SI P a t-< 1--1 Q H- o b Vc cr h(3 C H* 3 ^3 3 <a rn c~* CD CD H* OJ H* H- H* Cl H* H* 03 H- H- o a- o o p pp ft fl* rt (S If (0 Q 004684 If TABLE 2 -P IP IN G & EQUIPMENT TEMPERATURE RANGE VS THICKNESS MINERAL WOOL F la t 4.0 4.0 4.5 6.0 6.0 WGlOOJCtO^tOcnN4J.foOal)--*Ct^--'4Il--^13t--OlCHJ X)C14-0J^J^-, (31 z o c1n3 (3i 1 M zo 4* 4*1 4* 4* 4* 4*. 4*1 4*i CO CO CO CO CO co to to JO to o o o o o o o o o cn cn cn cn o o o o o o c4no 4* 4* 4* 4- 4* 4* 4*. 4- 4- 4* Co CO CO CO CO to JO to o O o o o o o o O O o cn cn o o o o o o cOn o 4* 4*1 4- 4- 4*- 4*. 4* 4* 4- 4- 4- CO CO CO CO JO to O O o o o o o o O o O O O cn cn o o o o 131 (31 o 4* 4* 4- 4- 4* 4- 4*1 4!i 4- 4*1 4* 4- 4*i 4- co CO CO JO co o o o o o o o o O o o O o O cn cn o cn cn Cl o o 4* 4- 4*1 * 4^> 41- 4- 4- 4- 4* 4* 4- 4- 4- 4- co CO co to o o o o o p o o O O o O o O O cn o o cn o (31 ( oo Cl 4* 4*1 4- 4- 4*> 4- 4- 4** 4* 4- 4- 4- 4*i 4*i 4- co CO to -J o o o o o o o o o O o O O O o O O o o Cn o o cn 4*1 4* 4*1 4^ 4* 4* 4* 4*1 4- 4- 4* 4. 4- 4- 4* 4*i CO CO co ^1 o o o o o o o o o O O o o O O O o cn o o (31 o Cl o 4- 4- 4*1 4*1 4*i 4*1 4*1 4* 4- 4*> 4* 4- 4- 4*i 4- 4*1 co CO CO o o o o o o o O O o o O o o O o cn cn o 0O3 O G1 o o Cl Cl CJl cn cn cn cn cn cn cn Cl cn cn 4> 4*1 4*i co CO o o o o o o o o o o o o cn o O o o cn cn (OO0 cn cn G\ Cl Cl cn Cl cn Cl Cl cn Cl cn Cl cn cn 4- 4- > co o o o o o o o o o o o o o o cn o O O o cn O o o / 004685 8/1/77 V rt UoJoUcJotOotO^orOatO>to--'h^-*'Hto'Ho-'Ct-*Dc^ 4s co to H* M O cn -cJn t^ Z oZ cn t--1 H1 t--* M H M t-i M M H* i--* iiiitiii j1 VQ Ln Cl cn cn U1 cn Cn cn cn cn in Cn Io to to H* M t--1 M H M M M H* o o cn cn cn cn in cn cn cn cn Cn cn cn i ii iI M Oo u> cn to to to to to to to to to to to to to H* i_t H* 1 cn cn cn cn Cn cn cn cn cn o o o o cn cn cn cn 1 <- j|,Uo1 4s CO CO CO CO Co CO CO CO CO CO CO to to to to to to o o o o O o o o O o o o cn cn o o o o to o o P IP IN G R EQUIPMENT - TEMPERATURE RANGE VS THICKNESS - HOT SERVICE FOAMGLAS 5 5 4s Co CO CO CO CO CO CO to CO CO CO CO CO CO to to to i-1 i; cwn o in o o o o o o o o o o o o o cn cn o O Cn |o 4a 4s 4s 4a 4S 4s CO CO CO CO CO CO CO CO CO CO to to to to CO o o o o O o cn cn cn cn o c o o o o cn cn cn cn o 4s to to4s 4a 4S 4a 4> 4a -4a 4a 4s to CO CO CO CO CO to to Ccno o o o o o o o o o o cn cn o o Q o cn cn cn Cn o 4a * o 4s O 4s o 4S o 4s o 4a o 4a O s o 4a o 4a O 4a 4s oo 4s O JS o CO cn CO cn Co o CO o to cn to cn . 4a oo 4s 4a 4a 41* 4a 4a 4s 4S> 4a 4a 4s 4s 4a 4s 4s CO CO to CO to c4na cn o O o o O o o O' O o O o O o cn o o o Cn o c \ 4s 4a. 4s 4* 4s. 4a 4a 4s *S 4S 4a 4s 4a 4a to CO CO CO cn o o o o o o O o o o o o o O o O O cn o o o o G\ 4s 4a 4a 4s. 4a 4* -4a 4s. 4s 4a 4* 4s . 4a 4s CO CO CO Oj |cn cn o in cn cn cn o o O o O o O o o C O cn cn o O jo 4G\ o o o O' o O' O O' o 4s Ui *s cn -4s *4a Cn 4a Cn 4s m 4a cn 4a O .is o 4a c 4a o 4S O CO In CO c OJ o (O' o O O ' o <y\ o cr. (TV o O' c\ cn O' O' 4a 4s 4a 4a 4s CO CO CO Ocn' o o o o o o o o o o o o o o o o o cn cn cn o O' o o O' cn O' O' O' O' O' O' O' O' 4s 4s . 4a 4a 4s CO CO CO o o o o o o o o o o o Cn cn cn O c cn cn cn S3 ilo O' O' O' O' cn O' O' cn O' O' cn cn 4a 4a CO CO ' o o o o o c o o o o o o o o o o o O cn cn j O 004686Cv o O' O' c\ C7\ cn C3> cr O' O' O' c\ <n O' cn 4s 4s 4a CO ilo o o o o o o o o o o o o o o o cn o o O cn O S/1/77 -P IP IN G S EQUIPMENT TEMPERATURE RANGE VS THICKNESS FIBERGLASS h*-3> O LooJcUojrOc7K3>tjOi.No3cJa--'cI5--' '^i--1-Nt--1 JoI--' a3crv*.oJto(-'i-<o MZ3 rr Ln cn I nS to Cn M H H-* M M <- i i i i i i i i i i OT Cn cn Cn Cn cn cn cn cn CoO to H* H1 t--* M H H H H t--1 l--4 i i i i 1 1 1 o. cn cn cn cn cn Cn cn cn cn cn cn cn cn o. to to to to to to to to to I--1 H H t-- !-* i , 1 1 M Cn cn cn o o o o o o cn cn cn in cn cn cn UO1 to cn to to to to CO co CO CO to to to to to H* M i--1 M cn cn cn Cn cn Cn cn cn cn cn o o o cn cn cn cn 1 1 OOW H3 OH to to to to to to to to CO to CO to to to to co t-i H* H* I-1 tLon Mcn Cn cn cn cn cn cn cn cn Cn cn cn cn cn cn Cn o cn cn .cn cn o cn rs o to to to to to to to CO to to to co to co to to to to M (jj cn cn cn cn cn cn cn cn cn cn cn cn cn Cn cn cn o o cn cn o o ro to to to to to to to to to to to to to to CO to to M M Uu1i cn cn cn cn Cn cn cn cn cn cn cn cn cn cn cn cn o o cn cn o to ro to to to ro CO to to to to to to to to to to to to to cn cn Cn cn cn cn cn cn cn cn cn cn Cn cn cn cn o o o o o o to to to to to to to to to to to co to to to to to to to to cn cn cn cn cn cn Cn cn cn cn cn cn cn cn cn cn o o o o U1 o 004687 8/1/77 Page 17 D is c o u n t f o r C elanese B u lk O rd e r, % Alum inum C o ve rin g O ver A ll In s u la tio n Type 13 S3 S3 3 D pp P O P- O' rt rt P o CD CD rt CD 3 o * p PI o 2; n 7* O O 0} rt p- CD p p- o Ml P- CD p H* Ml 3 P p O' < 3 p p tr nj O CD P O Cl CD P o p 13 CD PP c Cl H aw* >1 KP P tfl O 01 Pp O' O' P p ** rt rr rt Pp 01 CD o P p e* O HD a 01 a p- a 01 P p a \ t`p P Q 13 P o 3 o 01 o 3 O P- a. 3 01 PC \ P- CJ P_ P- 3, O 3 .. 3 vQ 3 3 MO P `C P .3 O' d O' O O' tr P O' vQ 3 01 o h P ** o p P P p 01 p O p P p n p <ri> 01 p a CD CD p G CD CD o p \ M 3F rt p o \D ,__. f F 01 F vQ F P F 13 o p ffp p oG p P p- P P p < o P p rr \ 01 p < *< 3 *< CD *< CD *< <: 01 P- >< rt 3 p CD vQ CD CD P CD CD O p p P PP FP V V CD V P p; V Pp V 3 W 01 tcdn P n o VO 45. W F 4^ CD W P P CO cY> p P vj p H* -vl O o < o O Ul pp o rt rt p p- p- H- P* P 33 3 3 3 p- o 3 OP3 01 01 01 to Cl 33 3 3 3 PP PP P PP P P P rt rt rr rt rt p- P- p- p p- oo O o O 33 33 3 Pi O P tPr o rr rt rt rf rt p 3* 3* P- p- Cl O w S' 33 P CD 3* 3" rr p- p p- O <1 a S' S' X 33 3 PPo s p <0+ 01 01 CO 01 01 p 01 01 01 01 01 ppp01- > CO 01 p < ft *< rt p 01 O p CD rt P p CJ CD rr vQ 3 3 CD S td 3 Q < rh 3* P P Hi CD rr P H* O P 3 O CD H* P f-h (D P 3 cn P O K rr rt 1 a 3 * Ml Cj P P- 3 P cP O * P P- C3 Cl CD 3 1-3 P O G 01 \N p: 13 O' </> c? to ah3 VO CiO vo H 133 > > 3P<< 01 P P CD 3OPP P PP P 01 vQ vQ rf 3 CD CD CD P & Mi > > P3 01 Cl 3 3 3 CD 3 3 p PP tD t=3 P P P3 O CD prt <C P- 3* rr 3 G m P Oj p- 33 p p- O C 3 r+ CD CD rf rt P P O t-3 3 a CD o p- 3 CD rt *o < P P P rt Tf W oi oi > a3 oWo 3 O f3--} O o o H *p-3i i>f 0 to 3 13 CO K a cn CO Ha PI 3 to t3-1 01 ! t 1 I I ! J 4 1 1 I I I s a c*5 *N)WtOK)!OM}-OW*tO 03 ^ O ^ O ^ * O C D *to W HN) HfO (cjc>\ * *o O U ^0 H O^ v ] cCfn OO * J~* CN O CO H* cn cn CO oo O 5^ oo 8/1/77 Page 18 004688 -P IP IN G & EQUIPMENT TEMPERATURE RANGE VS THICKNESS -C O L D SERVICE CELLULAR GLASS NOTES: (1) M inim um T h ic k n e s s f o r P ip in g , V e s s e ls and E q u ip m e n t f o r D e s ig n C o n d itio n s : 9 0 F A m b ie n t T e m p e ra tu re , 80% R e la t iv e H u m id ity , 7 -9 BTU P e r H o u r, P e r Sq. F t . , H eat G ain (2) P e rs o n n e l P ro te c tio n - Use +70F to 0F Column T h ic k n e s s e s , * *R e q u ire d When S u rfa c e T e m p e ra tu re B elow 20F OJ > cn tr tr H* (0 o 3 < <i M H* (0 o H* M M H* O0 Ji) k <n o ft* o HO crQo 3 (T 3 cn K (fl 0 (M 1--1 to cn td to Xi 31 c (TV H- rt O *0 O =3 fi> 3 M rt 3 ct* H * WOW1T t1OMO1HHf>1HHOOJ:O=Vi:vU: OV * 03 M m N1> or MI= tMdd O32 td m cn >3 Hf tNd cn C5fd0 o>td cn >d tT h id O O*1 i3d td H Cn > cn v-3 td o> >w3 3 ts it* td td o td % H 3 tad wK M td o >-3 H 3tn 3 td > cn -3 <X> id o XH td H**dd td cHn N td > 3a a cHn 3 Q vtn3 Cd CO CO OT OT cocococototototo CO M = = = =ororor = = ozr 4* O v-3 -4 o oO *d cn cn 0T = O(TTv 0(TTv 03 -o = OT CD 03 kr or t--1 M 0OT O= or or or s or or ..t = CO - CO o3r (JvcncnCniN^^^ U) U) = = or = or or = = Jsr* -- -jocnovuiuiit.* = = or = or = or or ^ = co o3r oCrOC-Do-Or -k-ltToVr O-C.Ca--nUorl o3r = V=OoOrOoCrO~o4r-O=GoVr(ToVr(TV- cn " tv*3'1 cin v-3 t-i* Oo O *3o d M H cn OOO O M*roj td lI McOon 1O-3 MMOo td *d Otio VO-3 Hcin* Oo Vo-* td trj actdn H o 3 vCJ3-d3J td HC550 ad otd O a mcn d > afd 3KtHd v-3 tIo v-3 t1o cn O o Oo 1--o1 td tq tH--*1 (M- or = Ho vorov= oorffolroovr ioer eor kcTn3* cn3 c1o v-3 t1o o O cn OO MO td td t--1 M tO to HHHVOOJOIOOV M= OorO= = o=r = =wT= o = cn o3r ii ctcodoon vO-3 ftCO--doo1 I--* I--1 or or 004689 oM" Mor Mor Mor Io--r*1--=*1--=*1--=1 (_I f-I o o 3 OO O td 33 v-3 cn 5tOr3 >v-3 m Q/l/1 Pace r~* o CO CD ca Cn 4 co o cn -r cn s: CD SI a X! ft o F- ft H- F Q o ft o F> F F 3 K ft F- CO C ro Di ro ft Oi O ft 3 33 Ia s* CO cn rt F- P- cn X3 CO 1 s: z 03 o F- 1 0 o o cn C n F1 3 1 !- rr f rt ft 13 H* F- cn Ci Ui rr o 0 ft 3 XJ z \ H- rr F F F- XJ C-l ftJ3 W i o G 03 3 3* o ro O o ri (n ft : G Oi F 3 F ft* 0 1 F G 1 to 03 ft ft1 ft *< F- X* i i 3< ft XI F >= O F- X* 3 " d co cQ ft X ft \ F CO rt K> -- X) C> OF X* 3 o <: FH- 3 3* cQ F* ft o 1 ft \ F- z -r* 3* ft Cd g F H Hi G O & ftO to 3 O to F H F- co 1 ft O3 3 r F* F X rt o 3 3 fO F- ft 3 rt ft o ui rt 3 M (0 CO XI f- *a 3 -3 o o f; F- O ft \ ft g = cn ft rr o a 3 rt XJ G ft r+ 3* ui .ro cQ CO 3 rt z li F ft CD F ft a ft F o o * a ft K F G f; X* ft F (D' tjJ ft ft F* 3 3 o g tO o CJ Oi F Oi ft <r rt G F CO U) o 3 ft li O u3 F- O KJ ft ft XJ ft f = co 3* O OO ft d F M O Oi o F* < CO o oF 3 G GG F oo F3 C0 ft 'i* ft o ft F O* *F IS) U) t-S* F* ft F to G <5 8 ft ft CO ft < ft O F F H* CO to O 3 ft a ft Oi rt ft ft 3 rt 3 to F 3F- *< a s *< i> A rt cn Oi F 3* O li N F- 3 o F 3 ft o ft O ft O ft F- F Oi rr F rt 73 rt 3 > 3* ft F ft ft 2 F ft ft 3_!. O ft 3* FF- 3 O 3* CO F 3 X* i* ft tf-t* ft w rt CO F* CD F 3 1 CO ft F ft F- F- F CO F F- F- o\ F 3O 3 O XI rt <_!. O 3 I CO 3 ;f CO ft ft a 3 F \ o rffett d rt X w ft to F- F 3 Oi ft F- n> 3 nF O ft F3 X> F cn 3O 3* < ft F wF *3 F* cn F- F F 0 li ft o O F ro rt O ri ft a F CO Oi ft 3 G ft TO CO rt ft F O 3 ft F F ft F Hi. d cn O. O. oO F CO ft rt 3 S F 0i ft 0 to F X ft < rt ft ft F tO Si G *< 3 3 X 'S* ft to 38 1 3 TO F Fo CO o F- ft 1 :a* 3 < O Jd rt O O F ro ft ft rt 1 k; 3* 3 F \ ft rt 3 3* tr* ft fO 01 n F- F Cn ft Oi F 3* ft oF O o :f TO ft O FF gF TO f .3 Ci Ox >1 oF .O =G XJ F- F* TO ftC xj XJ o ft F- 3 ft ft. Oi O o . to rt d 3 s Fft 3 <o d d XJ rt 3 d O jd. F 3 3* O FF 3* D* ft ft ft O O ft Oi i ft F F* ft O ) ft TO f; rt ft F tr >i Qj O ft rr X3 3 to =8= F F 3* TO F TO 3* O rt ft *3 rt ft CO F F- aco O O f- ft x*ft O F ft >G F rt co Hi CO TO G 3 ft ft O O ft F F F* 3 ft ft F< 3 3F ft TO F4 ft O ft F O3 F3 CO \ ft Oi F TO O TO O TO G . O;i F 3 ft 3 ft F* F 3 - O 0 < ft o TO 3 F- O O3 F F TO rt d G ft XJ 3 ft F- O 3 TO > 2 2 H to Jd 3 H to Jd H > tr* G co cn ui XI > O M 0 cn F 3 ft 3 3ft to CO c ft to G F 01 rr C ft O ft rt xj co F- F CftO ft CO <ft-3 O 3 0* o 3 F- Xf3t O ft oO 3 X ft 3 Be rt S3 F- ro F *< CO a O re 3F 3* ft F 3 0 X* ft rt ft =85 F I XJ *' # *0 O M (O 3F- F ft 3 ft ft CO F CO <13 F- O cr F- F* F< rr 3 ft 0 CO 3 F cn ft F- F- 3 rt ft O F *o F ro ro *0 ro < O Hi o F 3 7? ft rr ft Ga F ft rot CO F TO f; *3 < Ui h- 30 F ft > TO TO H K XJ CO ro Ftr- F* og F- ro e3 F o FF Gi M~ Cj oF as O ft co *< F- Oi ft rr O F F1 3 O F* XI d d ft F- TO F 0 3- ft ft F 01 \> sr F F- F3 O 3* f; CO co t3 dO C b* < 3 d ft 4 F3 ft a ro F* n F 3O CO XJ 3 F* F 3 3 ft < X 3 F- ft 3 'O F ft ft F SJ, . H* Oi a> . s F* 3 ft F ft F 0 F- 3 ft F >3 *< XJ ft CD X) F Fft XJ 3 ft X* ft 1 3 to cn ft o 3 FO 3 ft F * Jd F* G FOi cn 3 ro CD rt 0 *3 XJ F F- ft XJ 3 ft XJ F- XJ CD 1 F Ow O ro 3a 3 F* to O ro 3 < ft ro F F ft O Oi F 1 - Ui ft G g ro 3 3 Jf--t 1 3 Ui ft ft G ift CO 3 ft 3 li ft F *3 >0 I- F- ft XJ ft ft to I F o cn oo X* O rr F- o 3ft F* o F cftn G 3ft 3 rr ft F F to F cn -J ko 1 1-3 ro o ro ro H* o o3 o co UI ui F cn. M C2O o3 rr rr o a o j 3O o 3. rr co 3 0 F 3O O O 1? CO- 3 H- cn F Mh 'to to Oo F3 ft H* oo +O aO o o :d oX oo .. 3 rr Oi C/l o oo OO >0 c to Jd X f0 > z O , to z FI s G JO G FI to z t-3 cn ^0 O JO t3 X 3 Cro3 FI 0ro as C3 1 f Hz cn G H Oz *3 O JO xj H XJ C3 FzI cn 1 2 C3 Z 3 cn a to !0 G FC xj S* to 3> 004690 8/1/77 T> F(*YA lO-i IN S U LA TIN G MATERIALS SUMMARY El SCOPE E2 ITEMS INSULATED E3 PURPOSE E3.1 HOT SERVICE E3.1.1 GENERAL E3.1.2 ENERGY CONSERVATION E3.1.3 TEMPERATURE CONTROL E3.1.4 PERSONNEL PROTECTION E3.2 COLD SERVICE E4 GENERAL E4.1 OTHER SURFACES INSULATED E4.2 SURFACE PREPARATION E4.3 INSULATION SUPPORT E4.4 PIPING SUPPORTS E4.5 TRACED LINES E4.6 ALUMINUM WEATHER BARRIER E4.7 MASTIC WEATHER BARRIER E4.8 SURFACES EXPOSED TO FOOT TRAFFIC E5 DATA FORMS E5.1 HOT INSULATION DATA FORM E5.1.1 INSULATION MATERIAL E5.1.1.1 Piping & 36" Diameter & Smaller Equipment E5.1.1.2 Equipment Greater Than 36" Diameter E5.1.1.3 Bent Piping and Tubing ' E5.1.1.4 Irregular Surfaces CSaELANESE CHEMICAL COMPANY SECTION: TITLE: - INSULATION ENGINEERS GUIDE 004691 U/A 8/1/7* Siv. No. ?=c 20 E5.1.2 WEATHER BARRIER MATERIALS E5.1.2.1 Straight Run Piping and 36" Diameter and Smaller Equipment E5.1.2.2 Elbows E5.1.2.3 Vessel and Exchanger Shells E5.1.2.4 Irregular Surfaces and Equipment Heads E5.1.3 INSULATION SECUREMENT E5.1.3.1 Piping Through 12" Diameter E5.1.3.2 Piping Greater Than 12" Diameter and Equipment 36" Diameter and Less E5.1.3.3 Equipment Greater Than 36" Diameter E5.1.3.4 Equipment With Large Flat Surfaces E5.1.4 ALUMINUM JACKET SECUREMENT E5.1.4.1 Piping and 36" Diameter & Smaller Equipment E5.1.4.2 Equipment Greater Than 36" Diameter E5.1.5 REINFORCEMENT E5.1.5.1 Glass Cloth E5.1.5.2 Wire Netting E5.1.6 SPECIALTIES E5.2 COLD INSULATION DATA FORM E5.2.1' INSULATION MATERIAL E5.2.1.1 Piping E5.2.1.2 Equipment E5.2.1.3 Bent-Pipe and Tubing E5.2.1.4 Irregular Surfaces E5.2.2 WEATHER BARRIER MATERIALS SECT 1 ON: INSULATION '&lsaELANE3E CHEMICAL COMPANY TITLE: ENGINEERS GUIDE 1- o 004692 8/1/77 Ssv. No. Rage 21 El SCOPE This section describes the guidelines to be considered by the engineer in designing and selecting insulation. E2 ITEMS INSULATED Pipelines, instruments and equipment to be insulated are defined on the mechanical flow sheets and/or piping drawings. E3 PURPOSE E3.1' HOT SERVICE E3.1.1 GENERAL Hot service insulation serves four purposes; energy conservation, temperature control, personnel protection, and condensation prevention. The temperature used to determine the need for insulation or insulation thicknes is the normal operating fluid temperature. One exception to this is when piping or equipment has internal, insulation or refractory lining, the temperatur that determines insulation thickness is the metal temperature. Care should be taken when insulating refractory lined equipment that metal temperatures remain within acceptable limits. E3.1.2 ENERGY CONSERVATION Operating temperatures for which insulation is justified for energy conservation are indicated in the thickness tables in the Materials Section. E3.1.3 TEMPERATURE CONTROL In some cases piping or equipment which otherwise would not require insulation will require insulation for close process temperature control. E3.1.4 PERSONNEL PROTECTION Operating temperatures above 140F justify Protective insulation. Insulate piping or equipment to a height of 7 ft. above the operating level, or wherever there exists the probability of human contact. Metals such as copper and aluminum should receive personnel protective insulation above 120F. Thickness for personnel protection should be determined from the tables. SECTION: INSULATION sfeSELANESS CHEMICAL COMPANY TITLE: ENGINEERS GUIDE - 1 IJ 1't- 004693 8/1/77 Rev No, ?ac 22 E3.2 COLD SERVICE Cold service insulation serves two main purposes; to minimize heat gain, and to prevent condensation on the cold surface. All components in cold service insulation systems shall be insulated. E4 GENERAL E4.1 OTHER SURFACES INSULATED In general, because of energy conservation benefits, the following hot surfaces should be insulated: *Valves *Flanges Control Valve Bodies Expansion Joints Apparatus Nozzles Equipment nameplates and steam traps should not be covered with insulation unless extraordinary conditions so dictate. If possible the above surfaces should be insulated with the same type and thickness insulation as the adjacent connecting pipe or equipment. Good engineering judgement should be used in selecting the form and method of application of insulation to these surfaces (i.e. custom fitted block insulation, cement, preformed enclosures, loose insulations, etc.). E4.2 SURFACE PREPARATION The pipe, instruments or equipment to be insulated shall be cleaned of all oil, water and other foreign matter before insulation is installed. Insulated carbon steel surfaces operating under 200F shall have a protective coating on the steel in accordance with Celanese Paint Specification #1, revised. E4.3 INSULATION SUPPORT Insulation on vertical pipe 3" and larger diameter shall be supported near the bottom of the run if required. Additional supports will be used at intervals dependent upon the insulation materials being used. A spacing of 15' between supports is generally adequate. Insulation on vertical vessels shall have insulation supports or the stiffening rings may be used to provide the, supports. Insulation support spacing on large diameter equipment is covered in the fabricated equipment specifications; 004694 ` *See Tables S-I and S-II in Supplement Section for insulation guidelines. SECT 1 ON: INSULATION ELAN ESS CHEMICAL COMPANY TiTLE: ENGINEERS GUIDE "5Tfi---------8/1/77 V. MO. E4.4 PIPING SUPPORTS A minimum clearance of 1" should be maintained between the pipe supporting member and the insulation- This may be achieved by shoe height or notching of insulation. E4.5 TRACED LINES Pipe requiring steam or water tracing should be insulated. Provisions shall be made to allow room for the tracer tubing such as using insulation one size larger than line size. E4.6 ALUMINUM WEATHER BARRIER See Table 8 for coverage. E4.7 MASTIC WEATHER BARRIER Individual requirements should be calculated. E4.8 SURFACES EXPOSED TO FOOT TRAFFIC When insulating surfaces subject to foot traffic, a hard material (such as Kaylo) should be used or the surface protected by special walking areas. E5 DATA FORMS Data forms for the specification of specific materials to be used for the design, purchase and application of an insulation system are as follows: DF-1 Heat Insulation Data Form DF-2 Cold Insulation Data Form To expedite filling out the data forms, numbers appear on the forms that correspond to the following paragraphs. f SECTION: ^SELANESE CHEMICAL COMPANY TlTLI: INSULATION ENGINEERS GUIDE 004695 Oat c 8/1/77 rtY. 'iO. ?2.C 2*: E5.1 HOT INSULATION DATA FORM E5.1.1 INSULATION MATERIAL The selection of an insulation material for a particular application must take into consideration such factors as operating temperature, temperature limits of the materials, availability of material, cost, required thickness, and maximum allowable surface temperature and- heat-loss. The materials listed below . for a given service are those normally used by the Chemical Company. See the Materials Section, M2.1.1, M2..2.1, M2.3.1, M2.4.1, M2.5.1, M2.6.1, and M2.7.1 for description, service, and thickness for these materials. If other materials are used for temperature other than those shown in Tables 1-4, a Thickness Table must be included. E5.1.1.1 Piping & 36" Diameter & Smaller Equipment Carbon steel piping and equipment is insulated with fiberglass material, see. M2.4.2, for operating temperatures up to 450F. Above 450F either calcium silicate, see M2.1.2; mineral wool insulation, see M2.2.2; or Kaowool, see M2.8; is used. The upper temperature limit varies with the different materials and for operating temperatures above these limits other special high temperature materials may be required. Alloy piping and equipment is also insulated with fiberglass material, see M2..4.2, for operating temperatures up to 450F. Between 450F and 1000F cellular glass, see M2.3.2; calcium silicate, see M2.1.2; or mineral wool, see M2.2.2; is used. Above 1000F material must be specified to meet the requirements of temperature and vet not contribute to the initiation of stress corrosion cracking (see M2.2.2 and M2.8). E5.1.1.2 Equipment Greater Than 36" Diameter - Large diameter equipment is generally insulated with cellular glass, see M2.3.2, for operating temperatures up to 800F. Above 800F material must be specified to meet the requirements of the application, see 5.1.1. For temperatures between 90 and 450F fiberglass may.be used. SECT I ON: INSULATION vaSaELANESE CHEMICAL COMPANYfTITLE: ENGINEERS GUIDE 004696 -atc i-ace 8/1/77 25 .`.C. 1 I E5.1.1.3 Bent Piping and Tubing - Bent piping and tubing up to 2" IPS is insulated with foamed plastic insulation, see M2.7.2, for operating temperatui up to 180F. Above 180F use asbestos tape, see M2.6.2. E5.1.1.4 Irregular Surfaces - Irregular surfaces are insulated with insulating cement, see M2.5.2. For surfaces operating above 1000F thickness . must be specified- E5.1.2 WEATHER BARRIER MATERIALS Weather barriers used are aluminum, see M4.1.1, and mastic, see M4.2.1. The material used varies with the component insulated, environment, type of insulation, labor and material costs, and plant preference. For type "E" specify the brand or type of mastic. Type "F" is used for specials such as plastic, stainless, etc. E5.1.2.1 Straight'Run Piping and 36" Diameterand Smaller Equipment - All locations use aluminum jacketing, see M4.1.2; material cost and plant preference dictates the choice of smooth or corrugated type. Coastal locations use jackets with moisture barrier over calcium silicate insulation. ) . E5.1.2.2 Elbows - Material and labor cost and plant preference will dictate the choice of mastic, see M4.2.2, or aluminum, see M4.1.2, weather barrier for elbows. E5.1.2.3 Vessel and Exchanger Shells - The weather barrier used on vessel and exchanger shells is either mastic, see M4.2.2, or aluminum, see M4.1.2. E5.1.2.4 Irregular Surfaces and Equipment Heads Mastic is used on irregular surfaces where aluminum jacketing is impractical, see M4.2.2. / LANE SECTION; CHEMICAL COMPANY TITLE: INSULATION ENGINEERS GUIDE 004697 8/1/77 Siv. No. 2e E5.1.3 -INSULATION SECUREMENT The insulation is secured by using galvanized or stainless steel tie wire, see M5.5.1, or stainless steel bands, see M5.4.1. E5.1.3.1 Piping Through 12" Diameter - Coastal locations use stainless steel wire and non-coastal locations use galvanized wire, see M5.5.2. E5.1.3.2 Piping Greater Than 12" Diameter and Equipment 36" Diameter and Less - For large diameter pipe and small diameter equipment use 1/2" wide bands, see M5.4.2.2. E5.1.3.3 Equipment Greater Than 36" Diameter - For large diameter equipment use 3/4" wide bands, see M5.4.2`. 3, and Chil-springs, see M5.9, if required. E5.1.3.4 Equipment With Large Flat Surfaces - For all large flat or nearly flat surfaces such as tops of large diameter tanks that do not lend themselves to banding, a system of weld pins, speed clips and wire netting should be employed for securing the insulation to the surface being insulated. For weld pin spacing see M5.7.2. E5.1.4 ALUMINUM JACKET SECUREMENT Aluminum jacket material is secured by the use of stainless steel bands, see M5.4.1, and/or sheet metal screws, see M5.6.1. Aluminum screws may be preferred at coastal locations. Choice of HEX head or pan head depends on tool used by insulators. E5.1.4.1 Piping and 36" Diameter & Smaller Equipment For securing jacket material on piping and small diameter equipment 3/8" wide.bands, see M5.4.2.1, or sheet metal screv/s, see M5.6.2, are used depending on material and labor costs, and plant preference at a particular location. E5.1.4.2 Equipment Greater Than 36" Diameter - For securing jacket material on large diameter equipment 3/8" wide bands, see M5.4.2.1, or sheet metal screws, see M5.6.2, are used depending on material and labor costs, and plant preference at a particular location. Horizontal and vertical laps on vertical equipment at all plants are secured with screws. SECT! CN: LAN ESS CHEMICAL COMPANY TITLE: INSULATION ENGINEERS GUIDE nrufipa Cat8/1/77 n7 NO, ?CS 27 E5.1.5 REINFORCEMENT Glass cloth reinforcement, see M5.2.1, is required for mastic weather barrier. Wire netting reinforce ment, see M5.3.1, is required for thick applications of insulating cement or to act. as reinforcing/hold-down on block or mat type insulation on large flat surfaces. E5.1.5.1 Glass Cloth - Specify the type and weave of glass cloth to be used, see M5.2.2. E5.1.5.2 Wire Netting - Specify the material, see M5.3.1, depending on availability and cost. E5.1.6 SPECIALTIES This space is used to specify special materials, items to be insulated, thickness tables or brand names desired to complete theInsulation Data Form. E5.2 COLD INSULATION DATA FORM E5.2.1 INSULATION MATERIAL The selection of an insulation material for particular application must take into consideration such factors as operating temperature, temperature limits of the materials, availability of materials, cost, required thickness, minimum allowable surface temperature, and maximum heat gain. The two materials normally used by the Chemical Company are cellular glass, see M2.3.1 and M3.1.1, and foamed plastic, see M2.7.1. Foamed plastic is mainly used on bent pipe and tubing but may be used for any application where compressive strength is not required. If other materials are used or if the above materials are used for operating temperatures other than those shown in Table 6, a thickness table must be included. iff SECT 1 ON: INSULATION 23 ELAN ESS CHEMICAL COMPANYVrTITLE: ENGINEERS GUIDE 004699 8/1/77 ScV. Mo. ?a< 21 E5.2.1.1 Piping - Cellular glass is used to insulate pipe and small diameter equipment, see M2.3.2 and M3.1.2. E5.2.1.2 Equipment - Cellular glass is used to insulate equipment, see 112.3.2 and M3.1.2. E5.2.1.3 Bent Pipe and Tubing - Foamed plastic is used to insulate bent pipe and tubing, see M2.7.2. E5.2.1.4 Irregular Surfaces - Cellular glass is used to box in and insulate irregular surfaces, see M2.3.2 and M3.1.2. E5.2.2 WEATHER BARRIER MATERIALS Weather barriers used are aluminum, see M4.1.1, and mastic, see M4.2.1. The material used varies with the component insulated environment, labor and material costs, and plant preference. For type "C" specify the brand or type of mastic to be used. Type "D" is used for specials such as plastic, stainless', etc. SECTION: 'fea SIAN ESS CHEMICAL COMPANY TITLE: INSULATION ENGINEERS GUIDE 004700 L/A i s. 3/1/77 .TV. NC. 29 a- -- u> to <3 ap ox- o to !-> 3 ct H- 3 H- 2 & n CO H- o ip a 3 3 rti 1 Cd n O1 CD CD 0 1 3 iP si 2 r2o 2 w p c3 O Q (3 d r+ H 3 O rt 3 P- (0 t-* rr cr 3 < P o tn 0 Hi Q H iQ Hi rroo < H H) O rt P }--4 3 t-i H F 2 :a O 0 F* a C*4 c F* 3 Coz Hi O' F 3 > Ct Mro rt O' o 3 rror Qoi <O O< o H- Ci OHO 3 10 Htt t-i W* *0 p *b 3 o *0 <3 tr va V- Hto* (3 --' Hro* to (3 * X X X t-i rTol CO f t-i cn sM H* CO 13 OJ OJ F* X3 il tn K ro h- ii H- Ol ) o cn < F* o o o ro - t-i M to e* > o atoi Ho to *Tl oro CO O 0 rt to 2 2 rt 13 O (3 (3 a Hi o 43 iQ o *a C C Hi H Cl < p H- H` t-i D 0ro tfl p o 3 3to C H- & p. 3 n M M Pi F* p p D* H- H 3O frot H1 VP p p. (3 4a *0 ro Hroi 13 F- 03 z ti iroi 13 (3 XO I-1 rOt o oO Hi l-t 3 CO C H* P ft CD a 10 H- o 3 tCo\ w O to CD to cn 4toa to o co tO-j' i-* CO G1 to O to to t--1 i t--* \ to Co H CD 13 \ 4a 2H M NW B13 F* CD 03 CD 4 cn cn cn 4* CO CO to to F* f--* j-i o CO 4 ro CO cn CO CO CD cn CO CO 4 M CD cn 4^. to o tn cn CD F* 0^ ca t--1 co CD to to cn cn Cn F cn VD F* VO vo m 4 m <n cn cn 4* CO OJ to to (- F H M CO cn o cn VD 4 to cn o CO to 01 o 4^ M 03 cn cn 4a CO CO cn o CO vo CO o VO H 4^ o o 00 cn cn vo cn F (- I t-> \to t-1 H VO vo Cl 03 4 cn Cn cn on 4^ CO CO to to to to F F G\ VO CO 4 to o cn vO OJ o cn CO CO F f--1 00 <n to H cn 03 M CD H 4a CO vo CO vo to to CO cn cn 4 vo to F* o VD vO 03 4 Cl cn cn cn 4a 4a 0J OJ to to to to to VO to <n o cn 0J 4 to cn CJ 00 to cn o 4 tfct I-1 H o o Co cn o cn VD 4 Cl 03 F o o to Co 00 vn on I F* \ to t-* to o VD VD 03 4 cn cn cn cn 4a 0J OJ OJ to to to to i--1 VD OJ 4 01 o cn vo 01 o cn C3 CO o 4 4 03 CO Fi vn CD 4a 03 H cn VD OJ VD ro o to to 0J 00 OJ F f--* F* to o O vo VO 4 4 cn m cn cn 4a CO 00 to CO to to 4^ 4 to cn o VO CJ 4 to VD 0J CD to cn OJ o o 4 4 4 cn o CO cn 0J cn VD OJ 03 H* o to o o OJ OJ CO 1 F4 \ to FJ H* H* to l-i O VD VD. 00 4 4 cn cn Cn vn CO 0J Co OJ OJ OJ C3 O 4a VD Co N) d o cn to Cl o cn CD cn to co o o CO cn 03 cn H* &> 03 F> OJ cn VD 0J VD o to to o o F* H F OJ H M o vo 03 00 4 Cl cn cn Cn 4a oo OJ oo 0J CO cn O VD 4 to 01 o 4 to OJ o cn to 03 CD Cl o\ to to cn CD F* 03 *>> 03 VD OJ 03 vo 00 4a VD VO o o Cn CO to F H* o vo 03 CD -4 -4 <J1 cn vn cn 4a 4^ 4a 4a 4a CD H Cl O OJ 'O to cn CO 4 to cn o 03 cn Cn to to CD 03 to cn 03 cn CO H 4a cn VO Co cn VO M OJ CO 4a c\ MFF to to M f--1 vo VO 00 03 4 "4 Ol cn Cn cn cn cn 4a 4a 4a. 4 H* cn o VD CO -4 to vo CO 4 to cn CO o o CD 03 cn cn oo CO cn M cn 03 M OJ 01 VO CO cn 00 VO vO _ M H* M t-< M M H1 cn OJ to to l--1 o vo vO 03 00 -4 -4 cn cn cn Cn cn Cn Cn o CO O M cn Cs. VO CO -4 cn VD CO >4 to vo cn G1 Co OJ to to cn 03 to 03 M cn 03 o CO cn VO CO cn cn CO 03 CD > tr* M 2a Hs 2 cn a <3 o> 13 H o t-3 M 22 v3 O K H CO o 3* 2 ra OCO m m n 13 wM 2 o cUn tKs CD e> cn o F f-* M M f--* H cn Co CO to to M O vo vO vo 03 *4 *4 Cl cn cn Cl cn cn cn 03 CO -4 t-- o 4a vo OJ o cn vo OJ 'J cn to to vo vO vo 03 to cn 00 cn CD M cn cn o 0J Cl vo M OJ OJ CD FH M M t--1 }--' H-* cn 4^ CO CO to M M o vo vo VO 03 4 -4 *4 Cl Cl Cl 01 F J5* CD CO 4 o 4a vo cn O cn vO OJ O 4 *4 cn cn cn vn 03 to cn to cn 03 M 0J cn o OJ Cl 03 VD vo t-* H* t--1 o -* H t-* S--' M t--* 1-* H* o\ Cn 4a. OJ CO to H1 H* o O vO vo 03 -4 4 -4 4 4 4 4 o 4^ CD oo M cn o to cn o cn VO cn OJ OJ O o to to cn CD to CD to cn CO o OJ cn o CO Cl o CD CD 004701 M M 8/1/77 Page 30 I "5-1.1 INSULATION MESIAL FIFING AND 36"DIAMETER AND SMALLER EQUIPMENT CARSON STEEL 451F to F to to 4*>0 * j ... u**i> .... EQUIFMENT GREATEFi THAN 36" DIAMETER To 800F 451? to F to ALLOY to 450 F, Op 9 01 8oiF 0 E5.I.I.3 SENT PIPS AI.'D TUBING TO l20F above l80F 25.1.1,4 IRREGULAR SURFACES 5*1.2 WEATHER BARRIER MATERIALS US 2D SHALL 22 ONE 0? TH2 FOLLOWING TYPES: Type A -.016" thick alunir.ua -with 3/16" corrugationsand without noisture barrier Type E -.016" thick aluminum with 3/16" corrugations and withnoisture barrier Type C -.020" thick aluainua smooth without moisture barrier Type D - .020" thick aluminum smooth with noisture barrier Type 2 - mastic with glass cloth reinforcenent Type P - E5.1.2.1 STRAIGHT RUN PIPING AND C.S. to 450P type Alloy to 450F type 36'S)IAM2TER AND SMALLER EQUIPMENT , 451? to type > , 45lcF' to . __ type 3 F to F to F type F type 25.1.2.2 2LEOWS C.S. to 450F typo Alloy to 450F type , 4S1F to , 451? to type typo 9 . F to 9 . F to F type F type 25.1.2.3 VESSEL AND EXCHANGER SHELLS Horizontal type____________ Vertical type 25.1.2.4 IRREGULAR' SURFACES AND EQUIPMENT HEADS TYPE )s5. lO- INSOLATION SECUREMENT : 5.1.3.1 PIPING THROUGH 12 "DIAMETER, ;WIRE TIES. 25.I.3.2 PIPING GREATER THAN 12 "DIAMETER AND EQUIPMENT 24" DIAMETER AND LESS, 5" WIDE BANDS. 25.1.3.3 EQUIPMENT GREATER THAN 35nDIAMETER 3/4" WIDE BANDS 25.1.3-^ EQUIPMENT WITH LARGE FLAT SURFACES - WELO PINS, SPEED CLIPS 25.1.4 ALUMINUM JACKET SECUREMENT 25.1.4.1 PIPING AND 36"DIAMETER AND SMALLER EQUIPMENT 25.1.4.2 S2D.IFMENT GREATER THAN 36"DIAMETER_____________ 25.I.5 HEINFCRCEMENT E5.1.5.I .GLASS CL0TH_ ! 25.I.5.2 WIRE NETTING 25.1.6 SPECIALTIES I I I j *Vendor to Specify (p) SECTION* INSULATION 3E-LANSSE CHEMICAL CQMBAWY 004702 - [DATE 8/1/77 E.5.^1 ii'sulaiicn material --r*^r io. * ^ ix PIPING, _________________ 5.2.:..2 ECUIK1ENT, _____________ 15.2.1.3 BENT PI?H AMD TUBING 25.2.1.4 IRREGULAR SURFACES 25.2.2 V.2ATH2R BARRIER MATERIALS USED SHALL BE ONE OF THE FOLLOWING TYPES: Type A - .016" Thick aluntnun with 3/I0'' corrugations without coisture barrier Type B - .020" thick aluninun snooth without aoisture barrier Type C - rcastic with glass cloth reinforcement. Type D -_____________________ 2S.2.2.1 STRAIGHT RUN PIPING AND 36"aNB SMALLER EQUIPMENT TYPE 2.2 25.2.2.3 VESSEL AND EXCHANGER SHELLS Horizontal type _____________ Vertical type 22.2.2.4 IRREGULAR SURFACES AND EQUIPMENT HEADS TYPE 25.1.3 INSULATION SECUR2MEN? E5.I.3.I PIPING THROUGH 12"DIAMETER 'WIRE TIES 25.1 .3.2 PIPING GREATER THAN 12"DIAMSTSR, AND EQUIPMENT 24" DIAMETER AiMD LESS, WIDE BANDS 25-1 -30 EQUIPMENT GREATER THAN 36"DIAMSTER, 3/4" WIDE BANDS. Ep.1.3.4 EQUIPMENT WITH LARGE FLAT SURFACES - WELD PINS, SPEED CLIPS E5.1.4 ALUMINUM JACKET SECUR2K2NT Sp.l .4.1 PIPING AND 36" DIAMETER AND SMALLER EQUIPMENT E5.1 .4.2 EQUIPMENT GREATER THAN 36"DIAMETER 25-1 .5 GLASS CLOTH REINFORCEMENT _____________ jLp.1 b SPECIALTIES *Vendor to Specify 004703 .3SELANESE CHEMICAL COMPANY SECTION INSULATION T1TI ET * S\ l r\ I UOI M A."T JAM r> ^ ~r* A r- r-\ * . DATE 8/1/77 on/ Mr. A1 SCOPE A2 GENERAL ( A2.1 TIMING A2.2 SURFACE PREPARATION A2.3 DRY INSULATION A2.4 PIPING SUPPORTS A2.4.1 HOT SERVICE A2.4.2 COLD SERVICE A3 APPLICATION PROCEDURE - HOT SERVICE A3.1 STRAIGHT PIPE A3.1.1 INSULATION A3.1.1.1 Placement A3.1.1.2 Joint Sealer A3.1.1.3 Exposed Ends ' A3.1.1.4 Securement A3.1.2 ALUMINUM WEATHER BARRIER A3.1.2.1 Application A3.1.2.2 Securement A3.1.3 MASTIC WEATHER BARRIER A3.2 ELBOWS A3.2.1 INSULATION A3.2.2 INSULATING CEMENT A3.2.3 WEATHER BARRIER 004704 ivffi) SECTION: i '-iSSjELANES H CHEMICAL COMPANY TITLE: INSULATION APPLICATION Oats | 8/1/77 j = V. *SO. A3.3 FLANGES, FLANGED FITTINGS, AND VALVES A3.4 EQUIPMENT ' A3.4.1 SHELL INSULATION A3.4.1.1 Placement A3.4.1.2 Joint Sealer A3.4.1.3 Securement A3.4.1.4 Cork-Filled Mastic A3.4.1.5 Weather Barrier A3.5 IRREGULAR SURFACES A3.5.1 INSULATION A3.5.2 WEATHER BARRIER A4 APPLICATION PROCEDURE - COLD SERVICE A4.1 PIPING, VALVES AND FITTINGS "A4.1.1 PIPING A4.1.2 VAPOR BARRIER MASTIC FINISH PIPING & EQUIPMENT A4.1.3 ALUMINUM JACKETING A4.1.3.1 Piping A4.1.3.2 Equipment and Vessels A4.1.4 CONTRACTION/EXPANSION JOINTS A4.1.5 FITTINGS, VALVES AND FLANGES A4.1.5.1 Fittings A4.1.5.2 Valves A4.1.5.3 Flanges HLA.NSSE I SECTION: tTtleT- INSULATION APPLICATION 004705 8/1/77 l ?.V. '.C. J i ! A4.2 EQUIPMENT A4.2.1 EQUIPMENT AND VESSELS A4.3 PERSONNEL PROTECTION A4.4 COLD INSULATION DRAWINGS 004706 SECT I CM: INSULATION i ELANESH CHEMICAL COMPANY TiTLE: APPLICATION JA 7t | 8/1/77 r, V . 35 Al SCOPE This section describes the field application of the thermal insulation described in the materials requirements section. A2 GENERAL : A2.1 TIMING Insulation shall not be applied to any flanged, machined, or welded surfaces- until they have passed all field tests, including hydrostatic and have been released for insulation by the field engineer. A2.2 SURFACE PREPARATION The pipe, instruments or equipment to be insulated shall be cleaned of all oil, water and other foreign matter before insulation is installed. Insulated carbon steel surfaces operating under 200F shall have a protective coating on the steel in accordance with Celanese Paint Specification #1, revised. A2.3 DRY INSULATION All insulation shall be protected from moisture before and during application. If applied insulation should get wet before it is jacketed, it shall be thoroughly dried by heating the line or by other means before it is' sealed with weatherproofing. Insulation showing signs of deterioration after drying should be replaced. " A2.4 PIPING SUPPORTS A2.4.1 HOT SERVICE A minimum clearance of 1" should be maintained between the pipe supporting member and the insulation. This may be achieved by shoe height or notching of insulation. A2.4.2 COLD SERVICE Low-temperature piping below 32F shall be supported on outside of insulated surfaces if possible, with metal cradle to provide for adequate support and distribution of weight. Cradle shall be secured with at least two insulation bands looped about cradle and insulation. When pipe is suspended with hangers attached directly to the pipe, the hanger shall be insulated the same as the adjoining pipe. Insulation shall extend up the hanger for a distance of four times the specified thickness. 004707 SECTION: *^3SIANESS CHEMICAL COMPANY TITLE: - INSULATION APPLICATION 8/1/77 V. .'.-0. ?=. 3? A3 APPLICATION PROCEDURE - HOT SERVICE A3.1 STRAIGHT PIPE A3.1.1 INSULATION A3.1.1.1 Placement - Pipe insulation shall be applied with tightly butted end joints in a staggered position. Additional layers, where specified, shall be applied in the same manner as the first layer, with- side and end joints staggered over joints of preceding layer so that no two joints coincide, except where they cross at right angles. A3.1.1.2 joint Sealer - All butt edges and ends of the outer layer of insulation shall be buttered with joint sealer before application. The joints shall be drawn together when the insulation is applied so that only a very thin, vapor-tight coat separates the sections of insulation. A3.1.1.3 Exposed Ends - Exposed ends are to be beveled and covered with aluminum pipe bevels and flashed with high temperature sealer or they may be weatherproofed with fiberglass cloth and mastic. A3.1.1.4 Securement - Secure the insulation with tie wire or bands depending upon the pipe diameter. A3.1.2 ALUMINUM WEATHER BARRIER A3.1.2.1 Application - Aluminum jacketing shall be applied with longitudinal and circumferential joints lapped 2" minimum. Joints .shall be positioned to shed water and be away from prevailing wind. \ A3.1.2.2 Securement - Jacketing shall be secured with bands, see M5.4.2, or screws, see M5.6.2. t7 SECT! CM: INSULATION ^S3EIAiN3S CHEMICAL CGMPANYTTtlH APPLICATION 004708 | 11 8/1/77 ,nV* NC ?aca 37 A3'. 1.3 MASTIC WEATHER BARRIER Outer surface of insulation shall receive an adhesive coat of mastic. While still tacky, reinforcing glass cloth shall be stretched taut and thoroughly embedded in the coating, care being exercised that the weave is not stretched and that the cloth is overlapping approximately 1-1/2". Before the surface becomes dry to touch, a second coating shall be applied and allowed to dry. Total dry thickness of coating shall be a minimum of 1/8". Cloth shall not be visible on the finished surface. This same application also applies to a weld pin, speed clip and wire netting system. A3.2 ELBOWS A3.2.1 INSULATION If preformed elbows are not used, fabricate elbow cover from mitered segments of pipe covering secured with wire ties. A3.2.2 INSULATING CEMENT When mastic weather barrier is specified, insulating cement is used over fiberglass, calcium silicate, or mineral wool insulation to give the surface a smooth finish and to fill all cracks and voids. y A3.2.3 WEATHER BARRIER- Aluminum or mastic weather barrier shall be applied in accordance with paragraphs A3.1.2 and A3.1.3. A3.3 FLANGES, FLANGED FITTINGS AND VALVES Flanges and valves should be insulated with the same type and thickness insulation as adjoining piping where possible, but should not exceed the thickness of adjacent piping. See Tables S-I and S-II in Supplement Section for insulation guidelines. A3.4 EQUIPMENT A3.4.1 SHELL INSULATION <5` :ctscn 1ANE3H CHEMICAL COMPANY! i Tl: INSULATION APPLICATION 004709 j Sate j ?=c :------------ 8/1/77 j 38 A3.4.1.1 Placement - Equipment with diameters 36" and below shall be insulated as pipe. Insulation shall be applied to shell using standard ) broken joint method, starting with alternate full and half length lags. Application of lags shall start at one end, proceeding circumferentially and then axially. Each lag shall be tightly butted against adjacent lags. Where multi-layer application is required, all joints shall be staggered over joints of the preceding layer. A3.4.1.2 Joint Sealer - Joint sealer shall be applied to insulation in accordance with paragraph A3.1.1.2. A3.4.1.3 Securement - Secure the insulation or with weld pins and speed clips. if required should be used one for of banding. with bands Chil-spring: every 50 feel A3.4.1.4 Weather Barrier - Aluminum or mastic weather .barrier shall be applied in accordance with paragraphs A3.1.2 and A3.1.3. A3.5 IRREGULAR SURFACES A3.5.1 INSULATION ! Irregular surfaces in hot service shall be. insulated with insulating cement. Insulating cement 'shall be applied with a trowel on the surface to be insulated, filling all depressions for entire depth to eliminate voids of any nature. Careshall be exercised that' the thickness of each application will be no greater than that which will set on vertical surfaces without excess!' cracking upon drying. When sufficiently dry.,.additional applications, may be made as required to build cement to -full specified thickness. Where specified thickness of cement insulation exceeds.1-1/2", cement shall be reinforced with one layer of wire netting for each additional 1-1/2", or a part thereof, uniformly . embedded midway between metal and finished surface. A3.5.2 WEATHER BARRIER Mastic weather barrier shall be applied in accordance with paragraph A3.1.3. 004710 A4 APPLICATION PROCEDURE - COLD SERVICE A4.1 PIPING, VALVES AND FITTINGS A4.1.1 PIPING Pipe insulation shall be applied using the staggered joint method. Insulation over two inches thick shall be applied in layers. The bare surface of all layers shall receive a coating of Hydrocal B-ll or equal sufficient to fill the surface cells and permitted time to dry before being applied to the pipe. All butt edges, ends and the surface of all chips and fill pieces shall be pulled together leaving a complete but very thin vapor seal coating separating the sections of insulation. Insulation shall be free of voids and all joints shall be tightly butted. Each layer of insulation shall be secured in place with 1/2-inch wide x 0.020-inch thick stainless steel or monel metal (quarter hard) bands on 9-inch centers. Care must be taken to avoid cracking the foamglass insulation when applying the metal bands. A vapor barrier as described in section 4.1.2 shall be applied at this time. After application of vapor barrier the insulation shall be covered with a metal jacket as described in section 4.1.3. Vertical lines shall be provided with welded or bolted insulation support rings not more than 24 feet apart. Hangers or supports shall be on the outside of the insulation and shall not be in contact with the pipe. Curved metal cradles shall be used between the support and the insulation jacket. Cradles shall be secured with two circumferential bands. In the event hangers are fastened directly to the pipe, the hanger shall also be insulated a distance outward equal to four times the insulation thickness. Shield and hanger spacing shall be designed to limit the compressive stress between hanger and insulation . to 33 psig. SECTION: INSULATION %3ELANE3E CHEMICAL COMPANY TITLE: APPLICATION - 004711 Cat- 8/1/77 V. NO. PsLC 40 A4.1.2 VAPOR BARRIER MASTIC FINISH PIPING AND EQUIPMENT Over the installed and sealed foamglass insulation apply a tack coat of Pittcote #300 or approved equal vapor barrier mastic at the rate of 2 gallons per 100 sq. ft. While this coat is still tacky apply a layer of asphalt in pregnated 10 x 20 mesh glass cloth with a minimum of 4" overlap at all joints. The glass fabric shall be applied smooth without wrinkles or loose ends. After applying glass fabric and before the first tack coat has cured a final coat of vapor barrier mastic Pittcote #300 or approved equal shall be applied at a rate of 4 gallons per 100 sq. ft. There shall be no glass fabric visible through the final coat of vapor barrier mastic. A4.1.3 ALUMINUM JACKETING A4.1.3.1 Piping - Shall be weatherproofed wherever possible with a jacket of 0.016-inch thick 3/16-inch corrugated sheet copper-free aluminum with a factory attached moisture barrier as manufactured by Childers Products Company. The aluminum jacketing shall be secured to the pipe with 304 stainless steel bands 1/2-inch wide x 0.020-inch thick located externally over the aluminum jacketing on 9-inch centers. Each individual jacket shall be applied with a 3-inch minimum lap at all joints and arranged' to shed water. On horizontal pipe the jacketing shall have an overlap originating from the top of pipe and terminating on the side. All longitudinal and vertical joints shall be away from the prevailing wind. A4.1.3.2 Equipment and Vessels - Horizontal vessels shall be jacketed with 0.016-inch thick flat aluminum sheets with a factory applied moisture barrier. Vertical vessels shall be jacketed with 0.020-inch thick 1-1/4 inch corrugated aluminum sheets with a factory applied moisture barrier. Jacketing on both vertical and horizontal vessels shall be lapped at least 3 inches and secured in place with 3/4-inch wide x 0.020-inch thick bands placed on 12-inch centers. On vertical vessels figure S clips shall be used at each circumferential lap for additional support. On horizontal vessels or equipment the jacketing shall have an overlap originating at the top and terminating on the side. All longitudinal and vertical joints shall be away from the prevailing wind. All joints shall be arranged to shed water. SECTION CHEMICAL COMPANYTITLE: INSULATION APPLICATION 8/1/77 S'V, MC. ace 41 004712 A4.1.4 CONTRACTION/EXPANSION JOINTS On Vertical Lines - The insulation shall be supported by support rings at 12-foot intervals. A one-inch contraction joint as detailed in Drawing No. 34-11 shall be provided below each support ring. On Horizontal Lines - A 1/2-inch minimum contraction joint as detailed in Drawing No. 34-9 shall be provided every 10 feet. On either vertical or horizontal expansion/contraction joints, Pittseal No. 3 or equal sealer shall be used between each layer of foamglass insulation to provide a slip plane. Mechanical expansion joints shall be insulated as detailed in Drawing No. 34-13. A4.1.5 FITTINGS, VALVES AND FLANGES A4.1.5.1 Fittings - Where possible to insulate "fittings with preformed fabricated insulation segments the same procedures as specified for cold piping shall be followed. Fitting insulation shall be sized to match the adjacent piping insulation and shall provide a step-type juncture with the straight run piping insulatioj All field fabricated segments of foamglass insulation shall be adhered with hot asphalt through the entire thickness of the insulation. The hot asphalt shall be held at the lowest workable temperature to assure a complete through seal. A vapor barrier as described in section 4.1.2 shall be applied to all fittings. In those instances where installatio: of preformed aluminum covering is not possible or practical the insulation shall have a vapor seal applied as described in section 4.1.2. A4.1.5.2 Valves - Shall be insulated as shown in Drawing No. 34-10. Wherever possible the valve insulat will be covered with a metal jacket as describe' in section 4.1.3. The insulation shall be held to the valve body by 1/2-inch x .020-inch thick bands wherever possible. A4.1.5.3 Flanges - Shall be insulated as shown on Drawing No. 34-11. SECTION: ELANE3E CHEMICAL COMPANY TITLE: - INSULATION APPLICATION 004713 0a7Z 8/1/77 KV. Mo. A4.2 EQUIPMENT A4.2.1 Equipment and Vessels - Insulation shall be applied and secured to the shell in the same manner as described for cold piping in section 4.1.1. After the insulation has been secured in place a mastic vapor barrier as described in section 4.1.2 shall be applied. After application of the vapor barrier has been completed the insulation shall be weatherproofed with aluminum jacket as described in section 4.1.3. Chil-springs - Chil-springs (see MS.9) shall be used one for each 50 feet of banding where specified on large diameter equipment to allow for expansion/contraction. Support Rings - Support rings shall be 1-1/2" x 3/16" carbon steel. Attach one ring 3" below bottom head tangent line and at 18-ft. intervals. On carbon steel equipment that operates above 150F and on all corrosion resistant equipment, support rings shall be tack welded to shell (3" tack on 12" alternate centers).. On carbon steel equipment that operates below 150F, the ring shall be seal welded- to the shell. Reference should be made to the fabricated equipment section for further information. Stiffening Rings - When required, may be used as insulation support rings. Seam Interference - Miscellaneous support rings and stiffening rings shall not be located coincident with circumferential seams. Insulation support rings shall be not more than 18 feet apart. A 1/2-inch expansion joint packed with resilient glass blanket material shall be provided under each support ring. Insulation for Vessel Heads - Shall be applied same manner as described in section 4.1.1 for cold piping, using factory shaped discs head segments or standard flat block' trimmed in the field to fit. Each layer of insulation shall be held in place with 3/4-inch wide x 0.020-inch thick type .304 stainless steel or monel metal (quarter hard) bands on a maximum of 12-inch centers. Head insulation shall be additionally secured with Nelson studs or equal 1/4-inch O.D. x 7/8-inch long with a 1/4-inch hole located 5/16 of an inch from the end of the stud. These studs shall be spaced on 12-inch centers around the head. After the insulation has been secured a vapor barrier as described in section 4.1.2 shall be- applied. After the application of the vapor barrier has been completed a weatherproofed metal jacket as described in section 4.1.3 shall be applied. ' StCTI ON: IELANE3S CHEMICAL COMPANY T!TLI: INSULATION APPLICATION 004714 1,1 i1 l 5.-------- 1 ! 8/1/77 j rtiV * *0 l l 43 Contraction joints shall be provided on vessels in the manner as described for cold piping. Where nozzles, structural steel supports and other connections extend outward from the shell of a vessel or exchanger they shall be insulated as shown on Drawing No. 34-6. Insulation shall be extended outward along the projecting item, a minimum distance of four times the insulation thickness beyond the outer surface of the insulation on the shell. All vessel supports or saddles shall be insulated as shown on Drawing No. 34-5 with the same thickness as the vessel shell and the insulation shall be carried down the member four times the insulation thickness, but in no case less than 12 inches. Cold insulation will be required on bottom heads of vertical vessels. Vessel skirts shall be insulated inside and outside a minimum distance of one foot as shown on Drawing No. 34-7. Insulation for vessel manholes shall be as shown on Drawing No. 34-4. A4-.3 PERSONNEL PROTECTION In order to reduce frostbite (freeze burn) hazards for operating personnel, exposed low temperature piping and equipment operating below 20F shall be either insulated or shielded by .expanded metal rigidly supported by spacers, if the surfaces are within a distance of seven feet above finished grade or adjacent to an elevated platform. Insulation thickness and type shall be as specified in Table 6, +70F to 0F column. m SECTION: SsilaELANESS CHEMICAL COMPANY TITLE: - INSULATION APPLICATION 004715 Cats 8/1/77 'Hi'/, Mo. . Fac 44 A4,, 4 COLD INSULATION DRAWINGS 34-1 34-2 34-3 34-4 34-5 34-6 .34-7 34-8 34-9 34-10 34-11 34-12 34-13 Cold Pipe Hanger Insulation Cold Pipe Anchor Insulation Cold Vertical Equipment Insulation Cold Vessel Insulation Removable Manhole Cover Cold Horizontal Equipment Insulation Cradle Cold Equipment Structural Steel Support Cold Equipment Skirt and Bottom Insulation Cold Insulation Pipe Hangers and Supports Cold Insulation Horizontal Contraction Joints Cold Valve Insulation Cold Piping Insulation Support and Flange Cover Miscellaneous Cold Insulation Details Cold Insulation of Mechanical Expansion Joints APPLICATION 004716 Cat:Paga 8/1/77 45* .I /A/SULAT/Ofl/ i i -Af/cj/o/? s//oe -AA/CA/ae /^AATc a j j 004718 '*S33LANESS CHEMICAL. COMI'AH'f Ct-EAft UXC A AA SAa*4 oo* - &2Z-A? P/P APCPOP /A/SULAT/OA/ OQ. A**. OATC OATl JCAlf i CJAWINO >to: *1 j 3^-2 3 ....1 004719 ^22ELANESH chemicau company CLEAR LAKE ^UNT * * Cmwu c* *urii iniwuim ocrr EVEP " !//rT/CAL Etpi//f*MEA/7~ /A/Si/IAT/Ofi/ Dft. OAT* SCAlt | OlAVflHO HQ. 5 ( _-J ol/eee laves ss/srs coats# W/77L EO/L/T 3SALE? SEA'S/ ESSIE /353LAT/OAJ 6/EEL CEAOLE EESE EES EE COL/CEErS ///rtf J&LSr SEALES EEEEEE . AESL/EAT/OA/ Or /A/SELAT/OA/ 004721 vessel - \ * -rr1*-`-trviYmrUiif trfTtr m riM 'nrtit* TYPICAL SADDLE SUPPORT SEE DWG. NO. 54-8A FOPv CONSTRUCTION DETAILS 004724 JELANESE ch EMICAL COMPANY Ct_CAM UAKC M-AHT iminumin* C0> /A/SMLdT/OM-PA ASAA/GPPS ^SA/PP&Pr-Z Oft. OATS SCAU OftAWINO HO 3^-3 OATt aVi * Q t*- VoQ j i5 uO. ut St u* g ?. s 2I- Iin iu ?5 V- 0 j. ft ^O Q/ o*Z*tcl.` o u4>) a 1 1 \ a. s- 1| I r4 ft *0 H < 1 tstr*i > '*> f *rWrltd* Vn IS'K wrf) * < 010 V m ^Si k5 i|<3l5i V~ o 2 -J < O' z zu oo 2? . <O0i"0 Otf 3tf fSc~w 5r2\ 0jJ1 2* U .VOUow9i f u I V Q<u i 3 it 8 UJ 2 UJ J --JjfcJ QJu<; *?hj-uaJ>i uK <cUIh*Jn59-. O j<J 3 <! "S J o <h# J, EUi Gy<?$j Ifijf 0<^_t <J5f Ooil 3q sia Ut *<0 t"JJialwwj> ,,f-%tl 0 J Q N (- o, ^ 5^ - < iV*s** *vu ce i- 5'lU}< 'H < <0 feCwO 5 -- cc \s t< a 5H < a *v fs s 'csci "*IV ** *"`.4 ,-viivv^^ > vs `f?|V> Mr -N: fif oo ^ r $ Ih tya* 1 \S W K V) Vis l\3 v3 vs n|n .S-1R. 5.Mf4 *%v Jv? Hi M fcj 'i eg Ui Ho is g S]s!si 3B *dt A*0aj.x^ Ngt so v\ j# * sSl 'mt)l'>5'* s a;s SsVjiiS? R I> 5tS; i=ow3 Hfc-'S&' ij luS%>> Irj h ;^r -itj r-w w <<'.! i^X> UJ Q <^rs tl-Jw^ `T(-i'?iS Vw* t n*r- "in N. ,V> Vj vi o 2 Q NOMINAL INSULATION THICKNESS J-' * O a a In in :xu?> v> i <Q ^ i1r<^s /ivi:^itiotto ~'^--:?, !t1 5* . CJ sf UJ _1 f t- `^8 * W < la VinC *UK\ flioa-!4Vll| o. h Q 'sV |14 'lil^ <$ <0 Sj 5kj4? & s8fss *' Cg: T ^ * <CM*? ton 5^* [WSd O < cc CJ t- -s5J <S "^0 5it3 s Sl V V is '`ifn: \i If sr*fl* 1 ft- SS fj 54 ws? a? *s5 V Vwi G N|?5 41^ e-i^l 3: is Cl *oK w 51 jn m ^1 & *- Ui V* it 5 iR is 6s> <* a a 1 ftdstj TH'*- ini 'A \S siV =t'IiCi*Q *o ir- V? Veg k5sSv? fifjf w 7g ^'fia z o I--I < --I 3 in j- 'i is uk* >fc5 w|J s < VmS bi^ SBil5>xv5 a t+ma* la'mjirt 9111 <5 Si Ss VjjVi to cW O Vi fr" n<4i -!a n v f- -tol'wi^sjjia < c, Wltfi Vy Vfi* > a a ^(MJ^!rrsJ^NwsHWS\l sti\aJV^Oi^V.JV n? To9- bsc*i e* >. <v S.tiS H* sj.:53 h '*;i tplffcSR -CO to -CSO* V % t5f eg a <s^i Vj^ftcrjosj vcui.<a5; jccali- 1 v ?r CQ =5ri Yf fi? Uj H SjJiSl&iooiVta ssm St H5 0 is *4sr*sp < ^! cj! Si Csi co > xi-1 lA k N > 00 %*0 u* 5c* w Jlj ^ G >ssiijli-srSiiiV'i*i;M <miW}i"sH| 1II V, h- 5lS^iSSpW*-3M 1 i <i m *JS1 -- '-*! V* IV: ^ "Vjvo g <M V a? s a VIO 3QISJLnO -1 %i i as: i ! 1 1 i! i -a a Vtg 3t X*>* $5 *>n a 1= j < 1 J ! * aa v 00 \J a <tn4 aa s L-LENGTH |0 K> < 1 1 * jI*s; *i^t a `a `t > * a 5> H-' . 11 liiS i.-u1ip**o -irssi jw'csvj a 0 O a a <g \CuM a `a aa^ CO ^ a V . a J QSiftii HI * Cl) k<v Slv. sis: isjls: =tnjlt ^ ;i|t>-3 0 XU (1Csl i.o f^t )iVSS1I1r-I o g a 3 g a etjg. M<t i-a <g**> i %4* 004725 DOL/L LAy AhJSULAT/OAA 004726 IELANESE CLXA* UAfCC PLAKT chemical company # Cd : COLA? AA/SAJLAT/OA/ A0/Z. roA/r/AAcr/o/A so///rs Oft. IOATC SCALC | DftAWIHC trO. 5PHJT1 wuranvenruv '/j?T/CM F/F YAFOF 3AFF/SF NST^L 3A//3S VFFF/CAL F/F/Z/S /A/SSLATYOA/ AYSTAl 3AA/3 /.'/SOLAT-'O/V SZ/FFOF FIATS FAC/F AY/TF LA?3Sc /AYSC/L A T/OA/ A/STA/ 2JS/D 004728 rnnw'iuivn.i. tLC3-arra,>i* I tMVSCS-^ LOW TMPG?A7VZ SURFACE A/AA/Oa.'? EO.n VAPOR SARR/ER /A/SUIAT/OAJ SH2L 0 0 <"> /. i-_;. V" r C ;x ! r ! /to r * 5 ------------------------- ----* * ' MW.' X /' 45 \ .f u&zy f/utr MAS/AC r^i *2. >? Q th............................. r) OI fRCUND CSPAAPRS r ^i 1 minimum 4 tamps WASUiAT/OAA V/ZXAAcSS. pW 1 t--^r==rL=3 \p/ajsulat:o:. P/PE _J 1 aaoj/-~~/VrAirFwOy/v? PArA~:<p\ /\-p//p-,p\ L UGS AMO 3UPPOPPS P/PE MAMGEPS GAGE GLASS 004729 ixv 'SsSSElANES: chemical c o hra w r C-*A* IJMCS AY/SC. COLO /MSOLAT/OA/ OP/"ALLSO J A>*. OAT* | OAT I S.CAI.T SAl*IHa f MUM/NUM JACAJT SPAZL fit Joc/y^yyycjy j P4/VS/0/V -cOA/TP^cT~/oyy /AJT 004730 .>3 ^^ftvsELAN ESg CHEMICAL COMPANY Ct-CAW LAKE fl-AKT________________________ ao* r/Zy}A/S CAZ. /O SZ Coz/rPAcryo/y Jo/a/t_________ QAn//-/y-7o | 5CAU j a*A^ ^ Valve /ASSULAT/o/v /Required SIZE * 3 4" 0* 6 8 to" 4?" 14" /&" t8" ?o` RAT/aIG /ao** /so (50 & /So ^ /50** /so /SO# /so# /So# /so# 6 2V' 2&* 2`/2 2% 2^2 sV 2'/i 2'/? 2'/z 2`/2 A/PS 8" /o" n" /4" !3" ZO" 22 24" 26" 26" L /8" /s" 22" 24" 23" Z8" 2 8" 26" 3o" SO ttpe FIBERGLASS F/&ERGLA SS Fiber glass Fiberglass Fiberglass FIBERGLASS F/berglass fiberglass FIBERGLASS Fiberglass S" . 4" 6" a" lo" 12" 14" /&" /a" 2o` 300# 300# 3 00# 300# 300# 300# 300# 300# 3oo# 300# 3" 3" 3" 3" 3+i& 3*,h" al/'/z 3+/&' s'-l/'/z" 3+/%" 8" /o" /2"- 13U /8" 22 24" Z3 26-" /8" /6" 24" 24" 23" 28" 33" 33 33" 33" CA L CILIAH S!L ISA TE CALCIUM S/L /CA TE CA L C/UM S/L /CA TE calcium sil/cate CAL. S/L. * F/BER. CAL. SIL. * F/&ER. CAL. S/L. * F/BER. CAL. S/L. * F/BER. CAL. S/L. * FIBER. CAL. S/L. * F/BER. 3" 4" <o" a" io" 12" 14" /<&" /a" zo" <b 'oo# 300# 300 # 6 OO# 300 # 300# 300# 3 00# 300# 3 OO# 3" 3" 3*//z * t. a 3-* /?2 tt .. t* 3*t4z 3* 2 " 3* 2 " 3-* 2 ' 3*2" S*2" a1" /O" /4" /e" 2o" 2Z" 24" ZB 30" 321' 2(" 24" 30" 34 " 33 33" 33 " S3" 5 3" 30" CALCIUM S/L/CATE CALCIUM SILICATE cal s/l:* fuser. CAL. S/L. * F/BER. CAL. S/L. * TIBER. Cal. sil. * Fiber. cal. s/l. * Fiber. CAL. S/L. * FIBER. CAL. SIL, * FIBER. cal S/L. -/Fiber. JACKET S/ZE 33 iuo.k'c 4&" 66" 60" 34" 72" 93" 90" 93" 102" /OS - 43" 66" 34" 73" 88" 104 " /08" //4" 120* /ZB" 48 '* 55" 73" 88" 96 " /04*' /08 " /26" 130" 133" 004731 TABLE S-I MINIMUM PROCESS TEMPERATURE FOR WHICH FLANGES MAY BE ECONOMICALLY INSULATED Inches Flanqe Size 3 6 12 3 6 12 3 6, 12 3 6 12 N=1 2 3 6 12 350 350 450 650 750 250 350 350 450 650 250 250 250 450 550 250 350 350 550 550 250 250 350 350 550 250 250 250 350 450 250 250 350 450 450 250 250 250 350 450 250 250 250 250 350 250 250 250 450 450 250 250 250 250 450 250 250 250 250 350 Fuel $/MM BTU 2.00 3.00 4.00 5.00 N=Number of times insulation is removed for maintenance per year. Reference: DLB-392-77, JWF-2006-77, dated June 28, 1977. 004732 I II ENGINEERING & SAFETY \ t II ; , * . i Aluminum jacketing, TFE insulation | effectively protect valves,-piping at Wisconsin chemical plant ji it i i: li! .v.i I; - ir. > . v 34 1 r: > \ n Durable, attractive and easy to maintain RUDY H. WEISS, Chief Mechanic Borden Chemical Co. Sheboygan, Wis. ' * CP STAFF New Solutions to Plant Problems Problem: Adverse winter temperatures require special attention and effort in maintaining insulation and its protective metal jacketing on pipes and storage tanks at Borden Chemical Company's formalde hyde (CHjO) plant in Sheboygan, Wis. All 12 formaldehyde 16,000-gal storage tanks and 90% of all product piping are located outdoors. Likewise, steam and condensate return lines leading from the boiler room building to the formaldehyde plant, resin plant and storege tanks are all exposed to Wisconsin winters. Formaldehyde, which is made from oxi dized methanol, is liquefied for increased handling ease. To prevent the solution from polymerizing, product lines and stor age tanks must be well insulated to main tain a constant product temperature of 62'C. One section of the Borden plant is 13 years old while the other has been in oper ation 11 years. All steam lines, providing service from -15 and 125 psi, have been in sulated with 3 and 2" thick fiberglass, re spectively. Scrubbers and the vaporizing columns are insulated with 2" thick fiber glass insulation protected with aluminum jacketing while storage tanks measuring 10'6" diam and 25' high arc also protected with 2" insulation. All storage tanks and the majority of the piping at the plant has the original fiberglass insulation still in op eration. This fiberglass material covered with corrugated aluminum jacketing has provided an effective insulating medium. The problem has been in the area of valve insulation. Originally, all valves and other control components were insulated with asbestos cement and mastic mem brane and vere not protected with the same aluminum jacketing as the piping. This expensive cement covering has caused maintenance problems due to unsghtly unraveling and cracking. In addi tion, the covering is difficult and timeconsuming to install. Schematic shows 2" stainless steel lino with 2" thick insulation attached to a 2" stainless steel goto valve. The pipe is enclosed in fiberglass and aluminum jacketing. CotrupMai alumimim jacketing of 0.016" thickness also covers the valve Solution: Approximately one year ago, the asbestos cement and membrane cov ering began to he "phased out" at Borden sad was replaced with corrugated alumimni jacketing. Valves and other control devices are l>eing covered with easy-to-install, 0.016" thickness aluminum jacketlag. The jacketing has bends located on each end. The jacketing, which is pur chased in rolls 36" wide by 100 ft. is laid wt and cut to proper size strips bv the in staller. A cutout area in the middle of the peket exists for the valve homict. The prketing slits at the end arc about l" apart and are cut before bending. The ma terial is then prc-rblled by hand around ffar valve. For example, a 2" stainless steel gate salve with 2" piping covered with 2 x 2" jJpc* fiberglass insulation uses a 8 x IV jipe covering to protect the valve. Alumi- jacketing will he banded with A* aluminum strips in four places: near fie valve/pipe connection amt over the ( I < < Shown is a 6" pipe and control valve covered with aluminum jacketing and secured with H" wide aluminum banding. pipe. There is no need for sealing the jack eting at the ends. (See diagram.) Results: The aluminum jacketing over the valves and piping has provided casyto-install insulation that is effective, non discoloring and aesthetic-ally pleasing. In areas where banding of the jacketing was more difficult, pop rivets were used to make the connections between the jacket ing pieces. Excellent durability and easy main tenance have made the corrugated alumi num jacketing on valves a welcome im provement to the Borden plant. Presently, 5% of the valves have been recovered with aluminum jacketing. Even after the harsh winter of 1977, the insulation was per formed with outstanding results. The aluminum jacketing for the calves and piping teas supplied in/ Childers Products Co., I'O Ilox 2222S, Cleveland. Oil H122. Circle 413 opposite last page. Fiberglass Snap an pipe covering is a prodtu7 of CertainTeed Corp.. VO Box &(>(), Val ley Forge. I'A 101S2. Circlo 414 opposite last page. Circle 415 opposite last page. sal transfer. We have a variety of salts ready to do a belter job in your heat transfer system. Better because they have a working range of 350 to 1100F, they're nonflammable, won't foul surfaces, and will hold uniform temperatures. For information, call our nearest office listed below. Or write Dept. CP at the Detroit address. PARK CHEMICAL COMPANY 0074 Military Avonu* * Oolroil. Mich. 48204 (313) 80S-771S Subsidiary: PARK THERMAL LIMITED. 62 Todd Rond. Ui'oroulown, Ontario. Canada (416) 877-S2S4 Philadelphia Area Plant: 735 Birch Slroot. Cornwells Heights. Pa. 111020 (21$) 637-0550. llcinui: CALIf-ORNIA ALLOY CO., Los Angofes. CA 91733 (213) 579-3230 Circle 416 opposite last page. 004735 GCR-65-77, JEW-19-77 APPENDIX.E Uninsulated Steam Valves Page lU During the energy conservation survey, uninsulated steam valves were counted in each of the units. They were grouped into three size categories; 3", 6", 12". The valves were further divided into categories depending upon the steam service: 15 psig, 60 psig, 160 psig, 600 psig. The surface area of the valves was calculated conservatively~to be equal to the area of 2 flanges and a tee. The approximate insulation cost was taken from DLB-392-77 ("Economics of Insulating Valves and Flanges"). The insulation cost on valves is a continuing cost depending on how many times a year the valves have to be torn into for maintenance. The insulation costs listed in Table E-I are the initial costs. Repair/replacement of insulation more than once per year would rule out the insulation of 3" 15 psig steam valves. A more realistic maintenance frequency is probably once every 2 years and this would justify the insulation of 3" 15 psig steam valves. Table E-I contains a summary of uninsulated valves and potential savings in each unit. 004736 OCR-65-77, JEW-19-77 Page 15 Valve Size Process Temp. 12" 60C# Stm at U5O0 F 12" 160$ Stm at 350 F 12" 60# Stm at 300 F 12" 15# Stm at 250 F 6" 60C$ Stm at 450 F 6" 160# Stm at 350 F 6" 6C# Stm at 300 F 6" 15r Stm at 250 F 3" 6<X$ Stm at 450 F 3" 160# Stm at 350 F 3" 6(# Stm at 300 F 3" 15# Stm at 250 F TOTAL TABLE E-I Uninsulated Steam Valves Number of Valves Savings Per Valve, & Insulation Cost Per Valve, $ UTILITIES - Ko UNIT 6 2,610 250 Approximate Insulation Cost, $ Estimated Annual Savings, { i;5ob 15,660 4 1,538 250 1,000 6,152 . 5 i,oo4 256 1,250 5,020 0 599 250 00 8 1,055 14 621 180 180 i,44o 2,520 8,44o 8,694 1 405 180 180 405 0 242 180 00 2 508 150 300 1,016 18 299 150 2,700 5,382 9 195 150 0 117 150 1,350 0 1,755 0 12,240 52,524 004737 gcr-65-77, JEW-19-77 TABLE E-I (Cont'd) Page 16 Valve Size Process Temp. 12" 60Qr Stm at 450o F 12" l60# Stm at 350 F 12" 60# Stm at 300 F 12" 1# Stm at 2500 F 6" 60C# Stm at 450 F 6" l6c# Stm at 350 F 6" 6C# Stm at 300 F 6" 15# Stm at 250 F 3" 600# Stm at 450 F 3" 16q Stm at 350 F 3" 6c# Stm at 300 F 3" 15# Stm . at 25O0 F Number of Valves . Savings Per Valve, $ Insulation Cost Per Valve, $ Approximate Insulation Cost, & UTILITIES - BOILERS 10 2,610 250 2,500 Estimated Annual Savings, l 26,100 . 12 1,538 250 3,(^0 18,456 18 l,oo4 250 4,500 18,072 12 599 250 3,000 7,188 12 1,055 180 2,160 12,660 25 621 180 6 405 180 4,500 1,080 15,525 2,430 10 242 180 1,800 2,420 21 508 150 t 4 299 150 3,150 600 10,668 1,196 4 195 150 600 780 1 117 150 150- 117 TOTAL 27,040 115,612 004738 uw\-oj- ( i , ui^Vi-xy- i ( Valve Size Process Temp. 12" 600jr Stra at 450 F 12" 160# Stm at 350 F 12" . 60# Stm at 300 F 12" V$ Stm at 250 F 6" 600# Stm at 450 F 6" 160# Stm at 350 F 6" 60# Stm at 300 F 6" 1 Stm at 250 F 3" 600# Stm at 450 F 3" 160# Stm at 350 F 3" 6<# Stm at 300 F 3" 15# Stm at 250 F TOTAL TABLE E-I (Cont'd) iage JL7 Number of Valves Savings Per Valve. $ Insulation Cost Per Valve, $ Approximate Insulation Cost, $ AREA I - UTILITIES 9 2,610 250 2,250 Estimated Annual Savings, j 23,490 4 1,538 0 .1,004 250 250 1,000 0 6,152 0 7 599 250. 1,750 4,193 7 1,055 180 16 .621 180 l4 . 405 ' 180 1,260 2,880 2,520 7,385 9,936 5,670 0 242 180 00 19 508 150 2,850 9,652 13 299 150 1,950 3,887 15 195 150 0 117 150 2,250 0 2,925 0 18,710 73,290 004739 GCR-65-77, JEW-19-77 Page 18 TABLE ft-I (Cont'd) Valve Size Process Temp. 12" 12" 12" 12" 6" 6" 6" 6" 3" 3" 3" 3" 60C# Stm at ^50 F l6(# Stm at 350 F 6C# stm at 300 F 15? Stm at 250 F 60C# Stm at 459 F l60# Stm at 350 F 60# Stm at 300 F 1# Stm at 25O0 F 600$ Stm at 450 F .160$ Stm at 350 F 60r Stm at 300 F 15? Stm at 250 F TOTAL Number of Valves 3 Savings Per Valve, $ BuOH 2,6lO Insulation Cost Per Valve, $ Approximate Insulation Cost, $ 250 750 Estimated Annual Savings, : 7,830 4 1,538 6 i,oo4 250 250 1,000 1,500 6,152 6,024 0 599 250 00 9 1,055 30 . 621 180 I80 1,620 5,4oo 9,495 18,630 25 405 180 4,500 '10,125 0 242 180 00 10 508 150 1,500 5,080 15 299 150 2,250 4,485 25 195 150 0 117 150 3,750 0 4,875 0 22,270 '72,696 004740 < ( J 1 (OUU-J.p- TABLE E-I (Cont *d) i-cige Valve Size 12" 12" 12" 12" 6" 6" 6" 6" 3" 3" 3" 3" Process Temp. 600# Stm at 450 F l60# Stm at 350 F 6Q# Stm at 300 F 15# Stm at 250 F 600# Stm at 450 F l6o# Stm at 350 F 60# Stm at 300 F 15# Stm at 250 F 600# Stm at 450 F 16C# Stm at 350 F 60# Stm at 300 F ' 15# Stm at 250 F Number of Valves 5 3 5 3 10 15 15 6 20 7 10 10 Savings Per Valve, $ Insulation Cost Per Valve, $ Approximate Insulation Cost, $ AcH UNIT 2,610 250 1,250 1,538 1,004 250 250 759 1,250 599 250 750 1,055 180 1,800 621 180 2,700 405 180 2,700 242 180 1,080 . 508 150 3,000 299 150 1,050 195 150 1,500 117 150 1,500 Estimated Annual Savings, $ 13,050 4,6l4 5,020' 1,797 10,550 9,315 6,075 1,452 10,160 2,093 1,950 1,170 TOTAL 19,330 67,246 004741 GCR-65-77, JEW-19-77 Page 20 TABLE F.-I (Oont * cl) Valve Size Process Temp. 12" 12" 12" 12" 6" 6" 6" 6" 3" 3" 3" 3" 600# Stm at 450 P l6Q(r Stm at 350 F 6C# Stm at 300 F I'j/f Stm at 250 F 600$ Stm at 450 F l60ir Stm at 350 F 60$ Stm at 300 F 15$ Stm at 25O0 F 60C# Stm at 450o F 160# Stm at 350 F 60# Stm at 300 F 15$ Stm at 25O0 F Number of Valves 2 Savings Per Valve, $ Insulation Cost Per Valve, $ Approximate Insulation Cost, $ . SO UNIT 2,610 250 500 Estimati Annual Savings, 5,220 0 1,538 25O 00 2 1,0'04 250 500 2,008 .0 599 250 00 0 1,055 180 00 10 621 180 1,800 6,210 0 405 180 00 0 242 180 00 5 508 150 750 2,540 5 299 150 750 1,495 0 195 150 60 0 117 150 00 TOTAL 4,300 17,473 004742 GCR-65-77, JEW-19-7? Valve Size Process Temp. 12" 600# Stm at 450 F 12" 16(# Stm at 350 F 12" * 60# Stm at 300 F 12" 15# Stm at 250 F 6" 60C# Stm at 450 F 6" 16C# Stm at 350 F 6" 60$ Stm ' at 300 F 6" 15# Stm at 2500 F 3" 600# Stm at 450 F 3" l6c# Stm at 3 50 F 3" 6(3# Stm at 300 F 3" 15# Stm at 25O0 F TABUS E-I (Cont'd) Page 21 Number of Valves Savings Per Valve, $ VA UNIT 2 2,610 Insulation Cost. Per Valve, $ Approximate Insulation Cost, $ 250 500 Estimated Annual Savings, 5,220 3 1,538 250 '75O k,6lh 5 l,oo4 250 1,250 5,020 3 . 599 6 1,055 250 180 750 1,080 l,797 6,330 20 621 180 3,600 12,420 25 405 180 4,500 10,125 4 242 180 720 968 10 508 150 1,500 5,080 13 299 150 1,950 3,887 11 195 150 1,650 . 2,145 5 117 150 750 585 TOTAL 19,000 58,191 004743 GCR-65--77, JEW-19-77 TABLE F.-I (Cont'd) Pago 22 Valve Size Process Temp. 12" 600# Stm at U5O0 F 12" 160# Stm at 350 F 12" 60# Stm at 300 F 12" 15$ Stm at 250 F 6" 600# Stm at 450 F 6" 160# Stm at 350 F 6" 6C$ Stm at 300 F 6" 15# Stm at 250 F 3" 60Or Stm at 450 F 3" 16(# Stm at 3 50 F 3" 6C# Stm at 300 F 3" 15# Stm at 250 F Humber of Valves Savings Per Valve, $ HHOq 0 2,610 Insulation Cost Per Valve, $ Approximate Insulation Cost, & 250 0 Estimatf Annual Savings, .0 0 1,538 250 JO 0 5 l,oo4 250 1,250 5,020 0- 599 250 00 4 1,055 180 720 4,220 0 621 180 00 0 405 180 00 0 242 . 180 00 18 508 150 2,700 9,144 13 299 150 1,950 3,887. 3 195 150 450 585 7 117 150 1,050 819 TOTAL 8,120 23,675 004744 GCR-65-77 , JEW-19-77 Valve Size Process Temp. 12" 600# Sim at 1*50 F 12" 160# Sim at 350 F 12" 6c# Stm at 300 F 12" 15# Stm at 250 F 6" 600# Stm at 450 F 6" 160# Stm at 350 F 6" 60# Stm at 300 F 6" 15# Stm at 250 F 3" 600# Stm at 450 F 3" 16q# Stm at 350 F 3" 60# Stm at 300 F 3" 15# Stm at 250 F Page 23 TABLE E-T (Cont]d) Number Savings of Per Valves ' Valve, $ CHOX 3 2,6l0 Insulation Cost Per. Valve, $ Approximate Insulation Cost, $ 25O 750 Estimated Annual Savings, $ 7,830 8 1,538 25O 2,.0e 12,304 17 1,004 250 4,250 17,068 1 599 25O 250 599 9 1,055 180 1,620 9,495 16 621 180 s' 5 465 180 2,880 900 9,936 2,025 29 242 180 5,220 7,018 12 508 150 1,800 6,096 0 299 150 00 22 195 150 3,3CO 4,290 0 117 150 00 TOTAL 22,970 76,661 004745 OCR-65-77, JEW-19-77 table f. I (Cont'd) Page 24 Valve Size Process Temp. 12" 12" 12" 12" 6" 6" 6" 6" 3" 3" 3" 3" 600# Stm at 450 F 16C# Stm at 350 F 6C# Stm at 300 F 15# Stm at 250 F 60C# Stm at 450 F l6c$ Stm at 350 F 60# Stm at 300 F 15$ Stm at 250 F 60C# Stm at 450 F 160# Stm at 350 F 60# Stm at 300 F 15? Stm at 250 F Number of Valves Savings Per- Valve, $ HDO 1 2,610 Insulation Cost Per Valve, $ 250 Approximate Insulation Cost, $ 250 Estimate Annual Savings, 2,610 0 1,538 250 00 1 1,004 250 250 i,oo4 0 599 250 0 0 20 1,055 180 ' 3,600 21,100 10 621 ' 180 1,800 6,210 0 405 180 00 0 242 180 00 11 508 150 1,650 5,588 ` 3 299 150 3 195 150 450 . 450 897 585 3 117 150 450 351 TOTAL 8,900 38,345 004746 GCR-65-77, JEW-19-77 Page 25 TABLE E-I (Cont'd') Valve Size Process Temp. 12" 60Qr Stm at 45O0 F 12" 16C# Stm . at 350 F 12" 6C# Stm at 300 F 12" 15# Stm at 250 F 6" 600ff Stm at 450 F 6" 160# Stm at 350 F 6" 60# Stm at 300 F 6" Ijfr Stm at 250 F 3*' 60C# Stm at 450 F 3" l6C# Stm at 350 F 3" 6C# Stm at 300 F 3" 15^ Stm at 250 F TOTAL Number . of Valves 1 Savings Per Valve, $ HMDA 2,610 Insulation. Coat. Per. Valve, $ 250 Approximate Insulation Cost, $ 250 Estimate* Annual Savings, : 2,610 1 1,538 0 1,004 250 250 25b 1,538 00 0 599 250 0. 0 11 1,055 180 1,980 11,605 18 621 180 14 405 180 3,240 2,520 11,178 5,670 0 242 180 0 .. 0 30 508 150 4,500 15,24o 20 299. 150 3,000 5,980 13 195 150 0 117 150 1,950 0. 2,835 0 17,690 56,356 004747 gcr-65-77, JEW-19-77 TABLE E-I (Cont'd) Page 26 Valve Size Process Temp. 12" 600# Stm at 450 F 12" 16C# Stm at 350 F 12" 6c# Stm at 300 F 12" 15# Stm at 250 F 6" 600# Stm at 450 F 6" 160# Stm at 350 F 6" 6C# Stm at 300 F 6" 15^ Stm at 250 F 3" 600# Stm at 450o F 3" l6C# Stm at 350 F 3" 6c# Stm at 300 F 3" 15# Stm at 250 F Number of Valves Savings Per Valve, $ Insulation Cost Per Valve, $ ADA UNIT 0 2,610 250 Approximate Insulation Cost, $ 0 Estimate Annual Savings, 0 0 1,538 250 ' ~0 0 5 l,oo4 250 1,250 5,020 4 599 250 1,000 2,396 0 1,055 4 621 180 180 00 720 2,484 12 405 . 180 2,160 4,86o 17 242 180 . 3,060 4,n4 7 508 150 . 1,050 3,556 3 299 150 450 897 6 195 150 906 1,170 10 H7 150 1,500 1,170 TOTAL ' 12,090 25,667 004748 GCR-65-77, JEW-19-77 Page 27 Valve Size Process Temp. 12" 60C# Stm at U5O0 F 12" l6c# Stm at 3 50 F 12" 60# Stm at 300 F 12" 15^ Stm at 250 F 6" 600# Stm at 450 F 6" l60ir Stm at 350 F 6" 6C# Stm at 300 F 6" 15# Stm at 250 F 3" 600 Stm at 450 F 3" l6c# Stm at 350 F 3" 60# Stm at 300 F 3" 15# Stm at 250 F TABLE E~I (Cont'd) Number of Valves 0 Savings Per Valve, $ . NS UNIT 2,610 Insulation Cost. Per Valve, $ 250 Approximate Insulation Cost, $ 0 Estimated Annual Savings, 5; 0 0 1,538 4 l,oo4 250 250 0 1,000 0 4,016 5 599 0 1,055 250 180 1,250 . 0 2,995 0 0 \ 4 621 720 2,484 12 405 180 2,160 4,860. 18 242 180 3,24o 4,356 8 508 150 2 299 150 1,200 300 4,o64 598 5 195 150 10 117 150 750 1,500 975 1,170 TOTAL 12,120 25,518 004749 OCR-65-77, JEW-19-77. TABLE E-I (Cont'd) Page 28 Valve Size Process Temp. 12" 12" 12" 12" . 6" 6" 6" 6" 3" 3" 3" 3" 600# Stm at ^50 F l6c# Stm at 350 F 60# Stm at 300 F 15# Stm at 250 F 600# Stm at 1*50 F l6Q# Stm at 350 F 60# Stm at 300 F 15# Stm at 250 F 600# Stm at 450 F l6c# stm at 350 F 6(3# Stm at 300 F 15# Stm at 250 F Number of Valves Savings Per Valve, $ Insulation Cost. Per Valve, $ AREA II TANK FARM 0 2,610 250 Approximate Insulation. Cost, $ 0. Estimated Annual Savings, $ 0 0 1,538 250 75 P 0 1,064 250 00 0 599 250 00 0 1,055 180 00 0 621 180 00 1 405 180 180 405 0 242 180 00 2 508 150 300 1,016 7 299. 150 1,050 2,093 31 195 150 4,650 6,045 0 117 150 00 TOTAL- 6,180 9,559 004750