CHECKLIST ( ATTACHMENT 1)
Record Number 460546
QNOTIFICATION OF PROCESS CHANGE CHECKLIST TypeChtnge Mtjor
Mod.n, MlnorS
Originator:--------- ---- C.QHeen.Tjc.e.................. Date of Origination:.7/29/96.......................................... ..........--
Proposed Date of Change ...... 7/31/96...... Area: ........ Hj drachlorinatian......... Followup Required: ID Yes Bl No |
Pennanent
Temporary........ From ------------ To ------------ Temp MOCRetumed to Original Status: ID Yes No |
Description and Location of r
alarms. Write high and low level alarms on GP1. ________ _________
Technical Basis for Change:
Impact on:
indication is corrpcL
Type of Change:
Safety
Loss Prevention
Alarm Instrument
Addition or Removal ofEquipment Equipment/Matcrial Modification
Shutdown Point Process Computer Control
__ Piping Modification
Environment Job Procedure
Chemical Other
------ Health
Pre-Modification Checklist:
Applicable
N/A
...x.. ...x..
Initials
Consult piping and equipment specifications. Perform Reactive Chemicals testing. 7/29/96In-Progress?
...X..
Add materials involved to Toxic Substance Control Act (TSCA) inventory.
...X..
Calculate impact on F&EI and CEI
...X..
Comply with Engineering Practices.
...X...
...X...
Comply with Technology Center guidelines. Comply with Dow LAD Environmental Project Checklist.
DO A 0754 50 CONFIDENTT A i
...X...
Comply with Safety and Loss Prevention requirements.
...X...
Consult maintenance. (Name).................................................................................................................
_.x...
Consult instrument,an0/fectricxl Jfeqhnician.
((Name).....
..................................................................................................
...x..
Consult parts technician. (Name).............................................................................................................
...X...
Evaluate and modify relief system.(Name) .........................................................................................
...X...
Contact Industrial Hygiene.(Name)........................................................................................................
...X...
Contact Process Engineering. (Name) ..................................................................................................
...X...
Complete required reviews. (Name them).
...X...
...X...
...z...
...X...
Ol
Consult Computer programming supp
Consult Operations (Name)
Contact Environmental (Name).,
Champs work order (List) ........................................................................................
Review Training Needs With Operations Supervisors or Technologist (Name)
Consult With Quality Person to determine if product MOC Required
(Name)
Other ..................................................................................................................
Approvals:^
Originator (
First Review
Post-Modification Checklist: (Before startup)
/
...x...
........
Perform pre-startup audit.
Final Reviewr Na Init
V
l/BIC I
imhb
Instrument loop drawings
Complete or update training program. Job procedures written and approved.
...x...
Electrical drawings.
,.x... ,,x...
P&ID's, process flow sheets and plot plans updated. Personnel trained on the change. Training Documentation Attached
I Yes No Na
,.x.. Critical instrument checklist updated.
...X...
MOD check sheet completed, computer code and documentation changed.
..X...
Complete and Update Plant Files and equipment files
&//?/%
T-814 Level Alarms The M1 storage vessel T-814 has two level transmitters and a scam high level alarm that is hard-wired from one of the transmitters to the annunciator panel. However, the transmitters are not accurate because the nitrogen repeater is faulty. Therefore, the scam alarm and TDC alarms arc falsely activating. The correct level in T-814 is calculated on the PicsVax based on the top and bottom pressures. The scam alarm will be disconnected, and the TDC alarms will be removed. The level will be calculated on MOD5 as well as on PicsVax, and the level reading from PicsVax will be sent to GPI. Low, high, and high-high level alarms for both level readings will be set at 20%, 75% and 85% respectively. All alarms will be displayed on GPL Let me know if there are any questions.
Colleen Tice 7/30/96
\