Document wjxymjB6ZerkG1b4x7GJ80qD

Monsanto Enviro-Chem Mon: nto Enviro-Chem Systems Inc. Corporate Square Office Park Box 14547 St. Louis, Missouri 63)78 Phone: (314) 694-1000 May 24, 1978 VS1* Mr. W. T. Sweat, Director Central Engineering Department ASARCO, Incorporated 500 Crandall Building Salt Lake City, Utah 84101 Attention: Reference: Subject: Mr. M. L. Leary ASARCO Order 17H 0711 EA-26-EP, NY-3954 Pit. 623 MEC Letter No. 2102-229 Variation Order Transmittal ASARCO File 8 Gentlemen: Enclosed please find two copies of variation order No. 22 covering the performance premium paid to Worthington for exceeding their performance guarantees in accordance with the provisions of Purchase Order No. 21-2102. Since this premium was not part of our original estimate, I am submitting this variation order to adjust the guaranteed maximum only. No additional fee will result from this change. Please sign one copy of the varioation order and return to me by June 5, 1978. Sincerely MONSANTO ENVIRO-CHEM SYSTEMS, INC. JSJ:jm Enclosure CC: ASARCO Salt Lake City W. T. Sweat A. 0. Marsh W. R. Mahoney Julio Serra-Jones Manager, Project Engineering W. A. Bennis P.A. FILE 2102 6.3 ASARCO ELP 0007995 Monsanto Enviro-Chem 1 CONTRACT VAR!A TION H ORDER VARIATION ORDER NO:________________ ________________________________________________DATED5/22/78 TO: CONTRACT BETWEEN MONSANTO ENVIRO-CHEM SYSTEMS INC. amh ASARCO, Inc. MONSANTO ENVIRO-CHEM SYSTEMS INC. CONTRACT NO. 2102DATED |PROJECT [LOCATION Acid Plant No. 2 El Paso, Texas The following described variations aic authorized and accepted in accordance with Article of the contract and the contract is hereby amended accordingly. 12 Of general Conditions This variation order is issued to adjust the contract guaranteed maximum price by two cost of performance premium paid to Worthington which was not part of original contract. This CVO is issued to adjust guaranteed maximum cost only. No increase in fixed fee will result from this chanae. Variation order cost basis Cost of var iatron Effect on conliact price Per Exhibit "B" of Contract 5T27T85 Increases guaranteed maximum by 512, 185 Effect on comiact schedule____ None AUTHORIZED: Dale ACCEPTED: MONSANTO ENVIRO-CHEM SYSTEMS. INC. Date r '/:/-- tC 09 HCV C'7G ASARCO ELP 0007996 ACID l'LAr!T i:0. 2, KL PASO , EFFECT OF YAHIATIO.*'! ORDERS OU f:0`,;'iCA(-'!' COSTS : Vj. r.iation Order No. Costs 1. 2. 3A. 5- 6. 7. 8. .910. 11. 12. 13lA . 15. 16. 17 . 10. 19. Vertical Coolers Cooling Tov/er capacity Cooling Tower Tumps $ 7>800 $2A ,A00 $ 9,800 Cooling Tov;er Vendor $37, A 00 Sales Tax ($335,000) Add UPS System $1A ,3.00 Increase Control Room. Size $A,120 Provide Lift System for* $19, A'25 Fain Compressor Install lead lined elbow Miscellaneous electrical $53,9^0 changes Storage tank foundations $ao,ooo Additional product line $17,3*12 Install product acid cooler $1A 9,A 00 Install decolonization system . $728,500 Install mist precipt.structur e 98,5 Acid $A7,880 Hisc.ellanecus Field Changes Seal Weld .r< Drain Duct Install 985 Unloading Pipe $ 9,121 $ 30,000 $30,300 Engineering Manhours 311 50 0 20 0 38 129 130 -VOID205 0 0 600 2,165 -VOID A30 3A 0 22A Work Not In' v.i.ug Engine-. 0 0 0 0 0 0 0 0 0' A0,000 17,3A2 0 0 0 0 30,000 0 20. Gas Cleaning Plant *[$1,357,000] 21. Underground Piping 8,554 22. Worthington Performance Premium 12,185 Total 886,525 0 0 0 4336 0 8,554 0 95,896 * Not included in guaranteed max. CONTRACT COSTS ADJUSTMENTS: -Adjuoted guaranteed maximum: 11,830,800 + 886,525 = 12,717,325 CONTRACT FEE ADJUSTMENT: A. Engineering Manhours Adjustment Engineering manhour current projection: Engineering manhour due to variation orders: Manhour ratio per Article 12d General Conditions: Fee adjustment to date: (790,000) (0.199): 25,63c A,336 0.203 l6O,0l2 Ad;nmtment For Work Rot Involving Kngineering Cost oT work to date: 87',3,I2 Fee adjustment per-Article 12e General Conditions: Ac! j u d Fixed Fee: 790,000 + 360,802 950,012 ASARCO ELP 0007997