Document wq9K9ZQLy1BkKmqXVbZ7Le4Lo

TOXIC SUBSTANCES CONTROL ACT PCB HARKING AND DISPOSAL REGULATION INTERIM INSPECTION GUIDANCE HONS OOB315 fAELE CF CONTENTS I. Legal Authority to Conduct Inspections A. Introductory Materials................. General Authority to Conduct TSCA Inspections, Scope of 511 Inspections, Penalties for Failure to Allow Inspection 1 B. .' Pro-Inspect ion Considerations................................................................................,2 General Preparation for Inspections Record Inspections, Written Notices of Inspection, Credentials, Confidentiality, Opportunity to Accompany Inspector, Opportunity to Obtain Duolicate Samples C. What to do if Denied Entry..................... 5 D. Inspection Procedures................. Conduct, Personal Demeanor, Prohibited Activities, Taking Samples 5 E. Chain of Custody Procedures................................................................................... 11 F. Sample TSCA Forms TSCA Credentials................................................................. Appendix I TSCA Notice ofInspection..................................................................... Appendix II Notice of Inspection (Reverse Side) TSCA Inspection Confidentiality Notice......................................... Appendix III Sample Tag......................................... Appendix IV Receipt for Samples.....................................................................................Appendix V Chain of Custody Record............................................................................Appendix VI II. Inspection Procedures A. Incineration........................................................................................................... AI-A0 B. Chemical Waste Landfill..................................................................................... 31-fiS C. Marking Requirements........................................................................................... C1-C2 D. Electric Utilities ............................................................................................. C1-C9 E. Transformer Maintenance andRepair Facilities Rail Systems......................................................................................................... Sl-513 F. PCB Transformer and Capacitor .Manufacturers..............................................F1-F7 G. Storage Requirements........................................................................................... Gl-GS H. Decontamination..................................................................................................... H1-S2 I. Records and Monitoring....................................................................................... 11-16 III. Enforcement Proceedings Manual............................................................................J1-J1C Examples of Gravity Levels Appendix I Sample Pleadi.nas Accendix II i HONS 008316 2 RBQUirEMENTS OF INSPECTOR'S PROCEDURES HONS 008317 A* INTRODUCTION 1, GENERAL AUTHORITY TO CONDUCT INSPECTIONS Section II of the Toxic Substances Control Act (15 U.S.C. 2601) provides the basic authority for Inspection of establishments and con veyances It authorises an Inspector to enter# at reasonable time# any eetablishment# facility# or other premises in which chemical substances or mixtures are manufactured# processed# stored# or held before or efter their distribution in commerce and any conveyance used to transport chemical substances, mixtures# or such articles in connection with distribution in commerce. Inspections may be made only upon the presentation of appropriate credentials and written notice to the owner# operator# or agent in charge cf the premises or conveyance to be inspected* Section 11 provides that e separate notice shall be given for each such inspection# but a notice shall not be required for each entry made during the period covered by the inspection* 2. SCOPE or TSCA SECTION 11 INSPECTIONS Inspections conducted under Section 11 extend to all things within the premises or conveyance inspected (including records# files# papers* processes# controls# end facilities) bearing upon whether the require ments of TSCA applicable to the chemical substances or mixtures within the premises or conveyance have been complied with* However# inspections hall not extend to the following types of data unless the nature and extent of such data ere described with reasonable specificity in the written notice presented to the owner# operator# or agant in ehArge of the promisee or conveyance t a* financial data b* sales data (other than shipment data) c. pricing data d* research data (other then research data required by the provisions of TSCA or under a rule promulgated thereunder) * personnel data J. PENALTIES FOR FAILURE TO ALLOW INSPECTION Section 15 of TSCA makea it unlawful for ary person to fail or refuse to persdt entry or Inspection as required by Section 11 or to fail or refuse to pormlt access to or copying of-records* Section 16 provides for both civil end criminal penalties for violations of Section IS* Section 17 authorises specific enforemnent# Including the obtaining cf an lnjvsiction to restrain any violations of Section 15# or to ccnpel baking of any action required under TSCA* HONS 008316 B Pre Inspection Considerations 1, General Preparation for Inspections Certain Documents and data should be obtained and reviewed prior to performing on site inspections* Whenever practicable the inspectors should obtain relevant Federal State and local permits and author* laatlons tftich have been obtained by the facility for the purpose of operating the facility. These permits should be reviewed to determine whether PCBs have been at Issue with other regulatory programs* In addition/ where possible the record for compliance with other relevant regulatory programs should be investigated by obtaining pertinent data* The inspector should at all times obtain all PCB related approve! documents, authorisations/ exemption documents prior to arriving at an inspection site* Where these documents contain cperatlng conditions and raguirusents these conditions and requirements should be noted and eer^ as the basis for specific inquiries during the inspection* The inspector should then verify that the facility is complying with these conditions and requirements* After review of the above documents and any available PCB records the inspector should prepare the Notice of Inspection* The scope of the Notice whould/ at a minimum/ cover the specific areas that the office review Indicated may be potential problems* Records Review Prior to conducting s physical inspection the PCB records for the subject facility should be examined* Xn some instances the records inspection may be conducted prior to the physical inspection fay requesting the facility to send the records to the Regional Office* Conducting the records inspections early might make the conduct of the physical Inspection less difficult* The arithmetic related to records inspections Is fairly simple! PCBs removed from service should equal the PCBs stored plus the PCBs disposed* Xn addition to striking an appropriate balance* the records should adequately describe the disposition of all of the PCB items connected with the particular facility* The inspector should be able to dotendne the nane and location of all etorago and disposal facilities used/ Including the final disposal site* ' The value of the record inspection lies in forcing the PCb faci lity to account for their PCB items in a fairly accurate manner* An inspector, fay using the recorded information, should be better able to conduct physical inspections. Where reccric are kopt properly, the Inspector*s observations of facility processes should serve to uncover sources of imbalance in the PCB equation* In addition to forming the basis of a violation in ltaelf, inadequate or inaccurate record keep ing serves as a flag to areas of concern in inspecting facilities** HONS 000319 -3- 3* Written Notice of Inspection You must present the appropriate person at the facility to be inspected (preferably the Plant Manager or other similar official) with written notice of your intent to inspect the facility* Present the written notice at the time you appear at the facility to conduct the Inspection* As a general rule advance notice of an inspection should not be given* However, a general notice to a company or an industry that it may be subject to Inspection in the next several months is permissible* There may even be Instances where specific advance notice of inspection would be warranted* The giving of any such specific advance should first be cleared throucf) the haedquarters Regional Coordination Unit* Presentation of this notice_will allow you to inspect most things in operation In the facilities* However* If you wish to inspect any of the following: (1) (2) (3) (4) (5) Financial data: Sales data (other than shipment data): Pricing data: Personnel data* or Koet resaarch data The written notice of inspection which you present to the appropriate official at the facility to be inspected must also contain a description of the nature and extent of the data in the above categories which is to be inspected* As a general rule* you will know in advance If you ara going to inspect such data at the facility, in which case you should artsuro that the notice of inspection describee the nature and artent of that data* An example of a written notice of inspection is shown in Appendix II* 4* Credentials You must bring with you and present to the appropriate person at the inspection alts (Plant Manager or similar official having responsibility for operations at plant) credentials which indicate that you aro a lawful representative of the Administrator cf the Environmental Protection Agency and that you are authorised to perform the inspection tdiich you are to undertake* Sample creden tials for making inspections of facilities under TSCA are shown in Appendix I* 5* Confidentiality During the Inspection of a facility, you may come across infor mation which should be treated as confidential fcy the Environmental Protection Agency* To holp protect bona fide business trade secrets from public disclosure, you must adierc to the following procedure at the time you .present your credentials and notice of inspection to the appropriate official at the facility ycu are about to inspect* At the time you present the facility official with the Notice of Inspection, also {resent such official with one copy of the TCCA MONS 006320 6 Inspection Confidentiality Notice# sho*n in Appendix III* You will have four copies of the TSCA inspection Confidentiality Notice* At the time you {resent a copy of this Notice to the facility official# place a copy in an envelope addressed to the Chief Officer of the business whose facility you are inspecting* Ycu should determine the nane of such Chief Officer before your arrival at the inspection site* Mail the envelope at your earliest opportunity via certified mall* The envelope should be mailed no later than two days after your inspection of the facility* As indicated in the Enforcement Proceedings Manual# when you submit your Inspection Report to the person indicated in the Enforce* ment Proceedings Manual# also submit one copy of the TSCA Inspection Confidentiality Notice* Retain one copy for your own records* 6* Opportunity to Accompany Inspector During Inspection At the time you present the appropriate facility official with the Notice of Inspection# tell him that company representatives may accompany the inspector during the inspection for the purpose oft * (a) indicating to the inspector which processes# facilities# operations, records# etc* ctf the facility should be treated as confidential# and (b) any other reasonable purpose* 7* Opportunity to Obtain Duplicate Samples At the time you present the appropriate facility official dth the Notice of Inspection tell him that you may be taking samplas during your inspection and Inform the official that he has the right to request and receive duplicate samples. C. What To Do If You Are Denied Entry 1* If you are denied entry# first make sure that you have provided the appropriate facility official with all cf the material which must be presented prior to inspection* If you have not pre* sentad this official with such material# do so* 2* If you have followed all the appropriate procedural steps prescribed above and you are still denied entry# ask the person who denied you entry his or her reason for denying you entry into the facility* If the response indicates that ycu Called to adequately show your credentials show the person your credentials again* 3* If the person adanmntly refuses to admit an inspector# make no further attwnpt to enter* Upon leaving the premises make appropriate notes concerning any relevant observations whJchc may hava been noted concerning the refusal* If there are any reasonable bases for suspecting that refusal wao based upon a desire to cover up regulatory violations note the bases MOWS 008321 -5- (or ouch conclusion*. Also note such observations about the appearance of the facility as are possible* If there is a belief that an Immediate inspection of the facility is imperative, call the Head quarters Regional Coordination Unit at 202-755-1212* Where immediate Inspection is desired, a search warrant may be required by law* The Regional Coordination Unit will aid the inspector in obtaining a warrant there appropriate* - D* Inspection Procedures It Conduct During Inspection , Inspector*s Instructions, Violation Worksheet and Maintenance of Diaries and Field Notes Hie Znepeotion Manual for the PCB Marking and Disposal Regulation la dlvldod into ssveral sections* In addition to the sections dealing with Legal Requirements for Inspections and the Enforcement Proceeding! Manual, the Inspection Manual contains instructions on how to conduct inspections at the various categories of facilities subject to the regu lations* Tor each category ct facilities, there are separate Instructions* Thus, for example, if you ere inspecting an electric Utility company facility, turn to the Electric Utility Company portion of the Inspectors Manual and follow the instructions provided there* While conducting an inspection of a particular facility, the Inspector should closely follow the Instructions in tho Inspection Manual for Inspecting facilities of that type to the extent that they apply to the circumstances of the particular facility* Bad) inspector must nslntain legible and detailed Field Notes providing an accurate and inclusive documentation of Inspection activity* Entries in an Inspector's Field Notes should should include, but not be limited to, the following! . (I) (II) (ill) (iv) Name and location of facility inspected Explanation of what parts of the facility wera inspected . Summary of inspection related conversations with facility employees, along with names of employees with whom the conversations occured Place in the facility where samples were taken, along with explanation of the sampling tech nique employed, including, but not limited tot . (1) Numbor of samples collected . (2) Description of origin of sample ----- (transformer, PCB container, etc*) (3) Detailed analysis of method of obtaining the samples, including description of sample container* (v) Nature of suspected violation, including place and time of discovery, and including explanation of why you think your discovery is a violation* HONS 000322 9 6- rtports, they must contain only facts and observations. Language should be objective, factual and free from personal feelings or terminology which mi^>t prove inappropriate* The Field Notea are part of EPA'a files and should not be considered the inspector's personal property* The government's case in a formal hearing or criminal prosecu tion hinges on the evidence gathered by the inspector* It ie likely that Inspectors hill be called to testify in enforconent hearings* Therefore, It is imperative that each inspector keep detailed records of inspections in his Field Notes* This data will serve as an aid in giving testimony, in determining the conduct cf the prosecution cf the alleged violator, and in helping the inspector prepare his Inspection Report* Personal Demeanor During Inspection An inspector must conduct an inspection with the higheet degree of honesty and is cmpected to perform his duties in a professional and raaponsibla manner* At the very least, the inspector must conduct himself at all times in accordance with the regulations prescribing Environmental Protection Agency Employee Responsibilities and conduct which were published in the Federal Register (Vol. 30, No. 73) on April 17, 1973, codified at 40 CFR Part 3, and reissued in the EPA handbook "Responsibilities and Conduct for EPA Employees" In addi tion, the inspector must! . A. Develop end report facts of inspections completely, accurately and objectively* 8. Inspectors should at all times wear such safety equipment as is customary in the facility being inspected* Inspectors should wear a hard hat, safety glasses or gloves if the ovner or his aqmnt go advises* C. Know the limits of your Inspection authority* If you have presented the appropriate credentiala and written notice of inspection, your inspection of the facility may extend to all things within the premises being inspected (including records, files, papers, processes, controls and facilities) bearing on Aether the requirements cf the PCB Harking and Disposal Regulation have been complied with* Although you may not on your own authority take anything belonging to the facility other than a sample out of the facility, you may copy any relevant records and take the copies with you as part of your inspection report* You stoold remember that if you want to inspect financial data, sales data (other than shipment data), or most research data you need to describe the nature and extent of such data you wish to Inspect in the written notice of inspection* If at any tiro during the inspection you are prohibited from inspecting particular things or processes Milch you believe are within MONS 00&323 9 -7- the allowable scope cf your inspection* remind the person that such prohibition is tstlawful but do not argue with the person who prohibits your inspection. Simply ask the person why you ar not being allowed to inspect the particular thing or process and note all the particulars in your Inspection Diary, along with the name of the person who refused to let you inspect. Then, continue the remainder of your inspection of the facility. Following the inspection, contact the desig nated TSCA Enforcement Attorney for the regions for instruc tions concerning the area where you were not allowed to inspect* D* Zf an authorised representative of the~faclllty being inspected wishes to accompany you during the inspection allow him to do so. E* Be alert for any statements made by employees of the facility being inspected which may be construed to be admissions of acts of violation of the regulation. Prohibited Activities The following activities may not be engaged in by an B>A Inspector before, during or after an inspection of a facility under the FOB Narking and Disposal Regulation. These prohibitions are based upon and derived from saterial in the BPA Pesticides inspections Manual* A* Never discriminate by the dispensing of special favors or privileges to anyons, whether for remuneration or not> and never accept, for yourself or anyone else, favors or benefits wider circumstances which miepit be construed by reasonable persons as influencing the performance of your government, duties* The BPA handbook entitled "Responsibilities and Conduct for BPA Employees" specifies that an employee shall not accept anything of value from the trade, public or consumers for or because of any official act he has performed or will perform* Each inspector should refer to the above referenced handbook for amplification of this policy* In this regard one area of concern to inspection personnel which generates more questions than any other Is the matter of . handling a situation there, during a facility inspection, you have lynch with plant officials and/or personnel and find your Iwch paid for by them, or there is no way you can pay for your portion of the luncheon* EPA regulations cover this by providing an exemption whereby you can accept food and refresh* ments of nominal value on infrequent occasions in the ordinary course of an luncheon or dinner meeting or other meeting or on an inspection tour where you may be properly in attendance. Under no circumstances shall you interpret this to allow acceptance of meals or refreshments when It is proper and fea sible for you to pay for your own. You must avoid such situa tions then possible and must make every effort to pay your part. MOMS 008324 10 -8- unless the situation is such that it is impossible for you to do ao or to force the issue would provoke a scene creating em barrassment to or bring discredit on the government* B* Make no private promises of any kind which may be construed as binding upon the Agency since a Government employee by his private word cannot bind the Government* C. Haver use any information coining to you conf identially In the performance of governmental duties as a means for making private profit* D. During an inspection do not speak of any product, process, facility or person in a derogatory manner* Taking Samples 1. Responsibility Samples should be collected and prepared in accordance with procedures outlined in this Manual. Xeep in mind that you may have to testify in court regarding a sample you have taken. You may be required to identify the sample collected and to explain that you followed the sampling proce dures providod in this Manual* Mistakes or deficiencies in procedures may damage the Government's case In this regard. However, if you make a iistake in sampling, do not, under any circumstances, attempt to cover up kthe mistake* Record the mistake in your Field Notes and re-taka the sample as appropriate* " 2* Whan to Sample " , V.V Take a sanple only uider the circumstances indicated In this Manual and only during the course of an inspection of a facility covered by this Manual* 3* How to Sample A. Taking Samples Vhen taking a sample during an inspection of aiy facility covered by this Inspector's Manual you should follow the specific sampling techniques appropriate for each type of facility you inspect* Deviation from the standard Methods end procedures for a sample might causa problems in Introducing your sample Into evidence during an enforcement proceeding* If there is any dovlatlon from established procedures, explain the deviation in your Field Notes* Duplicate Samples If a responsible agent of the facility being inspected requests a duplicate sample, It should be collected and marked in the same manner the official samples, with an indication on the extreme left hand corner of the Cample Tag to be attached thereto that the sumple MONS 008325 -9- is a "Duplicate Sample" Of course# the fact of having prepared a duplicate sample should be reflected in the Inspector's Field Motes* If you provide a duplicate aample, make the appropriate notation on the chain of custody record# described below. C. Special Category of Samples - Photographs During an inspection, you may vent to photograph various parts of the facility# certain operations in the facility or locations where a sample was taken* In all cases there you take a photograph during an inspection, write the following in your Field Motes for each photograph taken. 1. Nature of object or process photographed 2. The sequential number of that photograph for tha inspection* J* Inspector's Number 4* Inspector's Name 5. Time* date and place of taking photograph* then the photographs ere developed, transpose the information recorded in your fields notes onto the back of the photograph at yoiar first opportwity. 4. Post - Sampling Procedure A. Identification of Samples Each unit of the sample is to be tagged in the Inspector's hand writing in ballpoint (waterproof) ink* The tag (Sae Attachment IV) shall contain* at a minimum* the following informations Inspector's Marne# type of sample* sample number# name of person taking sample* and the type of analysis required* This tag should be completely filled out by the inspector and attached to the sample container* B Receipt of Samples After taking a sample# prepare a Receipt for Semples Form In triplicate (See Appendix V). Civs one copy to the Plant Manager or similar official at the facility# Include one copy in your Inspec tion Report and retain one copy for your own records* You may record all the samples taken during the inspection of e facility on one Receipt for Samples Form* * Chain of Custody Procedures 1* Inspector to Laboratory The inspector who collects samples is responsible for the care and custody of the smnples until properly dispatched to the receiving laboratory or turned over to an assigned custodian. You must assure that each container let MQNS 008326 10- a* In your physical possession, or b* In your view, after being in your physical possession, or c* After being in your physical possession was locked by you in a manner' ao that --- no one could tamper with it* The following procedures should be followed* (1) . Samples will be accompanied by a Chain of Custody Record (Appendix VI) which includes, the name of person taking the sample* Inspector's number) type of sample taken* analysis required. If the person who takes the sample is required to transfer possession of the ample prior to dispatching It to the appropriate laboratory for analysis* the transferor and transferee will sign, date and time the sheet* (2) * The inspector taking the sample, or the person who right fully receives possession of the sample directly or throu^i a chain originating with the inspector who took the sample, has the respon sibility of properly packaging and dispatching samples to the proper laboratory for analysis* As a mattsr of policy, the inspector taking the sample should not relinquish possession cf the sample prior to dispatch to the appropriate laboratory except in circum stances where to do so would be highly impractical* In any event, the person who dispatchss the sample to the appropriate laboratory for analysis should fill in ths "Dispatch" portion of the Chain of Custody Record* (3) * Samples will be properly packed in shipment containers such ss Ice chests to avoid breakage* The shipping containers will be pedlocked for transfer to the receiving laboratory* (4) . All packages will be accompanied by the Chain of Custody Record showing Identification of the contents* The original will accompany the shipment (inside the locked shipment container) and will main on racord in the laboratory performing the analysis* (5) * If aent by mall, the person who dispatches the sample to the laboratory must send the package certified mail with return receipt requested* Zf sent by common carrier, a government bill of ledlng should be obtained; Receipts from post offices and bills of lading will ba ratained as jmrt of the permanent Chain of Custody documentation* 2* Laboratory Custody Procedures a* The laboratory ahull designate a "Sample Custodian" An alternate will be designated in his absence* In addition, the labora tory shall oet aside a "sample storage security area"* This should be a clean, dry, isolated room which can be securely locked frem the outside* - b* All samples should be handled by the minimum possible number of persons* e*. All incoming samples shall be received only by the custodian who will indicate receipt by signing the Chain of Custody Record Sheet accompanying the smnples and retaining the sheet as permanent records. HONS 008327 11 ) o -11- Couriers picking up samples at the airport, post office# etc* shall sign jointly with the laboratory custodian* If samples are delivered to the laboratory when appropriate personnel are not there to receive than, the samples must be locked in a designated area within the laboratory in a manner so that no one can tamper with them* The sane person must then return to the laboratory and unlock the samples and deliver custody to the appropriate custodian* d* Immediately upon receipt# the custodian will place the smnple in the sample room# Milch will be locked at all times except Wien samples ere removed or replaced by the custodian* To the maximum extent possible# only the custodian should be permitted in the sample rocm. e* The custodian shall ensure that heat-sensitive or lightsensitive samples# or other sample materials having unuaual physical characteristics# or requiring special handling# are properly stored end maintained* f* Only the custodian will distribute samples tS personnel who ere to perform tests* g. The smple analyst will record# in Ms laboratory notebook or analytical worksheet# identifying information describing the sample# the procedures performed end the results of the testing* The notes shall be dated end indicate who performed the tests and they should note any abnormalities which occured during the testing procadure* jn the event that the person who performed the tests is not available as e witness at time of trial# the government may be able to intro duce the notes in evidence under the Federal Business Records Act* h. Standard methods of laboratory analyses shall be used as described in the "Guidelines Establishing Test Procedures for Analysis of Pollutants"# 38 F*R. 28758# October 16, 1973* If laboratory per sonnel deviate from standard procedures, they should prepare the justification for the deviation in the laboratory notebook* i* Once the sample testing is completed# the unused portion of the sample# together with all identifying tegs and laboratory records# Should be returned to the custodian* The returned tagged sample will be retained in the sample room until it is required for trial* Strip charts end other documentation of work will also be twned over to the custodian* j. Upon completion of laboratory PCB sample analysis, the cus todian shall send a copy of all laboratory records and a copy of the appropriate chain at custody record to the Regional PCB violation Coordinator* The laboratory should retain the originals as permanent records* k* Alterations in or deviation from this chain of custody procedure must be approved, by the Regional Office of General Counsel and/or the Headquarters Enforcement Office, prior to implementation* HONS 008328 1A Appendix I TSCA Inspection Credentials UNITED STATES OF AMERICA ENVIRONMENTAL PROTECTION AGENCY This 1b to certify that whose signature and photo appear below is an authorized representative of the Administrator of the U.S. Environmental Protection Agency. Date issued! Expiration Date: Namet Title: Inspector (Photo) This Inspector is authorized aider the Toxic Substances Control Act to conduct . inspections (including taking samples. photographs and other inspection activi ties) of establishments, facilities, or other premises in which chemical substances or mixtures or any articles containing same are manufactured, processed, stored or held before or after their distribution in camerce, and any con veyance being used to transport chemical substances, mixtures or such arti cles in connection with distribution in commerce. Signature of Inspector SignaEure'of'the Administrator No. HONS 008329 Name of Firm: Firm Address: , Appendix II U.S. Environmental Protection Agency NOTICE OF INSPECTION UNDER THE TOXIC SUBSTANCES CONTROL ACT Date Inspection Commenced: Hour: EPA Regional Office Address: (type) Reason for Inspection: / / For the purpose of inspecting (including taking samples, photographs and other inspection activities) an establishment, facility, or other premises in which chemical substances or mixtures or articles containing Same are manufactured, processed or stored, or held before or after their distribution in commerce (including records, files, papers, processes, controls, and facilities) bearing on whether the requirements of the Act applicable to the chemical substances, mixtures or articles within or associated with such premises have been complied with. / / For the purpose of inspecting (including taking samples, photographs and other inspection activities) a conveyance being used to transport chemical substances, mixtures, or articles containing same in eonnection with their distribution in commerce (including records, files, papers, processes, controls and facilities) bearing on whether the requirements of the Act applicable to the chenical substances, mixtures or articles within or associated with the conveyance have been complied with. / ) In addition, this inspection extends to (circle appropriate letters): A) Financial data B) Sales data C) Pricing data D) . Personnel data : E) Research data The nature and extent of inspection of such data specified in A through E above is as follovm: Name of Person to whom Notice of Inspection Was Given: Signature of epa Employee: DATE frfuT -- Title " Distribution: one copy Plant Manager one copy PCB Violation Coordinator one copy Inspector's Files HONS 008330 Reverse Side- Notice of Inspection . . TSCA Notice of Inspection Authority to Conduct Inspections By authority of Section 11 of the Toxic Substances Control Act (15 USC 2601) an authorized representative of the Administrator of the United States Environmental Protection Agency may enter and in spect, at reasonable times, any establishment facility, or other premises in vhich chemical substances or mixtures are manufactured, processed, stored, or held before or after their distribution in commerce and any conveyance used to transport chemical substances, mixtures, or such articles in connection with distribution in commerce. Scope of Inspections Inspections conducted aider Section 11 of the Toxic Substances Control Act (15 USC 2601) extend to all things within the premises or conveyance inspected (including records, files, papers, processes, controls, and facilities) bearing upon whether the requirements of the Toxic Substances Control Act applicable to the chemical substances or mixtures within the premises or conveyance have been complied with. However, inspections shall not extend to the following types of data unless the nature and extent of such data are described with reasonable specificity in the written notice presented to the owner, operator, or agent in charge of the premises or conveyancet 1. financial data 2. sales data (other than shipment data) 3. pricing data 4. research data (other than research data required by the provisions of the Toxic Substances Control Act or aider a rule promulgated thereunder) 5. personnel data. Penalties for Failure to Allow Inspection Section 15 of the Toxic Substances Control Act makes it unlawful for any person to fail or refuse to permit entry or inspection as required by Section 11 or to fail or refuse to permit access to or copying of records. Section 16 provides for both civil and criminal penalties for violations of Section 15. Section 17 authorizes specific enforcement, including the obtaining of an injunction to restrain any violations of Section 15. HONS 008331 i Failure to request a hearing shall result in issuance of a default order by the Regional Administrator (depending on the final form of the Consolidated Rules of Procedure). A sample Default Order follows. HONS 008430 UNITED STATES ENVIRONMENTAL PROTECTION AGENCY REGION IN THE MATTER OF 8. G. POWER INDUSTRIES. INC. Respondent TSCA-V-OOl DEFAULT ORDER PRELIMINARY STATEMENT 1. This civil proceeding for the assessment of a penalty was Ini tiated pursusant to Section 16(a) of the Toxic Substances Control Act (TSCA), 15 U.S.C. 2601 et seq. The action was Instituted by the Issuance of a Complaint and Notice of Opportunity for Hearing to the Respondent, charging violations of 15 U.S.C. 2605 and 2614. It Is hereby determined that an appropriate Default Order shall be Issued based on the Finding of Fact and Conclusions of Law as set out below. FINDINGS OF FACT 1. B. G. Power Industries, Inc., Is a corporation organized pur suant to the laws of the State of Michigan. . 2. Respondent operates a facility at Alton, Michigan, which houses 66 large high-voltage capacitors, each containing PCB dielectric fluid. 3. On or about March 31, 1981, Respondent was unable to produce the records of monitoring data required under Section 6 of TSCA, 15 U.S.C. 2605, and 40 CFR 761.45, or produce the Identity of the central records location. 4. On or about March 31, 1981, there were stored In Respondent's above cited facility PCB's that were clearly marked for disposal. - 5. On or about March 31,' 1981, Respondent failed to provide the flooring required by TSCA and regulations promulgated thereunder In that no curbing has been Installed In the area of the above-referenced facility wherein PCB's marked for disposal were stored. 6. On or about March 31, 1981, Respondent failed to provide the flooring required by TSCA and regulations promulgated thereunder In that the floor Installed In the above-referenced facility .wherein PCB's marked for disposal were stored consisted of linoleum tiles. 7. On June 1, 1981, the Enforcement Division, EPA, Region ("the Complainant") Issued a Complaint and Notice of Opportunity to Respondent pursuant to 15 U.S.C. 2615(a) and the then applicable o HONG OOU<*3l 118 Rules of Practice, alleging that Respondent has violated TSCA by falling to maintain records on the disposition of PCB's and by falling to conply with certain construction specifications for a facility that stores PCBs designated for disposal by not Installing a curb of a minimum height of six Inches and by not Installing a floor composed of smooth and Impervious materials. 8. ' In the Instant Complaint, a civil penalty of $24,500.00 was proposed against the Respondent. Said penalty was proposed based on the nature, circumstances, extent and gravity of the violations, and. with respect to the Respondent, ability to pay. effect on Respondent's ability to continue to do business. Respondent's history of prior such violations, and the Respondent's degree of culpability. For purposes of assessing the said penalty. Respondent's gross annual revenues were determined to be in excess of $5,000,000.00 during the previous year. Based on a comparison of Respondent's gross annual revenues with the amount of the proposed penalty, it was determined that said penalty would have no substantial effect on Respondent's ability to continue In business. - 9. The Complaint in the Instant case set forth Respondent's right to request a hearing within fifteen (15) days of receipt of the Complaint, the requirement of a written Answer to the Complaint within fifteen (15) days of receipt of the Complaint If said hearing was desired, and the consequences of failure to do either. Furthermore, a copy of the Interim Rules of Practice was enclosed with the Complaint. 10. Said Complaint was mailed to Respondent on June 1, 1981, by certified mall. Receipt No. 202684 was returned to Complainant stamped June 5, 1981, and bearing the signature "Betty Wilson" as signor for the addressee. (A copy of certified mail receipt No. 202684 Is attached to and made a part of this Order.) 11. r As of this date.Respondent has failed to either request a formal hearing, or file an Answer to the Complaint pursuant to the Rules of Practice. CONCLUSIONS OF LAV 1. By reason of the facts as set out In the Findings of Fact, Respondent has violated TSCA by failing to develop and maintain records on the disposition of PCB's In violation of 15 U.S.C. 2614(3) and 40 CFR 761.45 and by falling to comply with certain construction specifications in violation of 15 U.S.C. 2614(1)(c) and 40 CFR 761.42(b). 2. By falling to file a timely Answer to the Complaint and/or to request a formal hearing. Respondent has admitted the facts alleged In the Complaint and has waived Its right to a hearing. Accordingly, Respondent Is In default and the proposed civil penalty Is therefore due and payable. 3. It is further concluded that by reason of the facts set out In (Finding 8) the Fir.dlof Fact zr.t enou.it of the proposed penalty Is appropriate pursuant to i5 U.S.C. 2oi5(c)(2)(;j. HONS 008432 ORDER Respondent shell Immediately upon receipt of this Order pay by cashier's or certified check a civil penalty in the amount of Twenty* Four Thousand Five Hundred Dollars ($24,500.00) payable to the Treasurer of the United States of America. Such remittance shall be delivered to the Regional Hearing Clerk, United States Environmental Protection Agency, Region V, 230 South Dearborn Street, Chicago, 111. 60604. In the event of failure of Respondent to make such payment the matter shall be referred to the Attorney General pursuant to 15 U.S.C. 2615(a)(4) for collection of said amount by an appropriate action In United States District Court. AND NOW, THIS DAY OF July 10, 1981, the foregoing Order Is hereby Issued under the authority of the Toxic Substances Control Act and tne Rules of Practice adopted pursuant thereto, 15 U.S.C. 2601 a i*a- Regional Administrator United States Environmental Protection Agency, Region v 230 South Dearborn Street Chicago, Illinois 60604 Date: o QOS'*33 HONS i- ! .1 ix , : f l i ' ' ' . 3. Settlement will often be reached prior to hearing on a civil penalty assessment. A sample Consent Agreement and Final Order follows (It Is not necessary for the Director of the Enforcement Division to sign the agreement, as long as one Of his attorneys signs). . . i \ MONS 008434 i 121 UNITED STATES ENVIRONMENTAL PROTECTION AGENCV REGION V IN THE MATTER OF TSCA-Y-002 B. G. DISPOSERS, INC. Respondent CONSENT AGREEMENT AND FINAL ORDER PRELIMINARY STATEMENT 1. This civil proceeding for the assessment of a civil penalty was Initiated pursuant to Section 16(a) of the Toxic Substances Control Act (TSCA), IS U.S.C. 2615. The action was Instituted by the Issuance of a Complaint and Notice of Opportunity for Hearing served upon the Respondent, charging violations of IS U.S.C. 2605 and 2614. 2. Respondent admits the factual allegations contained In the Complaint. 3. Respondent has agreed to cooperate fully wits the Envlronmental Protection Agency to conciliate this matter without the necessity of a formal hearing and, therefore, consents to the Issuance of the Order hereinafter recited with the Findings of Fact and Conclusions of Law. Respondent consents to the payment of the penalty In the amount hereinafter stipulated as full settlement of any and all civil penalties or liabilities which mglth have attached as a result of this proceeding. 4. Respondent waives Its right to request a hearing on any Issue consented to herein. STIPULATIONS OF FACTS 1. B. G. Disposers, Inc. Is a corporation organized pursuant to the laws of the State of Michigan. 2. Respondent operates an Incinerator for the purposes of des troying and disposing of liquid PCB mixtures at Its facility located in Alton, Michigan. 3. On or about March 31, 1981, Respondent Incinerated liquid PCB mixtures at Its above-referenced facility with an Incinerator tem perature of 950 degrees C. 4. On or about March 31, 1981, the above referenced Incinera tor failed to shut off automatically when the combustion temperature dropped below 1200 degrees C during the incineration of PCB's. 5. On or about March 31, 1981, Respondent maintained records, noting the rate and quantities of liquid PCB mixtures Introduced Into the combustion system recorded at Irregular Intervals varying In length from ten to twenty-eight minutes. HONS 008435 j, CONCLUSIONS OF LAW 1. By reason of the facts set out tn the stipulations of Fact, above, It Is concluded that Respondent has violated IS U.S.C. 2614 (1), tltd 40 CFR 761.40(a)(1) by falling to maintain an Incinerator tempera ture of 1200 degrees C. with a two-second dwell time at three percent excess oxygen In the stack gas during the Incineration and destruction Of liquid PCB mixtures. 2. By reason of the facts set out In the stipulations of Fact, above. It Is concluded that Respondent has violated 15 U.S.C. 2614(1), end 40 CFR 761.40(a)(5) by operating an Incinerator for the Incineration and destruction of liquid PCB mixtures where the Incinerator'does not shut off automatically when the combustion temperature drops below 1200 degrees C. 3. By reason of the facts set out In the Findings of Fact, above. It Is concluded that Respondent has violated 15 U.S.C. 2614(1)(3), and 40 CFR 761.40(a)(3), 761.45(c)(1)(A), by falling to maintain records that measure and record the rate and quantity of PCB's which are fed Into the Incinerator combustion system at Intervals of no more than fifteen minutes. ORDER Respondent shall within twenty days of receipt of this Consent Agreement and Final Order pay by cashier's check or certified check the amount of Thirty-Five Thousand Dollars ($35,000.00) payable to the United States of America. Such remittance shall be delivered to the United States Environmental Protection Agency, Regional Hearing Clerk, 230 South Dearborn Street, Chicago, Illinois 60604. Respondent: Date: Jamel"0i'ftc0dh4li`""................. . Director, Enforcement Division United States Environmental Protection Agency, Region V 230 South Dearborn Street Chicago, Illinois 60604 Date: Q08`*3fa *ONS It Is so ordered. This Order shall become effective immediately. Regional Administrator United States Environmental Protection Agency, Region V 230 South Dearborn Street Chicago, Illinois 60604 Date: HONS 008437 124 The following 1$ a model pleading in rein for seizure and condemnation of PCBs stored or disposetTTn violation of the PCB Marking and Disposal Regulation. Following the pleadings are the Verification and Warrant for Arrest of Property. HONS 008*38 125 United Slates Attorney Attorney for the Plaintiff IK THE UKI TED STATES DISTRICT COURT FOR THE___________________________________ UNITED STATES OF AMERICA, ) Plaintiff, CIVIL NO, vs. COMPLA.'.NT IN REM Defendant. The United States of America alleges that: This Is an action In rem Instituted pursuant to Section 17(b) of the Toxic Substances Control Act (15 U.S.C. 2616(b)), for the seizure and condemnation of chemical substances or mixtures manufactured, processed, or distributed In comnerce which are and In violation 28 U.S.C. 547(a). II This Court has jurisdiction of the subject matter of this action pursuant to 15 U.S.C. 2616(b). III The property to be seized Is located at _______ , which Is within this District, aniTls on land. 16taM6iVU ~ TR5 HONS 008439 126 IV 1$ a chetBlcaTsubstance or mixture manufacCured,processed, or"tfistrTbuted In commerce by _______ _________________________ . V WHEREFORE, plaintiff. United States of America, prays: (1) That the chemical substance or mixture be seized and condemned, and that they be disposed of as the court may direct in accor dance with the provisions of Section 17(b) of the Toxic Substances Control Act (15 U.S.C. 2616(b)) and In conformity with the practice of this Court. (2) That the party specified in Paragraph _ of this Com plaint and any and all other persons having, or pretending to have, any right, title or Interest In and to the chemical substaices or mixtures be notified to appear In order that they may answer the allegations set forth In this Complaint. (3) That the Court enter all such orders, decrees, and judgments as may be necessary In order to grant further relief to the plaintiff for the costs of this proceeding. (4) For such other and further relief as the Court may deem Just and proper. Dated: United"States Attorney Attorney for the Plaintiff HONS 008440 127 llrrttcrStatesTrttorney Attorney for the Plaintiff _ IN THE UNITED STATES DISTRICT COURT FOR THE_________ _____ UNITED STATES OF AMERICA, Plaintiff, CIVIL N0._ VERIFICATION Defendant. I.__________________ state that: 1. I being first duly sworn. "" 7T"T~am reTTa6Ty*Tnforied bf the facts set forth In the fore* going Complaint in Rem which I have prepared accordingly; and 3. All of the facts set forth in the foregolny Complaint In Rem are true to the best of my knowledge. Information and belief. SUBSCRIBED AND SWORN TO BErORE ME THIS DAY OF Rottry-Poimc--' HONS 008441 129 I I i .. J _______ tliSmrStStesTtEtornSy Attorney for the Plaintiff IN THE UNITED STATES DISTRICT COURT FOR THE_________ UNITED STATES OF AMERICA, Plaintiff, ) | CIVIL NO. vs. WARRANT FOR ARREST OR PROPERTY !Q *'UeTen9anir TO: UNITED STATES MARSHAL TOD"ARERREB?"CONroWOFD*S*arrelt"an3*take Into custody under further order of the Court the following described property: CTaTms"of~persons`entlETi3'T5*p6ssession of'the'foregoing property shall be filed with the Clerk of the Court and a copy served upon the United States Attorney, _ _ . . __ . , within ten (10) days after date of'pufiffcation of"notice"of" arrest*of` tRe foregoing property, or within such additional tine as may be allowed by the Court, and answers to the complaint shall be filed and served within twenty (20) days after date of publication of notice of arrest. Dated: (SONS 00B4A2 I 129 The following Is model Complaint for Injunction, followed by a Motion for Temporary Restraining Order and a Proposed Preliminary Injunction. MQNS 0084*3 UNITED STATES DISTRICT COURT KOR THE CENTRAL DISTRICT OF CALIFORNIA UNITED STATES OF AFRICA Plaintiff, V. DAD POLLUTER, TSCA, No.______________ _____ COMPLAINT FOR INJUNCTION Section 17(a) of the Toxic Substances Control Act, 15 USC 2617 Defendant The United States of America, by Its undersigned attorneys, by authority of the Attorney General of the United States, and acting on the request of the United States Environmental Protection Agency, alleges that: I 1. This Is a civil injunction to enjoin the above named defen dants from the continued storage of transformers containing the chemical substance polychlorinated biphenyls (PCB's) in violation of regulations promulgated by the Administrator of the Environmental Protection Agency (EPA), at Title 40 Parts 761.10, 761.42, Vol. 43, 34 FR 7150 et seq on February 17, 1978, as provided by Section 6(e)(1) of the toxic Substances Control Act, 15 USC 2605. 2. This Court has jurisdiction of the subject matter of this action pursuant to 15 USC 2616. 3. Defendant Is a corporation doing business In Los Angeles, California and such act has occurred and Is continuing to occur at Its facility located at ________Street, Los Angeles, California, with in the Central D1strT?f"5TtaTTT6rnTa. 4. The continued storage of such transformers contrary to the above cited regulations threatens to cause an Immediate and Irreparable Injury to the employees working at said facility and the general public living nearby unless defendants are Immediately restrained as prayed, as more fully appears In the affidavits submitted with plaintiff's motion for Preliminary Injunction filed herewith. Plaintiff has attempted to give oral notice of this motion to defendants attorney. Defendants will not be unduly prejudiced by issuance of a tempbrary restraining order pending hearing and determination of plaintiff's motion for Preliminary Injunction. There is a substantial likelihood that plaintiff will suceed on the merits of this case. . t HONS 000444 111 Wherefore, plaintiff prqys: 1. That the defendants, their officers, directors, agents, servants, employees, successors and assigns and each of them cease the storage of transformers containing PCB's contrary to the requirements of Title 40 Part 761.10 CFR, and be immediately required to comply with such regulations. 2. That costs and disbursements of this action be awarded to the plaintiff. 3. That this court grant such other and further relief as ' it may deem just and proper. o o MQNS 008445 1 **3 UNITED STATES DISTRICT COURT FOR THE CENTRAL DISTRICT OF CALIFORNIA UNITED STATES OF AMERICA Plaintiff, No.____________________ V. BAD POLLUTER, TSCA MOTION FOR TEMPORARY RESTRAINING ORDER AND ORDER TO SHOW CAUSE 'Defendant. Upon the Complaint herein and upon the papers submitted In support of this motion, plaintiff, by Its attorneys, respectfully moves the Court for a temporary restraining order restraining defendants as set forth below, and for an order that defendatns appear and show cause, as follows: 1. That defendants their officer, agent;;, servants, employees, and all persons in active concert with them or any of them be restrained and enjoined from the continued storage of transformers containing the chemical substance polychlorinated biphenyls (PCB's) In violation of regulations promulgated by the Administration of the Environmental Protec tion Agency (EPA) at Title 40, Part 761.10, 761.42 CFR, Vol. 43, 34 FR 7150 et. seq. on February 17, 1978. 2. Immediate and Irreparable Injury to the employees working at said facility and to the general public will occur unless defendants are Immediately restrained as prayed, as more fully appears In the complaint herein and the affidavits submitted with plaintiff's Motion for Preliminary Injunction filed herewith. PlalntiffHas attempted-to~give oral notice of this motion to defendants' attorneys. Notice should not be required herein as a temporary restraining order is necessary to preserve the status quo In this action, pending the determination of plaintiff's motion for a preliminary Injunction. Plaintiff's remedies at law are Inadequate. Defondants will not be unduly prejudiced by Issuance of a temporary re straining order pending hearing and determination of plaintiff's Motion for Preliminary Injunction. There Is a substantial likelihood that plaintiff will suceed on the merits of this case. . WHEREFORE: Plaintiff asks that this Court Issue a Temporary Restraining Order and Order to Show Cause, as prayed. Dated: Respectfully Submitted, HONS 008446 133 UNITED STATES DISTRICT COURT FOR THE CENTRAL DISTRICT OF CALIFORNIA United states of America Plaintiff, V. BAD POLLUTER, TSCA, No.___ _______ |__________ PRELIMINARY INJUNCTION Defendant. This matter came on to be heard on the day of ____ 1978, for preliminary injunction. Upon consideration of the ev13e?Sc8~338Ked at the hearing, the pleadings and papers on file herein, and the arguments of counsel: It appears to the court that the defendants, personally or through their agents, are engaged In the continued storage of transformers containing the chemical substances polychlorinated biphenyls (PCB's) In violation of regulations promulgated by the Administrator of the Environmental Protection Agency (EPA), at Title 40, Part 761.10, 761.42 CFR, Vol. 43, 34 FR 7150 at. seq. on February 17, 1978, as provided by Section 6(e)(1) of the Toxic Sub stances Control Act, 15 USC 2605. It further appears to the Court that the defendants will. If not enjoined by order of this Court, continue to store such transformers contrary to the above cited regulations, and thereby cause an Immediate and Irreparable Injury to the employees working at said facility and the general public and that plaintiff's remedies at law are Inadequate. It further appears that defendants will not be unduly prejudiced by Issuance of a preliminary Injunction pending hearing and determination of the merits. It further appears to the Court that there exists a substantial likelihood that plaintiff will suceed on the merits of Its case. NON THEREFORE, IT IS ORDERED, ADJUDGED AND DECREED that defendants, their officers, agents, servants, employers, and all persons In active con cert with them, or any of them, be enjoined from: The continued storage of transformers containing the chemical substance polychlorinated biphenyls (PCB's) In violation of regulations pro mulgated by the Administrator of the Environmental Protection Agency (CPA) at Title 40 CFR Parts 761.10, 761.42. -- --------- HONS 008447 IT IS FURTHER ORDERED that this injunction shall remain In .(feet until Final determination of the merits, or until further order ,f thl ; Court. . Dated: _- 3ti3ge;`0nTea*States'0T5frTcrCourr Central District of California HONS 008448 ' Appendix III TSCA INSPECTION OONPIDEOTIALJK NOTICE United States Environmental Protection Agency Regional Addresst Facility Inspected; Date Inspected: Address of Facility: Name of person at the facility to whan this notice given: TITUS Nans of chief officer of business: Date mailed to chief Officer: Name of EPA Inspector: Address: ~~ -- It is possible that EPA will receive public requests for release of the information obtained by inspectors during inspection of the facility indicated above. Such requests will be handled by EPA in accordance with provisions of the Freedaa of Information Act (FOIA), S U.S.C. 552, SA regulations issued thereunder, 40 CFR Part 2, and the Toxic Substances Control Act Section 14. EPA is required to make inspection data available in response bo FOIA requests tnless the Administrator of the agency deter mines that the data contains information entitled to confidential treatment. In order to facilitate the Agency's timely response to any public inquiries, while giving due consideration to your canpany's right to request confidentiality, please provide us with a statement specifying any informa tion which our inspection of the above indicated facility may reveal which you believe should be entitled to confidential treatment. your statement should be addressed to ________ _______ (RESPONSIBLE EPA OFFICIAL) and should reach this address no later than 30 days after your receipt of this notice. Failure by your firm to sutadt, within the 30 day time period, a written request that information be characterised as confidential or privileged will be treated by EPA as a waiver by your ccngwny of any claims for confidentiality regarding the Inspection data and the data will be made available to the public without furtter notice to you. date received by owner/operator signature ofPlant Manager Distribution: one copy Plant Manager one ccpy Chief Officer of Business one copy PCQ Violation Coordinator one copy Inspector's Files MONS 008332 Appendix IV SAMPLE TAG PSEPAt T8CA PCS Marking And Dlapoaa 1 Regulation fltld 8--pU Inapactor'a i Typa of Saatplae Date Taken Tjjna Taken Pla Taken Analyaia Required*. (Datami nation of PCB Content) Heap of Paraon Taking 8--pip (written A aigneA) Saapla Muabari HONS 008333 Appendix V U.S. Environmental Protection Agency Receipt for Samples . ~ i Regional Address: Name of Plant Manager --or Similar Official: Firm Name: Semple Numbers: Firm Address: Samples Collected: (Describe fully the time, place, date and type of sample, number of containers for each type of sample) Acknowledgement of Plant Manager or Similar Official Ihe undersigned acknowledges that the samples described above have been collected: . Signature: Title: Duplicate Samples for each Type of Sample Taken: Baxple j Requested and provided Not requested Name of person who collected samples: Title of Collector: -- Signature ef-Collector: Distribution: one copy to Facility Plant Manager original to PCB violation Coordinator one copy for Inspector's Records HONS 008334 Appendix VI Environmental Protection Agency Toxic Subetancea .Control Act . PCB Harking and Disposal Regulation CHAIN OF CUSTODY RECORD Name of Person Taking Sample Xnspoctor*e Humbert Signature* Type of Sample Date Taken Time Taken Place Taken Required Analysis RaUnquiahad byi Rallnqulahad byi Rallnqulahad byi Received by* Received by* Received byt Detet Date* Date* Timas Times Times Dlapatchad byi Datei Times Rtcalvad for Laboratory byi Date* Times Method of shipment* Distributiont Original to Accompany Shipment (inside locked shipment con tainer) . One copy fran laboratory to Regional PCB Violation Coordinator upon completion of analytica HONS 008335 22 INSPECTION PROCEDURES FOR - INCINERATION FACILITIES HONS 00033* Introduction to Disposal Site Inspections M When inspecting PCB disposal facilities there are at least three Investigations which should be pursued. 1) are the PCB disposal processess functioning properly. 2) are all of the PCBs sent to an approved disposal process, and 3) are the PCB records properly kept. lire first concern in inspecting a disposal facility is whether the facility effectively disposes of PCBs in a manner which is per mitted in the site's approval document. For incinerators and chemical waste landfill facilities there are specific minimal performance criteria which are incorporated as part of their facility approval documents (see requirements detailed below). Additionally the site approval document may apply further restrictions, require ments or waivers to the operation of the facility. Whenever an alternative method of disposal is authorized under the regulations the authorization will usually also specify performance standards for the alternative method to meet. The Inspector should collect the performance standards from the various approval and authorization documents and use them for comparison with the facility's operating data. Many of the performance requirements in the regulation are supported by requirements for related monitoring equipment. A neces sary first part of the inspection process is to determine whether all of the required monitoring equipment for the facility is in place and is operating properly. In addition to determining whether all of the equipment is measuring their required parameters properly, semo equipment, measuring vital criteria, may be required to Incorporate automatic shut off mechanisms. The inspector should establish that these mechanisms work as required. Another priority during an inspection is to determine if the facility properly receives and sends all of the PCBs that it receives to an approved disposal process; The basic issues are whether the facility is diligent in identifying the types of PCBs being received, and whether the facility is sending these PCBe to a disposal process which is in accordance with its approval document. A simple exanple of this would occur when liquid PCBs are received at a chemical waste landfill transformers or cont ainers and the landfill fails to remove the liquid PCBs from the items before disposal. The liquids would then have to be either properly stored or directed to an approved incinerator. ThlB situation will occur there transformers, containers, or equip ment are sent to landfills by users who have failed bo drain the PCBs. Another example would occur where incinerators receive PCB equipment or articles for disposal arri their approval document does not permit them to dispose of those particular items. Landfills receiving liquid PCBs should have observable procedures for recog nizing liquid PCBs when they are received and for sending them on bo an appropriate disposal facility. Incinerators should have similar procedure!- for identifying PCB items which may not be disposed of under their approval document. The procedures must HONS 008337 A-2 also provide Cor sending the PCB items to incinerators which are approved to incinerate them. An assessment of the facilities general procedures for receiving and disposing of the PCBs received can often provide significant clues as to whether the facility is careful in disposing of items in accordance with its approval document. A portion of the inspection should consider whether the facility is fastidious in disposing of all its PCBs. Many items such as rags old containers and even sweepings from floors may be disregarded as insignificant trash or waste. The inspector should explore the facilities diligence in PCB housecleaning and assure that such con tamination is not left unaddressed. A third but not necessarily final area of concern is the information in the facilities PCB records. The list of parties transporting PCBs to the a disposal facility should be copied. This nay provide new information concerning KB users. The inspector should also assess whether the facility is keeping all of the data which ia required under Annex VI and their approval or waiver douonents. In addition, the monitoring records for the facility should be reviewed to determine whether the facility is operating within its prescribed limits and whether these limits have been properly monitored. Some of the monitoring requirements in the regulations require continous monitoring. Some require intermittent monitoring. These monitoring methods should be reflected in the monitoring records which have been retained by the facility. The data should conform to the requiremnts of annexes I or II and VI as well as any requirements imposed by approval waiver documents. ' UNAPPROVES SITES The above discussion conerned only approved PCB disposal facilities. Inspections of suspected illegal or unapproved disposal facilities pre sent two pcoblems: First of all the inspector must establish the presence of PCBs at the facility. Second it must be established that the act of disposal occurred after April 18, 1978. Establishing the presence of PCBs may be accomplished by locating PCB labels or PCB items by sampling or by other methods such as comp aring aerial numbers to manufacturers records. Determining that disposal occured after April 16, 1978 presents a mare difficult problem. This may require direct observation of acta of disposal; unless other approaches are available. In the instance of PCBs which have at one time been in a proper storage facility, the items should be dated. Many other PCB items may be dated for one purpose or another. Where the operation of an unapproved site is suspected the inspector should make every effort to gather all relevant evidence to ensure comp lete enforcement against the facility.^, ____ HONS 008338 HONS 0 0 6 3 3 9 A* Incineration REGUIATOFT REQCIRPCWTS (1) $761.10 Disposal of Liquid FCBs (a) failure to comply with any con* dltions and/or limitations stated in the written approval document. r\ O' TVSWCTIOW FV0CEPTOE8_______________ Gaspare operation to conditions and/or limitations specified in the approval documents* <b) For ea<* operation of an lnctnerator or alternative to IntiLxierator# failure to gi^ the following written notices to the State and local governments within whose jurisdiction the disposal facility is located* (i) Notice at least 30 days before facility is first used for incineration of PCBs. in an approved incinerator. (11) At the request of any State or local government# annual notice during the time the facility is used for disposal of PCBe or disposed of during the year# not sore than 30 days after the end of the year oovered* ($761*10(g)(1)(1)#(11)) * Check records of SCB disposal operation* Ask to see copies of notices* o DOCCKESTATIOW Obtain copies of record and charts that show that that operation exceeds, specific limits* Photograph If pos sible* Document in field book*- Obtain copies of records written notices* Vote discrepancies* -A3- racpuqgpr wnonaBns nBWCHOB PBOCa3DI cogwamnai (c) FOr any person who dispose* of PCBo aider an exemption from incineration, failure to give at least 30 days prior written notice of such disposal to the State and local govermerits, within those jurisdiction the dis posed is to take place. (5761.10(g)(2)). Determine whether esaptien is required, i.e. Whether disposal other than by incineration takes- place. Verify notice. - Obtain copies of notice letters. Verify by phone or letter that letters were sent or received by agencies. (d) For any person tho is required to incinerate any PCB and who con tends that there is available a means of destroying FCBs which is as efficient as the incinera tion procedure provided in Annex I, failure to obtain written approval of the Regional Attaintstrator before employing any method of disposal of any PCB other than incineration with Annex I. (5761.10(f)). Ask to see approval documentation determine whether disposal methods require approval beyond customary site approval. Inspector should note in field book that PCBs are being handled in a manner such that all FCBs are not incinecated. Verify by examining approval document. (2) Sec. 761.10 Disposal Of Non-liquid FCBs (a) Failure bo properly dispose of non-liquid FCBs in the form of contaminated soil, rags, or other debris (761.10(b)(2)), soiled or contaminated with FCBs as a result of a spill or as a result of placement of FCBs in a disposal site prior to February 17, 1978 (761.10 (b)(3)). In areas there PCB items are used, processed, transported, stored or decontaminated, or otherwise handled^ check for likelihood of PCB contamination Cbserve for oily residues, discoloration etc. Sample, if necessary. Investigate source of contamination. Note observations in field book. Photograph obvious contamination and sources of contamin ation. (b) Failure bo properly dispose of PCB articles. (761.10(c)). Assess Wiether facility procedures Photograph PCB Items assure incineration of all FCBs which are not inciner- or sending them tao proper disposal, ated or sent to disposal. OOo MSOMTOW MOU1WEMW8 (c) Unless decontenlnsted In accordance with Annan IV, fallwe to diepoee of KB containers In an incinerator that cosplies with Annan I or In a chemical vaete landfill that coapliH with Annex II. ({761.10(d)(1)). (d) Failure to drain the PCB con tainer of liquid and flash it if necessary so that remaining PCB chemical sub stances are rnaoaed. IMPECTIOW WOCEDOWtS Deternlae procedure for deposition of of used PCB containers, articles, and equipaunt. lock for containers ihidi hare residues. lock for narked and or dated containers whidi hare not been disposed but are contaminated. DOCOWPCTATIOII Beta in fiald bock soarea of it<taint on isproper procedures. Photograph Marked contalnara uhlch are inproparly diapoaed. 'Sane as above. Sana as above. (3) Sec. 761.20 Marking of H3 (a) Failure to nark as specified with Hark as described in Annex V each of the following itens in existence on or after July 1, 1978i Check PCB containers, article con tainers and storage areas for appropriate marking. Photograph itens that era unmarked. Obtain sample from unmarked containers. Bote discrepancies in field book. (I) PCB Containers (II) PCB article containers (ill) Such storage area used to store PCBa HONS 0 0 8 3 4 1 (4) Sec. 761.40 Incineration (a) Continuously monitor and record Check the incinerator record* the combustion products itaneeer and the combustion product* PCBs are being incinerated. At onitoring record*. Nek* sore a minimum 0., CO, and CO are mon itored. ({761.40(e)(7)). that 02, CO-* and CO ear* Moni tored at ait tine* daring the Failure to noiti tor reeulte in VCB incineration period# Bold for0opJISt!SSK"Ti9?iSofSf}8?TK j data on CO*. CO for use in oom- Vo bustion efficiency drtarsination. Bo combustion products Monitoring record* are available for period* of PCB incineration. Inspector Most not* this in field book. -AS- MQNS 0 0 8 3 4 2 oo REGULATOR BBgPIRPgMTS HWFBCTIOB (b) PCS fed rate and quantity of PCBe fed into eoebutioB qratwc oat be nuvd end recorded at least every IS minutes. (761. 40(a)(3)). Failure to comply re sults in laaediate suspension of incinator operations. (761.40(a)(li>). Check the FCB feed rate and quantity records, look for differences in the recording intervals of greater than 15 1notes daring FCB incineration. Bold data on rate and quantity for use in dwell tine determination. (c) The taaperature of the incinera Check the FCB incineration and tion process shall be continuously temperature records making sure recorded, (f761.40(a)(8)(ii)). that the temperature was continuously monitored throughout the FCB Incin eration process. (d) Depending on the selected com bustion criteria, the tmapereture must be maintained at 1200* (+ 100*0 or 1600* (+100*C) (761.40(a)(l)(i)s(ii)). Failure to comply results in immediate suspension of inciner ation operations. Check the toaperature records against the selected combustion criteria tem perature. Make sure that the tmspara* ture is maintained within the 100* range throu^iout the FCB incineration process. (e) Depending on the selected com Check the combustion products, bustion criteria, the oxygen monitoring results. Make sure concentration must be maintained that oxygen concentration was at 2% or 3% excess oxygen. maintained at the appropriate ((761.40(a)(1)). Failure to main level during FCB incineration. tain excess oxygen at the level Verify automatic cut-off. specified causesc automatic sus pension of incinerator operations. (761.40(a)(8)(ill)) Depending on the selected com bustion criteria, the dwell time must be maintained for at least 1-1/2 or 2 seconds. Obtain feed rate data from step 2. Have the operator provide the calculations he need to determine dwell time of the o UCCWEWMIOil Monitoring intervals greater than IS minutes during FCB incineration Inspector must note. this in field book. Mo temperature recorded for periods of FCB incin eration. Inspector must note this in his field book. Temperature falls below above the specified limits Inspector must note this in his field book. Oxygen concentration fall below specified excess oxygen level. Inspector must obtain a copy of the monitoring records that show this violaton. If not possible, note the suepected violation in field book. Dwell time is leaa than specified in the selected combustion cri teria. Inspector must ob tain record of dwell time. -A6- HONS 0 0 8 3 4 3 a WCroWOWT KBOOiKPgWTS (|761.40U) (8X111)). Failure to maintain at laaat this dwell time causes auto* matic suspension of incinerator operations* (g) Tba flow of PCBs into tho incinrator mast stop automatically if ths combustion fpsraturs drops below ths value in ths selectsd combustion criteria* (h) Water acrihbers shall be used for HCL control during PCB incineration* <9 o 1W8WCCT0W PHOCEDOEES Material in the cembustion . chamber during PCB incineration. Calculate the maximum flow rate possible that would stay within the liadts of ths dwell time* Have ths operator show the tempera ture limit detection mechanism and tba linkaga to the automatic shut-off waive controlling PCB input. If possible# have the operator teat the unit using off line testing mechanisms incorporated in the devices* Review records of flow rate and combustion tempera tures and locate any periods in which the temperature fell below the specified limit* Check the ^proval letter for the performance requirements for ths water scrubber# and verify compliance reguirmssnts* ments. BOCCWBirTJttlOW FOR TIOLATIOW tain copies of ths records showing the times when the flow rates or the diamber velocity exceeded the rates that correspond to sinimus dwell time* The inspector should also show the appro priate dwell time calcula tions. Zf not possible# note suspected violation field book. Wo shut-off mechanism exists# or no actuation of ths shut-off median!am occured during a period in which the time fell below the specified limit. In spector must obtain copies of records showing the tmp eratore drop and no cor responding cessation of flow* If no mechanism exists# the Inspector should talcs photographs of the feed mechanism that attests toi the absence of such a shut-off mechanism# and record na ture of component parts and modal numbers. If not pos sible, note the suspected violation in field bode* Wo water srubber is being used. The Inspector must take photographs of the emission control system that attest to ths abssnos -h7- kegctatort nBwiimuatTS mnctitm aociwwi itr mtttrs shall asst azqr performance requirements specified by the Regional Mwlnlf trator. (|761.40(a)(9)) (1) Combustion efficiency shall be at least 99 per cent oca* puted as follows t Obtain concentration data free step 1* Calculate the coalnstion Coabustion eff Cco^- Cco x 100 CcOj Where Ccoj" Cone* of carbon dioxide Cco " Cone* of carbon aonoid.de . ! Section 761.40(a)(2) [}) Additional requirements that the Cheat the approval docuaent for Regional Adalnistrator finds additional requirements, necessary oust be aat. (761.40(d)(4)). i (5) Particular Record Keeping Require ments for Incineration Facilities (a) Failure to prepare end maintain all documents required ' by Annex FX. (|761.45(b>). Request opportunity to Inspect PCS records. cf the water scrubber. Inspector aust obtain eoples of records shoeing non-compliance with scrub ber raqulronsnts. If not possible# note the sus pected Violation In field book. . Coabustion efficiency lees than 99 per cent. Inspec tor aust obtain a copy of appropriate records shoe coabustion products concen trations. Shoe calcu lations In field book. note failure bo produce, or production cf inade quate records in field bode HONS 0 0 8 3 4 5 RBSCuanrar KseoiRBaans 1B8WBCT PH3Q3PUHES (b) in addition to the records and monitoring requiranenti specified in Mates VI, (See $761.45(b)) failure of each owner of a KB incineration facility to collect and maintain the following infer- nation. (i) Mien PCBs are being incin- Check records. . erated, the following contin- uous an) feort-interval . data shall be collected an) maintained for a period of 5 years from the date of collection. o ftate and quantity of I PCBs fed to the canbustion system, as provided in Annex I. (5761.40(a)(3)). o Stack emission products including 02 C02, and CD, as provided in Annex I. ($761.40 (a)(7)). 1 (Xi) Mien PCBs are being incin erated, data and records resulting from the monitoring of stack emissions as required in Annex I - (5761.40(d)(8)), shall be collected and main tained for S years. vj UXUHEWPgiai -. . Note discrepancies in field book. Obtain ' copies of any data or reoords available ovei the interval in ques*'" -A9- HONS 0 0 0 3 4 6 Liquid KB* - Incineration BBGOUqPIg RB0UIREHP1TS (c) Dotal weight in kilogram of any solid residues gener ated by the incineration of PCBs during the calendar }ear, the total wei^it in kilogram of any solid residue's disposed of by such facility in dieaical waste landfills, and the total weight in kilogram of any solid residues rattaining on the facility site shall be retained for 5 years. (d) When PCBs are being incin erated, additional periodic data shall be collected and maintained as specified by . the Regional Administrator pursuant to Annex I. ($7(1. '0(d)(4)). (e) A document shall be pre pared on any suspension of the operation of any incinafor by the owner or operator thereof, as required in Annex I - (5761.40(a)(3)). The document (hall, at a mini mus, include the date and time of the suspension and an explanation of tbs circuestances causing the sus pension of operation. Hie docwent shall be sent to UBa>BCnOH PFCCBWRES ooawyancN -A10- INSPECTION PROCEDURES ton CHEMICAL HASTE LANDFILLS HONS 008347 HONS 0 0 8 3 . Chemical nut* landfills RBCPIATORT RWOIKHPUS_______________________ 1. SC. 761.10 Disposal of PCBs (a) Failure to proparly dispose of liquid PCS Chemical Subatance and PCS Mixture* in an incin- . arator that cooplias with annex I. (761.10<a)(b)). IMPBCTUM fOCBUUBBg Observe for liquid PCB wastes deal stated for disposal, and for improper disposal of liquid PCB. (b) Failure to properly dispose of non-liquid PCBa in the Corn of a) contsinatad soil, raqa or other debris (pernitted. until July 1, 1980), b) soils and debris contandnated with PCB as a result of a spill or of plaeessnt of FCBs in a disposal sit* prior to February 17, 1978, and e) seaage treatment sludges that are PCB mixtures, (761.10(b) (2M3K4)). Determine whether PCB itos are placed in areas of the site which are approved for PCB disposal. lock for peculiarly placed itama. (c) Failure to properly dispose of look for ancmolous discarded PCB articles. ({761.10(c)). and improperly placed items. i (d) Failure to, prior to disposal Cheek on procedures for handling in a chemical waste landfill, transformers at the landfills drain each transformer of all Observe transformer handling opera free flowing liquid, fill the tion* Check transformer draining . transformer with solvent, and areas, solsent filling areas* Check allow 18 hours before solsent landfill note# ter undrained trane- is drained. See ({761.10(c)(ii formers* . Photograph and sample sue* pected areas of illegal disposal* mote or copy records vhich indleate items ere improerly place* Photograph items or sample areas suspected of being cont aminated* Photograph Improperly pieced item* Locate on map Photographic documentation of improper procedures* Record detailed observa tions in field book* 11- HONS 0 0 8 3 4 9 of' Chemical luta laatfilla e RBCULATORT MOOTUPmtTS IWPCIIOi PKOODM (e) Failure to properly dlepoee of PCS chemical substances end PCS mixtures, which ere removed free transformers. ($761.10(c)(11)). Check on procedures Bor handling drained mixtures from transformers. Observe transformer drainage opera tion. - (f) Unless decontaminated la . Accordance with Annex IV# failure to properly dispose of KB containers. ($761. 10(d)(1)). Bee incineration# chemical# and waste landfill procedures. (g) Failure to drain the KB eon* tainer of liquid and flush it if necessary so that re maining KB chemical sub stances and FCB mixtures consitute no more than 0.5 per cent of the total volume of the container, prior to dis posal in a chemical waste landfill that complies with Annex II. ($761.10(d)(l)). i Check landfill eite for KB con tainers that contain noticeable mounts of residual materials. Obtain samples of material. Measure the else of the container end the total volume of residual. (h) For all KB articles other than transCorners, end capac itors; if incineration is thou^it to be technologically infeasible, failure to obtain written permission (and fail ure to comply with any limita tions specified therein) from the R.A. to use a chemical waste landfill for disposal. (1761.10(c)(3)). Check landfill site for KB articles other than tranformers or capacitors. Ask to see R.A.*s written permission to use chemical vesta landfills. o DOCUHHWATIOB Photographic documentation of improper procedures. Record detailed observa tions in field notebook. Bee Incineration and chemical wests land fill procedures. Calculate volume of residual as percent of volumne of container. Document samples. Determine if residual volume exceeds 0.5 per cent of total container volume. Obtain photographs of FCB articles disposed in land fill. Obtain copies of records. Record observa tions in detail in field book. -B2- MUNS 0 0 8 3 5 0 Optical Hast* Landfills HBJMOB BBIIlWini v./ neracpai mxrooRgs (i) Failnt to store, prior to dis posal, ry PGB liquids or nooliquids described abow, in a storaqe facility that ccaplies with Mutex III. (1761.10(a) (2), (b)(5),(c)()). See storage procedures. (j) Failure to store aod dispose of liquid PCBs resulting from spill incidents in accordance with 1-5 above. (5761.10(e)). See storage and disposal pro cedures. (k) For each operator of a diaaical waste landfill or alternative to incineration approved aider (6) above, failare to give the following written notices to the State and local governaents iwithin those jurisdiction the `disposal facility is located: (heck records of PCB disposal, ask to see copies of written notices. (i) Notice at least 30 days before a facility is first used for disposal of PCBs, and i(ii) At the request of any State or local governsent, annual notice during the tine the faci lity is used for dis posal of PCBs of dis posed of during the year, not more than 30 days after the end of the jear covered. ($761.10 (g)(l)(i)(ii)). 00CUHEN1A11CM_____ See storage procedures. See storage and disposal procedures. Obtain copies of records written notices. Note discrepancies in field book. -B3- MQNS 0 0 8 3 5 1 Ch--icM (ut landfills wacouaoKf tmnmnm VJ' (1) For any parson wbo <Haposts of FCBs undtr an cnaption trot chemical wts landfilling, faHurt to tlsa at laaat 30 days prior vrittan notlea of such disposal to tha Stats and local yoisnutiits idthin whosa Jurisdiction tha dis posal is to taka placa. (761.10(g)(2)). Raqq^t capita of notice* Vtrify receipt if necessary* (2) Sec* 761*41 Operation Haoulrmants for Chemical Waste Landfill* (a)(i) Soils eeet certain para meters (parts i through el)* Liners shell be compatible with PCBB end liner integrity . maintained* Soil underlining shell be provided ec well es soil cover* (761.41(b)(1)). Check to see if cover has been pot on completed burial areas or does not cover entire area used, to bury PCBe to an adequate depth, or if soil has been eroded, damaged, or renoved* Photographs of inca plate cover should be taken* Kote in field book. (li) Hydrology* There shall be Inspect site for flowing or no hydraulic connection between standing surface water end site end standing or dotdng for. existence of useable moni surface water* Site shall toring wells and leachate col have monitoring wells end lection systems. leachate collection (761.41 (b)(2)). (Hi) Flood Protection if landfill is below 100 year floodweter elevation; opera* tor shall provide division dikas around landfill a TttftRiWh a.?: tfsitai Inspect for 100 peer floodvnter elevation and dike require* ants* Inspect integrity of dike* if appropriate, and deter mine height. DOCWUHOTIOi Hots absence of actual notice in field notes. Photograph inadequate cover. Hots in field book details of cover appear ance. Photographic -documenta tion that flowing or standing surface water exists. Mqke detailed notes in ffeld book show that monitoring wells or leachate system is not workable. Photographic documenta tion and field book note statiog that dike maint enance is poor, or that dlk has been eroded or damaged by operations so that gaps, cracks, or height loss has resulted. SNOW Ctmleal Ut Landfill* REGULATORY KgQUXWUJtTS nrspBcyiow procedures (iv) If landfill la above the 100year floodveter elevation? the operators shall provide di version structures capable of distorting all surface eater runoff froto a 24-hr, 25-yr ton. (761.41tb) (3) (111) ) ttramlne permit for 100 year floodeater elev* and diversion require ments. inspect diversion struc tures if appropriate. (v) Monitoring Systems* Monitor veils shall be cased and the annual or space between sons of saturation and sur face shall be completely backfilled or plugged with cement to prevent intrusion of surface water into well sone* The well shall have removable cap* (761*41(5) (ii)(S))- Check general integrity of wells* Check for cover* Insure that well is not plugged or filled with soil or debris* Take siples from wells* (vi) Leachate Collection must be monitored monthly for qual ity of leachate produced* (761*41(b)(6)) Check permit to determine leachate collection requirements r Check general integrity of leachate collection system. o oa> w DOCUME5TATIOS Photographs shoving that structure does not meet requirements of permit, maintenance is poor, or structures have been damaged, or erosion has occured. Make detailed notes in field book* Annual space is not completely backfilled or concrete in space is crack ed or crumbling* Wall is plugged, buried, damaged flooded, or otherwise unuseable* Samples cannot ba retrieved from well* Analysis of well indicating excess PCBs content* Obtain photos* Make detailed notes in Held book* Leachate system is not ' properly maintained* There ie visible evidence that system is plugged, or damaged* Samples cannot be retrieved free system Analysis of sytem sample show excess TCBs content Take samples from system Photo as appropriate* Make detailed field note oo Chemical >M landfill* - Bection 781.41 HBpCmgCHTSIltSraCTIOW PBOCEDOhES (vii) Chemical Hast* landfill Operations Visually obaerv* handling o KBs shall ha placad in the operations. Check for brohen ' landfill in a manner that Will or ruptured containers in prevent damage to containers holding and disposal areas, and articles. Other wastes, incompatible with ICBs and KB containers, shall be segregated from ICBs through out the waste handling and disposal process.(|761.41 (b)(7)(D). ' l HONS 0 0 8 3 5 3 will) Supporting Facilities | o k six-foot woven mesh fence, wall, or similar device shall be provided around the site. Inspect the fence or barrier for integrity, o Hoads shall be maintained to and on the site adequate Inspect road visually for ruts, to operate and maintain the bu^s. Hoad surface la inadequate site without causing nuisance, or hasards. so that it is too muddy in raining weather. It is net properly cleaned (1761.41(b)(8)). of snow. It is properly svfaced so as to minimise dust control* uucuHtifraTioii Operations observed that could damage con tainers is observed (e. g. dropping then, push ing them, pushing then with bulldozer, inappro priate stacking unless transferring, malfunc tioning handling equip ment), actual damaged containers seen. Pud dies of KBs seen in areas. Analysis of sur face soil shows exces sive KB content. Incom patlble wastes identified in KB areas. Take soil samples in areas or leaks from containers. Identif other wastes in handling and disposal areas. Bake detailed notes in field book. Fence or barrier is in disrepair or is damaged. Photographs and detailed field book notes as approp priate. Photograph conditions of roads. Naha detailed notes ia field book. -B6- Cbaiical Waste Landfills - Section 7U.41 RBsaiATORi HgjoiBBiansrnsreenow pfocedores o Site shall be operated anl maintained in a manner to prevent safety problems or hazardous conditions resul ting from spilled materials or wind blown materials. Inspect operations for gen eral good housekeeping as specified in the operations! plan (3) Particular RecordKeeping Requirements for Chemical Waste Landfills (a) Owners or operators main tain annual records, effective July 2, 1978. Inspect records and determine compliance with Annex VI. (i) Dste when PCBs removed from service and placed into storage. Quantities ' indicated as followsi o "total weight in kilograms of PCBs in containers including identification of containers contents such as liquids or capa citors. inspect records and determine ccnpllance with Annex VI. HONS 0 0 8 3 5 4 o Total timber of transformers and weight in kilograms of any PCS mixture con tained in transformers. o "total number of PCB large high, or low voltage capa citora. aocoHttnxnow Observe and photograph violations and make detailed field notes. Document non-compliance in field book or obtain copy of records. Document non-compliance field book or obtain cop of records. HONS MHiULMORf WWIIWHS (ii) PCBs removed fra* service, loca tion of initial disposal or storage facility and name of ouner or operator. ntspBcrxcw piccaxncs (iii) Total qualities of KBs retaining in service at end of calendar year. o Ibtal eeight in kilogram of KBs in containers including identification of container contents such as liquids or capacitors. o Total nunber of transformers and weight in kilogram of KB contained in the trans former. o Total ruber of KB large high, or Ion voltage capaci tors. ' (b) Onners or operators document on PCS handling at facility for previous calendar year. Effective date of regulation May 1, 1979. Document must be available July 1 of each year and include: Request copy of report or inspect report at site. Documents must be retained at site for 5 years after facility no longer used for storage (1) Date PCBs received and identification of person and facility bos hca PCBs Here received. DOCOHBTOttlOH Docueent non-compliance. HONS 0 0 8 3 5 b K^ri'iArow woomnnis (ii) Date PCSs disposed of or trans ported tao another disposal or storage facility, including identification of types of KBs in containers and those not in containers. (iii) Hei^it of PCB containers, aid weight of FOB chemical substance or mixture contained in' transformers received, transported or diposed of. Identify FOB container contents such as liquids, capacitors, etc. Identification of facilities to thich PCB containers or PCB chemical substances or aixtures in transformers are transported. <iv) Nimber of PCB articles or equipment not in PCB con tainers received trans ported to other storage' or disposal facility, and remaining on facility site at end of calendar year. Identification of specific type PCB article and equipment and identification of facility transferred to shall be included. (c) Special Records Retention (i) All documents, correspondence and data provided by facility to State or local government agency pertaining to disposal are retained at the site for appropriate length of time. v^' nsracrioH pbpcbxmss . . ' j ' . , I Examine Facility records. tiocowBHxnai Dociaent non-compliance. -B9- o MAXXING UQUZR1MENT8 o HONS 00835 7 eseeoo snow C ' larking taqulraaents r\ wsooaowr wouuujairs UCPBCTICN PBOCHXJBES (1) Items to be marked ML as of July 1, 1978 (a) all PCB containers (b) PCB Transformers (a) at the tine of manufacture (b) at the .time of distribution in coamerce (c) when removed from service (c) PCB High Voltage Capacitors (a) at the time of manu facture (b) at the time of distribution in commerce (c) then removed frcm eervice. Look for unmarked PCB items. Obtain legal justification for failing to mark any PCB item (there requirement exists, and item is not marked, document violation. Many PCB items must be marked upon removal frcm service but need not be marked n*iile in service until January 1, 1978. Between July 1, 1978. (d) Equipment containing a PCB transformer or large high voltage capacitor (a) at the time of manufacture (b) at the time of distri bution in commerce and (c) when removed frcm service. (e) PCB large low voltage capacitors when removed from use. (f) PCB motors. (g) PCB Hydraulic systems. (h) PCB Beat Transfer Systons. (i) PCB Article containers containing marked PCB items. (j) PCB Storage Areas. u DQQBPmmcw Ifcotograph, to document lack of- label. Sanple or otherwise establish that itan is a PCB item. Note in field book rea sons why itans should be marked, and status of item which imposes marking requirement. -a- c- v.y MSOmORT REOTIHZKZWTS___________________ (2) Items which oust be narked as of January 1, 1970. (a) All PCS Transformers (b) All PCS large high voltage capectors (e) All PCS equipment con taining saall PCD capa citor* must be narked ( ).according to 761.20(a) 4 (3) Aa of Oct. 1, 1978 all vehicle* for transporting PCB* must be marked. (4) Certain non PCB equipment (see 761.20(a)(b)) mast be narked Mo PCB's." (5) Improper use of Hark kg IKSPECTIOB PHOCtOORES All PCB items shall be checked for required label. All vehicles includes fork lifts etc. used at facilities Hot expected to arise at pre sently projected inspections. Photograph unmarked item explain why mark is required in field notes. jPhotographs at vehicles used in transport of PC HONS 0 0 8 3 5 9 -C2- O INSPECTION PROCEDURES FOR . ELECTRIC UTILITIES - 0 1 MOMS 008360 47 -Dl- 0. Introduction to Electric Utility Operations Electric utility operations consist of four primary activities: (1) generation of power, (2) distribution of bulk, high voltage poter, (3) distribution and sale of electricity to direct users, and (4) con struction, maintenance, and repair acitivities. lower Generation . Electric power can be generated using a variety of methods, including as hydroelectric units, nuclear reactors, and coal or oil fired generators. Generating methods have little bearing on PCS use except for coal fired generating facilities that use electro static precipitators for air pollution control. Precipitators frequently use PCB transformers for voltage control because of the location of the transformers on the roofs of buildings, (fire codes may require non-flammable KB transformers and large capacitors may be used for other applicat within the generating facilities, but such uses are analogous with these in any other large industrial facility. Bulk Power Distribution . Bulk power distribution occurs vhen large electric utilities such as the Tennessee Valley Authority provide power to smaller electric utilities such as Rural electric co-operatives or municipally owned electric utilities. These smaller electric utilities directly dis tribute and sell power to final consuners. Bulk distributors will probably own fewer PCB transformers, and large capacitors, as they are less involved in providing lower voltage or power factor correc tion for final customers. Large hi^i voltage capacitors, however, are frequently used in substations that distribute power to small utilities. Distribution and Direct Sale to Customers Electric utilities involved in the direct distribution and sale to end users will be the most common type of electric utility. These utilities may generate their own power, but the most important factor Is the design of the distribution system. Substations used for vol tage changes or other distribution corrections will contain racks of large high voltage capacitors (all will te PCB units except for recent replacements). Email transformers used for will also be found in seme substations. Larger PCB transformers are seldom found at sub stations unless special fire code considerations or unusual space constraints dictate the use of PCB transformer fluids. Power poles within the distribution system will have both large capacitors and transformers. These should contain mineral oil and not PCBs uiless special fire requirements or other factors, such as personal preference, dictated PCBs. MQNS 000361 40 -02- In Borne cases, the utility may own large capacitors or transformers that are located within buildings or other facilities owned or operated by final users. The capacitors will probably be PCB units and the transformers may also be PCB wits because of fire codes. It should be noted that fire codes do not require PCBs in transformers, but rather require fire protection in the event of an electrical failure that could ingnlte the transformer coolant. A fire proof vault could serve the purpose, but the use of non-flammable coolants has been the simplest solution. Silicon based coolants, other newly developed coolants, or even air cooled transformers (usually much larger than oil cooled uiits) are alternatives that may be used to meet fire code requirements. Construction, Maintenance, Repair Construction, maintenance, and repair activities performed by utili ties will be the primary activities involving both direct contact with PCBs and opportunities to comply with the marking and disposal require ments for PCBs. Construction operations will probably not involva the installation of new PCB transformers or capacitors, but the removal or relocation of existing PCB units may occur. PCB disposal may result from these construction activities. Capacitor Maintenance . PCB capacitor repair and maintenance operations will take place either at the location where the PCB units are used, or at a remote repair faci lity there the PCB wits are delivered for repair or maintenance. Main tenance of large capacitors is relatilvely straightforward. They either function properly, or they are replaced. When capacitors fail to fwction. properly it is usually because of a short circuit within the wit. This condition may cause the capacitor casing to bulge because of internal pressures due to the short circuit and the casing may rupture, in which case sane of the PCB liquid may leak out. Short circuited or damaged capacitors are never repaired, just replaced. The old wits are usually disposed. . Transformer Maintenance Maintenance or repair of PCB transformers is more varied. Cn-site or in-place maintenance can include the following: (a) Removing a sample (one pint to one quart) of PQBs to test . dielectric strength (the presence of water, carbon, or other contaminants lowers dielectric strength); (b) Adding a small amowt of PCBs to bring the PCB level up to the full-line (topping off); HONS 008362 49 -Ki te) Replacement or resealing of bushings, insulators, or gaskets (the PCB level of the transformer is lowered below the affected part and then refilled to the full-line after repairs have been made); (d) Removal, filtering (clay filter or paper cartridge), and return of PCB liquids into the transformer (filter media and any waste PCB liquids will require special disposal); (e) Removal of PCB liquids into the transformer and refilling with ' another batch of PCB liquids (unusable PCB liquids will require special disposal) ' PCB transformer repair and maintenance operations that are performed off site will usually be conducted at a transformer repair facility oper ated by the electric utility or by a separate transformer service caepany under contract. Special Electric Utility Operations Related to PCBs In addition to the above activities related to the actual use of PCBs, the PCB marking and disposal regulation will probably require electric utilities to perform several ancillary activities. Host utili ties will establish long term, ($761.42) and temporary PCB storage for disposal sites ($761.42(c)(1). Special markings will be required for PCB transformers and large capacitors in use or in storage, for containers of PCBs in use or in storage sites, and for vehicles used to transport PCB transformers and containers to storage. Special records will have bo be kept by utilities on PGB activities, (these records will permit the utility to keep track of PCBs to storage for disposal or final disposal. The records will identify locations of Storage areas and disposal sites and will enable PCBs to be traced . to determine if final disposal is performed in accordance with the ' regulation. ' II. Recommended Approaches for Conducting Electric Utility Inspections Inspection Priority and Records Review Before Initiating an inspection of an electric utility the following factors should be investigated and evaluated; (1) The relative size of the utility in terms of the number of kilowatt hours sold annually should be determined along with scope of activities (as descibed in the preceding sections) conducted by the utility. HONS 008363 50 -D4- (2) Previous inspection histories (TSCA as well as other environ mental health statutes) which may indicate corporate attitude toward canpliance with environmental regulations. (3) Utilities for which a third party report or "tip-off" has been made relating to illegal disposal or storage. These reports can come from competitors, environmental "wratchdogs", trans porters, or the general public. These potential sources of information can be effectively used only if the sources are aware of the general requirements of the regulation and the potential harm that can result from non-compliance. (Notes all third party reports should be converted into permanent evidence via signed statements, or, preferably, affidavits). HONS 008364 51 Utility Compliancies: Potential Violations# Inspection Processcres and Documentation A. General Inspection Procedures For those utilities selected for inspection# an investigator should (1) go to the central location for PCB records# (2) conduct a records examination as outlined in Appendix D (Annex VI)# and (3) based on the findings of this examination# determine the need for physical inspection of utility facilities. If the records are legally sufficient# and do not indicate that the utility has a violation# no further inspection should be perfo aed at the site* If records sither do exist or do not meet the minimal legal requirements of the regulation# o indicate that the utility has violated the regulation# a full inspection should ensue. The records review aay indicate specific facilities where violations might be expected# but in the absenc of specific leads# inspections should be directed in the following priority* (1) Transformer repair and maintenance facilities located at the utility (2) Long term PCB storage for disposal facilities (3) In use facilities such es major substations and coal fired power generation facilities (4) Storage areas for serviceable PCB articles (5) Temporary storage for disposal facilities (6) PCB transport vehicles B* Specific Inspection Procedures and Documentation REGULATORY REQUIREMENTS INSPECTIOW PROCEDURES______________________________________________ (1) <761.10 Disposal of bcB DOCOMERTATIOH MONS 0 0 8 3 6 5 (a) Failure to dispose of liquid PCBe Direct observations of illegal disposal Direct evidence (soils in an incinerator that complies when it occurs would be the most con etc.) of illegal PCB die with Annex I. (761.10(a)(b)). vincing evidence# but it is unlikely posal should be sampled this will possible* Direct observa to determine if any tion and sampling of residues from an . residual concentrations illegal disposal activity can be are below S00 ppm. acheived in some cases#, and such Special samples and notes evidence should be obtained whenever should be obtained when possible* there is suspicion that watercourses are being contaminated* i/i K) HONS 0 0 8 3 6 6 aSSCLUTOKT IWSWUTlOir WOCgODBES (b) Failure to dispose of non-liquid Inspect end senile wastes to determine PCBs in the forrt of (e) contamin- if non-liquid (does not flow freely or ated soil, rags or other debris, is not readily puapable) and contains and (b) soils and debris contain- 500 ppm or greater PCBs* ated with PCBs as a result of a spill or as a result of placement ' of FCBs in a disposal site prior to February 17, 1978, in an incinerator that compiles with Annex I* or in a chemical waste landfill that complies with Annex II (for itens specified in (a), disposal in a chemical waste landfill is permitted until July 1, 1980. After that date, these items . must be incinerated) (761.10(b) (2)(3)) (c) Failure to dispose of FOB trans formers and other PCB articles in an incinerator that compiles with Annex I, or in a chemical waste landfill that complies with Annex II. (761.10(c))* Determine if articles contain PCB mixtures or chemical substances. For transformers, use direct sampling. For capacitors, manu facturers reports can be used. oocamtKrxcm shorelines haws been contaminated* Photo graphs should be taken whenever possible and sample locations should be precisely referenced and located on maps or plots* Properly Identify sample and analytical results Field notes on physical nature of waste (liquid vs* non-liquid) Properly Identify sample and analytical results in field book. Copy any manufacturer's reports. .06- GO RSCgmTOKT REpOIREPgNTS (d) Failure to* prior to disposal in a ^ciical vasts landfill* drain each transformer of all frae flowing liquid* fill the trans former with solvent and allow 18 hours befora solvent is drained. (761.lQ(c)(ii)). IBSPBCTIOK PROCEDURES Open drain valves on tranformers and collect any free flowing liquid. If liquid volume collected is greater than 5% of the transformer volume* then adequate draining did not occur. This may apply more to disposal sites. If a utility has not completed adequate draining* they could claim that the disposal site is responsible for that operation. Follow may be neces sary. DOCUWarTATIOW (e) Failure to dispose of PCB chemical substances and PCB mixtures which are reeved from the transformer# (including solvent)* in an Incinerator or that complies with Annex I* or in a chemical waste landfill that complies with Annex II ($76l.lO(cMii)>. . Interviews with personnel to determine familiarity with power draining pro cedures as indicators of proper draining. Field notes and statements from workers. Obtain serial numbers or other . direct identity of trans former. (f) For any large high or voltage Similar to A*3. except that burden is capacitor owned by any person# on owner to furnish other evidence if failure to dispose in an inciner he contends PC8s are not present. This ator that complies with Annex I* requirement Is intended to force manu or in a chemical waste landfill facturers of new large capacitors to> that complies with Annex II* un mark their products *non-PCBs* if no less it is known from label inform PCBs are used. ation manufacturer's literature or chemical analysis that the capacitor does not contain PCB chemial sub stances or PCB mixtures. * (761.10(c) (2) (i) *{ii) ) Similar to A* 3*. (g) Unless decontaminated in accordance with Annex IV, failure to dispose of PCB containers in an incinarator that complies with Annex I# or a chemical waste landfill that complies with Annex XX. (7^1.10(d)(1)). Determine that containers PCBs by direct samples of residuals or from records review or third party statements. Field notes, photographs analytical- results* copies of records* and statements from employees or third party observers. MONS 0 0 8 3 6 7 HONS 0 0 8 3 6 8 K5SULAT0RY RSpOmPCSTS (h) Failure to drain the PCB contaliier of liquid prior to disposal in a chemical waste landfill that corrplies with Annex ZZ (76110(d)(2)) INSPECTOR PROCEDURES Observe to determine if any physical evidence of PCBs is present inside or outside of container. If PC3s are observed or if other information suggesting inadequate decontamination obtained, investigate decontamin ation process* See (i) For PCB articles other than . Examine documents from R.A* granting transformers and capacitors, permission* Continue investigation if incineration Is thought to determine if special conditions to be technogically infeasible, accompanying R.A. permission are failure to obtain written being complied with. permission (and to comply with any limitations specified therein) from the R. A. granting permission to use a chemical waste landfill for disposal* (761*10(e)). Failure to dispose of Liquid PCBs resulting from spill incidents in accordance with 1-9 above, (761.10(e)) Follow up spill reports* Direct inspection or contacts with spill officials will indicate degree of compliance* Son-compiiance will require procedures similar to 1 end 2, except for records review. 00 Failure to properly store, prior to disposal, airy PCB liquids or non liquids described in 1-10 above, in a storage area that complies with Annex III. (761.10() (2),(b),(5),(c)(4)(d)(2)). Ul) For any person who is required to incinerate any PCB and who contends that there is available a means of destroying PCBs which is as efficient as the incinerprocedures provided in Annex Z, See 9 above* ' POCUMSffTATZOB Field notes, photographs statements from employee or third party observers Copies of documents* Other documentation based on special conditions in R*A* permission* Samples of contamination zones and removed material Third party reports or direct observation of field disposal* See 9 above* >08- RBGOIATORY 8B30IPgMBfIS INSPUCTICH PROCEDURE failure to obtain written permission (and failure to comply with any limitations specified therein) from the P.A. before employing any method of disposal of any PCB other than inciner-- ation in a facility Wiich complies with Annex 1. (5761.10(f)). i DOCOHBnMICH MOMS 0 0 8 3 6 9 -D9in cs INSPECTION PROCEDURES FOR TRANSFORMER MAINTENANCE AND REPAIR FACILITIES AND RAIL SYSTEMS HONS 008370 -El- E. introduction to Transformer Maintenance and Repair Facilities and Kail road and Subway Systems. One of the major sources of PCB exposure for the environment and to workers occurs during transformer repair and-maintenance activities, as these operations often involve handling large volumes of highly concentrated liquid PCB's. The internal windings and other electrical apparatus within the transformer can hold significant residuals of PCB's, and major transformer disassembly often results in repeated leakage and drainage of PCB's. As with electrical utility companies, electrified railroads and, to lesser extent, subway systems, perform significant PCS transformer repair and maintenance operations that may be performed by a facility-owned operation or by a contracted outside firm. Electric railroad locomotives and self propelled commuters receive their electric power from overhead high voltage A.C. current distribution lines, This high voltage current is then reduced to a lower, working voltage by transformers on the locomotives for use by the electric motors that power the locomotives or cars. These transformers are subjected to severe working conditions in that the cramped space available on the locomotives and the heavy electrical load, result in high maintenance requirements vhen compared to other PCB transformer installations. In addition, many of the railway transformers are located on the undercarriage of the locomotive and are subject to damage from objects thrown up from the track roadbed. This damage may cause a leak of PCBs vhich will require transferral of the locomotive to a repair facility. ' Subway systems are also electrically powered, but receive their power through a third rail which delivers direct current at a working voltage for the electric motors on the subway cars. Transformers are used in the electric distribution system which regulates the voltage to the proper level, and since much of the electrical system is underground, the transformers are often PCB wits. The transformers are basically standard distribution system units and are reasonably reliable. The subway systems do not usually have special repair organizations for transformers, but instead contract with transformer repair firms. Ttansforner Repair and Maintenance Facility Functions Transformer repair and maintenance fuctlons are often split between on site and off-site activities. Since PCB transformers are heavy, bulky units and the transporation of them does pose some risks, many service operations are performed on-site. Some examples of these on-site operations ares (a) Removing a sanple (one pint to one quart of PCBs) for testing dielectric strength (the presence of water, carbon, or other contaminants lowers dielectric strength); MQNS 008371 58 (b) Acidirq a small amomt of PCBs to bring the level up to the full line (topping off); (c) Replacement or resealing of bushings, insulators, or gaskets (the PCB level of the transformer is lowered below the affected part and then refilled to the full line after repairs have been made); (d) Removal, filtering (clay filter or paper cartridge) and return of PCB liquids into the transformer (filter media and any waste PCB liquids will require special disposal); (e) Removal of PCB liquids from a transformer and refilling with new or reclaimed PCB liquids (unusable PCB liquids will require special disposal). Off-site operations are conducted at the transformer repair facility and include an operations sequence like the one below. 1. The tranformer is delivered to the shop, probably containing PCB liquids; 2. If minor repairs are all that are required, then a series of steps similar to the on-site operations above are performed; 3. For major repairs, the PCB liquids are drained and probably retained for re-use after filtering, unless the liquids ore grossly contamin ated, particularly with carbon particles from an electrical failure. These contaminated liquids would go to PCB disposal; 4. Before opening the transformer for major repairs, the unit may be flushed with solvent to lower the residual PCB content. The spent solvent should go to PCB disposal; 5. After the tqp Is opened, the internal coils and other electrical apparatus are probably removed for examination and/or repair. These devices may contain significant quantities of residual PCBs; 6. Depending on the condition of the coil, rewinding with new wire may be performed. The serspwire should be disposed of as a PCB solid. PCB contamination from such transformer salvage operations is considered to be a serious problem; 7. The Internal workings are replaced, the transformer resealed, and ' PCBs (either new or reclaimed) are added to the unit; 6. Tlie transformer is tested and, if satisfactory, returned to service. The risks these operations pose come fran three activities; ' 1. Newly arriving transformers may be leaking and contaminating trans port vehicles, Btorage areas or building; HONS 008372 -E3- 2* Significant quantities of waste PCBs will be generated, and adequate storage and disposal must be provided fori 3. Since dismantling and repair operations occur in a number of locations within the facility, housekeeping problems can be serious* If wide spread contamination occurs within the facility, drainage systems can readily become contaminated with PCBs* Railroad Maintenance Operations These operations are similar to the transformer repair facilities with two major exceptional 1* The transformers must be removed from the locomotives or serviced on the locomotives in the same work pits that are used for other locomotive maintenance operations* This often results in very cramped working conditions and an intermixing of PCB operations with other operations* 2* The railroad shops almost never open a transformer for repairs to intsrnal apparatus* For these services, the transformers are sent to outside transformer repair facilities* Railroad repairs are usually similar to the on-site repair and maintenance operations discussed above* Repair operations unique to the railroad unite include repair or replacement of PCB motors used to re-clrculate PCBS for cooling, and repair or replacement of cooling radiators that may be damaged by atones or other roadbed projectiles* The most significant risks at these railroad maintenance facili ties ere as followst 1* General housekeeping contamination, parltcularly in work pits* Drainage to sanitary or storm sewers from the pits could be a significant contamination pathway; 2* Although some quantities of waste PCBs will be generated, increased filtering end reclamation may reduce this* IX* Recommended Approaches for Conducting Transformer Maintenance Repair and Railroad and Subway Facility Inspections* Inspection Priority , Headquarters is providing a basic list of transformer repair facilities and railroad and subway systems that may handle PCB units* The facilities should bo contacted to determine if they are engaged in PCB activities* If there is any possibility or suspicion that PCB maintenance ia being HONS 008373 60 -E4- performed, the facility should be physically inspected. Any facilities for which a third party report or "tip-off" has been made relating to illegal disposal or storage should receive priority, these reports can come from competitors, environmental "watchdogs," transporters, or the general public, these potential sources of information-can be effectively used only when these sources are aware of the general requirements of the regulation and the potential harm that can result fran non-compliance, third party reports should be converted into permanent evidence via signed statements or, preferably, affidavits. MQNS 008374 fil Railroad and Subway Syttat . Ill, Transformer Repair and Maintenance Facilities; Potential Violations# Inspection Procedures and Documentation A. General Inspection Procedures 1* Transformer repair and maintenance facilities For those transformer maintenance and repair facilities selected for inspection, a thorough physical inspec tion should be performed with records review, as outlined in Chapter 5, Appendix 0, as a secondary priority. The following facility areas or activities should be inspected: 1* Storage lot or area where incoming transformers are placed. Inspector should look for leaking units and evidence of significant ground contmaination. If storm runoff of PCBs into storm drains or steams is suspected, samples of contaminated soil and stream or storm drain bottom deposits should be taken. 2. Storage for disposal area(s) should be inspected for compliance with 761.42 (see Chapter 5, Appendix A). 3. Scrap natal areas should be inspected for PCB contaminated wiring or other internal parts. Mo dis mantled or intact PCB transformer casing should be hare. They must be in storage for disposal areas. 4. General housekeeping conditions should be observed. PCB contaminated rags and other debris must be placed in proper containers for disposal. Boor housekeeping is indicated by PCB contamination of drainage systems and the general facility environment. Drainage systems samples should be taken. * HONS 0 0 8 3 7 5 5. PCB storage and handling areas within the facility should be carefully inspected. Although the regulation provisions apply only to storage for disposal, serials hazards can be addressed under emergency powers. i 6. The degree of worker knowledge about occupational hazards of PCBs should be determined. The availa bility of protective clothing should also be determined. These factors are not potential violations per se, but are good indicators of the degree of knowledge that exists regarding environmental con cerns. 7 Determine the amount at activity in retrof 11ling PCB transformers with substitute fluids. If this is e major activity at this facility, then expect large quantities of waste PCBs to be generated. 8. Records as required by Annex III (see Chapter 5, Appendix D), should be reviewed to determine the namas and locations of all storage for disposal and final disposal site locations. If outside transformer repair firms are acting as aiddiesmn in the transformer disposal chain from original user to final disposal, adequate records should be available indicating the origin of the trans formers or waste PCB fluids* , 15- 9. After July X# 1978* U PCS triufotitrt At a transformer repair facility will hare to be properly marked in accordance with Annex V (eee Chapter 5, Appendix C) This also applies to FCB con tainers storage for disposal areas* ' ZX* Railroad and Sub-way Systems: All of the above and locomotive and self-prepc'led car maintenance facilities B. Specific Inspection Procedures and Documentation Transformer Repair Facilities REGOIATORT RBQPIBPtENTS msracTiow procedures DOCUHEHTATIOW (1) 761*10 Disposal of PCBs (a) Failure to dispose of liquid FCBs in an incinerator that complies with Annex 1# (761.10(a), <b)>. Direct observation of illegal disposal when it occurs would be the most con vincing evidence, but is unlikely that this will be possible* Direct obser vation and sampling of residues from an illegal disposal activity can be achieved in some cases, and such evid ence should be obtained whenever pos sible. Direct evidence (soils, etc*) of illegal FCB dis posal should be sampled to determine if there are any residual concentrations below 500ppm* Special samples and notes should be obtained whenever possible and -sample locations should be precisely referenced or located on maps or plots* HONS 0 0 8 3 7 6 -16- MOWS 0 0 8 3 7 7 Transformer Repair Facilities REGUIATORT RBQOIRH7PXTS XMSPECTXOtl P30C5DUBES (b) Failure to dispose of non Inspect and sstple wastes to deter liquid PCSs in the form of mine if non-liquid (does not flow contaminated soil, rags or freely or is not readily pumpable) other debris contaminated and contains 500 ppm or greater. with PCBs as a result of a spill or as a result of place ment of PCBs in a disposal site prior to February 17, 1978, in an incinerator that complies with Annex I, or in a chemical waste landfill that complies with Annex II (for items specified in (a), disposal in a chemical waste landfill is permitted intil July 1, 1980. After that date, these items must be incinerated). (5761.10(b)(3)). (c) Failure to dispose of PCB trans formers and other PCB articles in an incinerator that complies with Annex I, or in a chemical waste landfill that complies with Annex II. (S761.1)(c)). ('d) Failue to, prior bo disposal in a chemical waste landfill, drain each transformer of all free flowing liquid, fill the trans former with solvent and allow 18 hours before solvent is drained. (7ol.l0(c)(li)). Determine if articles contain mix tures or chemical substances. For transformers, use direct sampling. For capacitors, manufacturers reports can be used. Cpen drain valves on transformers and collect any free flowing liquid. If liquid volume collected is greater than St of the transformer volume, then adequate draining did not occur. If no solvents are present in the liquid, then a solvent flush did not occur. Since transformer facilities can either serve as agents for final disposal or decide to dispose of a transformer after testing or examining it, proper draining of trans formers will be an important activity. DOCPHB8TATIOH Properly identify sample anl analytical result.. Field notes on physical nature of waste (liquid) vs. non-liquid). Sample and analytical results and copies of manufacturers reports. E7- HONS 008378 RS&IXATORT RZQUIRPCWTS IWSFECTIOK PROCEDURES (e) Failure to dispose of PCB ' chemical substances or mixtures which are removed from the transformer, (inluding solvent), in an Incinerator that compiles with Annex I, or in a dimical waste* Interviews with personnel to determine familiarity with proper draining procedures as indicators of proper draining. (f) Unless decontaminated in accor dance with Annex IV, failure to dispose of FOB containers in an - incinerator that complies with Annex I, or in a chemical waste landfill that complies with Annex II. (761.10(d)(1)). Determine that containers contained FCBs by direct samples of residuals or from records review or third party reports. (9) Failure to drain the PCB con tainer or liquid prior to dis posal in a chemical waste land fill that complies with Annex XX. (761.10(d)(a)) Observer to dstesmien if any physical evidence of FCBs is present inside or outside of container. If FCBs are observed or if other information suggesting inadequate decontwo!nation is obtained, investigate decontamina tion process. See (h) For PCB articles other then transformers and capacitors, if incineration is thought to be technologically infeasible, failure to obtain written permission (and comply with any limitations specified) to use a chemical waste landfill for - dicporal. (761.10(c)(3)). Examine documents from R. A. granting permission. Continue Investigation to determine if special conditions accompanying R.A. permission are being complied with. Will seldom apply to transformer repair facilitias. (i) Failure to properly etore, prim: to disposal, any liquids or non liquid described in 1-8 above, in a storage area that compiles with Annex III. (761.10(a)(2) (b)(5), (c)(4),(d)(2)). See Chapters on storage for procedures. POCUSEWTATIOW Field notes and statenents from workers- Obtain serial matbers or other direct identity of trans formers* Field notes, photographs analytical results, copies of records, and statements from employees or third party observers. Field notes,, photographs statements from employees or third party observers Copies of documents and other documents based on special conditions in the R.A. approval. See Chapters on storage for procedures. -II- o BEGOIATOSg RTOUIRPEVrS INSPBCTICK PBOCEDORBS (j) Failure to properly store and dispose of liquid PC3s resulting froo spill incidents. Follow up spill reports. Direct inspection or contacts with spill officials will indicate degree of compliance. Non-com pliance will require procedures similar to 1 and 2, except for records review. (k) For any person tfco if required See 8 above, to incinerate any FOB and contends that there is avail able a means of destroying PCBs which is as efficient as the incineration procedures pro vided in Annex I, failure to obtain written permission (and failure to comply with any limi tations specified therein) from the R.A. before other than inciner ation in a facility which com plies with Annex I. (5761.10(f)). DOCPHBnanat Smnples of contamination zones ar.d removed materials, third party reports or direct observation of final disposal. See 8 above. HONS 008379 -89- Vwr* ' V ftcilroml and Subway Systems: Specific inspection Procedures end Documentation rote: PC3* will generally be found In locomotive and self propelled ear maintenance facllitites. R3SUIAT0RY REQUIPiffiNTS INSPECTION PKOCEDUBSS `DOCUMENTATION (1) j 761,10 Disposal of PCBe (a) failure to dispose of liquid PCBe in an incinerator that compiles with Annex I (?61.10(a),(b)) Direct observations of illegal disposal *4ien it occurs would be the most con vincing evidence# but it is unlikely that this will be possible. Direct observation and smspling of residues from an illegal disposal activity can be achieved in some cases and such evidence should be obtained whenever possible. Direct evidence (soils# etc.) of illegal PCB dis posal should be sampled to determine if any residual concentrations of dilution was used to get concentrations below 500 ppm. Special samples and notes should be obtain ed whenever there is suspicion that watercourses have been contaminated. Photographs should be taken whenever possible and sample locations should be precisely referenced and located on maps or plots (b) Failure to dispose of non-liquid PCBs in the fora of a) conta Inspect and sample wastes to determine if non-liquid (does not flow freely or Properly identify sample and analytical results. minated soil# rags or other j is not readily pustpable) and contains Field notes on physical debris# and b) soils and debris 500 ppm or greater. contaminated with PCBs as a result nature of waste (liquid non-Xiquid) HONS 008380 of a spill or as a result of placement of PCBs in a disposal site prior to February 17# 1978# in an incinerator that complies with Annex Z# or in a chsmical wastes landfill that camplias with Annex II (for ltmss specified in a)# disposal in a chemical waste landfill is perritted until July 1# 1980. After that data# these items must be in cinerated (761.10(b) (200) ) * w E10 agenL&TOar RBgqiREXgKtg XlfSPBCTIOW PROCSOTOES POCOMbSTAnOW (c) failure to dispose of PCB trans formers and other PCS articles in an incinerator that complies with Annex I, or in a chemical waste landfill that complies with Annex II* (761.10(c)). Determine if articles contain PCB mixtures or chesiical substances* For transformers, use direct sampling* For capacitors, manufacturers reports can be used. Sample and analytical re suits should be noted in field book. Copies of manufacturers reports should be included if possible* (d) Failure to, prior to disposal in a chanical waste landfill, drain each transformer of all free flowing liquid, fill the transformer with solvent and allow 16 hours before solvent is drained* (761.10(c)(lil))* I Open drain waives on transformers and collect any free flowing liquid* If liquid volunm collected is greater than 5% of the transformer volume, then ade quate draining did not occur* If no solvents are present in the liquid, then a solvent flush did not occur* If the facility has not completed adequate draining, they could claim that the dis posal site Is responsible* be necessary* Follow up may (e) Failure to dispose of PCB chemical Interviews with personnel to determine substances and PCB mixtures which are familiarity with proper draining pro- removed from the transformer, (including cedures as indicators of proper draining solvent), in an incinerator that . complies with Annex X, or in a chemical vmste landfill that complies with Annex II ($76jL* 10(c)(ii)) Field notes and statements from workers* Obtain serial numbers or other direct identity of trans former* HONS 0 0 8 3 8 1 For any large high or low voltage Similar to A, 3* except that burden is on Similar to A, 3* capacitor owned by any person, failure owner to furnish other evidence if he to dispose in an incinerator that contends PCBe are not present* This re complies with Annex I, or in a chemical quirement is intended to force manufac waste landfill that complies with turers of new large capacitors to mark Aqnex II# unless it is Inown from label their products "Non-PCBs" if no PCBs are information, manufacturer's literature used* or chemical analysis used that the capacitor does not contain PCB chemical Capacitors may be found on some new substances or PCB mixture* (}76110(c)(2)(l)(ii)). motors and in building electrical systcas* Subway systmas may have than for pomr factor correction* 30 m- Hgg=t?I^TORT RLQUXWtMSirrs (9) Unless decontaminated in accordance with Annex IV, failure to dispose of PCB containers in an incinerator that complies with Annex X, or in a chemical waste landfill that ccetplies with Annex IX. (f761.13(d)(1)). IKPHTIOff PR0CEPUF5S Determine that containers contained TCBs by direct smaples of residuals or from records review or third party statements. DOCIBUSffl'ATIOii Field notes, photographs analytical results, copies of records, and statements from employees or third party observers. (h) Failure to drain the FOB container of liquid prior to disposal in a chemical waste lanfill that edaplies with Annex II. (761.10(d)(1)). Observe to determine if any physical evi dence of PCBs is present inside or out side of container. IF PCBs are observed or if other information suggesting in adequate dsoontmelnation is obtained, ' investigate decontamination process. See Filed notes, photographs statements from amployees or third party observers (i) For PCB articles other than trans formers and capacitors, if incineration is thought to be technologically . infeasible failure to obtain written permission (and to comply with an limitations specified therein) from the A.A. granting permission to use a chemical waste landfill for dis posal. (761.10(c)(3)). Examine documents from R.A. granting per mission. Continue investigation to determine if special conditions accom panying R.A. permission are being complied with. Copies of documents or other doosnents based on special conditions in R.A. permission. (j).Failure to dispose of liquid PCBe resulting from spill incidents in accordance with 1-9 above. (5761.10(e)(3)) Follow up spill reports. Direct in spection or contacts with spill official* will indicate degree of compliance. Non-compliance will require procedures similar to 1 and 2, except tor records review. Samples of contamination zones and removed mater ials. Third party report or direct observation of final disposal. HONS 008382 -E12- 3S7JLATOCT RBTJXRBigKTS INSPECTION PHOCBXJHES (k) Failure to properly store, prior to See Chapter on storage disposal, any PCS liquids or non-* for procedures, liquids described in 1-10 above, in ' a storage area that canplies with Annex III. (5761.10(a)(5),(c)(4)(l)(2)). (l) For any person viio is required to incinerate any PCS and who contends that there is available a means of destroying PCBs which is as effi cient as the incineration proce dures provided in Annex I, failure to obtain written permission (and fail ure to canply with any limitations specified therein) from the R.A. before enploying any method of dis posal of any PCB other than inclneraetion in a facility which canplies with Annex I. (5761.10(f)). See 9 above', I DogwanKncN See Chapter on storage for documentation. See 9 above. MOWS 0 0 8 3 8 3 -El 3- INSPECTION PROCEDURES FOR TRANSFORMER AND CAPACITOR MANUFACTURERS HONS 008384 -Fl- I. Introduction to PCB Capacitor and PCB Transformer Manufacturing Manufacturers of PCS capacitors and PCB transformers have been identified as major discharges of PCBs to U.S. waters: the contamination resulting from such discharges has forced the closing of a number of major rivers to fishing. Due to environmentalist pressure and new laws and regulations, the manufacture of PCB capacitors in the U.S. is expected to terminate by mid-1978. As far as EPA is aware, PCB transformer manu facturer;^ has already ceased. Nevertheless, PCB discharges resulting from complex materials handling systems, poorly constructed drainage systems, and general poor housekeeping practices will probably continue to contaminate U.S. waterways for some time after all PCB transformer and capacitor manufacturing has ceased. Signi ficant volumes of PCB solid wastes, in tire form of defective small capacitors, have been disposed of improperly in dumps, and PCB discharges fron such dusfw continue to contaminate both water systems and municipal sewage sludge. II. ftpeemmended Approach for Conducting PCB Capacitcr and PCB Transformer Manufacturing Facility Inspections Inspection Priority The highest inspection priority should be those few capacitor manufac turers who still use PCBs. They will have large amounts of highly concen trated liquid PCBs on hand, and thus have the greatest potential for PCB contamination. Storage and handling of PCB wastes from the manufacturing process will also be a major problem. The second priority should be former PCB capacitor manufacturers. Transformer manufacturers should be the third priority. All facilities should be physically inspected. Note: Those facilities for which third party reports on illegal disposal or storage have been made should receive priority. Those reports can come frati competitors, environmental "watchdogs*, transporters, or the general public. These potential sources of Information can be effectively used only if the sources are aware of the general requirements of the regulation and the potential ham that can result fron non-ccmpllance. Third party reports should be convereted into permanent evidence via signed statements or, prefer ably, affidavits. HONS 008385 72 V, Capacitor Kanofacturerg: Inspection Procedures and Documentation A. General: The following facility areas or activities should be inspected. 1. Storage for disposal areas containing any waste PCB 1iquids or solid wastes generated by manufacturing operations. This applies to nest current manufacturers. 2. Materials handling aysterns used for PCBs- Itesidual PCBs in the systems could contaminate other sub stances. Such contaminated substances must be handled as PCB mixtures. 3. Dumps, landfills, or pits used- in the pest for disposed of manufacturing wastes. Leachate and other indicators of contamination should be samples. 4. facility drainage systems rfiould be inspected and sampled for PCB contamination. NPDSS or other EPA or state programs may already be examining this problem. 5. Itecords should be reviewed. (Note: former manufacturers may not be required to keep records). 6. Any small PCB capacitors owned by manufacturers, pest or present, will herve bo be disposed of in accordance with Annex 11(761.10(c)(2)(iv). These are the only disposal requirements for small capacitors. I 8. Specific Procedures KEGOLflTOKy REQU1RSEMTS (1) $761.10 Disposal of PCBs XNSPBgnON PBOCHEOREs DOCDMENTATICN (a) Failure to dispose of liquid PCBs in an incinerator that complies with Annex I. (761.10(a),(b)). Direct observations of illegal disposal when it occurs would be the most con vincing evidence, but it is unlikely this will be possible. Direct obser vation and sampling of residues from an illegal disposal activity can be amheived in seme cases, and such evi dence should be obtained whenever pos sible. Difect evidence (soils etc.) of illegal P posal should be to determine if ary resi dual concentrations of 50Q ppm. or greater are present, or if dilution was used to get concen trations below 500 ppm. HONS 0 0 8 3 8 6 -F2- REGULATORY KEQOIRBgirrS (b) Failure to dispose of non-liquid PCBs in the fora of a) contaminated soil, rags or other debris* and b) soils and debris contaminated with FCBs as a result of a placement of FCBs in a disposal site prior to February 17* 1978* in an incinerator that complies with Annex I* or in a chemical waste landfill that complies with Annex II* (For items specified in a)* disposal in a chemical waste landfill is per mitted until July 1* 1980* After that date* these items must be incinerated. (761.10(b)(2),(3)). Inspect and sample waters to deter mine if non-liquid* (does not flow freely or is not readily pumoeble) and contains 500 ppm or greater. I (c) Failure to dispose of FCB articles in an incinerator that complies with Annex I* or in a chemical waste land fill that complies with Annex XI (761.10(c)(3)). . Determine if articles contain FCB mix tures or chemical substances. For transformers* use direct sampling. For capacitors* manufacturers reports can be used. DOCPHKfTATIOH should be taken whenever there is suspicion that r.S. waters or adjoining shorelines have been con taminated. Photographs should be taken whenever possible and sample loca tions should be precisel referenced and located on maps or plots. Properly identify sample and analytical results. Field notes on physical nature of waste (liquid) vs. non-liquid). Properly identify sample and anlaytical results. Copy manufacturers report HONS 0 0 8 3 8 7 -F3 Capacitor Kuofactorcn RECUUVT03Y CTQPIRZWEWTS mSPECTIOW PROCEDURES______________________________ DOCUKEHTATIOB OF VIOLATIONS (d) For any large high or low voltage capacitor owned by any person, failure to dispose in an incinerator that complies with Annex X, or in a chemi cal waste landfill that complies with Annex II, vxilees it is known from label information, manufacturer's literature or chemical analysis that the capacitor does not contain FCB chemical substances cr FCB mixtures* (761.10(c)(2)(i),(ii)). Similar to A3, except that burden is on owner to furnish other evidence if he contends FCBs are not present. This requirement is intended to force manu facturers of new large capacitors to mark their products "Non FCBs" if no FCBs are used. * Similar to A, 3. (a) Unless decontaminated in accordance with Annex' IV, failure to dispose of FCB containers in an incinerator that complies with Annex X, or in a cheaical waste landfill that complies with Annex II. (761.10(d)(1)). Determine that containers contained FCBs by direct samples of residuals or trcm records review or third party statements. Field notes, photographs, analytical results, copies of records and statements from employees or third party observers. (f) Failure to drain the FCB container of liquid prior to disposal in a chemical waste landfill that com plies with Annex II. (761.10(d)(1)). Observe to determine if any physical evidence of FCBs is present inside or outside of container. If FCBs are observed or if other information sug gesting inadequate decontamination is obtained, investigate decontamina tion process. (g) For FCB articles other than trans former and capacitors, if incinera tion is thought to be technologically Infeasible, failure to obtain written permission (and to comply with any 'limitations specified therein) from the R.A. granting permission to use a chemical waste landfill for disposal. (761.10(c)(3)). Examine docuamnts from R.A. granting permission. Ccontinue investigation to determine if special conditions accompanying R.A. permission are being complied with. Field notes, photographs, statements from employees or third party observers Copies of documents, documentation based on special conditions In R.A. permission. MOWS 0 0 8 3 8 8 -4 in F4- REGULATORS R3QCT?.BEnS (h) Failure to dispose of- liquid PCBs resulting from spill incidents in accordance with 5761.10(e). (761.10(e)). (i) Failure to properly store, prior to disposal, PCB liquid or non liquids described in 1-10 above, in storage area that complies with Annex III. (761.10(a)(2),(b)(5), (c)(4)(d)(2)). (j) tor any person Wio is required to incinerate any PCB and who contends that there is available a means of destroying PCBs which is as effi- ! cient as the incineration procedures 1 provided in Annex I, failue to ob tain written permission (and fail ure to canply with any limitations specified therein) from the R.A. be fore employing any method of dis posal of any PCB other than incinoration in a facility which complies j with Annex I. (761.10(1)). INSPECTION PROCEDURES Follow up spill reports. Direct inspection or contacts with spill official will indicate degree of compliance. Non-compliance will require procedures similar to 1 and 2 except for records review. See 9 above, . . DOCUHBminON Of VIOLATION Samples of contamination tones and removed mater ials. Third party report or direct observation of final disposal. See 9 above. HONS 0 0 8 3 8 9 -PS- } O' Traasfoiacr Manufacturers* Inspection Procedures A* General Procedures: the following facility areas or activities should be Inspected* 1* Storage for disposal aress containing any waste PCB Iquids or solid wastes generated* by manufacturing operations This applies to most current wastes generated by manufacturers. 2* Materials handling systems used for PCBe. Residual PCBs in the systssis could contaminate other substances* Such contaenated substances east be handled as PCB mixtures. *. 3* Drops, landfills, or pits ased in tbs past for disposal of aanufacuring wastes* ators of contamination should be sampled* Leachate and other indic . 4* Facility drainage systmas should be inspected and sampled for PCB contamination. programs may already be examining this problem* NPDES or other EPA or state 5* Records should be reviewed in accordance with the methods outlined in Chapter 5, Appendix D. manufacturers may not be required to beep records)* (Note: Former -- RSGvLATORY REQUIREMENTS INSPECTION PROCEDURES DOCUMENTATION (1) 761*10 Disposal of PCBs (a) Failure to dispose of liquid PCBs in an incinerator that complies with Annex X* (761.10(a),(b))* C 2 is> Direct observations of Illegal disposal when it occurs would be the most con vincing evidence, but is is unlikely this will be possible* Direct obser vation and aapllng of residues from an illegal disposal activity can be acbeived in some cases, and such evi dence should be obtained whenever pos sible* o WJ <6 o Direct evidence (soils etc.) of illegal PCB disposal should be sampled to determine if dilution was used to get concentrations below 500 ppm* Special samples and notes should be obtained whenever there is suspicion that (J* S* waters or adjoining shorelines have been contaminated* Photo graphs should be taken whenever poeeible and locations should be pre cisely referenced and loc ated on maps or plots* -F6I )> REGULATOR! INSPECTION PBDCBXJRES (b) Failure to dispose of non-liquid PCBs in the form of a) contaminated soil, rags or other debris, and b) soils and debris contaminated with PCBs as a result of a spill or as a result of placement of PCBs in a disposal site prior to February 17, 1978, in an incinerator that complies with Annex I, or in chemical waste landfill that complies with Annex II (for items specified in a), disposal in a chemical waste landfill is permitted until July 1, 1980. After that date, these items must be incinerated (761. 10(b)(2),(3)). Inspect and sample wastes to determine if non-liquid, (does nto flow freely or is not readily putroable) and con tains 500 ppm or greater. (c) Failure to dispose of FOB trans formers and other PCB articles in an incinerator that complies with Annex I, or in a chanical waste landfill that complies with Annex II. Determine if articles contain FOB mix tures chemical substances. For trans formers use direct sampling. DogjMBnwncN Properly identify sample and analytical results. Field notes on physical nature of wastes (liquid vs. non-liquid). Properly identify saaple and analyze results. HONS 0 0 0 3 9 1 -F7- 9J STORAGE REQUIREMENTS HONS 008392 STORAGE REQUIREMENTS MOWS 008393 INTRODUCTION TO STORAGE INSPECTIpNS Storage areas play a Kay role in preventing FOBS from reaching the envivorment prior to their disposal* The function of the storage requirements in the regualtions is to assure effective containment of PCBS until they are sent on to a disposal facility* To assure environ mental protection* the regulations provide for the construction of protective structures for the storage of PCBs* The cncentlal concerns of the regulation are that storage facilitate avoid potential migration of PCBs into watercourses and that they be able to contain possible spills* These concerns do not neceasarily require construction of an elaborate structure* The principle requirements* sn adequate roof and walla* impervious flooring and adequate containment capacity, may be met with fairly simple structures end some ingenuity* A steel tub for instance could suffice for meeting the floor and curbing requirements if it ware of sufficient capacity* The tub then could be placed in any building for weather protection* and the storage facility require* vents would be satisfied* The operations of the storage facility should comply with the requirements of the $761*20 marking regulation as well as Annex III and Annex IV* With respect to marking* all PCBs which are required to be placed in a storage facility should bo marked and dated* In addition* once marked and dated* the PCBs in storage must be carefully organized according to the regulation ao as to permit easy access* At ell facilities* PCBs in storage should be accurately recorded in the PCB records for tho facility* The quantity of PCBs in storage should relate directly to the quantity of PCBs removed from service or received fran other facilities* As a vital part of each Storage facility inspection the inspector should assess* as a guide to the likelihood of serious violations* the general housekeeping of the facility operation* Poor or non existent raccords and sloppy operations are good indicators of breaches of other significant requirments and should be carefully noted in the inspectors field book* Every facility which owns or uses PCBS should either have an Annex III storage facility or be capable of sending its PCBs directly to a remote storage or dispooal site* This suggests that inquiries as to the existence and location of storage facilities should be a part of nearly every PCB inspection* MOWS 008394 G- Storage (Afknmx III) REGULATORY RSQCIRMESTS_________________________ (1) Period of Storage: 5761.42(e) PCB article or container stored before January 1, 1973 shall be removed iron storage and disposed of before January 1, 1984, PCB article or container stored after January 1, 1983 east be disposed of elthin one year froa date placed into storage. (2) Storage Facility: $761.42(a) (a) Adequate shelter to present rain reaching PCBe. (b) Adequate floor with 6 inch high continuous curbing. Containment oust provide 2 tine internal volume of largest PCB article or container or 25% of total Internal volume of all PCB equipment or containers stored therein, whichever is greatsr. IB5PECTI0W PROCEDURES Check records for date of storage* Confirm that disposal occured by inspection of storage area. Visual inspection for leaks and gen eral condition of structure. Determine volume of all stored equiment or containers and volume of largest container by direct measure ment or [from records. Measure surface dimensions and curb height. DOCUMENTATIOK QT VIOLATIONS PCB Ar^lcl9 or container still in storage area* Record observations in field book, obtain photo graph- (if possible) of stored material; list quantities of material, type of containers, etc. ^V Record observation in detail In field book, provide exact location by measurement from stationary object such as floor, wall, or ceil ing where leak occurs, objects water contacts, and drainage path of water* Photographs (if possible Calculate total volume of containers, largest con tainer, and storage area If in violation verify all measurements. Obtain photocopies of all records describing container dimensions and volumes. HONS 0 0 8 3 9 5 -2- OD to *6teo n Storage (Annex XXX) Inspection Procedures REGULATORY REQUIREMENTS (c) Wo drains, valves, extension joints, or other openings within curbed erea* (d) Floors and curbing constructed of continuous maooth end inpervious materials* (e) Storage prohibited at site below 190 year flood water elevation* 5761.42(c) X (a) Temporary storage of non-leaking i/> - PCB articles and equipsmnt per mitted for up to 30 days from date of removal from service in area not complying with 761.42(b) (Rot containers) INSPECTION PROCEDURES Visual inspection of containment area* Review all piping and sewer blueprints Visual inspection material usually concrete or metal (metal storage bins) Determine from geological records elevation of storage facility* . DOCUMENTATION OF VIOLATIONS Provide exact locations detail in field book with oeasuresaents to station objects* Determine drain age path and ultimate dis posal location* Obtain photocopies of blueprint showing openings of area. Verify blueprints by visual inspection* Photograph (if possible)* Describe material used, exact location of cracks or expansion joints ftlch permit penetration of PCBs* Photograph (if po sible). Obtain of 100 year flood elevation and topographic maps of storage area. Determne accurate elevation of storage area above ground level* Determine date when equipment or artioise removed from service* Inspect all quipnent or article, for luk*. '. Obtain records when equip ment removed from service, Daicrib. Inks, number of containers, condition of equipment, drainage path and ultimite dispositon* Photograph (if possible) Collect sample of leaked material* -03 HONS 0 0 3 3 9 7 O RESOIATOKT IttpUTUgCHTS (b) Storage of non-leaking and structurally mdamaged PCB large high voltage capacitors on pallets is permitted next to storags facility seating the requiresents of 761.42b witil January 1, 1973* Capeitors checked for leaks weekly. (c) Storage areas are nfcrked. . W ______ INSPECTION WXJUCKES }1 Determine if storage facility has immediate available infilled storage space equal to 10% of voluse of capa citors stored outside of faci lity. Check all capacitors for leaks Verify marking to comply with 761.20(a) (6). (d) Movable equipment handling FCBs which contact PCB chemical sub stances or mixtures shall not be removed from storage facility unless it has bean decontaminated* Prepare or obtain list of all movable equipment used in storage facility. Inspect for contamination. Verify decontamination procedures. (e) All PCB containers and articles must be checked for leaks once every 30 days. All such leaking containers and articles and their contents shall be transferred immediately to properly marked non-leaking containers. Any spilled or leaked material shall be immediately cleaned up and disposed of as per the regulation. (f) PCB containers shall comply with DOT specifications 49CPR173.346 revised Dec. 31/ 1976. Check Inspection records. Determine if leaking containers are placed in properly marked non-leaking containers and if spilled or leaked materials are properly disposed or. Check specification numbers share available. Measure guage. Compare to DOT apecs* (g) PCB articles and containers most be dated when placed in storage* Storage area must be managed to locate iteas by date. Inspect records and storage area* VIOLATIONS Calculate voluse of unfil led storage space and vol use of capacitors. Docu ment all leaks if leaking capacitor can be placed in unfilled storage space. Document non-coepllance regulation. Photograph (if possible). Document where decontamina tion procedures deviate from method described in Annex IV. May need to collect samples of sol vents. Document in field book note compliance of markings/ leaking containers/ and improper disposal of leak material and abeordents. Collect samples. Document non-compliance field notebook. Obtain container equivalent to in non-compliance. Photo graph (if possible). Document in field book quantity of articles and containers not dated. Ob tain photocopies of records -04- r: RCCPIAIOKT weQUiHgKgTS IWPKTIW PROCEDURES (q) Owners or operators saintain annual records# effective July 2# 1978. Inspect records and determine compilance with Annex VI# (i) Dates when FCBe removed from service and placed into storage. Quantities indicated as follows: .. o Total weight, in kilogram, in containers and identi fication of -EC3 such as liquid or capacitor* ' o Total number of tranformera and might, in kilograms, of any PCB mixture contained in tranaformers. o. Total number of PCB large high or low voltage capacitors (il) FCBe rmoved !ra service, location of initial disposal or storage facility end name of owner or operator* HONS 0 0 8 3 9 8 (ill) Total quantities of FCBs re maining in service at and of calendar year o Total weight, in kilograms, of FCBe in oontansrs in cluding identification of container oontents such as liquids or capacitors. o Total number of transformers and might, in kilograms, of any PCB contained in the transformers* DOCUMEWTATIOW OF YIOIATIOBS Documentation of non-com pliance in field book or obtian copy of record R5GPIA70KT WCOJIFEHEHTS e Total number of PCB large high or low voltage capaitors* (1) Owners or cperators document on PCB handling at facility for previous calendar year* . Kffective date of regulation Hay 1, 1979* Documentation lost bn available July 1 of each year* (i) Date FCBs received and identification of pereon and facility from whom FCBs. were received* (ii) Date PCBs disposed of or transported to another disposal or storage faci lity, including identi fication of types of PCBs in containers and not in containers | ' HONS 0 0 8 3 9 9 (iii) Weight of PCB containers, and! weight of PCB chemical sub- ! stance or mixture contained in transformers received, transported or disposed Identify PCB containers con tents such as liquids, capscitors, etc* Identification of facilities to which PCB containers or PCB chemical substances or mixtures in trans forma rs are transported* IWSPPCTOH Request copy of report or inspect report at site* Documents must be retained at site for 5 years after facility no longer used for storage pocOHprrmow or violatiors Obtain copy of records* Document non-compliance in field book* o o h KECCTATORr KEQ0IHEHEET3 IWSPBCTIOW PROCEDURE___________________________________________________________ (It) Kus&er of PCB article* or equipment not in PCS con tainer received, transported to other storage or dieposal facility, and remain ing on facility aita at end of calendar year* Identifiction of facility trans ferred to shall be included. ' ' . (j) Special Records Retention Examine facility records. (i) All documents, correspondence and data provided by State or local government agency per taining to storage. (il) All documents, correspondence, and data provided by facility to State or local government agency pertaining to storage. DOCPWKMTATIOM Or VIOLATIONS Document non-compliance by noting lack of, or inadequate records in Field Book, ' OOVBOO SNOW -G7- decontamination u MONS 008401 Annex IVs Deconf1 nation (761*43) The decont.eoineti.on requirement* ere designed to bring the level of PCBs yiining in e container or on equipment efter use down to s minimal level, in order to prevent other liquids or articles placed in the con tainer or put in contact with equipment, from becoming contaminated with PCBs. * As decontamination is usually performed when fresh containers or equipment are needed, not at regular intervals, it is unlikely that the inspector will be able to observe decontiination procedures directly* However, it is possible to get a general idea of whether decontamination procedures are conducted in compliance with the regulation by asking "leading" questions such as: -Are containers and equipment decontaminated after they have been in contact with PCBs? -What is the normal decontamination procedure? Zf the facility representative outlines the procedures listed under "Regulatory Requirements", it can be assumed that he/she is at lsast familiar with the decontamination requirements of the regulation. Xf the representative does not outline the decontamination requirements of the regulation, it is unlikely that he/she is aware of proper decontamination procedures, in this case, the inspector should leave written instructions (based on the "Regulatory Requirements" column) describing proper methods of decontamination. If, however, decontamination procedures can be observed directly, an inspection should be conducted as outlined below. SIvSOLATORT REQUIREMENTS INSPECTION PROCEDURES (1) Containers (761.43(a)) HONS 0 0 8 4 0 2 (a) Was the container flushed three tires with a solvent containing less than 0.C5 percent PCB chemial sub stance in which the solubility of PCBs was five percent or more (by weight)? ' Observe procedures to vertify compliance . _ (b). Mas the rinse volume of the dilutant Observe the filling or emptying of sol equal to approximately ten percent vent Into/out of the container* of the container's capacity? Measure amount of solvent used and determine Internal volume of container. Compute to determine whether volume of CO solvent Is equal to 10 peroent 40 of container's capacity. DOCUMENTATION OF VIOLATIONS Document non-compliance In field book. Document non-compliance in field booh. . 'HI- or'\ Annex XV: Decontamination (761 *43) AEgglATOKY REgUISHEWTS IWSPECTIOW PROCBDOKES (c) Was the solvent properly disposed of as a PC8 mixture (761.10(b) (2)), when the level of PCBs in the sol vent reached 0*5 percent? Observe procedures to verify compliance, (d) were all Materials need in the deoon- Check to insure that all liquids tamination procedures properly dli and solids used in decontamination posed of as PCB sdxtures are placed in a properly-marked con (|761.10(b)(2))? tainer and transferred to a storage area that complies with Annex III. (2) Equipnent (761.43(b)) (a) Was all noveable equipment used in storage areas decontaminated by scabbing surfaces exposed to PCBs with a solvent nesting the criteria-of paragraph (a) above. Observe procedures to verify compliance. OOCOKZHTATIOW OF VIOIATIOHS Document non-coapLlance in field book. Taka sample. Document non-compliance in field book. Document non-complianc in field book. EOVBOO SNOW to o -H2- RJ500HDS AND MONITORING HONS 008404 Annex vis Records end Monitoring REGULATORY REQUIRMEETS lRSPBCTIOW PROCEDURES (i) The dates 'dien PCBs are removed fraB service, are placed la stor age for disposal, and are placed into transport for disposal* UOCPHglfTATIOS Obtain copies or make not# of locations and names of all storage sites and final disposal sites* (ii) Total quantities of PCBs resain ing in service at the and of the calendar year* The quantities of such PCBs in 2(a) and (b) shall be indicated using the following: o Total weight, in kilograms, of any PCB substances or mixtures in PCB containers, including the identi fication of container contents, such as liquids or capacitors; HUNS 0 0 8 4 0 5 .o total nuaber of PCB transformer and total weight, in kilograas, of PCB sulstances and mixtures con tained in the transformers/ and o total nuaber of PCB large high or low voltage capacitors* (($761.45(a)(1) * (3?). i (iii) For PCBs removed froa service, the location of the initial disposal or storage facility and the naee of the owner or operator of the facility ,, ($761*45(a)(2)) (c) Failure to maintain records and documents for at least 5 years after the facility ceases containing PCBs in the prescribed quaniteties (#1)($76l*45(a>). If facility has ceased operations, ask formtr owner or operator where the docu ment is located, and inspect for presence of all information required* Document non-compliance field book. When data has been emitted, photograph and copy docuasnt if pos sible* c 3. Records end Monitoring 761*45 Annex VI: - The general purpose of records end monitoring requirmnts is to (1) enable SPA to Veep track of the types, amount, and location of PCDe and (2) to provide further Impetus for stores and disposers to keep track of PCBs handled at the particular facility. Records and Monitoring: PCBs in service or projected for disposal ((761.45(a)) Records and monitoring requirements for PCBs in service projected for disposal are designed to (1) iden tify the type, amount, and location of PCBs currently in service at a particular location and (2) enable B>A to trace PCBs through storage, transportation and disposal, in order to identify those people/facilities vho receive PCBs when they are reaoved from service* Once receivers are identified, EPA may (a) compare records for the purpose of detecting discrepancies, (which may indicate violations), and (b) discover any storage and disposal facilities that had previously escaped EPA notice. REGULATORY REQUIREMENT (1) (761.45(a) PCBs in Service INSPECTION PROCEDURES DOCUMENTATION (a) Begining July 2, 1978, for any owner Determine mounts of FCB chemical sub or operator of a facility containing stances, mixtures transformers and any of the following: large high or low voltage capacitors by inquiry and direct observation. (i) 45kg (99.4 lbs) or more FCB If numbers equal or exceed regulatory zO chemlal substances or FCB requirements, oheck for the presence Lr mixtures, of records on the disposition of PCBs* (ii) one or more FCB transformers* OD *o a (ill) 50 or more FCB large high or low voltage capacitor, failure to develop and maintain records on the disposlton of PCBs* (5761.45(a)). (b) Failure to prepare an annual document, based on the above records of disposition, by July 1, covering the previous calendar year, which includes the following information: Cheek for (1) presence of dormant, end (2) the inclusion of all data specified in (a) and (b). Copy or photograph document for later camper!eon of records. Document non-compliance field book. Document non--compliance field book. When date has been omitted, photograph or copy document if pos sible. X3 Annex vis Records and Monitoring REGULATORY REQPIRHEWTS INSPECTION PROCEDURES DOCUMENTATION (d) For owners and operators with aore than one facility which contains PCBe in the quantities prescribed in #1, and maintaining the records and documents at a single location, failure to insure that the identity of this location is available at each facility containing PC3a that is normally manned for 8 boors a day. <761.45(a>). , Call all facilities manned for 8 hours a day and ask where records and documents for the facility are kept. This require ment is designed to eliminate the need for EPA to go on "wild goose chases* looking for records. If we know the location of records for a firm, we do not need to determine if all facilities of the firm know the location * If we encovnter fecilities that do not know the records location end we need to know it , then it should be considered a possible vio lation. Document non-compliance in field book, * . Annex VXs Ktcords and Monitorings Disposal and Storage Facilities (|761*43(bl fi (d)) Records an3 ernitaring requiresmats for storage and disposal facilities ara desgined to 1) identify the type, amount, and location of PC3s in various storage and disposal facilities, 2) enable EPA to compare stor age and disposal records with those of facilities with PCBS in service, for the purpose of detecting dis crepancies (which nay indicate violations), and 3) to enable EPA to trace back to original user, so that any *in service* facilities that had previously escaped EPA notice nay be identified. REGULATORY REQUIREMENTS INSPECTION PROCEDURES DOCUMENTATION Beglninning July 1, 1979, failure Of any owner or operator of a facility used for the storage or disposal of PCBs to pre pare and maintain, by July 1 of each year# a document which sunrises FCB activities at the facility during the previous calendar year# and to make such documents available at the fac ility for inspection by EPA* ($761*45(b) ) 1 Failure to retain such documents at each facility for at least 5 years after the facility is no longer used for the storage or disposal of PCBs, except in the case of chemical waste landfills, where such documents shall be maintained for at least 20 years after the landfill is no longer used fgr disposal of PCBs (761.45(b))* Failure of the owner or operator of the facility to notify the Agency RA* of the Region in which the facility is located when the facility ceases storage or disposal operations* (|761*45fb)) Check for presence of document* Copy or photograph document for later comparison of records* . Check for presence of document If the facility has ceased operations, check EPA records for presence of the notification and the specification of share all documents are located* Document non-compliance field book. Document non-compliance in field book* Document non-compliance in field book* MONS 0 0 8 4 0 a I* VI* Records and Monitoring R2GOU.TORY RgQUI^KfcHTS ' IBSPBCTIOB PHOCEIXJRES (2) Failure to include in the annual documents Cheat for the inclusion of all information required. < a) The date *dten any PCBs are received ly the facility during the previous calendar year for storage or disposal, and the identification of the person and facility from vhoo such PCBs were received (761.45 (b)(1)). ' (b) The date vhen any FCBs are 1) disposed of at the disposal facility, or 2) transferred to another disposal or storage facility, including the identification of the specific types of PCB substances, mixtures, or articles in containers, PCB . transformers, and PCB equipment or PCB articles not in containers which were stored or disposed of (761.45(b)(2)). .. . ` HONS 0 0 8 4 0 9 (c) The total weight, in kilograms, of any PCB containers kilograms of any PCB substances or mixtures contained in any PCB transformers, 1) receiving during the calendar year, 2) transferred to other storage or disposal facilities during the calendar year, and 3) remaining on the storage or disposal facility site at the end of the calendar year respectively. Including, where applicable, the Identification of PCB Container contents such as liquids, capacitors, ate. o n DUGUMEKJATIOW Docusmnt non-complaince in field book. . . ' ] j ' >15- Annex Vi: Records end Monitoring REGULATORY KBQUIRKEHTS ibspectiow procedures (d) when PCB coneinere or PCB substances or (fixture contained in a transformer/ are transferred to other storage or disposal facilities/ failure to include the identi ification of the facility to which such FCBs were transferred (}761*45(b)(3)) Check for the inclusion of ell infdrnation required* DOCUHERTATIOE Document non-compliance in field book* (i) The total number of any PCB articles or equipment/ not in PCB containers/. 1) received during the calendar year/ and 2) remaining on the facility year/ respectively/ including the identifi c z cation of the specific types of PCB t/> articles and equipment received/ trans o ferred, or remaining on the facility o site. OD 4" - o When PCB articles and equipment o are transferred to other storage or disposal facilities/ failure to include the identifiation of the facility to which such PCB articles and equipment were transferred* ($761*45(b)(4))* 761.45(d)s In additon to the information required to be maintained by $761*45(b) above/ each owner or operator of a PCB dis posal or storage site collect and maintain/ for the period described in #2 above, the following Information: Prior to a records inspection, the site approval file located at the SPA Regional Office should be reviewed for the pre sence of any documents listed under "regulatory requirements* If the EPA file contains any correspondence or permits not found in the records at the site, s violation exists* Document non-ccmplalnce field book. ENFORCEMENT PROCEEDINGS MANUAL HONS 008411 -J1- A. Wrap-up Activities of the Inspector* After each inspection the inspector shall write an Inspection Report based upon information on the Violation Worksheet and his Field Notes. The Inspection Report shall detail all violations vtoich the inspector believes he found during the inspection and shall describe all relevant supporting ovidence. After completing the Inspection Report, he shall submit that document, a copy cf his applicable Field Notes and other relevant supporting documents, in accordance with Regional procedures, to the designated Regional FCB Narking and Disposal Regulation Violation Coordinator. The inspector shall keep the original Field Notes in his files and shall make and keep on file copies of all other material sent to the Violation Coordinator. Wrap-up Activities of the Laboratory. After the laboratory performs its analysis on the FCB samples collected at the disposal site, the appropriate laboratory personnel shall send a copy of ell laboratory records relevant to such sample analysis, along with a copy of the relevant Chain of Custody Record, to the Regional FCB Violation Coor dinator All originals of the above documents shall be maintained by the laboratory as permanent records until required in an enforcement action. C. Decision Making by the Regional FCB Marking and Disposal Regulation Violation Coordinator. Each Regional Administrator shall appoint a FCB Marking and Disposal Regulation Violation Coordinator. All FOB Marking and Disposal Regulation Inspection Reports shall be sent to such Violation Coordinator, in accord ance with Regional procedures, by the inspector who made the inspection pursuant to the FCB Marking and Disposal Regulation. It should be ttphasixed that the Violation Coordinator may be ary person whom the Region desi^petes for such position. It is anticipated that the Regions shall integrate the function of the PCB Violation Coordinator into existing decision making structures. The Violation Coordinator shall examine each Inspection Report and determine the answers to the following questions! 1. Is there a probable violation? 2. If yes, what type of action. If any, should be brou^it against the alleged violator? 3. If the action is one for administrative civil penalty assessment, how much should the proposed civil penalty be? Criteria and guidelines for decision making in each of the above three areas are provided below. HONS 008412 99 -J2- 1 Ie there a probable violation? To determine whether or not there is a probable violation the Violation Coordinator must examine all the evidence provided in the Inspector's Report. In addition* the Violation Coordi nator should take all other reasonable steps (such as speaking with the Inspector* personnel of the laboratory performing any relevant sample analysis, and appropriate Regional attorneys) which he deems necessary for a determination of the existence and extent of a violation. If the Violation Coordinator determines that there is insufficient evidence to indicate a violation he shall take reasonable steps to gather sufficient evidence if he believes that: 1. such evidence may be obtained without \sireaoonably intensive resource efforts, and 2. the violation. If substantiated, is not an insigni ficant one* If the Violation Coordinator determines that there ie suf ficient evidence to indicate a violation, he shall determine in accordance with the following criteria, what action, if any, should be brou^it against the alleged violator. 2. What action, if any, should be brought against the alleged violator? There are several types of actions which may be brought against the alleged violator. These ares 1. notice of non-compliance 2. administrative civil penalty 3. civil court action 4. criminal court action. The starting point; for the Violation Coordinator should be that most violations will be handled via administrative civil penalty. Thus, when the Violation Coordinator determines, based upon review of an Inspection Report and other review, that there is a violation he should assume at the outset that an adminis trative civil penalty should be assessed against the violator. After making this initial assumption he should comply with the following guidelines in determining whether another enforcement action should be taken in lieu of, or in addition to, adminis trative assessment of a civil penalty. MGNS 008413 100 J3- Notice of Non-Compliance Notice of non-compliance may be Issued In lieu of a civil Penalty, where* a* the violation does not constitute a significant * threat to health or the environment! b. the violation is the first such violation of the . PCB Marking and Disposal Regulation on the part of the particular violator! c. the violation is not a by a disposal facility, whether approved or unapproved, of any of the regulatory require . ments governing auch facilities under the PCB Marking and Disposal Regulation! d. the violation does not Involve the Illegal actual disposal of PCBs on the pert of the violator (this does not Include insignificant leaks)! and e. the alleged violation does not appear to havs been e willful one. However, even though the violation natisfies the above testa, the administrative penalty remedy should not be summarily dismissed unless the violation coordinator determines the issuance of a notice of non-compliance will be sufficient to Induce the violator to cease violation of the Regulation. The lesser remedy of Issuance of a notice of non-compliance should be. employed only where the Violation Coordinator deter mines, in his discretion, that the violation "passes" the above tests and that Issuance of a notice of non-compliance will be sufficient to Induce the violator to cease violation of the regulation in those respects stated in the notice of non compliance* Civil Court Action A civil court action pursuant to {17 may be brought against an alleged violator, in addition to or in lieu of ansessment of administrative civil penalty* where it ia determined that the mere issuance of . a civil penalty will be insufficient to obtain compliance with the regulation. Section 17 allows the Agency to seek injunctive relief, both to restrain violations of the Act end to compel e person to actually follow the Act. Since this Injunctive type ranedy is not available under {16 civil penalty actions, a civil court action under {17 will allow the Agency to enforce the regulation against the violator who le willing to pay civil penalties but refuses to continue to comply with the PCB Marking and Disposal Regulation. Thus, a civil court action may be appropriate in the following instances! HONS 008414 im -34- 1, there is a PCB spill or lenk which poses a risk of injury to health or the environment* and our immediate concern is the cleaning up of the spill or leak rather than the assessment of civil penalties (of course* such an action may also be commenced under the Act*s Imminent hazard pro* . visions (|7)h or 2* we have reaeon to believe in the case of a particular violator* baaed on prior actions or other information* that abatement of his violative practices can only be accomplished by a court orderi or 3. the relief desired is that certain PCBs be seized and condemned* Where the violation coordinator determines that a civil court action is necessary* he must inform the Headquarters Regional Coordination Unit. No such action may be taken without approval from Headquarters* Criminal Court Action A criminal court action may be brought pursuant to $16(b), where the alleged violation was a knowing or willful one* These actions will moot often be brought where the circumstances of the violation indi cates a flagarent disregard for the FCB Regulations* Any contempled criminal proceeding should be brought to the attention of Head quarters throuch the Regional Coordinator* Headquarters approval Is necessary before a U S. Attorney is contacted to initiate criminal proceedings* 3* If the Action taken Against the Alleged Violator is Assessment of the Administrative Civil Penalty* How Much Should the Pro posed Civil Penalty Be? This section provides some guidance and sets parameters for the assess ment of civil penalties, pursuant to TSCA 16(a), for violations of Section 15(a)* The only penalty guidelines provided in Section 16(a) are that penalties of up to $25,000 may be assessed for each day of each violation, and that in assessing the penalty "the Administrator shall taka into account the nature, circumstances, extent, and gravity of_the~violation of viola tions and, with respect to the violator, ability to pay* effect or ability to continue to do business, any history of prior such violations* the decree of culpability* and such other matters as justice may require*" The following guidelines are intended to assure nationwide consistency in penalty assessment, and to assure that violation of TSCA should not only bring no economic benefit to the violator* but should be the cause of some financial loss, ie*, there should be a strong econanic disincentive to violate the Act* This section describes how to compute a penalty for the purpose of serving a written notice of proposed assessment of civil penalty under Section 16(a)(2)* HONS 000415 102 -J5- To make penalty assessment reasonably uncomplicated and consistent, while leaving some discretionary judgment in the Regional Administrator, this system requires an initial assignment of a violation to ono of four levels of gravity. The initial penalty assessment will ba at a fixed amount for each level of gravity. Following the initial assessment several adjustment ^ctorst as specified in the statute, are utilized to raise or lower the Initial penalty. The four gravity levels are as follows: Level 1 - This violation is of the type which could cause only localised harm, such as failure to promptly dispose of PCB contaminated rags, minor leaks in stored transformers, etc. The initial assessment for a Level 1 violation will be $1000/day/violation. Where such a violation meets the criteria discussed on page S3 for issuance of a Notice of Non-compliance, the penalty may be waived. Level II - These violations are generally serious in nature. This level may include general recordkeeping and marking violations, and storage violations where exposure is more hazardous than at Level X, The Initial assessment for a Level 11 violation is $5000/day/violation. Level 111 - This level applies to violations of a very serious nature, ueh violations may Include failure of incinerators to maintain proper tempera tures for sufficient periods of time, and leakage from a chemical waste landfill not resulting in permanent environmental damage. In many cases, the differences between Levels XI, III and XV violations are largely only ones of degree, depending on feuch factors as the extent of possible harm. The Initial assessment for a level XIX violation is $15000/day/violation. Level XV - These violations are the most egregious, both in terms of blatant disregard for the requirements of the standard end damage caused. Such violations would include significant spilling and dumping of PCBa resulting in large scale contamination and operating an ^approved disposal facility. The initial assessment for Level XV is $25,000/day/ violation. In determining the gravity level for a violation, the Violation Coordinator, In accordance with regional procedures, should Incorporate the statutory factors of nature, circumstances and extent of the vlolatlon, i.e,, rather than confuting separately for nature, circumstances, extent and gravity, all four factors should bo considered In the Initial lovel aenignmant which is termed "gravity". In arriving at this deter mination, the Coordinator should consider factors such as the extent of exposure, both in terms of numbers, (i.e., number of people, volume of water) and possible severity and permanence of harm, Xt must be kept in line that the examples of levels of gravity ae used above and in the attached Appendix X should not be rigidly applied, since the circumstances behind an otherwise minor violation could render it a more major violation e*g, minor leaks in stored transformers where the leak could degrade HONS 008416 103 -J6- * waterway could wry well make the violation attain a higher level of gravity* Upon making the level of gravity determination, the indicated penalty ehould be used as a base from which adjustments should be made according to the following additional statutory criteria! 1. Violator's ability to pay* This factor may be difficult to consider at the time of penalty assessment, since the Inspector ordinarily will not examine violators' financial records (See Section 11(b)(2)(A))* Thus, the inability of a violator to-pay probably would not be fully considered until raised by the violator after Issuance of the complaint* However, several factors can be evaluated at the Initial stages of penalty * determination* The inspector should inquire of the person-in-charge the else of the business being inspected. Gross annual revenue is probably the best Indication* In addition, the inspector or violation coordinator can consult Dun & Bradstreet, even prior to the inspection, to determine groes annual revenue* In determining a violator's ability to pay# the fact that a company is a subsidiary of a parent corporation should be considered, i*e*, it is appropriate to look at the resources of the parent* A reduction of penalty amount of up to 20% may be allowed where gross annual revenues are below $250,000 and up to 10% where gross annual revenues arc between $250,000 and $1,000,000* No reduction will be allowed for larger companies* 2* Inability of a violator to continue in business* This cate gory la intertwined with "ability to pay"* A substantiated claim of Inability to continue in business if a large penalty is sustained may require negotiation of the penalty to an amount lower than would other wise be assessed under these guidelines* Since such a claim will not normally be raised until after the initial penalty assessnent, it la discussed below* 3* History of prior such violations* Where a violator has no prior history of violation of EPA regulations or statutes, penalties may be reduced up to 20% A violator with a prior history of EFA viola tions, but with no prior violations of TSCA receives no penalty adjustsent* If a violator has any pravious TSCA violations his penalty should be in creased 10%, for each prior TSCA violation* If a violator has violated the same standard previously, the repeated nature of this violation requires that the penalty be raised 25% for Levels Z and XI; and 50% for Levels III and IV (up to $25,000 total) - these figuroe should be doubled in caees idiere the same standard Is violated for the third time* For the purpose of this "repeat" policy, a company with more than one facility can bo assessed for a repeat violation if the second violation takes place at a different facility than did the initial violation* 4, Degree of culpability. The degree of culpability of a vio- (mm contributed to by pel ions outsido the violator's company, or where the violator has made a good faith effort to comply with the regulation. MONS 008*17 104 -J7- Conversely, a parson who negligently and/or willfully violates the Act suffers an upward penalty adjustment. Thus, a negligent violator can be assessed up to an additional 20% penalty, depending on his degree of negligence. A willful violator should be assessed an additional 25% penalty. The maximum adjustments for culpability are down 20% or up 25% - l.c., if a violator is willful and negligent the willful 25% upward adjustment only is assessed. Of course, such a violator may be the subject of criminal proceedings* Computation of Penalties - In calculating the adjusted initial penalty, the adjustments should be added together prior to being applied to the ini tial level of gravity figure. For example, with a level II violation the penalty baaed on that level alone is $5000 if the violation was for one day* If the company's revenues are between $250,000 and $1,000,000 it la entitled to a 10% reduction; if the company has a previous T5CA violation 10% le added on; and if the violation occurred in spite of some good faith efforts by the company it may be entitled to a reduction of, say, 10%. The adjustasnt factors are, -10, 410, and -10, for e net reduction of 10%, which alien applied to the $5000 Initial penalty, results in a $4500 proposed penalty assessment sent to the violator. Do not compute the penalty piecemeal, i.e., do not deduct 10% of $5000 for size, then add 10% oi the remainder for history, and than subtract 10% of the remainder for culpability* In computing duration of a violation generally only count the days on which the violation was actually.observed* Thus if a violation la observed during an inspection, and the complaint is not served for a month, compute the penalty as if the violation lasted one day, not a full month. However, if reliable evidence exists that the violation was pre sent before the inspection, an assessment for multiple days of violation may be appropriate. D* ' Disclosure of Information - Confidentiality TSCA Section 14 addresses the protection of trade secrets and confi dential Information* Section 14 provides that any Information reported to or otherwise obtained by SPA under this Act, ufolch Is exempt fraa disclosure pursuant to subsection (a) of Section 552 of Title 5, United 6tatee Code, by reason of subsection (b)(4) shall not be disclosed by the Administrator or by any officer or caployee of the United States. Exceptions from this prohibition are also provided* Disclosure of Information described in Section 552(b)(4) of Title 5 may be made in the following situational 1. to officers or employees of the United States in connection with their official duties to protect health or the environment, and for specific law enforcement purposes* 2. to contractors with the United States when the Administrator determines it to be necessary for the satisfactory per formance of their dut.es in connection with this Act and under such conditions as may be necessary to preserve confiden tiality as the Administrator may specify. HONS ooa*id 105 3. if the Administrator determines it necessary to protect health or the environment against an unreasonable risk of injury to health or the environment. 4. when relevant under a proceeding under TSCA, except that disclosure under such proceeding under this Act shall be made in such a manner as to preserve confidentiality to the extent practicable without impairing the proceeding. Disclosure of any health or safety study, or any information obtained from such study, on any substance or mixture tAilch is already being distri buted. or for which testing Is required under Section 4. or for which noti fication is required under Section 5, is not prohibited. Data In such a study, however, which discloses manufacturing processes or the propor tions of a mixture may not be disclosed if such processes or proportions would otherwise be entitled to protection from disclosure. Section 14(c) of TSCA provides that a manufacturer, processor or distributor in ccmmerce of a toxic substance mayi A. designate the data tdilch such person believes is entitled to confidential treatment under subsection (a) of the sane section, and B. submit such designated data separately from other &ta submitted under this Act. Designation by a manufacturer, processor, or dirtributor that certain Information is entitled to confidential treatment must be made in writing* Section 14(c)(2)(A) states that where the Administrator proposes to release for inspection data thieh has been designated by the manufacturer, processor, or distributor as being entitled to confidential treatment, the Administrator shall notify in writing and by csrtlfied mall, the manufacturer, processor, or distributor who submitted such data, of the intent to release such data and that if release of such data is to be made pursuant to a request made under the Freedom of Informa tion Act, such notice shall be given immediately upon approval of such request by the Administrator* The Administrator may not ralease the data before the expiration of 30 days after the manufacturer, processor or distributor submitting such data has received the notice of the Adminis trator' intent to release such data* 6action 14(c)(2)(B) states in additional requirement that whera disclosure of data is warranted by a determination by the Administrator that such disclosure is necessary to protect the health or the envirojwent against an unreasonable risk of Injury to health or the environment, the Administrator must notify each manufacturer, processor, and distributor who submitted such date of such release* Such notice shall be mads In writing by certified mail at least 15 days before tho release of such data, except that if the Administrator r/nines t`r..z tho release of such data is necessary to protect against ar. imminent, U'.roa^aroblo risk of Injury to health or the environment, such notice may be mr.co by such means as the Administrator determines will provide notice at least 24 hours before such release is made* HONS 006419 SPA regulations dealing with confidentiality of business informa- ion appear in 40 CFR Part 2, Subpart B ' Handling Inspection Data For the purposes of* (1) assuring Agency compliance with Section 14 of the Toxic Substances Control Act; (2) limiting the likelihood of Inadvertent disclosure of confidential business information; (3) affording businesses a fair opportunity both to assert a confiden tiality claim and to substantiate the claim prior to an J3A ruling on the claim; (4) protecting the interests of members of the pidblic . who roquest disclosure of business information under the Freedom of Information Act, 5 U.5.C. 552; and (5) furnishing assistance to those EPA officers and employees must deal with confidentiality claims and requests for Information obtained by the Agency pursuant to its Inspection authority, the following procedures will be employed in handling inspection data* A B. C. . D. At the time an inspector presents the TSCA Notice of Inspec tion (see appendix II) to the appropriate official at a facility which is about to be inspected, he shall also present one copy of the TSCA Inspection Confidentiality Notice (See Appendix III). At the time the inspector presents a copy of said TSCA Inspec tion Confidentiality Notice to the facility official, he shall place a second copy in an envelope addressed to the chief officer of the business whose facility he is Inspecting. The inspector should determine tho name and address of ouch chief officer before his arrival at the inspection site. The Inspector shall mail the envelope at his earliest opportunity, vis certified mail retwn receipt requested. In any event, the envelope should be mailed no later than 2 days after completion of the inspection of the facility* When an Inspector submits his Inspection Report, via Regional procedures, to the FCB Violation Coordinator, the Inspector shall include a third copy of the TSCA Inspection Confidential* ity Notice along with his Inspection Report and shall keep a fourth copy for his own records. The business conesrn which receives the TSCA Inspection Confi dentiality Notice must make its confidentiality claim within 30 days aftar the chief officer receives the Notice. Nhen a business concern asserts a timely claim of confidential ity for inspection data, the Inspection data for tdiich confi dentiality was claimed shall be removed, in accordance with Regional procedures, from the main file of the Inspection Report. Such data shall be placed in a locked file cabinet and shall be .. . fpa emoloyees and contractors in the exercio`ofbtaTr* of f 1 c i a 1 dutie* and re.por.oiblllti... If .uoh claim la received before the PCD Violation Coordinator receive, the Inspection Report on the facility for which the claim is made, the appropriate Inoosctor shall remove s-ch data and keep it in a ioexed trio. -..all turn ov-r svr.i -..ta (markLO as "Claimed TSCA Inspection Confidential fiat.a") to the PCB Viola tion Coordinator with his Inspection Report. If the confidfcntial- MONS 008420 ity claim la roceived after the PCB Violation Coordinator haa possession of the Inspection Report he shall be responsible for separating such data, for maintaining it in a locked file* end for marking It "Claimed TSCA Inspection Confidential Date"* If a formal or informal request for data claimed as confidentlal is made by any person other than an EPA employee or contractor the person in possession of the data claimed as confidential shall forward such data, in accordance with Regional procedures, to the person designated in the Region to handle such requests* Such person shall follow established procedures for granting or denying the request for informs* tlon* If a person other than an EPA employee or contractor requests data obtained during an inspection and no claim of confiden tiality has been asserted with respect to such date, the following procedures shell be followed! 1* If the request for information is received by SPA before the expiration of 30 days from the date when the chief officer of the business concern whose facility was inspected received the TSCA Iniection Confidentiality Notice, it shall be presumed that a claim of confiden tiality will be made within the thirty d^ period* The information request shall be initially denied and the chief officer of the business whose data was requested shall be notified and required to substantiate any claims of confidentiality which he may make, in accordance with procedures stated In 40 CFR Section 2*204* 2* If the request for Information is received by SPA after expiration of such 30 day period, the requested data shall be treated, in accordance with procedures stated in 40 CFR Part II, Subpart B, like any data fox which no claim of business confidentiality has been made* HONS 008421 ) SAMPLE PLEADINGS 1, Sample lettar for Civil Penalty Action 2> Complaint for Civil Penalty Action ). Default Order for failure to request hearing 4. Consent Agreement-Final Order 5. Condensation and seizure pleading 6. Complaint for Injunction ___ 7. Motion for Temporary Restraining Order 8. Preliminary Injunction Order HONS 000422 109 Complaints# Pleadings and Related Document* Title section gives examples of the complaints# affidavits# verifi cations# pleadings and other documents that may be used to Initiate actions under TSCA Sections 16 and 17 for violations of the PCB Marking and Dis posal Regulation* 1* Section 16 provides for the assessment of civil penalties for TSCA violations* As indicated in Section 111 of this Enforcement Proceedings Manual* It is anticipated that ( most TSCA enforcement ectlone will be prosecuted under Section 16 and that an administrative civil penalty will be assessed* Such an action is initiated under Section 16(a)(2) by the issuance of a Complaint and Notice of Opportunity for Hearing* The follotting is a sample of such a document# with cover letter* Please note that the question of who issuos Default Judgements has not been finally determined pending development of the Coneolidated Rules of Practica* MOMS 00S43 CERTIFIED MAIL TKTPRPFttPT REQUESTED Mr. X . Chief Corporate Officer (j&in'nijrilrRegion - Registered Agent) 26 River Drive Alton, Michigan RE: TSCA Complaint and Notice of Opportunity for Hearing Docket No. B.G. Power Industries, Inc. Alton, Michigan Dear Mr. X: Enclosed please find a Complaint and Notice of Opportunity for Hearing concerning violations of the Toxic Substances Control Act, 15 U.S.C. 2601, discovered by EPA Inspectors at the above-captioned facility. It Is recommended that the enclosed Complaint and Rules of Practice, 40 C.F.R. , be carefully read and analyzed to determine the alter natives available In responding to the alleged violations, proposed penal ties, and opportunity for a hearing. Please note that each day the viola tions cited herein continue constitutes a new violation for which additional penalties may be Imposed. _ Regardless of *rfteth'er you choose to request a hearing within the pre scribed time limit of fifteen (15) days following service of this Complaint, you are extended an opportunity to request an Informal settlement conference To request a conference, please write to Mr. Attorney, Enforcement Division United $tates Environmental Protection Agency, etc., or telephone him at Failure to respond to this Complaint and Notice of Opportunity to Hearing by specific answer within 15 days of your receipt of this Complaint constitutes your admission of the allegations made in the Complaint. Such failure shall result in the Issuance of a Default Order Imposing the penal ties proposed herein without further proceedings. Very Truly Yours, Enforcement Division Director MONS 008424 UNITED STATES ENVIRONMENTAL PROTECTION AGENCY IN RE B.tri Respondent TSCA - V - 001 ~tORPCATTIT~M)~iroriCr OF OPPORTUNITY FOR HEARING COMPLAINT This 1$ a civil administrative action Instituted pursuant to Section 16(a) of the Toxic Substances Control Act (TSCA), 15 U.S.C. 2615(a)- The coat* pi aInant Is the Director, Enforcement Olvlslon, Region , United States Environmental Protection Agency (U.S. EPA). The Respondent Is B.G. Disposers, Inc., which Is and at all times hereinafter referred to was a corporation Incor porated under the laws of the State of Michigan, and has a place of business at 100 North Nowhere, Alton, Michigan. This Complaint serves as notice of the Director's preliminary detenalnatlon that Respondent has violated Section 6 and Section 15 of TSCA, 15 U.S.C. 2605 and 2614, as follows: Count 1 1. The above-referred facility of B.G. Disposers, Inc., operates an Incinerator (as defined at 40 C.F.R 761.2(j)) Intended to des troy and dispose of liquid PCB. 2. 40 C.F.R. 761.40(a)(1) of Annex I, Incineration, requires that liquid PCB Introduced Into an incinerator for a 2-second dwell time at three percent excess oxygen In the stack gas be main tained at 1200 degree C (+ 100 degrees C) for destruction. 3. On March 31, 1981, a temperature of 950 degrees C was being main tained In the Incinerator at B. G. Disposers, Inc., during the attempted disposal of liquid PCB, In violation of Section 6 of TSCA and regulations promulgated thereunder. 15 U.S.C. 2605; 40 C.F.R. 761.40(a)(l)(1). HONS 008425 ] Count 2 1. 40 C.F.R. 761.40(a)(b) of Annex I, Incineration, requires that the Introduction of PCB Into an Incinerator must stop automatically tdienever combustion temperatures fall below 1200 degrees C (+ 100 degree C) when a two-second dwell time Is employed. " 2. On March 31, 1981, the Incinerator at the above-cited facility failed to shut off automatically when the combustion , temperature consistently fell below 1200 degrees C, In vlola' tlon of Section 6 of TSCA and regulations promulgated there under. 15 U.S.C. 2605, 40 C.F.R. 761.40(a)(5). Count 3 1. 40 C.F.R. 761.40(a)(3) of Annex I, Incineration, requires that, for every incinerator used to dispose of liquid PCB, the rate and quantity of PCB fed to the combustion system must be measured, and recorded regularly at Intervals of no more than 15 minutes. 2. 40 C.F.R. 761.45(c)(1)(A) also requires that the owner or operator of PCB incinerators compile records on the rate and quantity of PCB supplied to the combustion system, under the terms specified at 40 C.F.R. 761.40(a)(3). 3. On March 31, 1981, records maintained at the above-captioned facility noting the rates and quantities of_PCB_Introduced into the combustion system reflected a recording at Irregular Intervals (varying In length from ten to 28 minutes) of the rates and quantities of PCB introduced Into the combustion system. In violation of Section 6 of TSCA and regulations promulgated thereunder. 15 U.S.C. 2605; ' 40 C.F.R. 761.40(a)(3), 761.45(c)(1)(A). II PROPOSED CIVIL PENALTY Section 16 of TSCA, 15 U.S.C. 2615 and the regulations promulgated thereunder, 40 C.F.R. [for the Section 16 civil penalty regula tions when promulgated] authorize a civil penalty of up to $25,000 per day for each violation of the Act. Based on the facts given In I above, and on the nature, circumstances, extent and gravity of the above-cited violations, as well as the Respondent's ability to pqy, effect on ability to continue to do business, history of prior violations and degree of culpability, the following proposed penalties are hereby proposed for the subject violations: u HONS 00842b 113 Count 1 15 U.S.C. 2614(1) 40 C.F.R. 761.40(a)(1) Failure to maintain proper Incineration temperature $15,000 Count 2 15 U.S.C. 2614(1) 40 C.F.R. 761.45(a)(5) Failure to automatically cease operation $15,000 Count 3 15 U.S.C. 2614(1),(3) 40 C.F.R. 761.40(a)(3) 761.45(c)(1)(A) Failure to record regularly rate and quantity of PCB $15,000 wjfikro TOTAL Payment of this penalty may be made by certified or cashier's check, payable to the United States of America, and remitted to: Regional Hearing Clerk Region etc. HI OPPORTUlilTY TO REQUEST A HEARING As provided at TSCA Section 16(a), and in accordance with Section 554 of Title 5, United States Code, you have the right to request a hearing regarding the proposed Order to contest ar\y material fact contained in this Complaint, or to contest the appropriateness of theamount of the proposed penalty. If you wish to avoid being found in default, you must request a nearing of the Region Hearing Clerk, EPA Region __, etc., within fifteen (IS) days of this CompTalnt. A receipt of written answer must be made, which answer shall clearly and directly admit, deny or explain each of the factual allegations contained in the Complaint with respect to which Respondent has aqy knowledge; or which shall clearly state tnat respondent has no knowledge as to particular factual allegations In the Complaint. The answer shall also state: ' HONS 008427 114 1. The circumstances or arguments which are alleged to constitute the grounds of defense; 2. The facts which Respondent intends to place at issue. The denial of any material fact or the raising of any affirmative de fense shall be construed as a request for a.hearing. Failure to deny any of the factual allegations In this Complaint constitutes admission of the undenied allegations. Any hearing that you request will be held In the county, parish, or Incorporated city of your residence. Hearings held in the assessment of these civil penalties will be conducted In accordance with the provisions of the Administrative Procedure Act (5 U.S.C. 552 et seq.) and the "Consolidated Rules of Practice Governing Administrative Assessment of Civil Penalties or the Revocation or Suspension of Permits" (40 C.F.R. ), a copy of which accompanies this complaint. ' If you fail to file a written answer and request for a hearing within fifteen (15) days of service of this Complaint, such failure constitutes a.binding admission of all allegations made In the Complaint and a waiver of your right to a hearing under TSCA. A Default Order may thereafter be Issued by the Regional Administrator [Administrator], and the civil penalty proposed herein shall become due and payable without further proceedings. Such Default Order Is not subject to review In any court. V SETTLEMENT CONFERENCE Whether or not you request a hearing, an informal conference may be requested In order to discuss the facts of this case and to arrive at settlement. To request a settlement conference, please write to Mr. Attorney, Region , etc., or telephone him at . Please note that a request for an Informal settlement conference does not extend the fifteen (15) day period during which a written answer and request for a hearing must be submitted. The Informal conference procedure may be pursued as an alternative to and simultaneously with the adjudicatory hearing procedure. . U.S. EPA encourages all parties against who a civil penalty Is proposed to pursue the possibilities of settlement as a result of Informal conference. However, no penalty reduction will be made simply because such a conference is held. Any settlement which may be reached as a result of such conference shall be embodied In a written Consent Agree ment and Final Order by the Regional Administrator [Administrator], U.S. EPA Region . The issuance of such Consent Agreement shal1 constitute a waiver of~your right to request a hearing on any matter stipulated to therein. MONS 008428 If you hive neither effected a settlement by informal conference nor requested a hearing within the 15>day time period allowed by this Motlce, the above penalties will be assessed without further proceedings and you will be notified that the penalties have become due and payable. To explore the possibility of settlement In this matter by Infor mal conference, contact Mr. , at telephone . Sincerely yours. Enforcement Division Director MONS 008449