Document wq4XGe96LNRL18ObZj3a5dwqV
Request for Renewal of Contract dated November , 1970, between Monsanto`Company and Biological Consultants: Dr. R. D. Suttkus and Dr. G. E. Gunning
Introduction:
For the past two years consultants have conducted a biological survey of the
streams affected by Monsanto Company discharge at Anniston, Alabama: Choccolocco
Creek, Coosa River, Logan Martin Reservoir, and various tributaries of these.'
The survey has actually consisted of two separate but related parts: 1) An
ichthyological survey of these waters designed to determine species composition
and relative abundance of the various fishes present with a view toward ascer
taining any possible effects the Monsanto effluent might have on the fish popu
lations, and 2) A residue analysis conducted by Monsanto Company using fishes
from ten (10) stations supplied by consultants. Consultants have interpreted
the residue findings on a trip-by-trip basis during the first two years of the
present contract as they are available from Monsanto Company employees. We have
worked rather closely with Mr. J. T. Bell and Mr. Donald Turner of the Anniston
plant, and previously with Mr. Wright before he left Monsanto Company.
Background:
Consultants have found a rather large number of deformed fishes below the
point of effluent discharge, as well as many fishes that are hemorrhaging or
exhibiting various degrees of nervous system damage. These instances have been
reported to Monsanto regularly. Since these fishes are found in parts of the
stream that are characterized by high P.C.B. levels, one must admit the possi-
i
bility that debilitation is due directly to P.C.B s or other products manufactured
by Monsanto.
.
DSW 178292
STLCOPCB4050733
2
Analysis of five sets of data for trips made during December, 1970;
March, 1971; June, 1971; September, 1971; and December, 1971 have shown that
there has been no decrease in P.C.B. levels during this time, that is to say the
levels within a given species of fish have remained fairly constant. Mr. Turner
is presently doing the analyses for the March, 1971 survey and has in his possession
the fishes for the June and September trips as well. Other work at the plant
caused this delay which will be rectified by the end of December, 1972 (personal
communication with Mr. Bell and Mr. Turner).
-
The release of P.C.B. effluent in some form, or to some degree, has been
such that the first trip for the collection of fishes that should be free of
P.C.B. effluent discharge was made in September, 1972, This is the last trip in
our present contract, hence this request for a renewal.
Proposal for Additional Work:
As consultants we recommend that the contract be extended for one additional
year in order that we may learn whether or not there will be a decrease in
P.C.B. residues in the fishes of Choccolocco Creek and the Coosa River. It is
imperative that residue analyses be made for at least two survey trips in order to
determine whether or not the curtailment of P.C.B. release is reflected in the
fish residue levels. The ichthyological survey (two trips) would be continued in
its present form in order to monitor species composition and relative abundance
of the various fish species as in the past two years of the survey. A study of the
frequency of deformities and other abnormalities would be included as an integral
part of the ichthyological survey as well.
DSW 178293
STLCOPCB4050734
3
Cost of Renewal Contract:
Trip 1 March, 1973
; Dr. Suttkus--$1,800; Dr. Gunning--$1,800; 2 students--$lj00 total,
i.e. $200 each per trip; jar allowance for year--$2^0.
.
Grand total of $1;,20 for Trip 1
'
Trip 2 . September, 1973
Dr. Suttkus--$1,800; Dr. Gunning--$1,800; 2 students--$i*00 total. Grand total of $h,000 for Trip 2
Hence, total cost of survey for one year would be $8,20 plus expenses, i.e.
vehicle travel of 10i per mile and actual motel expense for the four men
(see original contract).
(Signed)
Gerald E. Gunning, Ph.D. Biological Consultant
DSW 178294
STLCOPCB4050735