PROGRESS REPORT
TECHNICAL SERVICES DEPARTMENT
ANNISTON. ALABAMA PLANT
JOB HO.
370-740
EEPOBT MO. 1
DATE February 24, L969
TITLE: OBJECTIVE:
AJOTISTCH PIAHT DEPAJETMZSTAL WASTE AUDITS
To Identify the major vesta components free ell the operscing departments end to provide relieble flew data o thet vesta lones can be eccutet ir celculeted.
PERSONNEL:
E. G. Wright (V. 7. Teffee)
REPORTED IT: E. G. Wright
SUMMARY:
At the preaent time both the vesta treatment plant end the neutralisation pita ere operating at near capacity. During certain perloda theie 17arena era overloaded. These audits will provide data to show where these losses actually are and provide lose Insight as to how these losses can be reduced. The reduction of lose of these losses will provide for better operation of the waste treatwent plant as veil as the neutral lxa cion pits.
The taac period will leat for Cvo veeks In each operating department. Flew measurement will be aade a einieom of three timea in each department so that a good average flow rata can be determined. The samp Ling vill be done in the same manner in which It la now dona. Accurate data vill be collected on production racee ao thee the loeaee can be related co'thia. Sample data sheet! and drawings shoving sailing points ara attached at the end of this report.
FUTUIX WOKX: 1. After identifying theae vesta materials, efforts vill be aade to decereine atathoda by which theae loeaee can be reduced.
2. After completion of ell of the audits, e comprehensive report will be issued.
ANaifTOM
bar
Technical Services Dept. OSW 014277
HARTOLDMON0012124
u
Anniston TSD Progress leport 370-740
?ge 2
Decails
1. Sailing Procedure#:
The sampling program will continue to operate ss it is operating presently (it. sa^jLes will be taken sc Cha mm points sc which they era presently collected). These Map lea will ba 24 hour co^ailci u^lu la aoac cases, howcrar 4 hour composites will ba collected ac cha hold tanks la che Si ran daparuaac. These M^les will ba collaccad using Cha smell Zandolph Peri staltic puo^a which ara now being uaad. A dacallad account of whara cha sasplas will ba collaccad and Aac they will ba analysed for la Included In cha daacrlpclon of each departmental audit.
2. Plow Kuiuraaacci:
Plow aaaacrwanci will ba taken using a method developed ac the VGC Plane. A known concentration of Lithium Chloride lolution will ba eatarad Into cha daalrad aawar. Ac <oea point downitrua Maples will ba collaccad from cha ever. These Maples will ba collected using a high (peed Landolph Peri anal Cl c pump. The flow eaasuraaanti will ba Bade a mi.ni.mm of three Claes In Mch department to Insure that an accurate average flow it determined. Lithium Chloride wes chosen for chase fine measurements because it is not normally found In cha plant sewer system and because It can be detected using raadily available analytical methods and Instrumentation.
Departmental Audits
'
1. Chlorine Department:
The chlorine department will not ba audited because of the shutdown of che facility. However, sables from the east limestone pic will ba analysed for mercury because of the toxicity of this material.
2. HC1 Department:
Background: The primary waste products from this department are HC1 and organic (Aroclor) material. Presently, Cha BC1 department Is severlag approximately one-third of cha production or 30 H pounda par day (haaed on theory) . This causes problem with the operation of cha east limes cone pic. These losses sra Intentional because che depertment la trying to purge organic nacerlal froa Cha SCI system in an attache to produce Staley Grade (organic free) HC1. rrngreme are aov underway looking for a batter method to remove chase organics.
Sampling Points: (See attached
A. Influent to LiMscone Pit >. Xffluenc from Limestone fit C. By-pass Ditch D. Total Plant Xfflumnt
drawing)
Ph> Pk P& P*,
Analysis
Z SCI, hi. 1 l SCI, hi. Z l SCI, hi l SCI, hi, X
organics organics
organics,
P04
QSW 01>278
HARTOLDMON0012125
u
Anniston TSD Progress leport 370-703
) Page 3
2. HC1 Department: (continued)
Plow HMIUTMCt: Tha Lithium Chloride solution will be metersd Into ths acid sever t* close to the HCi departaent as passible. The diluted samples Till be callsccsd sc Che eeahole loeecsd JusC southwest of gees So. 6 (see setsched drawing) The Biphenyl department probably will contribute some of this 'ilov, but it won't affect the calculations of SCI losses from the department. Accurate records will be leapt on production rates so chat losses can be correlated to production rates.
3. Paranltrophenol Departaent:
Baerground:
The aejor waste products from the PSP departaent are PSP, !UC1, PSC3, 0NC3,
XSC3 and HaCH. These materials account for approximately 13-201 of the
total loading to the waste treatment plant. This taounc vsrlss with chs
efficiencies of the carbon adsorption twsers. By doing this audit end care
fully noting the operating condiClone, it is possible that soae of the vari-
eblee in carbon tser operations can be defined.
'
Seen ling Points: (See attached drawing)
Analysis
A. Toxic Sewer from PS?
U
PSP, P5C3, 0HC3, HHC3, JUC1, C.O.D., ph
Plow Haasureaent: The Lithium Chloride solueloa will be aecered into the toxic sewer (southwest corner of PSP structure) at the same point at which the sables are collected. The diluted samples will be taken downs tree* In the toxic sewer above where the Hlran departaent tlee Into the sewer (see attached drawing) . The flow In this sewer is maintained at a relatively constant rata so the three flow mea surements which ere planned should give a reliable average flow.
U. Aroclor Departaent:
The priaary wastes fro* the Axoclor departaent are organic eaterlals and HCI.
These was tee originate from spills, pump leaks, or whsn Che department is
being cleaned up. IXaa to tha recent concern over chlorinated Biphenyl
(Aroclor) coayouada being found in the tissue of some anieels end the effects
of these co^ounds an the pslatabillcy of fishes, It is necessary that chs
^nanddea of this notarial being lost la determined.
Baeoliar Points: (See attached drawing) A. Manhole adjacent to Porocal Coluen
Analysis Organics, 1 HCI
Plow Measurement: The Lithium Chloride solution will be necared into the eanhole leaedlacaly north of the south maintenance shop. This will Include the flea from the Chlorine department as veil as the phosphoric add acutrallsadoo pit. The flimr from the phosphoric add pit Is knovn. Tha flow from the Chlorine department can be aeasured by the Lithium Chloride dilution aethod, and then the flea* from the Aroclor department can be calculated.
QSK 01^279
HARTOLDMON0012126
u
inH iron XSD Prograas Xeport 370-760
J
?*ge 1
5. Parachion D^4rtiac:
Background: Tha primary waste produces from cha Parachion department are Srhyl and XathyL hracMon, Zchyl and Jtachyl Intermediate, acacona, ParanicropkanoL and Inorganic sales (la. IfeCl, SA2C03/ X+&C&}) * Acacona Is cha Largest C.O.D. contributor in cha department. A program la underway ac cha prasenc time experimentlng with ways of reducing ehaaa loaaaa. This program conslscs of applying a Lower vacuum oa eha condensation raaccor. If chls program la successful, chare should ba a larga raducelou la C.O.D. Loading eo cha waste craacmanc plane, tha reduction In C.O.D. Loading vlLl result in more efficient and easier op era cl on of cha wasca eraacmanc pLanc.
Sampling Polncs: (Sea attached drawing)
Analysis
A. Still Jac Header
I HC1, Intermediate, C.O.D. ph
S. Cone Tank Overflow
FKP, C.O.D., Parachion, Acetone
c. Peed to Kasim
PSP, C.O.D., Parachion, Acacona, pb, Sua. Solid
D. Incinerator Scrubber Water
i h3po4
Plow Waasuraa^nc: The flows ac cha cona tank, still jac headers, and Cha incinerator scrubber ara metered by roeomacars. Thesereadings will ba noted carefully during Che wasta audit parlod. However, Lithium Chloride will ba used to check on chasa valves by measuring the total flmr from cha Para chi on department. The actual flow to cha aeration basins will ba measured using cha magnetic flew aatar located In the Influent feed line from cha bold tanks to cha basins.
br Attach.
. X. G. Wright
OSW 014280
HARTOLDMON0012127
vast; audit data shut
3p*rca*ac______________ _________
Dc 1
Saapliaj Poiae Prod
Plow Sac*
Coe*aeaca
*
r
__ osw 014281
HARTOLDMON0012128